CN108879707A - 一种电力系统无功补偿地点在线排序方法 - Google Patents

一种电力系统无功补偿地点在线排序方法 Download PDF

Info

Publication number
CN108879707A
CN108879707A CN201810748573.0A CN201810748573A CN108879707A CN 108879707 A CN108879707 A CN 108879707A CN 201810748573 A CN201810748573 A CN 201810748573A CN 108879707 A CN108879707 A CN 108879707A
Authority
CN
China
Prior art keywords
node
voltage
power
place
reactive power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810748573.0A
Other languages
English (en)
Inventor
王怀远
陈启凡
江岳文
林建新
温步瀛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201810748573.0A priority Critical patent/CN108879707A/zh
Publication of CN108879707A publication Critical patent/CN108879707A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及一种电力系统无功补偿地点在线排序方法包括以下步骤:步骤S1:设置一个电压危险节点,通过多端口戴维南等值将多节点电网等效成两节点电网;步骤S2:根据得到的双节点电网,计算各无功补偿节点对电压不稳定地点的相关性指标;步骤S3:对相关性指标的大小进行排序处理,得到提高电压危险节点电压稳定性的无功补偿控制地点的排序。本发明能够根据在线信息实时计算系统无功补偿控制的排序,快速提高系统的电压稳定性。

Description

一种电力系统无功补偿地点在线排序方法
技术领域
本发明涉及电力系统技术领域,具体涉及一种电力系统无功补偿地点在线排序方法。
背景技术
当前电力系统中,主要采取暂态电压稳定指标,或者灵敏度分析作为参考依据对无功补偿控制地点进行评估,在这过程中往往需要较为复杂的算法、较大的计算量,对各类技术都有较高的要求。因此,需要设计一种方便简单的无功控制地点排序方式,来提高电力系统在线无功控制的效率,这对电力系统的分析和方案制定有十分重要的意义。
发明内容
有鉴于此,本发明的目的在于提供一种电力系统无功补偿地点在线排序方法,用以在线信息实时计算系统无功补偿控制的排序,快速提高系统的电压稳定性。
为实现上述目的,本发明采用如下技术方案:
一种电力系统无功补偿地点在线排序方法,其包括以下步骤:步骤S1:设定一个多节点的局部电网的电压危险节点为i,通过多端口戴维南等值将多节点的局部电网等效成电压危险节点i两阻抗两节点电网;步骤S2:根据得到的两节点电网,计算各无功补偿节点对电压危险节点的相关性指标;步骤S3:对相关性指标的大小进行排序处理,得到提高电压危险节点电压稳定性的无功补偿控制地点的排序。
进一步的,所述步骤S2具体为:
计算电压危险节点i与无功补偿节点j之间的相关性指标
其中: 为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;V 为节点j的电压幅值。
本发明与现有技术相比具有以下有益效果:
本发明仅需要获知局部电网的阻抗信息和各无功补偿节点的电压信息,便可得到有效无功补偿地点的排序。相比于现有方法的方法,本方法能够根据在线信息实时计算系统无功补偿控制的排序,快速提高系统的电压稳定性。
附图说明
图1是本发明一实施例计算示例IEEE14节点图;
图2是本发明一实施例节点i两阻抗两节点电网;
图3是本发明流程图。
具体实施方式
下面结合附图及实施例对本发明做进一步说明。
请参照图3,本发明提供一种电力系统无功补偿地点在线排序方法,其包括以下步骤:
步骤S1:设定一个多节点的局部电网的电压危险节点为i,通过多端口戴维南等值将多节点的局部电网等效成电压危险节点i两阻抗两节点电网;
步骤S2:根据得到的两节点电网,计算各无功补偿节点对电压危险节点的相关性指标;
步骤S3:对相关性指标的大小进行排序处理,得到提高电压危险节点电压稳定性的无功补偿控制地点的排序。
在本发明一实施例中,所述步骤S2具体为:
计算电压危险节点i与无功补偿节点j之间的相关性指标
其中: 为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;V 为节点j的电压幅值。
实施例1
计算实例选择IEEE14节点系统(如图1所示,其参数见附录1)。某时刻,在节点13和节点14间发生断线,节点14成为电压危险节点。
第一步:通过戴维南等值,将复杂电网等效成节点i两阻抗两节点电网,其结果如图2所示。
第二步:计算反映电压危险节点与无功补偿地点密切关系的指标Mi,其结果如表1所示。
表1 各无功补偿节点对节点14的M指标
节点序号 M指标
4 0.0525
5 0.0312
9 0.3090
10 0.2625
11 0.1352
14 1.0000
第三步:将该指标按照从大到小的顺序进行排序,得到有效的无功补偿地点排序为节点14、节点9、节点10、、节点11、节点4、节点5。
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。

Claims (2)

1.一种电力系统无功补偿地点在线排序方法,其特征在于:包括以下步骤:
步骤S1:设定一个多节点的局部电网的电压危险节点为i,通过多端口戴维南等值将多节点的局部电网等效成电压危险节点i两阻抗两节点电网;
步骤S2:根据得到的两节点电网,计算各无功补偿节点对电压危险节点的相关性指标;
步骤S3:对步骤S2得到的相关性指标的大小进行排序处理,得到提高电压危险节点电压稳定性的无功补偿控制地点的排序。
2.根据权利要求1所述的电力系统无功补偿地点在线排序方法,其特征在于:所述步骤S2具体为:计算电压危险节点i与无功补偿节点j之间的相关性指标
其中: 为节点i网络阻抗倒数的共轭;为节点j与节点i的互阻抗的共轭;V 为节点j的电压幅值。
CN201810748573.0A 2018-07-10 2018-07-10 一种电力系统无功补偿地点在线排序方法 Pending CN108879707A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810748573.0A CN108879707A (zh) 2018-07-10 2018-07-10 一种电力系统无功补偿地点在线排序方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810748573.0A CN108879707A (zh) 2018-07-10 2018-07-10 一种电力系统无功补偿地点在线排序方法

Publications (1)

Publication Number Publication Date
CN108879707A true CN108879707A (zh) 2018-11-23

Family

ID=64300292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810748573.0A Pending CN108879707A (zh) 2018-07-10 2018-07-10 一种电力系统无功补偿地点在线排序方法

Country Status (1)

Country Link
CN (1) CN108879707A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117215205A (zh) * 2023-11-09 2023-12-12 国网经济技术研究院有限公司 基于决策树和iss理论的直流系统控制参数分析方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103972900A (zh) * 2014-05-21 2014-08-06 中国南方电网有限责任公司电网技术研究中心 利用电压控制敏感因子确定多馈入直流输电系统无功补偿装置布点的方法
CN104362642A (zh) * 2014-10-27 2015-02-18 国家电网公司 提高交直流电网中长期电压稳定的动态无功备用优化方法
CN106026118A (zh) * 2016-05-26 2016-10-12 国家电网公司 基于节点电压回复指标的电网动态无功补偿节点选择方法
CN107039984A (zh) * 2017-06-19 2017-08-11 国网重庆市电力公司电力科学研究院 一种无功电压分区方法
CN108199381A (zh) * 2018-01-18 2018-06-22 国网福建省电力有限公司 一种用于风电接入系统电压稳定性的切负荷地点选择方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103972900A (zh) * 2014-05-21 2014-08-06 中国南方电网有限责任公司电网技术研究中心 利用电压控制敏感因子确定多馈入直流输电系统无功补偿装置布点的方法
CN104362642A (zh) * 2014-10-27 2015-02-18 国家电网公司 提高交直流电网中长期电压稳定的动态无功备用优化方法
CN106026118A (zh) * 2016-05-26 2016-10-12 国家电网公司 基于节点电压回复指标的电网动态无功补偿节点选择方法
CN107039984A (zh) * 2017-06-19 2017-08-11 国网重庆市电力公司电力科学研究院 一种无功电压分区方法
CN108199381A (zh) * 2018-01-18 2018-06-22 国网福建省电力有限公司 一种用于风电接入系统电压稳定性的切负荷地点选择方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MARIANA KAMEL, STUDENT MEMBER, IEEE, ABDELRAHMAN A. KARRAR: "Development and Application of a New Voltage Stability Index for On-Line Monitoring and Shedding", 《IEEE》 *
牟晓明,李志民: "电压薄弱节点的在线识别与控制方法", 《电网技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117215205A (zh) * 2023-11-09 2023-12-12 国网经济技术研究院有限公司 基于决策树和iss理论的直流系统控制参数分析方法
CN117215205B (zh) * 2023-11-09 2024-02-06 国网经济技术研究院有限公司 基于决策树和iss理论的直流系统控制参数分析方法

Similar Documents

Publication Publication Date Title
Zhou et al. Distribution feeder reconfiguration for operation cost reduction
CN107492888B (zh) 一种直流受端交流系统的电压薄弱区域评估方法
WO2019154135A1 (zh) 一种基于网络抗毁度的微电网可靠性评估方法
CN110350511B (zh) 一种基于转供电亲和度的配电网故障恢复方法
WO2015027756A1 (zh) 电力系统元件参数和功率修正系数的辨识方法及系统
CN108199381A (zh) 一种用于风电接入系统电压稳定性的切负荷地点选择方法
CN103793556B (zh) 综合出线负荷的变电站负荷建模方法
CN109378819A (zh) 基于谱聚类及模块度校验的电力系统电压分区方法及系统
CN109802435A (zh) 一种风电接入系统的储能配置地点选择方法
CN108879707A (zh) 一种电力系统无功补偿地点在线排序方法
CN108808681A (zh) 基于混合注入模型的光伏并网潮流计算方法
CN110311372A (zh) 基于谱聚类的电网分区方法
CN109599870A (zh) 一种抑制短路电流的联络线电抗快速计算方法
CN108923433A (zh) 一种提高电压稳定性的有效切负荷地点在线选择方法
CN108574287A (zh) 一种基于网络结构的电力系统无功补偿地点排序方法
CN105226644B (zh) 基于可用容量一致性的带约束等值方法
CN104218668B (zh) 设备发生故障时引起动作的备自投的追踪确定方法
CN105846447B (zh) 多回直流逆变站动态无功补偿配置优先次序的确定方法
Parihar et al. Power flow analysis of balanced radial distribution system with composite load model
Adebayo et al. Static voltage stability enhancement using FACTS controller
CN105184511A (zh) 供电业扩服务系统
CN107508318A (zh) 一种基于电压灵敏度分区的有功控制方法及系统
Fang et al. A calculation method of electric distance and subarea division application based on transmission impedance
CN105427182A (zh) 一种台区低电压成因分析方法及装置
CN108923439A (zh) 一种电力系统有效无功补偿地点的在线选择方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication