CN101144325B - Pasting machine - Google Patents

Pasting machine Download PDF

Info

Publication number
CN101144325B
CN101144325B CN2007101527125A CN200710152712A CN101144325B CN 101144325 B CN101144325 B CN 101144325B CN 2007101527125 A CN2007101527125 A CN 2007101527125A CN 200710152712 A CN200710152712 A CN 200710152712A CN 101144325 B CN101144325 B CN 101144325B
Authority
CN
China
Prior art keywords
ash
support
plastering
horizontal support
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101527125A
Other languages
Chinese (zh)
Other versions
CN101144325A (en
Inventor
张兴波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007101527125A priority Critical patent/CN101144325B/en
Publication of CN101144325A publication Critical patent/CN101144325A/en
Application granted granted Critical
Publication of CN101144325B publication Critical patent/CN101144325B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a plastering device, and the plastering device belongs to a building construction machinery, the invention comprises a machine seat, a machine frame guide way, an ash supply device and a plastering head, wherein, the plastering head comprises a plastering head frame, a spatula and an ash storage room, the spatula is a rectangular plate, and arranged at the upper part of the plastering head frame, the front face of the ash storage room is composed of an upper soft face cover and a lower hard face cover, the rear face of the ash storage room is composed of a bottom bag,the lower fringe of the spatula is connected with the lower fringe of the bottom bag, an ash outlet is composed of a gap between the upper fringe of the soft face cover and the lower fringe of the spatula, the lower fringe of the hard face cover and the lower fringe of the bottom bag are respectively connected with the two upper fringes of a tubular agitating ash groove, a packing auger is arranged in the agitating ash groove, an ash inlet connected with the ash supply device is arranged on the agitating ash groove, an ash sealing plate is arranged on the both sides of the plastering head frame, the ash sealing plate is arranged on a supporting bearing, a back moving spring is arranged between the ash sealing plate and the plastering head frame. The operation is convenient, the operating is reliable, the invention can easily execute the plastering on the top end of the wall body, the fly ash is reduced, and the working quality and the efficiency are effectively guaranteed.

Description

Troweling machine
Technical field
The present invention relates to a kind of troweling machine, belong to construction machine.
Background technology
Construction wall is plastered, and is replaced manually having alleviated labour intensity by machinery, has improved efficiency of construction, and effect is remarkable.But find that in application in practice also there is certain problem in the existing machinery plastering technique, mainly be: plant equipment was difficult to break away from smoothly body of wall after the mortar that lands was many, grieshoch is not smeared on the body of wall top, once the program of plastering is finished, and influence repeats the program of next time plastering.The main cause that produces these problems is that what prior art was taked all is the strip-type plastered work mode of smearing out grieshoch from down.When the plastering plate of troweling machine was up to the body of wall top, because plastering plate itself has certain height, and grieshoch was to push mortar by the lower edge of plastering plate to form.Therefore, have at least on the metope that equals the plastering plate height on the top of body of wall to can not form grieshoch, this part metope need artificial mend to smear finish.In addition, finish the program of once plastering, when leaving existing operating position and entering next operating position and implement another time and plaster program when troweling machine, the mortar that some is still arranged between the plastering plate of troweling machine and the metope, troweling machine breaks away from by force, can cause mortar to come off, and forms to land ash.This part is landed ash in the process of coming off, can adhesion the grieshoch smeared of bottom, and then form and more land ash, waste material pollutes, and lowers efficiency, artificial post processing task is heavy.
Summary of the invention
The object of the present invention is to provide a kind of improved troweling machine, rational in infrastructure, easy to operate, reliable, construction quality is good, can implement the body of wall top at an easy rate and plaster, and reduces to land ash.
Troweling machine of the present invention, comprise support, rack rail, for the apparatus for ash and the head of plastering, the head of plastering is arranged on the rack rail, its head of plastering comprises a framework of plastering, spatula and Dust Storage Room, spatula is a rectangular slab, be installed in a framework upper of plastering, the front of Dust Storage Room is made of top soft envelope and following stiff dough envelope, the back of Dust Storage Room is made of end pocket, the spatula lower limb connects the top edge of end pocket, gap between the top edge of soft envelope and the lower limb of spatula constitutes ash hole, and the lower limb of stiff dough envelope and the lower limb of end pocket are connected two top edges of the stirring ash-pit of tubular respectively, are provided with screw feeder in the stirring ash-pit, stirring ash-pit is provided with and the ash inlet that is connected for apparatus for ash, the plaster both sides of a framework are provided with the envelope hawk, and the envelope hawk is arranged on the back shaft, envelope hawk and plaster and be provided with back-moving spring between a framework.
The plastering plate that the present invention adopts can be realized the top-down mode of plastering, and carries out the strip-type plastered work.Upper end from body of wall begins to plaster earlier, and is downward along body of wall, up to the bottom, finishes the float work of a face wall successively.Can implement the body of wall top at an easy rate and plaster, reduce and to land ash.
Ash inlet is arranged on the middle part of stirring ash-pit, is the boundary with the ash inlet, and screw feeder is divided into two sections, and the helical blade rotation direction on two sections screw feeders is opposite.Mortar is gushed out from stir ash-pit equably, guaranteed evenly to smear, improve plastering quality.
The mortar of confessing apparatus for ash constantly enters the stirring ash-pit from ash inlet, under the effect of screw feeder, mortar is gushed out from stirring in the ash-pit equably, enter in the mezzanine space that forms by a framework of plastering, face envelope, end pocket, envelope hawk, finally arrive on the metope, and smear by spatula immediately and form grieshoch on the metope by long and narrow ash hole.
Can also set up an envelope hawk sliding support axle, the envelope hawk is provided with corresponding arc slide opening, can adjust voluntarily, thereby be implemented under the effect of back-moving spring, and the envelope hawk can be pressed on the metope.
Among the present invention, rack rail is arranged on the support, rack rail comprises the flexible guide pillar of two vertical (perpendicular to the ground), flexible guide pillar is made up of upper guide post and following guide pillar, be set with sliding guide sleeve on the upper guide post, upper guide post is inserted into down in the guide pillar, be provided with horizontal support in top and bottom transverse between twice guide pillars and support and be fitted with the horizontal support of sliding, be provided with the horizontal support in top between two upper guide posts, be provided with the leading screw of parallel upper guide post between two upper guide posts, leading screw passes the feed screw nut in the horizontal support in top, the upper end of leading screw is arranged in the horizontal support in top, slide and be equipped with spindle motor in the horizontal support, the lower end of leading screw connects spindle motor, be fitted with crane on twice guide pillars, the head of plastering is installed on the crane, crane also can be referred to as the pedestal of plastering that slides, be provided with steady brace between horizontal support in top and support, horizontal support in top and bottom transverse are respectively equipped with one group of pulley on supporting, two one group, coaxial assembling, support is provided with reel, be connected stay cord on the crane and walk around pulley in the horizontal support in top successively, pulley on support coiling and bottom transverse support is connected to and forms a closed loop wire on the crane.
For the smooth rotation of leading screw, the two ends up and down of leading screw are installed on the bearing support respectively.
The external diameter of sliding guide sleeve is identical with the outside dimension of following guide pillar, guarantees to drive the top that crane moves to upper guide post reposefully.When crane goes upward to guide pin bushing position on the upper guide post, drive guide pin bushing and slide along upper guide post, go upward to till the top of upper guide post; When descending, crane drives guide pin bushing and glides along upper guide post under the affecting of stay cord, and during to guide pillar top down, guide pin bushing is blocked and resets, and crane then continues along guide pillar down to lower slider.
Flexible guide pillar can be regulated height easily, satisfies instructions for use, adapts to the body of wall of differing heights.
Pulley is provided with five groups, on the support, set up one group respectively in the horizontal support in top and in the horizontal support of sliding, the stay cord that is connected on the crane is walked around the pulley in the horizontal support in top, the pulley that pulley, the pulley on the support, support coiling and bottom transverse in the horizontal support in pulley, top in the horizontal support of sliding support successively, is connected to and forms a closed loop wire on the crane.Because in being employed adjustment process, drive by leading screw, along with the height of upper guide post is regulated, the horizontal support in top and the horizontal support of sliding are in mobile status, and the pulley on it is also followed mobile, played the effect of regulating stay cord actual motion pulling length at any time, within the specific limits, no matter the height of body of wall how, stay cord all can be along with the flexible of upper rail increase and decrease work pulling length, how many upper guide posts stretching out in the guide pillar down, and how much work pulling length of stay cord just increases; Otherwise how many upper guide posts withdrawing in the guide pillar down, and how much work pulling length of stay cord just reduces, thereby closed loop wire need not be adjusted and change, rational in infrastructure, easy to operate, and reliable.
The supporting bolster that passes through of twice guide pillar bottom designs is connected with support with axle sleeve, the two ends of steady brace are connected with support with the horizontal support in axle sleeve and top by supporting bolster respectively, steady brace is made up of screw rod and screwed pipe, the two ends of steady brace are two sections screw rods, and two sections screw flight rotation directions are opposite, and two sections screw rods are connected by the screwed pipe of centre, the rotation screwed pipe, can adjust the verticality or the gradient of guide pillar easily, satisfy instructions for use better, improve construction quality.
Establish height spacer pin in support bottom, realize the height fine setting of guide pillar, be mainly used in adjust guide pillar and roof will the degree that holds out against, assurance work progress solid and reliable.
Troweling machine of the present invention, rational in infrastructure, easy to operate, reliable, can implement the body of wall top at an easy rate and plaster, reduce and to land ash, compliance is good, can regulate the state relation of body and metope well, and operation quality and efficient are effectively guaranteed.
Description of drawings
Fig. 1, one embodiment of the invention easy structure schematic diagram of plastering.
The right side view of Fig. 2, Fig. 1.
A-A cross section structure schematic diagram among Fig. 3, Fig. 1.
B-B cross section structure schematic diagram among Fig. 4, Fig. 1.
Fig. 5, one embodiment of the invention rack rail structural representation.
The left side view of Fig. 6, Fig. 5.
Among the figure: 1, spatula 2, ash hole 3, soft envelope 4, envelope hawk 5, back shaft 6, sliding support axle 7, screw feeder 8, stir ash-pit 9, stiff dough envelope 10, connect support 11, the framework 12 of plastering, tension extension spring 13, end pocket 14, ash inlet 15, arc slide opening 16, Dust Storage Room 17, buffering flange 18, wheel 19, support 20, reductor 21, screw rod 22, reel 23, steel wire tow line 24, screwed pipe 25, screw rod 26, the horizontal support 27 in top, pulley 28, pulley 29, the horizontal support 30 in top, upper guide post 31, sliding guide sleeve 32, pulley 33, the horizontal support 34 of sliding, following guide pillar 35, crane 36, plaster 37, pulley 38, handle 39, spacer pin 40, pulley 41, leading screw 42, bottom transverse supports 43, spindle motor.
The specific embodiment
The invention will be further described in conjunction with the foregoing description accompanying drawing.
As Fig. 5, shown in Figure 6, troweling machine of the present invention comprises support 19, rack rail, for apparatus for ash with plaster 36, plasters 36 to be fitted on the rack rail by crane 35.
As Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4, plaster and 36 comprise the framework 11 of plastering, spatula 1 and Dust Storage Room 16, spatula 1 is a rectangular slab, be installed in a framework 11 tops of plastering, the front of Dust Storage Room 16 is made of top soft envelope 3 and following stiff dough envelope 9, the back of Dust Storage Room 16 is made of end pocket 13, spatula 1 lower limb connects the top edge of end pocket 13, gap between the top edge of soft envelope 3 and the lower limb of spatula 1 constitutes ash hole 2, the lower limb of stiff dough envelope 9 and the lower limb of end pocket 13 are connected two top edges of the stirring ash-pit 8 of tubular respectively, stir in the ash-pit 8 and be provided with screw feeder 7, stirring ash-pit 8 is provided with and the ash inlet 14 that is connected for apparatus for ash, ash inlet 14 is arranged on the middle part of stirring ash-pit 8, with ash inlet 14 is the boundary, screw feeder 7 is divided into two sections, helical blade rotation direction on two sections screw feeders is opposite, the plaster both sides of a framework 11 are provided with envelope hawk 4, envelope hawk 4 is arranged on back shaft 5 and the sliding support axle 6, envelope hawk 4 is provided with the arc slide opening 15 of corresponding sliding support axle 6, and the envelope hawk 4 and 11 of the frameworks of plastering are provided with back-moving spring 12.Plaster and 36 be fixed on the crane 35 by connecting support 10.
As Fig. 5, (having omitted the head of plastering among Fig. 6) shown in Figure 6, rack rail is arranged on the support 19, support 19 bottoms are provided with spacer pin 39, regulate by handle 38, rack rail comprises two vertical flexible guide pillars, flexible guide pillar is made up of upper guide post 30 and following guide pillar 34, be set with sliding guide sleeve 31 on the upper guide post 30, upper guide post 30 is inserted into down in the guide pillar 34, be provided with horizontal support 26 in top and bottom transverse support 42 between twice guide pillars 34 and be fitted with the horizontal support 33 of sliding, be provided with the horizontal support 29 in top between two upper guide posts 30, be provided with the leading screw 41 of parallel upper guide post 30 between two upper guide posts 30, leading screw 41 passes the feed screw nut in the horizontal support 26 in top, the upper end of leading screw 41 is arranged in the horizontal support 29 in top by bearing support, the lower end of leading screw 41 is arranged in the horizontal support 33 of sliding by bearing support, slide and be equipped with spindle motor 43 in the horizontal support 33, the lower end of leading screw 41 connects spindle motor 43, be fitted with crane 35 on twice guide pillars 34, be equipped with on the crane 35 and plaster 36, horizontal support 26 in top and 19 on support are provided with steady brace, pulley is provided with five groups, two one group, coaxial assembling, at support 19, the horizontal support 26 in top, the horizontal support 33 of sliding, horizontal support 29 in top and bottom transverse support on 42 and are respectively equipped with one group of pulley 40,27,32,28,37, support 19 is provided with reel 22, be connected steel wire tow line 23 on the crane 35 and walk around pulley 28 in the horizontal support 29 in top successively, pulley 32 in the horizontal support 33 slides, pulley 27 in the horizontal support 26 in top, pulley 40 on the support 19, support 19 coilings 22 and bottom transverse support the pulley 37 on 42, are connected to and form a closed loop wire on the crane 35.
Twice guide pillar 34 bottoms are connected with support 19 with axle sleeve by supporting bolster, one connects bolster, a connecting bushing, in like manner, the two ends of steady brace are connected with support 19 by the horizontal support 26 in supporting bolster and axle sleeve and top respectively, and steady brace is made up of screw rod and screwed pipe, and the two ends of steady brace are two sections screw rods 21,25, the thread rotary orientation of two sections screw rods 21,25 is opposite, and two sections screw rods 21,25 are connected by the screwed pipe 24 of centre.By rotation screwed pipe 24, can adjust the verticality or the gradient of guide pillar easily, satisfy instructions for use better.
During construction operation, connect for apparatus for ash, support 19 is pushed into the operating position, adjust and plaster 36, guide rail concerns with the position of metope according to general knowledge.Start spindle motor 43, driving leading screw 41 rotates, under the effect of feed screw nut, leading screw constantly rises, drive the horizontal support 29 in top and rise to the house ceiling, can set up the spindle motor switch contact on the horizontal support end face in top, when switch contact contacts with the house ceiling, spindle motor 43 stops operating.Under the effect of leading screw 41, the upper guide post 30 in addition that rises simultaneously, the horizontal support 29 in top and top pulley 28, the horizontal support 33 of slip and top pulley 32 thereof thereof, at this moment, turn handle 38, raise support 19 by spacer pin 39, rack rail just forms a firm frame guide rail between house ceiling and ground.Under the driving of reductor, reel 22 rotates, and by the pulley transmission, crane 35 drives to plaster and 36 moves up and down along guide pillar, by for apparatus for ash supply mortar in the head of plastering, enforcement plastered work.Buffering flange 17 is beneficial to the buffering transition of plastering, and improves the floated coat quality.After above crane 35 runs to sliding guide sleeve 31, sliding guide sleeve 31 is thereupon along upper guide post 30 passive moving upward, thereby the movement locus that guarantees crane can not change because of the size difference of upper and lower guide pillar.When crane 35 was descending from the top, sliding guide sleeve 31 resetted with line retrace.Implement the top-down mode of plastering, the upper end from body of wall begins to plaster earlier, and is downward along body of wall, up to the bottom, carries out the strip-type plastered work, finishes the float work of a face wall successively.Plaster 36 and 35 of cranes can set up and compress regulating spring, realize plastering 36 and metope between compress gap adjustment, especially metope not at ordinary times, guaranteeing to plaster 36 closely contacts with metope all the time, guarantees the grieshoch quality.
The present invention can regulate the height of body well, and compliance is good, can regulate the state relation of body and metope well, and good operating stability is simple and reasonable, makes in operation, and operation quality and efficient are effectively guaranteed.

Claims (6)

1. troweling machine, comprise support, rack rail, for the apparatus for ash and the head of plastering, the head of plastering is arranged on the rack rail, the head that it is characterized in that plastering comprises a framework of plastering, spatula and Dust Storage Room, spatula is a rectangular slab, be installed in a framework upper of plastering, the front of Dust Storage Room is made of top soft envelope and following stiff dough envelope, the back of Dust Storage Room is made of end pocket, the spatula lower limb connects the top edge of end pocket, gap between the top edge of soft envelope and the lower limb of spatula constitutes ash hole, and the lower limb of stiff dough envelope and the lower limb of end pocket are connected two top edges of the stirring ash-pit of tubular respectively, are provided with screw feeder in the stirring ash-pit, stirring ash-pit is provided with and the ash inlet that is connected for apparatus for ash, the plaster both sides of a framework are provided with the envelope hawk, and the envelope hawk is arranged on the back shaft, envelope hawk and plaster and be provided with back-moving spring between a framework.
2. troweling machine according to claim 1 is characterized in that ash inlet is arranged on the middle part of stirring ash-pit, is the boundary with the ash inlet, and screw feeder is divided into two sections, and the helical blade rotation direction on two sections screw feeders is opposite.
3. troweling machine according to claim 1 and 2, it is characterized in that rack rail is arranged on the support, rack rail comprises two vertical flexible guide pillars, flexible guide pillar is made up of upper guide post and following guide pillar, be set with sliding guide sleeve on the upper guide post, upper guide post is inserted into down in the guide pillar, be provided with horizontal support in top and bottom transverse between twice guide pillars and support and be fitted with the horizontal support of sliding, be provided with the horizontal support in top between two upper guide posts, be provided with the leading screw of parallel upper guide post between two upper guide posts, leading screw passes the feed screw nut in the horizontal support in top, the upper end of leading screw is arranged in the horizontal support in top, slide and be equipped with spindle motor in the horizontal support, the lower end of leading screw connects spindle motor, be fitted with crane on twice guide pillars, the head of plastering is installed on the crane, be provided with steady brace between horizontal support in top and support, horizontal support in top and bottom transverse are respectively equipped with one group of pulley on supporting, two one group, coaxial assembling, support is provided with reel, is connected stay cord on the crane and walks around pulley in the horizontal support in top successively, pulley on support coiling and bottom transverse support is connected to and forms a closed loop wire on the crane.
4. troweling machine according to claim 3, it is characterized in that pulley is provided with five groups, on the support, set up one group respectively in the horizontal support in top and in the horizontal support of sliding, the stay cord that is connected on the crane is walked around the pulley in the horizontal support in top, the pulley that pulley, the pulley on the support, support coiling and bottom transverse in the horizontal support in pulley, top in the horizontal support of sliding support successively, is connected to and forms a closed loop wire on the crane.
5. troweling machine according to claim 4, it is characterized in that twice guide pillar bottoms are connected with support with axle sleeve by supporting bolster, the two ends of steady brace are connected with support with the horizontal support in axle sleeve and top by supporting bolster respectively, steady brace is made up of screw rod and screwed pipe, the two ends of steady brace are two sections screw rods, two sections screw flight rotation directions are opposite, and two sections screw rods are connected by the screwed pipe of centre.
6. troweling machine according to claim 5 is characterized in that the support bottom is provided with height spacer pin.
CN2007101527125A 2006-09-11 2007-09-10 Pasting machine Expired - Fee Related CN101144325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101527125A CN101144325B (en) 2006-09-11 2007-09-10 Pasting machine

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
CN200610068861.9 2006-09-11
CN200610068862 2006-09-11
CN200610068861 2006-09-11
CN200610068862.3 2006-09-11
CN2007101527125A CN101144325B (en) 2006-09-11 2007-09-10 Pasting machine

Publications (2)

Publication Number Publication Date
CN101144325A CN101144325A (en) 2008-03-19
CN101144325B true CN101144325B (en) 2010-12-15

Family

ID=39207037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101527125A Expired - Fee Related CN101144325B (en) 2006-09-11 2007-09-10 Pasting machine

Country Status (1)

Country Link
CN (1) CN101144325B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104514360A (en) * 2013-10-08 2015-04-15 天太·郭元焜 Automatic machine for plastering cylinder with cement mortar
CN104533062A (en) * 2014-12-30 2015-04-22 王耀刚 Wall leveling machine
CN105672629B (en) * 2016-02-24 2017-12-12 金华市秸和环保技术咨询有限公司 A kind of mechanical float and its operating method
CN106150049B (en) * 2016-06-24 2018-10-12 翁荣森 Spray robot
CN106303458B (en) * 2016-08-31 2019-05-31 浙江新亚华网络智能工程有限公司 A kind of intelligent integrated monitoring device
CN107130778A (en) * 2017-06-22 2017-09-05 长沙万工机器人科技有限公司 A kind of metope Work robot
CN107893522B (en) * 2017-10-30 2023-04-25 深圳市森博机器人有限公司 Automatic plastering machine
CN110714597B (en) * 2019-10-22 2021-05-11 马衍俊 Strickling machine
CN112012450B (en) * 2020-09-18 2022-04-12 上海蔚建科技有限公司 Automatic plastering machine
CN112012451A (en) * 2020-09-22 2020-12-01 湖南汇渠建筑科技有限公司 Automatic plastering device for house building construction
CN112376856A (en) * 2020-10-29 2021-02-19 林晓霞 Coating wheel based on roller rotates automatic fixed handle
CN113482373A (en) * 2021-07-27 2021-10-08 戚聿斌 Brick joint filling device and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2407318A2 (en) * 1977-10-29 1979-05-25 Lingl Anlagenbau Plaster applying machine for brick walls - has plaster hopper and application roller together with smoothing profile
CN2412957Y (en) * 2000-01-18 2001-01-03 李进兰 Plastering machine
CN2732895Y (en) * 2004-08-22 2005-10-12 张廷显 Wall plastering machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2407318A2 (en) * 1977-10-29 1979-05-25 Lingl Anlagenbau Plaster applying machine for brick walls - has plaster hopper and application roller together with smoothing profile
CN2412957Y (en) * 2000-01-18 2001-01-03 李进兰 Plastering machine
CN2732895Y (en) * 2004-08-22 2005-10-12 张廷显 Wall plastering machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CN 2412957 X,全文.

Also Published As

Publication number Publication date
CN101144325A (en) 2008-03-19

Similar Documents

Publication Publication Date Title
CN101144325B (en) Pasting machine
CN104131687B (en) Automatic plastering machine
CN202755627U (en) Wall plaster troweling machine
CN211817755U (en) Wall surface scraping device for building construction
CN206722340U (en) A kind of intelligent mechanical float
CN111502193A (en) Building wall whitewashes equipment
CN110388037A (en) A kind of rendering robot
CN203961229U (en) Automatic plastering machine
CN212668789U (en) Cable laying device
CN111255250B (en) Building cement device of building a wall
CN201826507U (en) Automatic mortar feeding mechanism of wall whitewashing machine
CN2849021Y (en) Simple wall plastering machine
CN213898011U (en) Building mortar spraying equipment for building engineering
CN210828211U (en) Plastering plate and plastering machine
CN210943625U (en) Solid material feeding mechanism
CN201627347U (en) Wall surface plastering machine
CN206748714U (en) Precast concrete feed arrangement with rinse bath
CN204626896U (en) A kind of plastering machine automatically moving back hopper
CN212865847U (en) Structure convenient to sluice overflow surface template installation
CN215978287U (en) Wall surface whitening machine
CN220667176U (en) Dust screen for building engineering
CN220072084U (en) Spraying device for processing sofa cover coating
CN220013687U (en) Bored concrete pile concrete vibrating device convenient to concrete trowelling
CN218920969U (en) Forestation dotter
CN108915217B (en) A device of plastering a wall for building intelligent installation engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20130910