CN108867664B - 一种基于逆作法的路改桥段基坑支护结构及其施工方法 - Google Patents

一种基于逆作法的路改桥段基坑支护结构及其施工方法 Download PDF

Info

Publication number
CN108867664B
CN108867664B CN201811025134.3A CN201811025134A CN108867664B CN 108867664 B CN108867664 B CN 108867664B CN 201811025134 A CN201811025134 A CN 201811025134A CN 108867664 B CN108867664 B CN 108867664B
Authority
CN
China
Prior art keywords
construction method
road
bridge
jikeng
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811025134.3A
Other languages
English (en)
Other versions
CN108867664A (zh
Inventor
朱登元
王玉兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi University
Original Assignee
Linyi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi University filed Critical Linyi University
Priority to CN201811025134.3A priority Critical patent/CN108867664B/zh
Publication of CN108867664A publication Critical patent/CN108867664A/zh
Application granted granted Critical
Publication of CN108867664B publication Critical patent/CN108867664B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

本发明公开一种基于逆作法的路改桥段基坑支护结构及其施工方法,包括原有道路,原有道路两侧的边坡设置有采用逆作法制得的基坑支护,两侧的基坑支护的桥面板与原有道路的桥面平齐;原有道路的底端水平间隔设置有若干层水平向支撑体系,若干层水平向支撑体系的两端浇筑有上下贯通的混凝土面板墙。本发明中的基于逆作法的路改桥段基坑支护结构及其施工方法,对于路改桥段的设计方案,采用逆作法基坑支护的施工方法,可以使桥梁分离修建,暂时保留原有道路的正常通行,避免了临时道路的修建,保护环境,节约土地资源,降低施工成本,缩短施工工期。

Description

一种基于逆作法的路改桥段基坑支护结构及其施工方法
技术领域
本发明涉及道路建设技术领域,特别是涉及一种基于逆作法的路改桥段基坑支护结构及其施工方法。
背景技术
随着交通量的不断增长,高速公路改扩建已成为我国公路工程建设中的一个热点。针对旧路扩建为桥段的设计方案,在不影响正常交通的情况下,施工方案通常是在改建道路两侧修建临时道路,车辆改道行驶,然后再进行旧路及以下土层的挖除,改建为桥段,这种施工方案的缺点是投资高,工期长,并且造成周边土地临时浪费。在这种形势下提出一种新的施工方法,迫在眉睫。
发明内容
本发明的目的是提供一种基于逆作法的路改桥段基坑支护结构及其施工方法,以解决上述现有技术存在的问题,可以使桥梁分离修建,暂时保留原有道路的正常通行,避免了临时道路的修建,保护环境,节约土地资源,降低施工成本,缩短施工工期。
为实现上述目的,本发明提供了如下方案:本发明提供一种基于逆作法的路改桥段基坑支护结构,包括原有道路,所述原有道路两侧的边坡设置有采用逆作法制得的基坑支护,两侧的所述基坑支护的桥面板与所述原有道路的桥面平齐;所述原有道路的底端水平间隔设置有若干层水平向支撑体系,若干层所述水平向支撑体系的两端浇筑有上下贯通的混凝土面板墙。
优选的,所述水平向支撑体系包括水平钻孔且两侧钻透设置于所述原有道路地下的通长锚杆。
优选的,所述混凝土面板墙为竖向支撑体系,所述通长锚杆的两端与所述混凝土面板墙浇筑连接。
优选的,所述通长锚杆位于所述混凝土面板墙的外侧通过锚定板固定。
优选的,若干层所述水平向支撑体系从上至下根据不同标高划分成若干施工段布置。
优选的,若干层所述水平向支撑体系每层的施工间隔高度为2-3m,所述水平向支撑体系的宽度为20-25m。
优选的,所述原有道路的两侧边坡末端还设置有排水沟。
本发明还提供一种基于逆作法的路改桥段基坑支护的施工方法,应用于上述的基于逆作法的路改桥段基坑支护结构,包括以下步骤:
保留原有道路的正常通行,对所述原有道路两侧的边坡采用逆作法进行基坑支护,每垂直开挖一定深度的土体后设置水平向支撑体系,水平方向钻孔,两侧钻透,设置通长锚杆,注浆;竖向支撑体系是在垂直方向支模板浇筑混凝土面板墙,所述通长锚杆的两端与所述混凝土面板墙浇筑连接;分层分段从上至下施工;
所述原有道路两侧支护完成后,在所述原有道路的两侧进行上行桥和下行桥的施工;
两侧桥梁施工完成后,车辆由所述原有道路改道为两侧新桥通行,同时对中间的所述原有道路开挖进行中间桥梁的施工,待中间桥梁施工完成后,路改桥段的扩建工程完成,车辆完全恢复交通。
优选的,所述两侧桥梁的施工包括上部结构和下部结构,所述下部结构包括从下至上依次固定的桩基础和桥墩,所述桩基础的顶端水平连接设置有地梁;所述上部结构包括固定于所述桥墩顶部的盖梁,所述盖梁的顶部通过T型梁对桥面板进行支撑固定。
优选的,间隔设置的多个所述T型梁之间设置有横隔板。
本发明相对于现有技术取得了以下技术效果:
本发明中的基于逆作法的路改桥段基坑支护结构及其施工方法,对于路改桥段的设计方案,采用逆作法基坑支护的施工方法,可以使桥梁分离修建,暂时保留原有道路的正常通行,避免了临时道路的修建,保护环境,节约土地资源,降低施工成本,缩短施工工期。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为原有道路的结构示意图;
图2为基于逆作法的路改桥段基坑支护的施工横断面图;
其中,1原有道路;2边坡;3排水沟;4桥面板;5横隔板;6盖梁;7桥墩;8地梁;9桩基础;10混凝土面板墙;11锚定板;12通长锚杆;13T型梁。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的目的是提供一种基于逆作法的路改桥段基坑支护结构及其施工方法,以解决上述现有技术存在的问题,可以使桥梁分离修建,暂时保留原有道路的正常通行,避免了临时道路的修建,保护环境,节约土地资源,降低施工成本,缩短施工工期。
本发明提供的基于逆作法的路改桥段基坑支护结构,包括原有道路,原有道路两侧的边坡设置有采用逆作法制得的基坑支护,两侧的基坑支护的桥面板与原有道路的桥面平齐;原有道路的底端水平间隔设置有若干层水平向支撑体系,若干层水平向支撑体系的两端浇筑有上下贯通的混凝土面板墙。
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
请参考图1-2,其中,图1为原有道路的结构示意图;图2为基于逆作法的路改桥段基坑支护的施工横断面图。
如图1-2所示,本发明提供一种基于逆作法的路改桥段基坑支护结构,包括原有道路1,原有道路1两侧的边坡2设置有采用逆作法制得的基坑支护,两侧的基坑支护的桥面板4与原有道路1的桥面平齐;原有道路1的底端水平间隔设置有若干层水平向支撑体系,若干层水平向支撑体系的两端浇筑有上下贯通的混凝土面板墙10。水平向支撑体系包括水平钻孔且两侧钻透设置于原有道路1地下的通长锚杆12;混凝土面板墙10为竖向支撑体系,通长锚杆12的两端与混凝土面板墙10浇筑连接;通长锚杆12位于混凝土面板墙10的外侧通过锚定板11固定。利用通长锚杆12对两侧的混凝土面板墙10施加拉力,提高了土体的稳定性,避免在上部荷载作用下,发生土体坍塌。
若干层水平向支撑体系从上至下根据不同标高划分成若干施工段布置,每层的施工间隔高度为2-3m,水平向支撑体系的宽度为20-25m。
此外,原有道路1的两侧边坡2末端还设置有排水沟3。
本发明还提供一种基于逆作法的路改桥段基坑支护的施工方法,应用于上述的基于逆作法的路改桥段基坑支护结构,包括以下步骤:
保留原有道路1的正常通行,对原有道路1两侧的边坡2采用“逆作法”进行基坑支护,每垂直开挖一定深度的土体后设置水平向支撑体系,水平方向钻孔,两侧钻透,设置通长锚杆12,注浆,竖向支撑体系是在垂直方向支模板浇筑混凝土面板墙10,利用通长锚杆12对两侧的混凝土面板墙10施加拉力,提高了土体的稳定性,避免在上部荷载作用下,发生土体坍塌。分层分段、由上而下施工,即从上到下根据不同标高划分成若干施工段,分段从上往下施工,每层施工高度宜为2~3m,宽度宜为20~25m;
原有道路1两侧支护完成后,在原有道路1的两侧进行上行桥和下行桥的施工;
两侧桥梁施工完成后,车辆由原有道路1改道为两侧新桥通行,同时对中间的原有道路1开挖进行中间桥梁的施工,待中间桥梁施工完成后,路改桥段的扩建工程完成,车辆完全恢复交通。
两侧桥梁的施工包括上部结构和下部结构,下部结构包括从下至上依次固定的桩基础9和桥墩7,桩基础9的顶端水平连接设置有地梁8;上部结构包括固定于桥墩7顶部的盖梁6,盖梁6的顶部通过T型梁13对桥面板4进行支撑固定。间隔设置的多个T型梁13之间设置有横隔板5。
本发明中的基于逆作法的路改桥段基坑支护结构及其施工方法,针对旧路扩建为桥段,在不影响正常交通的情况下,在原有道路1的两侧边坡2采用逆作法进行基坑支护的施工,可以使桥梁分离修建,既不影响原有道路1的正常通行,还能够避免修建临时道路,采用在原有道路1的土体进行水平向支撑体系和竖向支撑体系的设置,还保证了原有道路1在改桥后的稳定性;该施工方案,从整体角度不仅缩短了工期,而且降低了投入成本,也避免了由于临时道路对周围土地和环境的浪费与污染,具有更好的可实行性。
本发明中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的方法及其核心思想;同时,对于本领域的一般技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处。综上所述,本说明书内容不应理解为对本发明的限制。

Claims (7)

1.一种基于逆作法的路改桥段基坑支护的施工方法,其特征在于:包括以下步骤:
保留原有道路的正常通行,对所述原有道路两侧的边坡采用逆作法进行基坑支护,每垂直开挖一定深度的土体后设置水平向支撑体系,水平方向钻孔,两侧钻透,设置通长锚杆,注浆;竖向支撑体系是在垂直方向支模板浇筑混凝土面板墙,所述通长锚杆的两端与所述混凝土面板墙浇筑连接;分层分段从上至下施工;
所述原有道路两侧支护完成后,在所述原有道路的两侧进行上行桥和下行桥的施工;
两侧桥梁施工完成后,车辆由所述原有道路改道为两侧新桥通行,同时对中间的所述原有道路开挖进行中间桥梁的施工,待中间桥梁施工完成后,路改桥段的扩建工程完成,车辆完全恢复交通;
该基于逆作法的路改桥段基坑支护的施工方法应用在基于逆作法的路改桥段基坑支护结构上,其中,基于逆作法的路改桥段基坑支护结构包括原有道路,所述原有道路两侧的边坡设置有采用逆作法制得的基坑支护,两侧的所述基坑支护的桥面板与所述原有道路的桥面平齐;所述原有道路的底端水平间隔设置有若干层水平向支撑体系,若干层所述水平向支撑体系的两端浇筑有上下贯通的混凝土面板墙。
2.根据权利要求1所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:所述通长锚杆位于所述混凝土面板墙的外侧通过锚定板固定。
3.根据权利要求1所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:若干层所述水平向支撑体系从上至下根据不同标高划分成若干施工段布置。
4.根据权利要求3所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:若干层所述水平向支撑体系每层的施工间隔高度为2-3m,所述水平向支撑体系的宽度为20-25m。
5.根据权利要求1所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:所述原有道路的两侧边坡末端还设置有排水沟。
6.根据权利要求1所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:所述两侧桥梁的施工包括上部结构和下部结构,所述下部结构包括从下至上依次固定的桩基础和桥墩,所述桩基础的顶端水平连接设置有地梁;所述上部结构包括固定于所述桥墩顶部的盖梁,所述盖梁的顶部通过T型梁对桥面板进行支撑固定。
7.根据权利要求6所述的基于逆作法的路改桥段基坑支护的施工方法,其特征在于:间隔设置的多个所述T型梁之间设置有横隔板。
CN201811025134.3A 2018-09-04 2018-09-04 一种基于逆作法的路改桥段基坑支护结构及其施工方法 Active CN108867664B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811025134.3A CN108867664B (zh) 2018-09-04 2018-09-04 一种基于逆作法的路改桥段基坑支护结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811025134.3A CN108867664B (zh) 2018-09-04 2018-09-04 一种基于逆作法的路改桥段基坑支护结构及其施工方法

Publications (2)

Publication Number Publication Date
CN108867664A CN108867664A (zh) 2018-11-23
CN108867664B true CN108867664B (zh) 2023-09-15

Family

ID=64322997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811025134.3A Active CN108867664B (zh) 2018-09-04 2018-09-04 一种基于逆作法的路改桥段基坑支护结构及其施工方法

Country Status (1)

Country Link
CN (1) CN108867664B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067203B (zh) * 2019-04-19 2021-01-26 中交二航局第二工程有限公司 一种应用于强涌浪低墩区的墩身盖梁悬挂支架
CN113804617B (zh) * 2021-09-23 2024-02-09 辽宁工程技术大学 一种中间桥支挡效应下的边坡稳定性评价方法

Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1282048B (de) * 1965-11-13 1968-11-07 Gruen & Bilfinger A G Brueckentragwerk aus Stahl- oder Spannbeton zum Einbau an Kreuzungen von bestehenden Eisenbahnstrecken mit zu unterfuehrenden Verkehrswegen
EP0245155A1 (fr) * 1986-05-09 1987-11-11 Jean Marie Beauthier Procédé pour la construction d'ouvrages sous des voies ferrées en exploitation
EP0325574A1 (fr) * 1988-01-20 1989-07-26 Constructions Et Entreprises Industrielles S.A. Pont semi-préfabriqué
DE4445707A1 (de) * 1994-12-21 1996-06-27 Euka Bauelemente Verkaufsgesel Verfahren zur schnelleren, rationelleren und umweltfreundlicheren Herstellung nicht höhengleicher Kreuzungen von Verkehrswegen und von Stützbauwerken entlang vorhandener Verkehrswege
US5807020A (en) * 1996-09-17 1998-09-15 Chen; Chien-Yuan Traffic guide constructions at road intersections to provide smooth traffic flows and methods of traffic control thereof
JPH1122366A (ja) * 1997-06-30 1999-01-26 East Japan Railway Co トンネルの構築工法
JP2004190266A (ja) * 2002-12-09 2004-07-08 Yokogawa Bridge Corp 立体交差路の施工方法およびその方法に用い得る高架橋の基礎構造と橋脚との接合方法
KR100571525B1 (ko) * 2005-11-07 2006-04-14 코벡주식회사 콘크리트 구조물을 이용한 교량의 확장공법
CN101831873A (zh) * 2010-05-25 2010-09-15 北京城建设计研究总院有限责任公司 一种运营轨道交通地面线下方修建箱涵的便桥盖挖法
CN101899839A (zh) * 2010-03-30 2010-12-01 山东大学 一种预应力悬臂对拉式置筋挡墙
CN102071607A (zh) * 2011-01-26 2011-05-25 北京中铁瑞威基础工程有限公司 一种不影响既有行车条件下铁路路基修复方法
DE202011105507U1 (de) * 2011-07-19 2012-01-31 H. Klostermann Baugesellschaft Mbh Überbaudeckel und Anordnung aus Überbaudeckel, Bohrpfahl und Steckträger
CN202577157U (zh) * 2012-04-17 2012-12-05 中交三航局第三工程有限公司 一种简支拱桥系梁施工支架体系
CN102953387A (zh) * 2011-08-17 2013-03-06 临沂大学 一种适合土石山区的生态护坡方法
KR101244048B1 (ko) * 2012-11-01 2013-03-15 용호건설(주) 철도 가교의 시공장치 및 시공방법
CN103437353A (zh) * 2013-08-23 2013-12-11 郑怡 一种基于锚杆支护的现浇轻质泡沫混凝土加固方法
CN103821071A (zh) * 2014-03-04 2014-05-28 西南交通大学 准平原地区软弱地基土高路堤装配式修筑方法及装置
CN204174492U (zh) * 2014-10-11 2015-02-25 德州市公路工程总公司 已通车公路路堤沉降处置结构
CN104652470A (zh) * 2014-12-24 2015-05-27 中交第二公路勘察设计研究院有限公司 轻型自锚式预制钢筋混凝土挡土墙及施工方法
CN104894935A (zh) * 2015-04-03 2015-09-09 重庆大学 一种既有高速公路(铁路)路堤轻质化沉降控制方法
CN105297564A (zh) * 2015-10-13 2016-02-03 青岛林川工程技术咨询有限公司 一种高速公路改扩建施工期主线道路的保通方法
CN205152981U (zh) * 2015-11-13 2016-04-13 中铁西安勘察设计研究院有限责任公司 一种轻型柔性既有支挡病害整治结构
CN106283967A (zh) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 中低速磁浮双线填方地段桩基托梁分幅式承轨梁过渡段结构
CN107190630A (zh) * 2017-07-04 2017-09-22 重庆大学 道改隐形桥梁式新型盖挖法
CN208717919U (zh) * 2018-09-04 2019-04-09 临沂大学 一种基于逆作法的路改桥段基坑支护结构

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2537180B1 (fr) * 1982-12-06 1987-01-30 Vidal Henri Culee de pont construite en terre stabilisee

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1282048B (de) * 1965-11-13 1968-11-07 Gruen & Bilfinger A G Brueckentragwerk aus Stahl- oder Spannbeton zum Einbau an Kreuzungen von bestehenden Eisenbahnstrecken mit zu unterfuehrenden Verkehrswegen
EP0245155A1 (fr) * 1986-05-09 1987-11-11 Jean Marie Beauthier Procédé pour la construction d'ouvrages sous des voies ferrées en exploitation
EP0325574A1 (fr) * 1988-01-20 1989-07-26 Constructions Et Entreprises Industrielles S.A. Pont semi-préfabriqué
DE4445707A1 (de) * 1994-12-21 1996-06-27 Euka Bauelemente Verkaufsgesel Verfahren zur schnelleren, rationelleren und umweltfreundlicheren Herstellung nicht höhengleicher Kreuzungen von Verkehrswegen und von Stützbauwerken entlang vorhandener Verkehrswege
US5807020A (en) * 1996-09-17 1998-09-15 Chen; Chien-Yuan Traffic guide constructions at road intersections to provide smooth traffic flows and methods of traffic control thereof
JPH1122366A (ja) * 1997-06-30 1999-01-26 East Japan Railway Co トンネルの構築工法
JP2004190266A (ja) * 2002-12-09 2004-07-08 Yokogawa Bridge Corp 立体交差路の施工方法およびその方法に用い得る高架橋の基礎構造と橋脚との接合方法
KR100571525B1 (ko) * 2005-11-07 2006-04-14 코벡주식회사 콘크리트 구조물을 이용한 교량의 확장공법
CN101899839A (zh) * 2010-03-30 2010-12-01 山东大学 一种预应力悬臂对拉式置筋挡墙
CN101831873A (zh) * 2010-05-25 2010-09-15 北京城建设计研究总院有限责任公司 一种运营轨道交通地面线下方修建箱涵的便桥盖挖法
CN102071607A (zh) * 2011-01-26 2011-05-25 北京中铁瑞威基础工程有限公司 一种不影响既有行车条件下铁路路基修复方法
DE202011105507U1 (de) * 2011-07-19 2012-01-31 H. Klostermann Baugesellschaft Mbh Überbaudeckel und Anordnung aus Überbaudeckel, Bohrpfahl und Steckträger
DE102011107918A1 (de) * 2011-07-19 2013-01-24 H. Klostermann Baugesellschaft Mbh Überbaudeckel, Anordnung aus Überbaudeckel, Bohrpfahl und Steckträger sowie behelfsbrückenfreies Verfahren zum zügigen Verkehrswegkorper-und Verkehrsweganschluss eines Brücken- oder Unterführungstragwerkes in Deckelbauweise
CN102953387A (zh) * 2011-08-17 2013-03-06 临沂大学 一种适合土石山区的生态护坡方法
CN202577157U (zh) * 2012-04-17 2012-12-05 中交三航局第三工程有限公司 一种简支拱桥系梁施工支架体系
KR101244048B1 (ko) * 2012-11-01 2013-03-15 용호건설(주) 철도 가교의 시공장치 및 시공방법
CN103437353A (zh) * 2013-08-23 2013-12-11 郑怡 一种基于锚杆支护的现浇轻质泡沫混凝土加固方法
CN103821071A (zh) * 2014-03-04 2014-05-28 西南交通大学 准平原地区软弱地基土高路堤装配式修筑方法及装置
CN204174492U (zh) * 2014-10-11 2015-02-25 德州市公路工程总公司 已通车公路路堤沉降处置结构
CN104652470A (zh) * 2014-12-24 2015-05-27 中交第二公路勘察设计研究院有限公司 轻型自锚式预制钢筋混凝土挡土墙及施工方法
CN104894935A (zh) * 2015-04-03 2015-09-09 重庆大学 一种既有高速公路(铁路)路堤轻质化沉降控制方法
CN105297564A (zh) * 2015-10-13 2016-02-03 青岛林川工程技术咨询有限公司 一种高速公路改扩建施工期主线道路的保通方法
CN205152981U (zh) * 2015-11-13 2016-04-13 中铁西安勘察设计研究院有限责任公司 一种轻型柔性既有支挡病害整治结构
CN106283967A (zh) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 中低速磁浮双线填方地段桩基托梁分幅式承轨梁过渡段结构
CN107190630A (zh) * 2017-07-04 2017-09-22 重庆大学 道改隐形桥梁式新型盖挖法
CN208717919U (zh) * 2018-09-04 2019-04-09 临沂大学 一种基于逆作法的路改桥段基坑支护结构

Non-Patent Citations (9)

* Cited by examiner, † Cited by third party
Title
The Earth Excavation and Support Technology of the Connection Engineering on the both Banks of the River Bridge;Zhou, YM et al.;PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING;全文 *
不影响通车的路改桥施工方案在京台高速曲阜段的应用;朱振祥等;科技创新导报;132、134 *
临沂双岭高架快速路总体设计;韩旭;;城市道桥与防洪(第05期);6+51-57 *
既有桥改建对拉锚杆加固桥后路基新技术;邹维国;;山西建筑(第34期);162-163 *
既有高速公路"路改桥"不中断交通 施工关键技术;高安荣;桥隧工程;134-135 *
桥台前坡挡墙化改造关键技术;朱均悦等;山西建筑;171-172 *
考虑施工交通组织的桥梁改扩建方案设计――沪宁高速公路(江苏段)扩建工程;张世平;;中外公路(第02期);206-210 *
道路桥梁深基坑支护施工存在的问题及对策;贺琦;;智能城市(第09期);143-144 *
高速公路改扩建工程在设计中若干问题的考虑;代庆兵;;建材与装饰(第25期);274-275 *

Also Published As

Publication number Publication date
CN108867664A (zh) 2018-11-23

Similar Documents

Publication Publication Date Title
CN110512647B (zh) 一种局部装配式地铁车站结构设计及施工方法
CN110820594B (zh) 一种适用于伸缩缝桥墩的对称悬臂施工工艺
KR100892137B1 (ko) 보강이 가능한 횡방향 피에스씨 빔을 이용한 라멘식 지하차도 시공방법
CN107268366B (zh) 一种装配化墙板、桩板组合式无土路基
CN108265618B (zh) 一种高架桥柱墩基础地下逆向增层施工方法
CN112342935B (zh) 一种宽间距的既有桥梁在通车状态下连接拓宽的施工方法
CN108867664B (zh) 一种基于逆作法的路改桥段基坑支护结构及其施工方法
CN110983891B (zh) 公路改扩建装配式路基结构及其施工方法
CN105064711A (zh) 一种在居民楼间施工地下车库的方法
CN104674645A (zh) 一种适合软土地基的整板式小桥涵
CN106812359B (zh) 一种装配式地下车库及其建造方法
CN217839734U (zh) 一种大型高架测试平台的支撑结构
CN111156030A (zh) 一种抗底鼓预制拼装式隧道仰拱结构、装配式隧道及方法
CN108824211A (zh) 一种桥梁的河道内桥墩基础施工方法
CN111963203B (zh) 一种高烈度地区高架独柱车站及其施工方法
CN208717919U (zh) 一种基于逆作法的路改桥段基坑支护结构
CN211816415U (zh) 一种地铁车站边墙施工防裂预应力结构
CN107916798A (zh) 适用于多层建筑套建高层建筑的建筑结构
CN113006083A (zh) 基坑内支撑的换撑施工方法
CN111042214A (zh) 一种浅覆土地下结构的抗浮结构及其施工方法
CN212533543U (zh) 硬质岩地区跨座式单轨的路基结构
CN215857760U (zh) 明洞接长泡沫混凝土回填结构
CN219886925U (zh) 一种永临结合的桩板结构
CN111877812B (zh) 一种高架独柱车站
CN115324017B (zh) 一种用于在原船闸基础上改建船闸导航墙段的施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant