CN108677892A - Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole - Google Patents

Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole Download PDF

Info

Publication number
CN108677892A
CN108677892A CN201810840336.7A CN201810840336A CN108677892A CN 108677892 A CN108677892 A CN 108677892A CN 201810840336 A CN201810840336 A CN 201810840336A CN 108677892 A CN108677892 A CN 108677892A
Authority
CN
China
Prior art keywords
tunnel
diversion
working tunnel
working
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810840336.7A
Other languages
Chinese (zh)
Other versions
CN108677892B (en
Inventor
张超
李永红
李家亮
付峥
陈世全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201810840336.7A priority Critical patent/CN108677892B/en
Publication of CN108677892A publication Critical patent/CN108677892A/en
Application granted granted Critical
Publication of CN108677892B publication Critical patent/CN108677892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Disclosed by the invention is a kind of reconstruction structure that diversion tunnel working tunnel is used as ecology for water hole in hydraulic and hydroelectric engineering field, including diversion tunnel and upper working tunnel and the lower working tunnel in diversion tunnel side are set, the outlet of wherein upper working tunnel and lower working tunnel is connected to diversion tunnel, the outlet end of upper working tunnel is connected by arc-shaped transition with diversion tunnel, the radius of the arc-shaped transition section is more than the hole diameter of 5 times or more working tunnels, and is equipped with backwater gate in the junction of the upper working tunnel and diversion tunnel.The beneficial effects of the invention are as follows:Special ecology is eliminated for water hole, has saved cost and duration;In the construction time of diversion tunnel, access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal diversion function of diversion tunnel;The dam water storage phase, solve that the lock water storage phase under high earth and rockfill dam diversion tunnel does not stop and reservoir level rises uppity problem.

Description

Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
Technical field
The present invention relates to hydraulic and hydroelectric engineering fields more particularly to a kind of diversion tunnel working tunnel by high earth and rockfill dam to be transformed For the reconstruction structure in ecological water supply hole.
Background technology
Currently, the extra-high earth and rockfill dam hydroelectric project of more large sizes is built in Southwestern China region high mountain and steep gorge area, such as double Jiangkou, two River mouth, long sill may, monkey rock etc., the construction diversion of these engineerings is all in such a way that disconnected+diversion tunnel aerial drainage is once blocked in cofferdam.
High earth-rock works are large-scale, and the construction period is very long, and lower lock water storage difficulty is high, involves numerous factors, have There is following difficult point:Downstream does not stop, and letdown flow needs the requirement for meeting ecological water supply flow;The water storage phase needs to control on water level Lifting speed is to ensure the safety of earth and rockfill dam dam body.Expire for water hole currently, high earth and rockfill dam is typically necessary specially one ecology of setting Sufficient above-mentioned requirements.However, specially one ecology of setting is big for the project scale in water hole, investment is high, and the construction period is long.
Invention content
To overcome existing high earth and rockfill dam to need to be arranged special ecology for water hole, cause of high cost, long construction period etc. is no Foot, the technical problem to be solved by the present invention is to:There is provided it is a kind of diversion tunnel working tunnel can be transformed, together with diversion tunnel Reconstruction structure as the hole that ecology supplies water.
The technical solution adopted by the present invention to solve the technical problems is:
Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole, including diversion tunnel and is arranged in diversion tunnel side Working tunnel, the working tunnel are divided into working tunnel and lower working tunnel, wherein the entrance of upper working tunnel connects with river Logical, outlet is connected to diversion tunnel, and the entrance of lower working tunnel is connected with upper working tunnel, is exported and is connected to diversion tunnel, it is described on One end that working tunnel is connected with diversion tunnel be equipped with gate, gate upstream side be equipped with arc-shaped door lock chamber, the lower working tunnel with The junction of diversion tunnel, which is equipped with, blocks plug, and the junction of the upper working tunnel and lower working tunnel is equipped with connection plug.
Further, the outlet end of the upper working tunnel is connected by arc-shaped transition with diversion tunnel.
Further, the radius of the arc-shaped transition section is more than the hole diameter of 5 times or more working tunnels, corner is less than 60 °.
Further, the entrance of the lower working tunnel is connected with the arc-shaped transition section of upper working tunnel, the connection The upstream face of plug is the cambered surface to match with the arc-shaped transition section of upper working tunnel.
Further, being equipped with liner structure section, the gate and arc door lock in the outlet end of the upper working tunnel Room is arranged in liner structure section, and the described one end of liner structure section far from diversion tunnel is equipped with gradual transition section.
Ecology is used as the construction method of the reconstruction structure in water hole to above-mentioned diversion tunnel working tunnel, is included the following steps:
A, the access tunnel constructed as diversion tunnel in diversion tunnel construction time, the above working tunnel and lower working tunnel;
B, after the completion of diversion tunnel construction, in the outlet end of lower working tunnel, setting blocks plug, in going out for upper working tunnel Gate is arranged in mouth end;
C, the dam construction phase first blocks upper working tunnel with gate, using diversion tunnel overcurrent river water, then builds dam and encloses Weir carries out dam construction;
D, after the completion of dam construction, the lock water storage phase under diversion tunnel first removes the gate in upper working tunnel, then passes through tune Arc-shaped door lock chamber on section in working tunnel carries out overcurrent to make ecology supply water through upper working tunnel to diversion tunnel, while can be to water Reservoir level rising is controlled;
E, after dam reaches water storage requirement, the arc-shaped door lock chamber in closing in working tunnel stops supplying water, and is then applied upper Permanent plug is set between the arc-shaped door lock chamber and diversion tunnel in work branch hole, and reconstruction is completed.
Further, in the dry season during carrying out water using diversion tunnel, enclose in the entrance setting of upper working tunnel Then weir reconstructs upper working tunnel, include the junction of upper working tunnel and lower working tunnel setting connection plug, Arc-shaped door lock chamber and the construction of the transition of lining cutting section, so that upper working tunnel meets the overcurrent requirement that ecology supplies water.
The beneficial effects of the invention are as follows:
1, it is ecological water supply hole by reconstructing working tunnel, eliminates the engineering for resetting an ecology for water hole, It is with good economic efficiency, and the duration is greatly shortened;
2, so that working tunnel different times have different functions, the construction time of diversion tunnel, working tunnel is as water conservancy diversion The access tunnel of hole construction;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal water conservancy diversion of diversion tunnel Function;Dam water storage phase, the lock water storage phase under high earth and rockfill dam diversion tunnel that preferably resolves do not stop, and meet downstream ecology flow It is required that while solving the uppity problem of high earth and rockfill dam reservoir level rising;
3, the characteristics of being gradually transformed, making full use of different times high rock fill dam construction water conservancy diversion, subsequent adaptation is in previous transformation On the basis of carry out, can greatly alleviate the duration pressure of construction in later period in this way, shorten the construction period of critical circuits.
Description of the drawings
Fig. 1 is diversion tunnel construction time structural schematic diagram.
Fig. 2 is dam construction phase structural schematic diagram.
Fig. 3 is lock water storage phase structural schematic diagram under diversion tunnel.
Fig. 4 is the structural schematic diagram after water storage.
Fig. 5 is gates of segmental shape structural sections schematic diagram.
It is 1- diversion tunnels to be marked in figure, the upper working tunnels of 2-, working tunnel under 3-, 21- gates, 22- arc-shaped transition sections, 23- liner structure sections, the permanent plugs of 24-, 25- arc-shaped door lock chambers, 31- block plug, 32- connection plugs.
Specific implementation mode
The following further describes the present invention with reference to the drawings.
As shown in Figure 1, Figure 2, Figure 3 shows, diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole, including diversion tunnel 1 With the working tunnel in 1 side of diversion tunnel is set, the working tunnel is divided into working tunnel 2 and lower working tunnel 3, wherein on The entrance of working tunnel 2 is connected to river, and outlet is connected to diversion tunnel 1, entrance and 2 phase of upper working tunnel of lower working tunnel 3 Even, outlet is connected to diversion tunnel 1, and one end that the upper working tunnel 2 is connected with diversion tunnel 1 is equipped with gate 21,21 upstream of gate Side is equipped with arc-shaped door lock chamber 25, and the junction of the lower working tunnel 3 and diversion tunnel 1, which is equipped with, blocks plug 31, the upper construction Branch hole 2 and the junction of lower working tunnel 3 are equipped with connection plug 32.After the completion of structure of modification construction, it's the water phase pasts diversion tunnel, can Upper working tunnel 2 is blocked using gate 21, lower working tunnel 3 is blocked using plug 31 is blocked;In diversion tunnel 1 Lower lock water storage phase, dismountable gate 21 are controlled using arc-shaped door lock chamber 25, make upstream river water along upper working tunnel 2 into Enter diversion tunnel 1, then flow to downstream and form ecological water supply, eliminate the engineering for resetting an ecology for water hole, has good Economic benefit, the duration is greatly shortened.The concrete structure of arc-shaped door lock chamber 25 is convenient for as shown in figure 5, its top is open type Installation and adjusting arc-shaped door lock chamber 25.
Be arranged connection plug 32 purpose be, if not connecting plug 32, when carrying out ecological water overcurrent, although under apply The outlet end in work branch hole 3 is sealed by blocking plug 31, flow can not overcurrent, but in river water full of after lower working tunnel 3, Newly into flow still can form impact turbulent in the junction of upper working tunnel 2 and lower working tunnel 3, downstream life cannot be met State water supply requirement, and since 3 position of lower working tunnel is relatively low, subsequently also needs to pull water out, be more troublesome, increase without recruitment Journey.And after provided with connection plug 32, flow directly from 2 overcurrent of upper working tunnel, reduces path, also just reduces and applies The engineerings such as reconstruction, the reinforcing in work branch hole.
The construction method of the reconstruction structure, includes the following steps:
A, the access tunnel constructed as diversion tunnel 1 in diversion tunnel construction time, the above working tunnel 2 and lower working tunnel 3, it is complete Structure after is as shown in Figure 1;
B, after the completion of diversion tunnel construction, in the outlet end of lower working tunnel 3, setting blocks plug 31, in upper working tunnel 2 Outlet end setting gate 21 and with arc-shaped door lock chamber 25, structure after the completion is as shown in Figure 2;
C, the dam construction phase first uses gate 21 to block upper working tunnel 2, using 1 overcurrent river water of diversion tunnel, then builds big Dam cofferdam carries out dam construction;
D, after the completion of dam construction, 1 time lock water storage phase of diversion tunnel first removes the gate 21 in upper working tunnel 2, then leads to It overregulates in working tunnel 2 arc-shaped door lock chamber 25 and carries out overcurrent through upper working tunnel 2 to diversion tunnel 1 to make ecology supply water, Reservoir level can be risen simultaneously and be controlled, as shown in Figure 3;
E, after dam reaches water storage requirement, 2 arc-shaped door lock chamber 25 of working tunnel stops supplying water in closing, then in upper construction Permanent plug 24 is set between the arc-shaped door lock chamber 25 and diversion tunnel 1 in branch hole 2, and reconstruction is completed, structure such as Fig. 4 institutes after the completion Show.
By being transformed to traditional working tunnel so that working tunnel different times have different functions, water conservancy diversion The construction time in hole 1, the access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks 31 He of plug by setting Gate 21 ensure that the normal diversion function of diversion tunnel 1;The dam water storage phase preferably resolves lock under high earth and rockfill dam diversion tunnel The water storage phase does not stop, and meets the requirement of downstream ecology flow, while it is uppity to solve high earth and rockfill dam reservoir level rising Problem.And entire improvement project is gradually to be transformed, the characteristics of making full use of different times high rock fill dam construction water conservancy diversion, is subsequently changed It makes and is carried out on the basis of previous transformation, can greatly alleviate the duration pressure of construction in later period in this way, shorten critical circuits Construction period.
Since the trunk roads of working tunnel are generally parallel with diversion tunnel 1, then need to be arranged needing the when of being connected to diversion tunnel 1 Corner is turned to diversion tunnel 1, and right-angled bend is usually used in currently existing scheme, but in order to reduce water when follow-up overcurrent ecology supplies water The impact to working tunnel is flowed, is connected with diversion tunnel 1 by arc-shaped transition section 22 in the outlet end of the upper working tunnel 2.Into One step, in order to reach the overcurrent most smoothed out, the radius of the arc-shaped transition section 22 should be greater than the hole diameter of 5 times of upper working tunnels 2, Corner is less than 60 °.
As shown in figure 3, the entrance of the lower working tunnel 3 is connected with the arc-shaped transition section 22 of upper working tunnel 2, in order to 22 phase of arc-shaped transition section of upper working tunnel 2 is agreed with, and sets and upper working tunnel 2 upstream face of the connection plug 32 to The cambered surface that arc-shaped transition section 22 matches.
Punching is formed to the outlet of upper working tunnel 2 when entering diversion tunnel 1 from upper working tunnel 2 in order to avoid ecological flow Brush, is equipped with liner structure section 23 in the outlet end of the upper working tunnel 2, and the gate 21 and the setting of arc-shaped door lock chamber 25 exist In liner structure section 23, the described one end of liner structure section 23 far from diversion tunnel 1 is equipped with gradual transition section.The liner structure section 23 Can be that permanent plug 24 is subsequently arranged to provide construction basis simultaneously.
In view of entire duration situation, to reconstructing preferably during carrying out water using diversion tunnel 1 for upper working tunnel 2 Dry season carries out, specifically, cofferdam is arranged in the entrance in upper working tunnel 2, is then reconstructed to upper working tunnel 2, including In the setting of the junction of upper working tunnel 2 and lower working tunnel 3 connection plug 32, arc-shaped door lock chamber 25 and liner structure section 23 Transition construction so that upper working tunnel meet ecology supply water overcurrent requirement.
The reconstruction structure of the application takes full advantage of the design feature of working tunnel and water conservancy diversion, is made by transformation gradually whole A engineering not only meets ecological water supply requirement, has saved cost and duration, even more plays different works in the different construction stages With, or even solve high earth and rockfill dam reservoir level and rise uppity problem, there is good practicability and application prospect, be Similar engineering provides good reference.

Claims (7)

1. diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole, including diversion tunnel (1) and setting in diversion tunnel side (1) working tunnel, it is characterized in that:The working tunnel is divided into working tunnel (2) and lower working tunnel (3), wherein on apply The entrance in work branch hole (2) is connected to river, and outlet is connected to diversion tunnel (1), entrance and the upper working tunnel of lower working tunnel (3) (2) it is connected, outlet is connected to diversion tunnel (1), and one end that the upper working tunnel (2) is connected with diversion tunnel (1) is equipped with gate (21), gate (21) upstream side is equipped with arc-shaped door lock chamber (25), and the lower working tunnel (3) and the junction of diversion tunnel (1) are set There are closure plug (31), the junction of the upper working tunnel (2) and lower working tunnel (3) to be equipped with connection plug (32).
2. diversion tunnel working tunnel as described in claim 1 is used as reconstruction structure of the ecology for water hole, it is characterized in that:On described The outlet end of working tunnel (2) is connected by arc-shaped transition (22) with diversion tunnel (1).
3. diversion tunnel working tunnel as claimed in claim 2 is used as reconstruction structure of the ecology for water hole, it is characterized in that:The arc The radius of shape changeover portion (22) is more than the hole diameter of 5 times of upper working tunnels (2), and corner is less than 60 °.
4. diversion tunnel working tunnel as claimed in claim 2 is used as reconstruction structure of the ecology for water hole, it is characterized in that:Under described The entrance of working tunnel (3) is connected with the arc-shaped transition section (22) of upper working tunnel (2), the upstream face of the connection plug (32) For the cambered surface to match with the arc-shaped transition section (22) of upper working tunnel (2).
5. the diversion tunnel working tunnel as described in Claims 1 to 4 any one claim is used as transformation of the ecology for water hole Structure, it is characterized in that:Liner structure section (23), the gate (21) and arc are equipped in the outlet end of the upper working tunnel (2) In liner structure section (23), the one end of the liner structure section (23) far from diversion tunnel (1) is equipped with for shape door lock room (25) setting Gradual transition section.
6. a pair diversion tunnel working tunnel as claimed in claim 5 is used as construction method of the ecology for the reconstruction structure in water hole, It is characterized in, includes the following steps:
A, the access tunnel constructed as diversion tunnel in diversion tunnel construction time, the above working tunnel and lower working tunnel;
B, after the completion of diversion tunnel construction, in the outlet end of lower working tunnel, setting blocks plug, in the outlet end of upper working tunnel Gate and arc-shaped door lock chamber are set;
C, the dam construction phase first blocks upper working tunnel with gate, using diversion tunnel overcurrent river water, then builds dam cofferdam, Carry out dam construction;
D, after the completion of dam construction, the lock water storage phase under diversion tunnel first removes the gate in upper working tunnel, then by adjusting Arc-shaped door lock chamber in working tunnel carries out overcurrent to make ecology supply water through upper working tunnel to diversion tunnel, while can be to reservoir water Position, which rises, to be controlled;
E, after dam reaches water storage requirement, the arc-shaped door lock chamber in closing in working tunnel stops supplying water, then in upper construction branch Permanent plug is set between the arc-shaped door lock chamber and diversion tunnel in hole, and reconstruction is completed.
7. construction method as claimed in claim 6, it is characterized in that:Dry season during carrying out water using diversion tunnel, Cofferdam is arranged in the entrance of upper working tunnel, is then reconstructed to upper working tunnel, including in upper working tunnel and lower construction branch The transition construction of junction setting the connection plug, arc-shaped door lock chamber and lining cutting section in hole, so that upper working tunnel meets life The overcurrent requirement that state supplies water.
CN201810840336.7A 2018-07-27 2018-07-27 Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel Active CN108677892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810840336.7A CN108677892B (en) 2018-07-27 2018-07-27 Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810840336.7A CN108677892B (en) 2018-07-27 2018-07-27 Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel

Publications (2)

Publication Number Publication Date
CN108677892A true CN108677892A (en) 2018-10-19
CN108677892B CN108677892B (en) 2024-04-19

Family

ID=63814965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810840336.7A Active CN108677892B (en) 2018-07-27 2018-07-27 Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel

Country Status (1)

Country Link
CN (1) CN108677892B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258474A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 It can be used for the ecological diversion tunnel structure that extra-high rock-fill dams major flood season is passed the flood period
CN111828050A (en) * 2020-07-28 2020-10-27 中铁二局集团有限公司 Construction method for small-section traffic hole to enter thin and high special-shaped space structure diversion lock chamber
CN114673125A (en) * 2022-03-15 2022-06-28 长江岩土工程有限公司 Plugging construction method for diversion tunnel of hydraulic engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007032129A (en) * 2005-07-28 2007-02-08 Dam Gijutsu Center Method of construction of dam
CN205501957U (en) * 2016-04-11 2016-08-24 中国电建集团成都勘测设计研究院有限公司 Retaining phase downstream water supply system
CN106284240A (en) * 2016-08-29 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of power station is in construction time downstream interim water-supply structure and method
CN107858990A (en) * 2017-12-13 2018-03-30 中国电建集团成都勘测设计研究院有限公司 The arrangement of Canyon Area high dam ditch engineering of water treatment
CN208965520U (en) * 2018-07-27 2019-06-11 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007032129A (en) * 2005-07-28 2007-02-08 Dam Gijutsu Center Method of construction of dam
CN205501957U (en) * 2016-04-11 2016-08-24 中国电建集团成都勘测设计研究院有限公司 Retaining phase downstream water supply system
CN106284240A (en) * 2016-08-29 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of power station is in construction time downstream interim water-supply structure and method
CN107858990A (en) * 2017-12-13 2018-03-30 中国电建集团成都勘测设计研究院有限公司 The arrangement of Canyon Area high dam ditch engineering of water treatment
CN208965520U (en) * 2018-07-27 2019-06-11 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258474A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 It can be used for the ecological diversion tunnel structure that extra-high rock-fill dams major flood season is passed the flood period
CN111828050A (en) * 2020-07-28 2020-10-27 中铁二局集团有限公司 Construction method for small-section traffic hole to enter thin and high special-shaped space structure diversion lock chamber
CN111828050B (en) * 2020-07-28 2022-04-08 中铁二局集团有限公司 Construction method for small-section traffic hole to enter thin and high special-shaped space structure diversion lock chamber
CN114673125A (en) * 2022-03-15 2022-06-28 长江岩土工程有限公司 Plugging construction method for diversion tunnel of hydraulic engineering
CN114673125B (en) * 2022-03-15 2024-06-04 长江岩土工程有限公司 Hydraulic engineering diversion tunnel plugging construction method

Also Published As

Publication number Publication date
CN108677892B (en) 2024-04-19

Similar Documents

Publication Publication Date Title
CN108677892A (en) Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
CN104032714B (en) Once block disconnected and block the disconnected dam-type power plant construction diversion method combined by stages
CN104358575A (en) Sealing device for slurry shield starting of water-rich sand layer and sealing control method for starting
CN106759250B (en) Unfavorable geologic body grouting method under the conditions of a kind of pressure-bearing seepage flow
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN105386426A (en) Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction
CN108411865A (en) A kind of construction method of water conservancy diversion discharge structure
CN105672208B (en) The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN208965520U (en) Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN108316259A (en) Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method
CN203905031U (en) Drainage structure used during concrete plug construction period
CN202440787U (en) Riverway diversion device
CN204662388U (en) Diversion tunnel shutoff head exhaust structure
CN105178268A (en) Construction method and structure for combining diversion tunnel and flood discharge tunnel
CN205152918U (en) Structure that diversion tunnel and flood discharge tunnel combine
CN204715318U (en) Diversion tunnel gate shaft structure in mountain
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN210562058U (en) Ecological diversion tunnel structure capable of being used for flood season of main flood of ultra-high rock-fill dam
CN105369786B (en) Diversion tunnel reconstructs the gates of segmental shape lock chamber structure and method for arranging of ecological drainage tunnel
CN207775844U (en) Diversion tunnel concrete plug structure
CN103526767B (en) A kind of method of plugging dewatering well device and shutoff dewatering well
CN221052538U (en) Diversion tunnel, flood discharge cavity and vertical shaft type spillway combined structure
CN206245328U (en) A kind of water-stop curtain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant