CN108867546A - Semi-circular caisson and pile foundation combined type breakwater - Google Patents

Semi-circular caisson and pile foundation combined type breakwater Download PDF

Info

Publication number
CN108867546A
CN108867546A CN201810944785.6A CN201810944785A CN108867546A CN 108867546 A CN108867546 A CN 108867546A CN 201810944785 A CN201810944785 A CN 201810944785A CN 108867546 A CN108867546 A CN 108867546A
Authority
CN
China
Prior art keywords
pile foundation
semi
caisson
arch ring
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810944785.6A
Other languages
Chinese (zh)
Inventor
肖忠
刘莺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201810944785.6A priority Critical patent/CN108867546A/en
Publication of CN108867546A publication Critical patent/CN108867546A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of semi-circular caissons and pile foundation combined type breakwater, including caisson and pile foundation, the caisson is semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate is provided with floor and the vertical plate for supporting semicircular arch ring between semicircular arch ring and bottom plate;It is embedded with the casing for forming pile foundation mounting hole in vertical plate and floor intersection, pile foundation mounting hole squeezes into ground with for pile foundation vertically;Aperture is set on semicircular arch ring.It is short and reusable that the present invention is suitable for soft soil foundation and deep water conditions and having the advantages that rubble-mound foundation of constructing that convenient, no setting is required, Potential Working Time For Operation At Sea.

Description

Semi-circular caisson and pile foundation combined type breakwater
Technical field
The present invention relates to a kind of caissons and pile foundation combined type breakwater.
Background technique
Semicircle breakwater is (such as:A kind of semicircle breakwater, publication number CN206736844U) it is a kind of adaptation weak soil The Novel breakwater structure of base, is usually made of prefabricated semi-circular member or semi-circular caisson and rubble-mound foundation.With it is traditional straight Vertical breakwater, sloping breakwater are compared, semicircle breakwater have from heavy and light, easy construction, it is reusable, beautiful, The advantages that foundation stress is evenly distributed, suffered wave force is small and antiskid and stability against overturning are good.
When building, semi-circular caisson need to be placed on rubble-mound foundation existing semicircle breakwater.On soft soil foundation When construction, needs first to excavate ground or reinforcing soft foundation, then semi-circular caisson is placed on rubble-mound foundation.Have four among these A main problem, first is that the building stones needed are more since it is desired that building rubble-mound foundation, exploitation of stone can destroy ecological environment;Second is that throwing The setting of ground mass bed not only increases cost, while causing added burden to foundation bearing capacity, is easy that breakwater is made to occur to sink It falls into and destroys;Third is that the stability against sliding of existing semicircle breakwater is by between semi-circular caisson bottom and rubble-mound foundation top Frictional force, when the wave is high for the depth of water, in order to maintain the stability against sliding of breakwater, needs to fill in semi-circular caisson come what is provided More sand material, increase cost and duration, while the increase of dead load, can threaten foundation bearing capacity, factor of safety against sliding Increase but reduce the vertical bearing capacity of this structure, to limit application of this structure in deep water breakwater;Four It is to increase the construction time because there is riprap work.
Summary of the invention
The purpose of the present invention is overcoming the above-mentioned deficiency of the prior art, provide a kind of suitable for soft soil foundation and deep water item Part, simple and reasonable, construction is convenient, project cost is low, environmental-friendly and reusable new type of deep-water breakwater.This hair Bright breakwater is a kind of semi-circular caisson and pile foundation novel combined type breakwater, can to avoid using rubble-mound foundation, pile foundation Setting not only increases this new structural stability against sliding, while increasing its vertical bearing capacity.Technical solution is as follows:
A kind of semi-circular caisson and pile foundation combined type breakwater, including caisson and pile foundation, which is characterized in that the caisson For semi-circular caisson made of being poured based on combined steel formwork, semicircular arch ring including bottom plate and on bottom plate, in semicircle Floor and the vertical plate for supporting semicircular arch ring are provided between shape arch ring and bottom plate;It is pre- in vertical plate and floor intersection It is embedded with the casing for forming pile foundation mounting hole, pile foundation mounting hole squeezes into ground with for pile foundation vertically;It is set on semicircular arch ring Set aperture.
In the present invention, semi-circular caisson can keep off wave, baffle, earth-retaining, and semicircular in shape can reduce wave force, and answer ground Power distribution uniform;Its base areas is larger, can expand the contact area with ground, reduces foundation stress;Floor and vertical plate can The globality and rigidity of reinforcement structure, while its intersection prefabricated can form vertical pile foundation mounting hole by service sleeve; The effect of pile foundation mounting hole is to squeeze into ground vertically for foundation pile;The effect of pile foundation be enhance ground bearing capacity and structure antiskid with Stability against overturning.
Detailed description of the invention
(a) and (b) of Fig. 1 is respectively the sectional view and outside drawing of single group semi-circular caisson and pile foundation combined type breakwater
Fig. 2 single group semi-circular caisson and pile foundation combined type breakwater three-view diagram
Specific embodiment
Fig. 1 is single group semi-circular caisson and pile foundation combined type breakwater outside drawing;Fig. 2 is single group semi-circular caisson and pile foundation Combined type breakwater structure figure.In Fig. 2,1 is vertical plate, and 2 be semicircular arch ring, and 3 be floor, and 4 be bottom plate, and 5 be pile foundation, wherein half On round arch ring can appropriate aperture, as the back-up sand hole of semi-circular caisson, at the same semi-circular caisson sink when, aperture can be passed through Water filling sits bottom convenient for semi-circular caisson.
The main working procedure of semi-circular caisson and pile foundation combined type breakwater is as follows:First with combined steel formwork, Precasting yard pours semi-circular caisson by the sequence layering substep of bottom plate 4, vertical plate 1 and floor 3, semicircular arch ring 2, wherein in entirety When prefabricated vertical plate 1 and floor 3,3 intersection service sleeve of vertical plate 1 and floor, to form the mounting hole of pile foundation 5, and prefabricated pile Base 5, pile foundation 5 preferentially select prestress high intensity concrete stake (PHC);That then uses for reference caisson goes out fortune and setting method, will spell The semi-circular caisson installed integrally goes out to transport, transportation by driving to job location;Then past through the tapping of semicircular arch ring in job location Semi-circular caisson is sat bottom in designated position by water filling in caisson;There are the semi-circular caisson of filling ballast requirement, component for design Filling in case should be carried out after installation in time, filling should symmetrically, uniformly should immediately block pack hole after the completion of filling, and It is ensured that blocking tight, secured;Pile foundation 5 is finally placed in pile foundation mounting hole, is squeezed into pile foundation 5 using equipment such as pile driving barges specified Depth;Cement slurry is injected between pile foundation 5 and the gap of pile foundation installation hole wall, pile foundation and semi-circular caisson is made to be linked to be entirety.
Breakwater engineering is gradually to deep-water developments at present;In addition, the seashore of many offshore areas and seabed all there is Soft Soil Layer, several meters to tens meters of thickness are differed, such as the active Bohai Sea Gulf of China's economic development, entrance of Changjiang River, the mouth of the Zhujiang River and Zhejiang, Fujian All widely distributed the soft soil foundation in coastal area.Semi-circular caisson and pile foundation combined type breakwater can be perfectly suitable for badly Wave and Soft Soil build breakwater using the new structure without excavating ground or carrying out ground on soft foundation Reinforce, only ground need to simply be flattened, can be applicable in soft soil foundation and deep water conditions, structure it is simple, it is easy for construction, Project cost is low, is a kind of excellent new type of deep-water structure, is with a wide range of applications in silt coast.

Claims (1)

1. a kind of semi-circular caisson and pile foundation combined type breakwater, including caisson and pile foundation, which is characterized in that the caisson is Semi-circular caisson made of being poured based on combined steel formwork, the semicircular arch ring including bottom plate and on bottom plate, in semicircle Floor and the vertical plate for supporting semicircular arch ring are provided between arch ring and bottom plate;It is pre-buried in vertical plate and floor intersection There is the casing for forming pile foundation mounting hole, pile foundation mounting hole squeezes into ground with for pile foundation vertically;It is arranged on semicircular arch ring Aperture.
CN201810944785.6A 2018-08-19 2018-08-19 Semi-circular caisson and pile foundation combined type breakwater Pending CN108867546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810944785.6A CN108867546A (en) 2018-08-19 2018-08-19 Semi-circular caisson and pile foundation combined type breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810944785.6A CN108867546A (en) 2018-08-19 2018-08-19 Semi-circular caisson and pile foundation combined type breakwater

Publications (1)

Publication Number Publication Date
CN108867546A true CN108867546A (en) 2018-11-23

Family

ID=64319018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810944785.6A Pending CN108867546A (en) 2018-08-19 2018-08-19 Semi-circular caisson and pile foundation combined type breakwater

Country Status (1)

Country Link
CN (1) CN108867546A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960732A (en) * 2022-06-09 2022-08-30 交通运输部天津水运工程科学研究所 Single-pile wind power foundation and semicircular breakwater combined structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0544206A (en) * 1991-08-09 1993-02-23 Shibata Ind Co Ltd Breakwater
CN2340807Y (en) * 1998-04-10 1999-09-29 交通部第一航务工程勘察设计院 Wave dissipation breakwater
CN101314942A (en) * 2008-07-18 2008-12-03 天津大学 Wave breaker of inverse T shaped pipe wall pile
JP2016204971A (en) * 2015-04-22 2016-12-08 東洋建設株式会社 Breakwater structure
CN206736844U (en) * 2017-04-28 2017-12-12 中交第四航务工程勘察设计院有限公司 A kind of semicircle breakwater
CN208857762U (en) * 2018-08-19 2019-05-14 天津大学 Semi-circular caisson and pile foundation combined type breakwater

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0544206A (en) * 1991-08-09 1993-02-23 Shibata Ind Co Ltd Breakwater
CN2340807Y (en) * 1998-04-10 1999-09-29 交通部第一航务工程勘察设计院 Wave dissipation breakwater
CN101314942A (en) * 2008-07-18 2008-12-03 天津大学 Wave breaker of inverse T shaped pipe wall pile
JP2016204971A (en) * 2015-04-22 2016-12-08 東洋建設株式会社 Breakwater structure
CN206736844U (en) * 2017-04-28 2017-12-12 中交第四航务工程勘察设计院有限公司 A kind of semicircle breakwater
CN208857762U (en) * 2018-08-19 2019-05-14 天津大学 Semi-circular caisson and pile foundation combined type breakwater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960732A (en) * 2022-06-09 2022-08-30 交通运输部天津水运工程科学研究所 Single-pile wind power foundation and semicircular breakwater combined structure

Similar Documents

Publication Publication Date Title
CN104452829B (en) A kind of pile-raft foundation float Structure and construction method
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN201245846Y (en) Clamshell excavator stirring concrete enclosure wall
CN103015367B (en) High-efficiency economical construction method for revetment
CN1773022A (en) Fast soft foundation dyke building method and technology
CN108999142A (en) The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater
CN210104758U (en) Foundation pit supporting system of soil nail bored concrete pile anchor cable combination
Chu et al. Land reclamation using clay slurry or in deep water: challenges and solutions
CN108867547A (en) The construction method of semi-circular caisson and pile foundation combined type breakwater
KR20120012504A (en) Cast in place concrete pile With precast type Caisson
CN103233444A (en) Underwater riprap foundation bed and side slope erosion resisting structure and construction method thereof
KR101256274B1 (en) Reverse Drill Method With precast type Caisson and Jacket
CN102733407A (en) Two-ring grouted single pile foundation
CN208857762U (en) Semi-circular caisson and pile foundation combined type breakwater
CN108867546A (en) Semi-circular caisson and pile foundation combined type breakwater
CN208965494U (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN204326119U (en) A kind of pile-raft foundation float Structure
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN109024470A (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN106149624A (en) A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof
CN201883413U (en) Combined concrete rectangular open caisson harbor basin
KR100704460B1 (en) Device for harbor revetment construction
KR20210047481A (en) Core wall structure of composite cassion for offshore runway
KR20150105891A (en) The underground facilities for offshore airfield of semi land reclamation type
Hawkswood et al. Foundations to precast marine structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123