CN206571118U - A kind of construction apparatus of plastering - Google Patents
A kind of construction apparatus of plastering Download PDFInfo
- Publication number
- CN206571118U CN206571118U CN201720226123.6U CN201720226123U CN206571118U CN 206571118 U CN206571118 U CN 206571118U CN 201720226123 U CN201720226123 U CN 201720226123U CN 206571118 U CN206571118 U CN 206571118U
- Authority
- CN
- China
- Prior art keywords
- housing
- plate
- plastering
- sleeve pipe
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to construction plastering technique field, especially a kind of construction apparatus of plastering, including support base, the upper surface of the support base is provided with two symmetrically arranged columns, two columns, which run through, is provided with housing, the housing is by adjusting means in the enterprising line slip of column, locking device is additionally provided with the top of the housing, the inside of the housing is additionally provided with feeding unit, mounting groove is offered on described two symmetrical side walls of housing, the inside of mounting groove is provided with sleeve pipe, fixed plate is installed at casing shoe opening, installing plate is provided with described sleeve pipe top end opening, and installing plate can along sleeve pipe side walls, the inside of described sleeve pipe is additionally provided with spring.The utility model is simple in construction, easy to use, is applied not only to control the conveying capacity of concrete, moreover it is possible to reduce waste of the concrete during plastering, so as to improve the utilization ratio of resource.
Description
Technical field
The utility model is related to construction plastering technique field, more particularly to a kind of construction apparatus of plastering.
Background technology
It is typically to be plastered by manpower, so not only in the prior art when the metope to construction site is plastered
Building cost is improved, and wastes the time of construction, and with the development of science and technology, the appearance of mechanical float improves building
The situation of wall plastering, is improved to the speed of wall plastering, and the mechanical float of existing structure, when to wall plastering, it has not been convenient to
Conveying capacity to concrete is controlled, and the substantial amounts of concrete that can drop causes to waste.
Utility model content
The purpose of this utility model is to solve present in prior art when to wall plastering, it has not been convenient to coagulation
The conveying capacity of soil is controlled, and can drop the wasting shortcoming of substantial amounts of concrete, and a kind of construction proposed is plastered
Device.
To achieve these goals, the utility model employs following technical scheme:
A kind of construction apparatus of plastering, including support base are designed, the upper surface of the support base is provided with two symmetrically
The column of setting, two columns, which run through, is provided with housing, and the housing is by adjusting means in the enterprising line slip of column, the shell
Locking device is additionally provided with the top of body, the inside of the housing is additionally provided with feeding unit, described two symmetrical side walls of housing
Mounting groove is offered, the inside of mounting groove, which is provided with sleeve pipe, casing shoe opening, is provided with fixed plate, and described sleeve pipe top is opened
Mouthful place provided with installing plate, and installing plate can along sleeve pipe side walls, the inside of described sleeve pipe is additionally provided with spring, the spring
Two ends be connected respectively with fixed plate and installing plate, one side of the installing plate away from spring is provided with mounting rod, and mounting rod
Multiple frock holes being vertically arranged are offered, the side wall of the housing, which runs through, is provided with pivot pin corresponding with frock hole site, and energy
It is plugged in frock hole, strip plate is additionally provided between two mounting rods, the bottom surface of the strip plate is provided with scraper plate, and scrapes
Plate is located at the top of feeding unit.
It is preferred that, the feeding unit includes the first motor and the second live-roller, and first motor is arranged on housing
Inner bottom surface, second live-roller is arranged on the top end opening edge of housing, and the turning end of the first motor is also equipped with
First live-roller, is also equipped with belt conveyor, along the belt conveyor between first live-roller and the second live-roller
Plastering plate is additionally provided with the direction of motion, and plastering plate is arranged on the lateral surface of housing, one side of the plastering plate away from housing is in incline
It is ramp-like.
It is preferred that, the top of first motor is provided with baffle plate, and one end of baffle plate and the top of housing are connected, baffle plate it is another
One end is contacted with the surface of belt conveyor, and the baffle plate is also obliquely set.
It is preferred that, the adjusting means includes fixing axle, the second motor and rack, and the rack is arranged on column side,
The fixing axle is arranged on to be coaxially installed with gear, the fixing axle in the inside of housing, the fixing axle and is also co-axially mounted
There is worm gear, second motor is arranged on the inner bottom surface of housing corresponding with worm gear position, the turning end of second motor
The worm screw matched with worm gear is installed, the locking device includes electric cylinder, and the electric cylinder is connected with housing, the electric cylinder
One end connecting plate is installed, one side of the connecting plate away from electric cylinder is provided with multiple fixture blocks, and the fixture block can be with rack card
Connect.
It is preferred that, the frock hole is arranged at least provided with six, and in equidistant mode.
It is preferred that, the surrounding corner of the housing is mounted on metal tube, and the support base is provided with and metal tube
The corresponding fix bar in part position, and fix bar through metal tube and can extend to the top of metal tube, the fix bar
It is identical with the height of column.
The utility model proposes a kind of construction apparatus of plastering, beneficial effect is:By adding mounting rod, spring
The distance between and sleeve pipe, bottom and belt conveyor upper surface for adjusting scraper plate, so that the conveying capacity to concrete is carried out
Control so that when being plastered to metope, can reduce the concrete amount of dropping, and reduce the waste of resource;By adding frock
Hole and pivot pin, after the completion of the position adjustment of baffle plate, are fixed for the position to baffle plate, so as to improve the steady of scraper plate work
It is qualitative.The utility model is simple in construction, easy to use, is applied not only to control the conveying capacity of concrete, moreover it is possible to reduce concrete and exist
Waste during plastering, so as to improve the utilization ratio of resource.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction apparatus of plastering structural front view;
Fig. 2 be the utility model proposes a kind of construction apparatus of plastering structure top view;
Fig. 3 be the utility model proposes a kind of construction apparatus of plastering mounting rod and casing-pipe connection structure signal
Figure;
Fig. 4 be the utility model proposes a kind of construction apparatus of plastering A at enlarged drawing;
Fig. 5 be the utility model proposes a kind of construction apparatus of plastering B at enlarged drawing.
In figure:Spring 1, installing plate 2, mounting rod 3, frock hole 4, strip plate 5, sleeve pipe 6, fixed plate 7, pivot pin 8, mounting groove
9th, housing 10, scraper plate 11, baffle plate 12, the first motor 13, the first live-roller 14, the second live-roller 15, plastering plate 16, belt conveyor
17th, column 18, support base 19, gear 20, worm gear 21, fixing axle 22, the second motor 23, worm screw 24, rack 25, fixture block 26, company
Fishplate bar 27, electric cylinder 28, fix bar 29, metal tube 30.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.
Reference picture 1-5, a kind of construction apparatus of plastering, including support base 19, the upper surface of support base 19 is provided with two
Individual symmetrically arranged column 18, two columns 18, which run through, is provided with housing 10, and housing 10 is enterprising in column 18 by adjusting means
Line slip, the top of housing 10 is additionally provided with locking device, and adjusting means includes fixing axle 22, the second motor 23 and rack 25, tooth
Bar 25 is arranged on the side of column 18, and fixing axle 22 is arranged in the inside of housing 10, fixing axle 22 and is coaxially installed with gear 20, Gu
Worm gear 21 is also coaxially installed with dead axle 22, the second motor 23 is arranged on the inner bottom of housing 10 corresponding with the position of worm gear 21
Face, the turning end of the second motor 23 is provided with the worm screw 24 matched with worm gear 21, and locking device includes electric cylinder 28, electric cylinder 28
It is connected with housing 10, one end of electric cylinder 28 is provided with connecting plate 27, and one side of the connecting plate 27 away from electric cylinder 28 is provided with multiple
Fixture block 26, fixture block 26, for playing fixed effect to housing 10, can prevent the landing of housing 10 with the clamping of rack 25.
The inside of housing 10 is additionally provided with feeding unit, and feeding unit includes the first motor 13 and the second live-roller 15, first
Motor 13 is arranged on the inner bottom surface of housing 10, and the second live-roller 15 is arranged on the top end opening edge of housing 10, and first
The turning end of motor 13 is also equipped with the first live-roller 14, and conveying is also equipped between the first live-roller 14 and the second live-roller 15
Belt 17, plastering plate 16 is additionally provided with along in the direction of motion of belt conveyor 17, and plastering plate 16 is arranged on the outside of housing 10
Face, the one side of the plastering plate 16 away from housing 10 is oblique, and the top of the first motor 13 is provided with baffle plate 12, one end of baffle plate 12
It is connected with the top of housing 10, the other end of baffle plate 12 is contacted with the surface of belt conveyor 17, baffle plate 12 is also oblique to be set,
Concrete is deposited for convenient.
Mounting groove 9 is offered on 10 two symmetrical side walls of housing, the inside of mounting groove 9 is provided with sleeve pipe 6, the bottom of sleeve pipe 6
It is provided with end opening at fixed plate 7, the top end opening of sleeve pipe 6 and is provided with installing plate 2, and installing plate 2 can be slided along the side wall of sleeve pipe 6
Dynamic, the inside of sleeve pipe 6 is additionally provided with spring 1, and the two ends of spring 1 are connected with fixed plate 7 and installing plate 2 respectively, and installing plate 2 is away from bullet
The one side of spring 1 on mounting rod 3, and mounting rod 3 provided with multiple frock holes 4 being vertically arranged are offered, and frock hole 4 is at least provided with six
It is individual, and arranged in equidistant mode, the side wall of housing 10, which runs through, is provided with pivot pin 8 corresponding with the position of frock hole 4, and can be plugged on
In frock hole 4, strip plate 5 is additionally provided between two mounting rods 3, the bottom surface of strip plate 5 is provided with scraper plate 11, and scraper plate 11 is located at
The top of feeding unit.
The surrounding corner of housing 10 is mounted on metal tube 30, and support base 19 is provided with and the position phase of metal tube 30
Corresponding fix bar 29, and fix bar 29 through metal tube 30 and can extend to the top of metal tube 30, fix bar 29 with
The height of column 18 is identical, and housing 10 is during moving up and down, it is to avoid rocking for housing 10, is being moved so as to improve housing 10
Stability during dynamic.
Operation principle:When scraper plate 11 is adjusted, first pivot pin 8 is pulled out, pressure then is applied to strip plate 5, made
Obtain after mounting rod 3 is pressurized and spring 1 is pressed, the height of scraper plate 11 is adjusted so as to be contracted in sleeve pipe 6, to scraper plate 11
Height adjustment after the completion of, pivot pin 8 is reinserted in the side wall and frock hole 4 of housing 10, so as to be kept punching to scraper plate 11
It is fixed.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model is disclosed, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (6)
1. a kind of construction apparatus of plastering, including support base(19), the support base(19)Upper surface be provided with two it is right
Claim the column set(18), two columns(18)Run through and be provided with housing(10), the housing(10)By adjusting means vertical
Post(18)Enterprising line slip, the housing(10)Top be additionally provided with locking device, the housing(10)Inside be additionally provided with it is defeated
Expect mechanism, it is characterised in that the housing(10)Mounting groove is offered on two symmetrical side walls(9), mounting groove(9)Inside
Sleeve pipe is installed(6), sleeve pipe(6)Fixed plate is installed at bottom end opening(7), described sleeve pipe(6)Provided with installation at top end opening
Plate(2), and installing plate(2)Can be along sleeve pipe(6)Side walls, described sleeve pipe(6)Inside be additionally provided with spring(1), it is described
Spring(1)Two ends respectively with fixed plate(7)And installing plate(2)Connection, the installing plate(2)Away from spring(1)One side set
There is mounting rod(3), and mounting rod(3)On offer multiple frock holes being vertically arranged(4), the housing(10)Side wall run through
Provided with frock hole(4)The corresponding pivot pin in position(8), and frock hole can be plugged on(4)It is interior, two mounting rods(3)Between
It is additionally provided with strip plate(5), the strip plate(5)Bottom surface scraper plate is installed(11), and scraper plate(11)Positioned at the upper of feeding unit
Side.
2. a kind of construction apparatus of plastering according to claim 1, it is characterised in that the feeding unit includes first
Motor(13)With the second live-roller(15), first motor(13)Installed in housing(10)Inner bottom surface, it is described second pass
Dynamic roller(15)Installed in housing(10)Top end opening edge, and the first motor(13)Turning end be also equipped with the first transmission
Roller(14), first live-roller(14)With the second live-roller(15)Between be also equipped with belt conveyor(17), along described defeated
Send belt(17)The direction of motion on be additionally provided with plastering plate(16), and plastering plate(16)Installed in housing(10)Lateral surface, should
Plastering plate(16)Away from housing(10)One side it is oblique.
3. a kind of construction apparatus of plastering according to claim 2, it is characterised in that first motor(13)It is upper
Side is provided with baffle plate(12), baffle plate(12)One end and housing(10)Top connection, baffle plate(12)The other end and belt conveyor
(17)Surface contact, the baffle plate(12)It is also oblique to set.
4. a kind of construction apparatus of plastering according to claim 1, it is characterised in that the adjusting means includes fixing
Axle(22), the second motor(23)And rack(25), the rack(25)Installed in column(18)Sideways, the fixing axle(22)Peace
Mounted in housing(10)Inside, the fixing axle(22)On be coaxially installed with gear(20), the fixing axle(22)It is upper also coaxial
Worm gear is installed(21), second motor(23)It is arranged on and worm gear(21)The corresponding housing in position(10)Inner bottom surface,
Second motor(23)Turning end be provided with and worm gear(21)The worm screw of matching(24), the locking device include electric cylinder
(28), the electric cylinder(28)With housing(10)Connection, the electric cylinder(28)One end connecting plate is installed(27), the company
Fishplate bar(27)Away from electric cylinder(28)One side be provided with multiple fixture blocks(26), the fixture block(26)Energy and rack(25)Clamping.
5. a kind of construction apparatus of plastering according to claim 1, it is characterised in that the frock hole(4)At least set
There are six, and arranged in equidistant mode.
6. a kind of construction apparatus of plastering according to claim 1, it is characterised in that the housing(10)Surrounding turn
Metal tube is mounted at angle(30), the support base(19)It is provided with and metal tube(30)The corresponding fix bar in position
(29), and fix bar(29)Metal tube can be passed through(30)And extend to metal tube(30)Top, the fix bar(29)
With column(18)Height it is identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720226123.6U CN206571118U (en) | 2017-03-09 | 2017-03-09 | A kind of construction apparatus of plastering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720226123.6U CN206571118U (en) | 2017-03-09 | 2017-03-09 | A kind of construction apparatus of plastering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206571118U true CN206571118U (en) | 2017-10-20 |
Family
ID=60057525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720226123.6U Expired - Fee Related CN206571118U (en) | 2017-03-09 | 2017-03-09 | A kind of construction apparatus of plastering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206571118U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915217A (en) * | 2018-07-11 | 2018-11-30 | 合肥尚涵装饰工程有限公司 | A kind of device of plastering a wall for building intellectualization installing engineering |
CN109736564A (en) * | 2018-12-06 | 2019-05-10 | 安徽中嘉环保建材科技有限公司 | A kind of drop plate sizing aluminium alloy formwork |
-
2017
- 2017-03-09 CN CN201720226123.6U patent/CN206571118U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915217A (en) * | 2018-07-11 | 2018-11-30 | 合肥尚涵装饰工程有限公司 | A kind of device of plastering a wall for building intellectualization installing engineering |
CN109736564A (en) * | 2018-12-06 | 2019-05-10 | 安徽中嘉环保建材科技有限公司 | A kind of drop plate sizing aluminium alloy formwork |
CN109736564B (en) * | 2018-12-06 | 2021-04-13 | 安徽中嘉环保建材科技有限公司 | Plate-lowering shaping aluminum alloy formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206571118U (en) | A kind of construction apparatus of plastering | |
CN202755627U (en) | Wall plaster troweling machine | |
CN108560930A (en) | A kind of installation equipment of wall heat insulation material for building | |
CN107843216A (en) | A kind of adjustable steel plate bump height detection means of detection means | |
CN102747840B (en) | Door and window installation device and method for installing doors and windows through device | |
CN110630022B (en) | Accurate adjusting device of assembled wallboard | |
CN212927100U (en) | Portable mortar bed board | |
CN208117624U (en) | Experimental rig is adjusted in precast stair plate | |
CN206888224U (en) | Dry-hang external wall insulation | |
CN206346463U (en) | A kind of slide cartridge for plastering machine Extensible upright rod | |
CN208936991U (en) | A kind of wall body slit detection device | |
CN206997828U (en) | A kind of shipbuilding steel tube drilling device | |
CN210879902U (en) | Cutting device for pipeline production | |
CN107989355B (en) | A kind of support platform and window construction method of floaing for window construction of floaing | |
CN209195042U (en) | A kind of concreting face flattening device | |
CN208513429U (en) | A kind of bicker of door and window production | |
CN207402097U (en) | A kind of cast cleaning device | |
CN207298268U (en) | A kind of solar energy safety monitoring equipment of installation easy to disassemble | |
CN206860174U (en) | A kind of spillplate of coal-winning machine | |
CN213442705U (en) | Material moving device for constructional engineering | |
CN214946959U (en) | Quick-release formwork support is taken soon to piping lane | |
CN216787891U (en) | Prefabricated assembled house structure for house building construction | |
CN217106288U (en) | Building engineering is with consolidating structure of rectifying | |
CN219449249U (en) | Anchor bolt driving equipment | |
CN206930668U (en) | A kind of placing box of Soil K+adsorption equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171020 Termination date: 20180309 |
|
CF01 | Termination of patent right due to non-payment of annual fee |