CN205152918U - Structure that diversion tunnel and flood discharge hole combine - Google Patents

Structure that diversion tunnel and flood discharge hole combine Download PDF

Info

Publication number
CN205152918U
CN205152918U CN201520600056.0U CN201520600056U CN205152918U CN 205152918 U CN205152918 U CN 205152918U CN 201520600056 U CN201520600056 U CN 201520600056U CN 205152918 U CN205152918 U CN 205152918U
Authority
CN
China
Prior art keywords
tunnel
diversion tunnel
flood discharge
diversion
discharge hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520600056.0U
Other languages
Chinese (zh)
Inventor
张涛
俞灵光
秦晓亮
彭继乐
赵继勇
赵星
余志超
刘淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520600056.0U priority Critical patent/CN205152918U/en
Application granted granted Critical
Publication of CN205152918U publication Critical patent/CN205152918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(B, ) the utility model discloses a structure that diversion tunnel and flood discharge hole combine is including diversion tunnel (1) and flood discharge hole (2), the diversion tunnel entrance point is equipped with diversion tunnel import lock chamber (3), the flood discharge hole is connected with the diversion tunnel, and the entrance point in flood discharge hole is equipped with flood discharge import floodgate (5), is equipped with flood discharge export floodgate (6) on the flood discharge hole of flood discharge hole and diversion tunnel junction, be equipped with in the diversion tunnel of flood discharge hole and diversion tunnel junction shutoff section (4). The utility model provides a diversion tunnel and flood discharge hole separately arrange the problem that has increased construction work volume, construction period and construction investment, arrange through combining, reduced the construction investment, effectual satisfied construction diversion require with permanent flood discharge requirement, compare the tradition method of arranging and has reduced the construction work volume, shortened construction period. (B, )

Description

The structure that a kind of Diversion Tunnel and flood discharging tunnel combine
Technical field
The utility model relates to the structure of a kind of Diversion Tunnel and flood discharging tunnel combination, belongs to the hydraulic architecture technical field in Hydraulic and Hydro-Power Engineering.
Background technology
In Process of Hydropower Plant Construction, most of engineering all can relate to should arrange that Diversion Tunnel arranges the situation of flood discharging tunnel again, conventional way normally arranges separately a Diversion Tunnel and a flood discharging tunnel, both are independent of each other, although conventional way can meet the needs of engineering, investment is comparatively large, difficulty of construction is high, the construction period is long.Therefore, need to find a kind of most economical arrangement and both can meet requirement of engineering, can construction costs be reduced again.
Utility model content
The purpose of this utility model is, provides the structure that a kind of Diversion Tunnel and flood discharging tunnel combine, and to solve the technical problem that prior art investment is comparatively large, difficulty of construction is high, the construction period is long, thus overcomes the deficiencies in the prior art.
The technical solution of the utility model is achieved in that
The structure that a kind of Diversion Tunnel of the present utility model and flood discharging tunnel combine is that this structure comprises Diversion Tunnel and flood discharging tunnel; Inlet of diversion tunnel end is provided with inlet of diversion tunnel lock chamber; Flood discharging tunnel is connected with Diversion Tunnel, and the entrance point of flood discharging tunnel is provided with flood discharge import lock, and the flood discharging tunnel of flood discharging tunnel and Diversion Tunnel junction is provided with flood discharge and exports lock; Block section is provided with in the Diversion Tunnel of flood discharging tunnel and Diversion Tunnel junction.
In aforementioned structure, the cross section of described Diversion Tunnel is rectangle, and its top is arch.
In aforementioned structure, the cross section of described flood discharging tunnel is tubular.
Owing to have employed technique scheme, the utility model compared with prior art, the utility model solves Diversion Tunnel and the flood discharging tunnel problem adding construction works amount, construction period and construction investment arranged apart, arrange by combining, reduce construction investment, effectively meet construction diversion requirement and permanent flood discharge requirement, compare traditional arrangement method and decrease construction works amount, shorten the construction period.
Accompanying drawing explanation
Fig. 1 is structural plan of the present utility model schematic diagram;
Fig. 2 is structural facades schematic diagram of the present utility model;
Fig. 3 is the cross sectional representation of Diversion Tunnel;
Fig. 4 is the cross sectional representation of flood discharging tunnel.
Mark in accompanying drawing: 1-Diversion Tunnel, 2-flood discharging tunnel, 3-inlet of diversion tunnel lock chamber, 4-block section, 5-flood discharge import lock, 6-flood discharge outlet lock.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to any restriction of the present utility model.
The utility model is that constructed by the construction method that combines according to following a kind of Diversion Tunnel and flood discharging tunnel, as shown in figures 1-4, the method first carries out the construction of Diversion Tunnel 1, is provided with inlet of diversion tunnel lock chamber 3 at the entrance point of Diversion Tunnel; After Diversion Tunnel starts water conservancy diversion, then carry out the construction of flood discharging tunnel 2; The entrance point of flood discharging tunnel is provided with flood discharge import lock 5, and the port of export of flood discharging tunnel is connected with Diversion Tunnel; Flood discharge outlet lock 6 is provided with at the port of export of flood discharging tunnel; By Diversion Tunnel and the shutoff of flood discharging tunnel junction after flood discharging tunnel is fixed, after block section 4 consolidation of Diversion Tunnel, open flood discharge outlet lock and flood discharge import lock, carry out flood discharge by flood discharging tunnel and discharge water.
The structure that the of the present utility model a kind of Diversion Tunnel formed according to said method and flood discharging tunnel combine, as shown in figures 1-4, this structure comprises Diversion Tunnel 1 and flood discharging tunnel 2; The cross section of Diversion Tunnel is rectangle, and its top is arch.Inlet of diversion tunnel end is provided with inlet of diversion tunnel lock chamber 3; Flood discharging tunnel is connected with Diversion Tunnel, and the entrance point of flood discharging tunnel is provided with flood discharge import lock 5.The cross section of flood discharging tunnel 2 is tubular.The flood discharging tunnel of flood discharging tunnel and Diversion Tunnel junction is provided with flood discharge and exports lock 6; Block section 4 is provided with in the Diversion Tunnel of flood discharging tunnel and Diversion Tunnel junction.
Embodiment
During concrete enforcement, implement in accordance with the following steps:
Step 1, first carry out Diversion Tunnel 1 and flood discharging tunnel 2 excavates and first liner timbering, after excavating and first liner timbering completes, carry out reinforced concrete lining layer construction.
Step 2, having constructed and meet after design strength requires until Diversion Tunnel 1 and flood discharging tunnel 2 reinforced concrete lining layer, close flood discharge import lock 5 and flood discharge outlet lock 6, Diversion Tunnel starts overcurrent.
Step 3, until major project is complete build after, inlet of diversion tunnel lock chamber 3 times locks, starting to build block section 4, has constructed and has met after design strength requires in block section, can determine whether to open flood discharge import lock 5 according to requirement of engineering and flood discharge outlet lock 6 flood discharging tunnel barrel lock chamber carries out releasing flood.

Claims (3)

1. a structure for Diversion Tunnel and flood discharging tunnel combination, comprises Diversion Tunnel (1) and flood discharging tunnel (2); It is characterized in that: inlet of diversion tunnel end is provided with inlet of diversion tunnel lock chamber (3); Flood discharging tunnel is connected with Diversion Tunnel, and the entrance point of flood discharging tunnel is provided with flood discharge import lock (5), and the flood discharging tunnel of flood discharging tunnel and Diversion Tunnel junction is provided with flood discharge and exports lock (6); Block section (4) is provided with in the Diversion Tunnel of flood discharging tunnel and Diversion Tunnel junction.
2. the structure of Diversion Tunnel and flood discharging tunnel combination according to claim 1, is characterized in that: the cross section of described Diversion Tunnel (1) is rectangle, and its top is arch.
3. the structure of Diversion Tunnel and flood discharging tunnel combination according to claim 2, is characterized in that: the cross section of described flood discharging tunnel (2) is tubular.
CN201520600056.0U 2015-08-11 2015-08-11 Structure that diversion tunnel and flood discharge hole combine Active CN205152918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520600056.0U CN205152918U (en) 2015-08-11 2015-08-11 Structure that diversion tunnel and flood discharge hole combine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520600056.0U CN205152918U (en) 2015-08-11 2015-08-11 Structure that diversion tunnel and flood discharge hole combine

Publications (1)

Publication Number Publication Date
CN205152918U true CN205152918U (en) 2016-04-13

Family

ID=55688630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520600056.0U Active CN205152918U (en) 2015-08-11 2015-08-11 Structure that diversion tunnel and flood discharge hole combine

Country Status (1)

Country Link
CN (1) CN205152918U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178268A (en) * 2015-08-11 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Construction method and structure achieving combination of diversion tunnel and flood discharging tunnel
CN109356124A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Cavern usual friendship fork structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178268A (en) * 2015-08-11 2015-12-23 中国电建集团贵阳勘测设计研究院有限公司 Construction method and structure achieving combination of diversion tunnel and flood discharging tunnel
CN109356124A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Cavern usual friendship fork structure
CN109356124B (en) * 2018-11-21 2023-11-21 中国电建集团成都勘测设计研究院有限公司 Chamber level crossing fork structure

Similar Documents

Publication Publication Date Title
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN204877493U (en) Soft rock tunnel supporting construction
CN105839604B (en) Plugging structure for diversion tunnel and diversion tunnel rapid plugging method for first filling
CN205636683U (en) Quick block structure of diversion tunnel
CN105114098A (en) Method for treating unfavorable geology segment of diversion tunnel and major-diameter diversion tunnel structure
CN102287207B (en) Assembling jacking method in relation to serious collapse of small-section tunnel
CN205152918U (en) Structure that diversion tunnel and flood discharge hole combine
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN105178268A (en) Construction method and structure achieving combination of diversion tunnel and flood discharging tunnel
CN212077859U (en) Tunnel structure capable of being used for diversion, flood discharge and emptying
CN203795398U (en) Structure for backfilling and reconstructing diversion hole of reservoir into flood discharge hole
CN204326032U (en) A kind of concrete dam internal drainage gallery structure
CN108316259A (en) Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN104164858A (en) Diversion tunnel sequential blocking method for realizing continuous stream of down stream of high arch dam in storage period
CN108677892A (en) Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
CN205100992U (en) Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously
CN209429084U (en) Cavern usual friendship fork structure
CN203729280U (en) Water retaining structure of lower sluice gate for blocking lower water head flow-guiding hole
CN207376584U (en) For the tunnel flow passage structure of hydraulic and hydroelectric engineering
CN203145028U (en) Corrugated pipe water-collecting well
CN205088684U (en) Interim irrigation gallery of riverbed position geology fault location
CN105780805A (en) Tower foundation treatment structure in multi-purpose tunnel bank-tower water inlet combined arrangement
CN205653757U (en) Lock chamber tonifying qi structure in water and electricity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant