CN205100992U - Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously - Google Patents

Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously Download PDF

Info

Publication number
CN205100992U
CN205100992U CN201520921609.2U CN201520921609U CN205100992U CN 205100992 U CN205100992 U CN 205100992U CN 201520921609 U CN201520921609 U CN 201520921609U CN 205100992 U CN205100992 U CN 205100992U
Authority
CN
China
Prior art keywords
aqueduct
lining cutting
steel pipe
country rock
flat jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520921609.2U
Other languages
Chinese (zh)
Inventor
汪小刚
刘立鹏
凌永玉
贾志欣
赵宇飞
林兴超
段庆伟
孙平
曹瑞琅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN201520921609.2U priority Critical patent/CN205100992U/en
Application granted granted Critical
Publication of CN205100992U publication Critical patent/CN205100992U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a self -adaptation lining cutting structure for can bear high interior extra income does simultaneously. This lining cutting structure mainly comprises concrete lining, ring shape flat jack, aqueduct, steel pipe and five parts on the check valve, and wherein, ring shape flat jack install before the lining cutting is pour in country rock rock -wall, adopts steel pipe serial connectivity formula to connect between the adjacent flat jack of hoop, is connected with the aqueduct on the steel pipe, and the junction of steel pipe and aqueduct has a catchment hole, the country rock is inserted to one end of aqueduct, and another passes the lining cutting, installs the check valve on inserting the aqueduct of country rock. The aqueduct is passed through to the water injection of serial connectivity formula ring shape flat jack to this lining cutting structure, and intelligent regulation applys the prestressing force in the lining cutting, makes its ideal stress that keeps the optimization. Utilize the check valve to realize that the water -logging does not get into outer water system, can effectively stop the extra income to get into the water -logging simultaneously, reduce the groundwater resources of influence distinguish to(for) the tunnel construction, protection natural environment.

Description

The self adaptation liner structure that high inside and outside water acts on simultaneously can be born
Technical field
The utility model relates to a kind of liner structure, particularly relates to a kind of self adaptation liner structure bearing high inside and outside water and act on simultaneously, belongs to water-conveyance tunnel (road), access tunnel (road) technical field.
Background technology
In hydraulic tunnel (road) design of bearing high internal water pressure, main employing Shi Hanzhang technology makes lining cutting, and axis, hoop bear compressive stress in advance, and then the tensile stress produced when offsetting runtime high internal water pressure effect, to reach the object that restriction Lining Crack produces.Traditional pre-stress lining technology mainly comprises prestress anchorage cable technology and high pressure grouting formula prestressing technique.
Anchor cable formula prestressed concrete liner structure makes lining cutting produce compressive pre-stress by stretch-draw concrete lining course inner ring to the anchor cable arranged.According to the difference of form of construction work and anchor cable form, be divided into and have bonding and soap-free emulsion polymeization two kinds of forms.Prestress anchorage cable technology is mainly by prestressing steel Shi Hanzhang, generally cannot play the effect of contraction of country rock, the steel of meeting at substantial in engineering, increase construction costs, simultaneously due to the form variations at the rubbing action in anchorage cable stretching process and lock segments position, prestress distribution can be caused uneven.In addition, in later stage running, because stretch-draw steel creep beharior exists, institute's Shi Hanzhang can be caused to reduce, and then reduce prestressing force action effect.
Grouting formula prestressed concrete liner structure then makes concrete lining produce compressive pre-stress by the mode of carrying out pressure grouting to annular space reserved between lining cutting and country rock.Compared with anchor cable formula pre-stress lining structure, this structure utilizes the effect of contraction Shi Hanzhang of country rock, do not need to lay prestressing steel in lining cutting, lining cutting not only can be made thinning, save material and excavated volume, and prestress application technique can be simplified, reduce difficulty of construction, it also avoid the endurance issues because steel corrosion etc. causes simultaneously, in addition, can also be reinforced country rock by grouting.But due to factors such as country rock plasma volume is uncertain, the solidification shrinkage distortion of slurries later stage, there is the problems such as pre-stressed compressive stress of concrete lasting effect is indefinite, prestressed grouting residual stress is wayward in this structure, and then is difficult to accurately reach prestress application desired value.
Above-mentioned two kinds of pre-stress lining technology occur for preventing interior water outer-flowing phenomenon, general employing Closed Lining structure, in the outer water Environmental effect of height, lining cutting will bear high external water pressure effect again, and then lining cutting stablized cause certain adverse effect, particularly under emptying turn(a)round this unfavorable operating mode, when compressive stress superposition exceedes the strength of lining limit, be easy to cause lining cutting entirety to destroy.
Utility model content
For the deficiencies in the prior art; the purpose of this utility model is to provide a kind of self adaptation liner structure bearing high inside and outside water and act on simultaneously; the prestressing force in lining cutting is put on by this liner structure adjustable; thus keep optimized desirable stress; simultaneously by controlling outer water one-way flow; thus effectively control outer seepage and endochronic model phenomenon, protection of the environment.
For achieving the above object, the utility model is by the following technical solutions:
A kind of self adaptation liner structure bearing high inside and outside water and act on simultaneously, primarily of concrete lining, annular flat jack, aqueduct, steel pipe and one way valve five part composition, wherein, annular flat jack is installed on country rock crag before lining cutting is built, steel pipe serial communication formula is adopted to connect between the flat jack that hoop is adjacent, steel pipe is connected with aqueduct, and the junction of steel pipe and aqueduct has a charge for remittance hole; One of aqueduct is inserted country rock, and other end, through lining cutting, the aqueduct inserting country rock is provided with one way valve.
Wherein, outer water inside water system seepage when described one way valve only allows external water pressure to be greater than internal water pressure.
Preferably, described several annular flat jack is arranged along the axis of country rock crag and hoop.
Preferably, one of described aqueduct is inserted more than country rock 10cm.
The beneficial effects of the utility model are:
Self adaptation liner structure of the present utility model by aqueduct to the water filling of serial communication formula annular flat jack, and then to lining cutting Shi Hanzhang, high inside and outside water can be born act on simultaneously, and it is different according to interior external water pressure value, Intelligent adjustment puts on the prestressing force in lining cutting, makes it keep optimized desirable stress.Utilize the one way valve installed in aqueduct, in realizing, water does not enter outer water system, because interior water is to the applied pressure effect of one way valve institute, outer water effectively can be stoped to enter Nei Shui, reduce the impact for tunnel construction district groundwater resources, conservation of nature environment.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of flat jack riding position in lining cutting and country rock.
Fig. 2 is the enlarged drawing at a certain flat jack place in Fig. 1, there is shown the arrangement relation of flat jack and country rock and lining cutting.
Fig. 3 is the schematic diagram that flat jack is arranged at tunnel hoop.
Fig. 4 is flat jack profile.
Fig. 5 is the connected mode schematic diagram of flat jack and steel pipe.
Fig. 6 is the connected mode schematic diagram (top view) of aqueduct and steel pipe, flat jack.
Detailed description of the invention
Self adaptation liner structure of the present utility model can bear high inside and outside water and act on simultaneously.As shown in figures 1 to 6, this self adaptation liner structure is primarily of concrete lining 1, annular flat jack 2, aqueduct 6, steel pipe 5 and one way valve 7 five part composition, wherein, annular flat jack 2 is installed on the crag of country rock 3 before concrete lining is built, and what arrange between the crag and flat jack of country rock is mortar levelling layer 4.These annular flat jacks are arranged along the axis of the crag of country rock 3 and hoop.As adopted steel pipe 5 serial communication formula to connect between Fig. 5,6 adjacent two flat jacks, steel pipe 5 is connected with aqueduct 6, steel pipe 5 has a charge for remittance hole 8 with the junction of aqueduct 6, one of aqueduct 6 is inserted more than country rock 10cm, other end is through concrete lining 1, the aqueduct inserting country rock 5 is provided with one way valve 7, enters water-filling pressure in interior water process and annular flat jack for the inside and outside lower outside water system of hydraulic pressure various combination of restriction.
In the utility model, the size, neighbor distance etc. of annular flat jack needs according to on-the-spot country rock situation, and the concrete numerical value of inside and outside water pressure is optimized design.
The hydraulic tunnel runtime and turn(a)round Main change be inside and outside hydraulic pressure force value, wherein the runtime is thought of as outer water with seasonal variety, turn(a)round, then for emptying is without interior water environment, can be summarized as that internal water pressure is greater than external water pressure, internal water pressure equals external water pressure and internal water pressure is less than external water pressure three kinds of situations.For above-mentioned three kinds of situations, one way valve in self adaptation liner structure of the present utility model, is utilized to realize outer water one-way flow, and then external water pressure value in controlling, concrete control principle is:
(1) when internal water pressure is higher than external water pressure, interior water enters stress application in flat jack by the aqueduct running through lining cutting, and because one way valve exists, interior water cannot go deep in country rock or grout blanket by aqueduct, avoids endochronic model phenomenon to occur.Now in annular flat jack, water injection pressure is mainly provided by internal water pressure, and namely now lining cutting inside and outside wall substantially all bears internal water pressure effect.
(2) when internal water pressure equals external water pressure, interior water enters annular flat jack stress application by aqueduct, there is not mutual Alternate Phenomenon in inside and outside water, now in annular flat jack, water injection pressure is mainly provided by internal water pressure, and namely now lining cutting inside and outside wall substantially all bears internal water pressure effect.
(3), when internal water pressure is less than external water pressure, outer water enters internal water system system by aqueduct, and along with the increase of displacement, external water pressure value reduces gradually, and is finally tending towards identical with internal water pressure.Now in annular flat jack, water injection pressure is mainly provided by external water pressure, and the inside and outside wall of lining cutting bears force value after inside and outside water balance substantially.
No matter which kind of situation, adopt this kind of self adaptation lining structure type, the inner wall pressure finally put in lining cutting is substantially equal with outer wall pressure, and then reaches the stable required suitable environment of lining cutting.Because one way valve enters internal water system system for outer water, there is certain restriction, external water pressure need be greater than internal water pressure and to be allowed for access internal water system system seepage, and internal water pressure again limit leakage, so both ensure that the stability of lining cutting, minimum to underground Southeast Tibetan Plateau again, the object of doulbe-sides' victory can be realized.

Claims (4)

1. the self adaptation liner structure that can bear high inside and outside water and act on simultaneously, it is characterized in that, primarily of concrete lining, annular flat jack, aqueduct, steel pipe and one way valve five part composition, wherein, annular flat jack is installed on country rock crag before lining cutting is built, adopt steel pipe serial communication formula to connect between the flat jack that hoop is adjacent, steel pipe is connected with aqueduct, the junction of steel pipe and aqueduct has a charge for remittance hole; One of aqueduct is inserted country rock, and other end, through concrete lining, the aqueduct inserting country rock is provided with one way valve.
2. self adaptation liner structure as claimed in claim 1, is characterized in that, outer water inside water system seepage when described one way valve only allows external water pressure to be greater than internal water pressure.
3. self adaptation liner structure as claimed in claim 1, is characterized in that, described annular flat jack is arranged along the axis of country rock crag and hoop.
4. self adaptation liner structure as claimed in claim 1, is characterized in that, one of described aqueduct is inserted more than country rock 10cm.
CN201520921609.2U 2015-11-18 2015-11-18 Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously Withdrawn - After Issue CN205100992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520921609.2U CN205100992U (en) 2015-11-18 2015-11-18 Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520921609.2U CN205100992U (en) 2015-11-18 2015-11-18 Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously

Publications (1)

Publication Number Publication Date
CN205100992U true CN205100992U (en) 2016-03-23

Family

ID=55516778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520921609.2U Withdrawn - After Issue CN205100992U (en) 2015-11-18 2015-11-18 Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously

Country Status (1)

Country Link
CN (1) CN205100992U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332716A (en) * 2015-11-18 2016-02-17 中国水利水电科学研究院 Adaptive lining structure capable of bearing simultaneous actions of high internal and external water
CN109404008A (en) * 2018-11-28 2019-03-01 中国水利水电科学研究院 Intelligent prestressed concrete liner tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332716A (en) * 2015-11-18 2016-02-17 中国水利水电科学研究院 Adaptive lining structure capable of bearing simultaneous actions of high internal and external water
CN105332716B (en) * 2015-11-18 2017-06-06 中国水利水电科学研究院 The self adaptation liner structure that water is acted on simultaneously inside and outside height can be born
CN109404008A (en) * 2018-11-28 2019-03-01 中国水利水电科学研究院 Intelligent prestressed concrete liner tunnel

Similar Documents

Publication Publication Date Title
CN203742623U (en) Water-pressure-resistant composite structure for tunnel
CN102352601A (en) Tunnel type composite anchorage
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN205100992U (en) Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously
CN105332716B (en) The self adaptation liner structure that water is acted on simultaneously inside and outside height can be born
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN105714827A (en) Post-grouting construction method of cast-in-situ bored pile
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN202187288U (en) Compound tunnel anchorage
CN203533005U (en) Prestressed steel-concrete composite pressure jacking pipe
CN104452746A (en) Construction method for bored pile
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN204125941U (en) Uplift pile structure
CN107152034A (en) A kind of pipe gallery and its construction method
CN201865672U (en) Support structure for soft tunnel surrounding rock
CN204371386U (en) The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor
CN207633358U (en) A kind of prefabricated assembled pipe gallery jointing construction
CN202989911U (en) Post-grouting pile of precast concrete
CN103184737A (en) Grouting machine for post grouting under embedded rock geological condition
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN204551464U (en) Enlarged footing bellows anchor pole
CN204199279U (en) Prefabricated reinforced concrete anchor pole
CN203879548U (en) Sealing wall for water plugging of mine roadway
CN202124860U (en) Annular impervious curtain for high pressure water channel
CN202969371U (en) Novel pipe pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160323

Effective date of abandoning: 20170606

AV01 Patent right actively abandoned