CN204371386U - The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor - Google Patents
The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor Download PDFInfo
- Publication number
- CN204371386U CN204371386U CN201420839609.3U CN201420839609U CN204371386U CN 204371386 U CN204371386 U CN 204371386U CN 201420839609 U CN201420839609 U CN 201420839609U CN 204371386 U CN204371386 U CN 204371386U
- Authority
- CN
- China
- Prior art keywords
- anchor cable
- grouting
- outer tube
- floor
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000004568 cement Substances 0.000 claims abstract description 17
- 239000011440 grout Substances 0.000 claims abstract description 10
- 229920000742 Cotton Polymers 0.000 claims description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 230000000903 blocking effect Effects 0.000 claims 1
- 230000002093 peripheral effect Effects 0.000 claims 1
- 238000002347 injection Methods 0.000 abstract description 10
- 239000007924 injection Substances 0.000 abstract description 10
- 230000002787 reinforcement Effects 0.000 abstract description 10
- 239000011435 rock Substances 0.000 abstract description 10
- 230000007797 corrosion Effects 0.000 abstract description 2
- 238000005260 corrosion Methods 0.000 abstract description 2
- 238000004873 anchoring Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000005553 drilling Methods 0.000 description 5
- 239000002002 slurry Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 2
- 239000003245 coal Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- DERZBLKQOCDDDZ-JLHYYAGUSA-N cinnarizine Chemical compound C1CN(C(C=2C=CC=CC=2)C=2C=CC=CC=2)CCN1C\C=C\C1=CC=CC=C1 DERZBLKQOCDDDZ-JLHYYAGUSA-N 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Piles And Underground Anchors (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
一种巷道底板内外双注式预应力锚索结构;该结构穿过注浆加固区、止浆层、地坪层及碎石层,钻掘有钻孔,钻孔中插装有锚索,锚索外装有锁具及外套管,外套管内装有内注浆管及外注浆管,在外套管下端内部由马丽散固定封闭,在外套管上端内部由棉纱填塞固定,外套管上端与地坪层平齐,锚索上端、锁具、外注浆管及内注浆管上端均露出地坪层,由三孔平托盘套装平铺在地坪层面上,固定在外套管外部及锚索外部,分别由快硬水泥及水泥浆液充填封堵固定,在止浆层及地坪层上向下插装有浅孔注浆管。该结构不仅可以进行底臌治理,实现锚索在较长的范围内具有高预应力;而且提高底板围岩抵抗因受水平压力和动压影响而变形破坏的能力和防止锚索发生腐蚀。
A double-injection prestressed anchor cable structure inside and outside the bottom plate of the roadway; the structure passes through the grouting reinforcement area, the grout stop layer, the floor layer and the gravel layer, and drilled holes are drilled, and anchor cables are inserted in the holes. The anchor cable is equipped with a lock and an outer sleeve. The outer sleeve is equipped with an inner grouting pipe and an outer grouting pipe. The floor layer is even, and the upper end of the anchor cable, the lock, the outer grouting pipe and the upper end of the inner grouting pipe are all exposed to the floor layer. The three-hole flat tray is set on the floor layer and fixed on the outside of the outer casing and the outside of the anchor cable. , respectively filled and fixed by quick-hardening cement and cement grout, and shallow-hole grouting pipes are inserted downward on the grout-stop layer and the floor layer. This structure can not only carry out bottom sag treatment, realize the high prestress of the anchor cable in a long range; but also improve the ability of the surrounding rock of the floor to resist deformation and damage due to the influence of horizontal pressure and dynamic pressure, and prevent the anchor cable from corrosion.
Description
技术领域 technical field
本实用新型涉及煤矿软岩巷道底板支护和加固的锚索结构,尤其是应用于深部高地压、富水的一种巷道底板内外双注式预应力锚索结构。 The utility model relates to an anchor cable structure for supporting and reinforcing the bottom plate of a soft rock roadway in a coal mine, in particular to a double-injection prestressed anchor cable structure inside and outside the bottom plate of a roadway which is applied in deep areas with high ground pressure and rich water.
背景技术 Background technique
我国煤矿井工开采深度以每年8~12m的速度递增,深部高地压、高动压开采条件下软岩巷道底臌剧烈,特别是在底板围岩富水条件下,岩溶水、裂隙水进一步加剧了泥质岩石的泥化崩解,底臌量高达1.5~2m,循环卧底增加巷道维护成本,严重影响巷道正常使用,安全问题异常突出。The underground mining depth of my country's coal mines is increasing at a rate of 8-12m per year. Under the conditions of deep high ground pressure and high dynamic pressure mining, the bottom of the soft rock roadway is severe. The muddy disintegration of the argillaceous rock has been prevented, and the amount of bottom scum is as high as 1.5-2m. The circulation undercover increases the maintenance cost of the roadway, seriously affects the normal use of the roadway, and the safety problem is extremely prominent.
目前用于巷道底臌治理的方法大致可分为卸压法、强化支护法和联合支护法,而采用锚索进行底板锚注加固方法施工方便且治理效果显著,使用最为广泛。想要实现锚索高预应力,必须先进行锚索端部锚固后才能施加预应力,使用普通锚索可采用以下三种方法实现锚索高预应力:1)底板钻孔施工完成后采用水泥浆液在钻孔一定深度范围内灌浆进行锚固,后施加预应力;2)底板钻孔施工完成后采用树脂锚固剂对锚索深部一定范围内进行锚固,后施加预应力;3)底板钻孔施工完成后,采用橡胶塞进行深部封孔后加压注浆锚固,后施加预应力。At present, the methods used for the treatment of roadway bottom can be roughly divided into pressure relief method, reinforced support method and combined support method, and the method of anchoring and grouting reinforcement of the floor with anchor cables is the most widely used because of its convenient construction and remarkable treatment effect. In order to achieve high prestress of the anchor cable, the end of the anchor cable must be anchored before the prestress can be applied. The following three methods can be used to achieve high prestress of the anchor cable by using ordinary anchor cables: 1) After the drilling of the bottom plate is completed, use cement The grout is grouted within a certain depth of the borehole for anchoring, and then prestress is applied; 2) After the bottom plate drilling is completed, the resin anchoring agent is used to anchor the anchor cable within a certain range of depth, and then prestress is applied; 3) Base plate drilling construction After completion, use rubber plugs for deep hole sealing, pressurize grouting and anchor, and finally apply prestress.
在底板富水条件下,钻孔中具有大量地下水、施工用水,且抽出后又会快速聚集,显然上述方法存在以下三个突出问题:第一,传统灌浆锚固、锚固剂锚固受水的影响无法有效实施,锚固效果极差;第二,橡胶塞无法与钻孔壁密实接触,漏浆现象严重,注浆压力低,锚固效果差;第三,若直接浅部封孔后加压注浆,后张拉锚索,能够保障注浆效果和实现全长锚固,但无法实现锚索在较长的范围内具有高的预应力。因此可以看出,使用普通锚索和目前的锚固、封孔技术无法实现底板锚索在较长范围内具有高预应力。 Under the condition of rich water in the bottom plate, there is a large amount of groundwater and construction water in the borehole, and it will quickly accumulate after being pumped out. Obviously, the above method has the following three outstanding problems: First, the traditional grouting anchoring and anchoring agent are affected by water. Effective implementation, the anchoring effect is extremely poor; second, the rubber plug cannot be in close contact with the borehole wall, serious grout leakage, low grouting pressure, and poor anchoring effect; third, if the shallow hole is directly sealed and then pressure grouted, Post-tensioning the anchor cable can ensure the grouting effect and achieve full-length anchoring, but it cannot achieve high prestress in a long range of the anchor cable. Therefore, it can be seen that using ordinary anchor cables and the current anchoring and sealing technology cannot achieve high prestress in a long range of floor anchor cables .
发明内容 Contents of the invention
为了克服现有技术中使用普通锚索和目前的锚固、封孔技术无法实现底板锚索在较长范围内具有高预应力的不足,本实用新型提供了一种巷道底板内外双注式预应力锚索结构,该巷道底板内外双注式预应力锚索结构用于实现底板锚索在较长范围内具有高预应力,进而改善巷道底板围岩的应力状态和力学性能,提高巷道底板岩石的自承载能力,保证底板围岩的完整与稳定。In order to overcome the disadvantages of using ordinary anchor cables and the current anchoring and sealing technology in the prior art that cannot realize the high prestress of the floor anchor cables in a long range, the utility model provides a double-injection prestress on the inside and outside of the roadway floor Anchor cable structure, the double-injection prestressed anchor cable structure inside and outside the roadway floor is used to realize the high prestress of the floor anchor cable in a long range, thereby improving the stress state and mechanical properties of the roadway floor surrounding rock, and improving the roadway floor rock. The self-supporting capacity ensures the integrity and stability of the surrounding rock of the floor.
本实用新型解决其技术问题所采用的技术方案是:该种巷道底板内外双注式预应力锚索结构包括碎石层、地坪层、锚索、锚索上端、锁具、三孔平托盘、浅孔注浆管、棉纱、内注浆管、外套管、马丽散、外注浆管、水泥浆液、锚索下端、钻孔、快硬水泥、止浆层和注浆加固区;该巷道底板内外双注式预应力锚索结构穿过深部注浆18加固区中部的止浆层、地坪层及上部的碎石层,钻掘有6-21m深的钻孔,直接到注浆加固区;钻孔中插装有6-20m的长圆柱状的锚索,锚索外围顺序套装有锁具及外套管,外套管内装有内注浆管及外注浆管,在外套管下端内部由马丽散固定封闭,在外套管上端内部由棉纱填塞固定,外套管上端并与地坪层平齐,锚索上端、锁具、外注浆管及内注浆管上端均露出地坪层,并由三孔平托盘套装平铺在地坪层面上,固定在外套管外部及锚索外部;外套管外部由上至下分别由快硬水泥及水泥浆液充填封堵固定,在止浆层及地坪层上向下均匀插装有浅孔注浆管,并向止浆层注浆填充加固。The technical scheme adopted by the utility model to solve the technical problem is: the double-injection prestressed anchor cable structure inside and outside the roadway bottom plate includes a gravel layer, a floor layer, an anchor cable, an upper end of an anchor cable, a lock, a three-hole flat tray, Shallow hole grouting pipe, cotton yarn, inner grouting pipe, outer casing, marisan, outer grouting pipe, cement slurry, lower end of anchor cable, drill hole, rapid hardening cement, grout stop layer and grouting reinforcement area; the roadway The double-injection prestressed anchor cable structure inside and outside the bottom plate passes through the grouting layer in the middle of the deep grouting 18 reinforcement area, the floor layer and the upper gravel layer, and drills a 6-21m deep hole, directly to the grouting reinforcement area; a 6-20m long cylindrical anchor cable is inserted in the borehole, and the outer periphery of the anchor cable is sequentially set with a lock and an outer casing. The outer casing is equipped with an inner grouting pipe and an outer grouting pipe. Lisan is fixed and closed, and the upper end of the outer casing is filled and fixed by cotton yarn. The upper end of the outer casing is flush with the floor layer. The three-hole flat tray set is laid flat on the floor level and fixed on the outside of the casing and the anchor cable; the outside of the casing is filled and fixed by rapid hardening cement and cement grout from top to bottom, and is fixed on the slurry layer and the floor. Shallow-hole grouting pipes are evenly inserted downwards on the top of the layer, and filled and reinforced by grouting to the grout-stop layer.
所述外套管外经为65~75mm,比钻孔孔径小10~25mm,外套管内经为60~70mm,外套管长为3~10m。The outer diameter of the outer casing is 65-75mm, which is 10-25mm smaller than the borehole diameter, the inner diameter of the outer casing is 60-70mm, and the length of the outer casing is 3-10m.
所述锚索外径为20~30mm,长度为6~20m,外套管与锚索上端伸出外套管的长度为50~200mm。The outer diameter of the anchor cable is 20-30mm, the length is 6-20m, and the length of the outer casing and the upper end of the anchor cable protruding from the outer casing is 50-200mm.
本实用新型的有益效果是:该种巷道底板内外双注式预应力锚索结构不仅提供了一种深部高地压、富水底板条件下底臌治理用锚索结构,使用该锚索结构进行底臌治理,通过套管内外双注后能够实现锚索在较长的范围内具有高预应力;而且通过该结构外注浆管进行深部高压注浆能够改善底板岩石的内摩擦角和粘聚力,锚索高预应力能够将巷道底板一定范围内的岩石从双向受力状态、低围压三向受力状态转化为具有较高围压的三向受力状态,大大提高底板围岩抵抗因受水平压力和动压影响而变形破坏的能力;并且通过该结构内注浆管注浆可以将锚索与套管之间的空隙充填,防止锚索受水的影响而发生腐蚀。The beneficial effects of the utility model are: the double-injection prestressed anchor cable structure inside and outside the floor of the roadway not only provides an anchor cable structure for bottom swell treatment under the condition of deep high ground pressure and water-rich floor, but also uses the anchor cable structure for bottom In order to improve the internal friction angle and cohesion of the floor rock, the deep high-pressure grouting through the external grouting pipe of the structure can realize the high prestress of the anchor cable in a long range after double injection inside and outside the casing. The high prestress of the anchor cable can transform the rock within a certain range of the floor of the roadway from a two-way stress state and a low confining pressure three-way stress state to a three-way stress state with high confining pressure, which greatly improves the resistance factor of the floor surrounding rock. The ability to be deformed and destroyed by the influence of horizontal pressure and dynamic pressure; and the grouting through the grouting pipe in the structure can fill the gap between the anchor cable and the casing to prevent the anchor cable from being affected by water and corrosion.
附图说明 Description of drawings
下面结合附图对本实用新型进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.
图1为本实用新型的结构示意图。Figure 1 is a schematic structural view of the utility model.
图2为锚索结构的剖面图。Figure 2 is a cross-sectional view of the anchor cable structure.
图中1.碎石层,2.地坪层,3.锚索,4.锚索上端,5.锁具,6.三孔平托盘,7.浅孔注浆管,8.棉纱,9.内注浆管,10.外套管,11.马丽散,12.外注浆管,13.水泥浆液,14.锚索下端,15.钻孔,16.快硬水泥,17.止浆层,18.注浆加固区。In the figure 1. gravel layer, 2. floor layer, 3. anchor cable, 4. upper end of anchor cable, 5. lock, 6. three-hole flat tray, 7. shallow hole grouting pipe, 8. cotton yarn, 9. Inner grouting pipe, 10. Outer casing, 11. Ma Lisan, 12. Outer grouting pipe, 13. Cement slurry, 14. Lower end of anchor cable, 15. Drilling, 16. Rapid hardening cement, 17. Grouting layer , 18. Grouting reinforcement area.
具体实施方式 Detailed ways
在图中,一种巷道底板内外双注式预应力锚索结构,包括:碎石层1、地坪层2、锚索3、锚索上端4、锁具5、三孔平托盘6、浅孔注浆管7、棉纱8、内注浆管9、外套管10、马丽散11、外注浆管12、水泥浆液13、锚索下端14、钻孔15、快硬水泥16、止浆层17和注浆加固区18;该巷道底板内外双注式预应力锚索结构穿过深部注浆加固区18、中部的止浆层17、地坪层2及上部的碎石层1,钻掘有6-21m深的钻孔15,直接到注浆加固区18;钻孔15中插装有6-20m的长圆柱状的锚索3,锚索3外围顺序套装有锁具5及外套管10,外套管10内装有内注浆管9及外注浆管12,在外套管10下端内部由马丽散11固定封闭,在外套管10上端内部由棉纱8填塞固定,外套管10上端并与地坪层2平齐,锚索上端4、锁具5、外注浆管12及内注浆管9上端均露出地坪层2,并由三孔平托盘6套装平铺在地坪层2面上,固定在外套管10外部及锚索3外部;外套管10外部由上至下分别由快硬水泥16及水泥浆液13充填封堵固定,在止浆层17及地坪层2上向下均匀插装有浅孔注浆管7,并向止浆层17注浆填充加固。In the figure, a double-injection prestressed anchor cable structure inside and outside the floor of the roadway, including: gravel layer 1, floor layer 2, anchor cable 3, anchor cable upper end 4, lock 5, three-hole flat tray 6, shallow hole Grouting pipe 7, cotton yarn 8, inner grouting pipe 9, outer casing 10, Ma Lisan 11, outer grouting pipe 12, cement slurry 13, anchor cable lower end 14, drilling 15, rapid hardening cement 16, grout stop layer 17 and grouting reinforcement area 18; the double-injection prestressed anchor cable structure inside and outside the floor of the roadway passes through the deep grouting reinforcement area 18, the grouting layer 17 in the middle, the floor layer 2 and the upper gravel layer 1. There is a 6-21m deep borehole 15, directly to the grouting reinforcement area 18; a 6-20m long cylindrical anchor cable 3 is inserted in the borehole 15, and the outer periphery of the anchor cable 3 is sequentially set with a lock 5 and an outer sleeve 10, The outer casing 10 is equipped with an inner grouting pipe 9 and an outer grouting pipe 12. The lower end of the outer casing 10 is fixed and closed by Ma Lisan 11, and the upper end of the outer casing 10 is filled and fixed by cotton yarn 8. The upper end of the outer casing 10 is connected to the ground. The floor layer 2 is flush, the upper end of the anchor cable 4, the lock 5, the outer grouting pipe 12 and the upper end of the inner grouting pipe 9 are all exposed to the floor layer 2, and the three-hole flat tray 6 is set on the floor layer 2. , fixed on the outer casing 10 and the anchor cable 3; the outer casing 10 is filled and fixed by rapid hardening cement 16 and cement slurry 13 from top to bottom, and is uniformly applied downward on the grout stop layer 17 and the floor layer 2. The shallow hole grouting pipe 7 is inserted, and the grouting layer 17 is grouted for filling and reinforcement.
所述外套管10外经为65~75mm,比钻孔15孔径小10~25mm,外套管10内经为60~70mm,外套管10长为3~10m。The outer diameter of the outer casing 10 is 65-75mm, which is 10-25mm smaller than that of the borehole 15, the inner diameter of the outer casing 10 is 60-70mm, and the length of the outer casing 10 is 3-10m.
所述锚索3外径为20~30mm,长度为6~20m,外套管10与锚索上端4伸出外套管10的长度为50~200mm。 The outer diameter of the anchor cable 3 is 20-30mm, the length is 6-20m, and the length of the outer casing 10 and the upper end 4 of the anchor cable extending out of the outer casing 10 is 50-200mm.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420839609.3U CN204371386U (en) | 2014-12-26 | 2014-12-26 | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420839609.3U CN204371386U (en) | 2014-12-26 | 2014-12-26 | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204371386U true CN204371386U (en) | 2015-06-03 |
Family
ID=53327615
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420839609.3U Expired - Lifetime CN204371386U (en) | 2014-12-26 | 2014-12-26 | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204371386U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110374653A (en) * | 2019-08-21 | 2019-10-25 | 中国矿业大学 | A kind of hollow grouting cable anchor hole sealing device of rock crusher band and its method for sealing |
| CN110593927A (en) * | 2019-09-30 | 2019-12-20 | 宁夏久威矿山安全工程有限责任公司 | Grouting structure with adjustable depth and grouting method |
| CN113216172A (en) * | 2021-05-25 | 2021-08-06 | 宜宾学院 | Basalt fiber anchor rod for slope support |
-
2014
- 2014-12-26 CN CN201420839609.3U patent/CN204371386U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110374653A (en) * | 2019-08-21 | 2019-10-25 | 中国矿业大学 | A kind of hollow grouting cable anchor hole sealing device of rock crusher band and its method for sealing |
| CN110593927A (en) * | 2019-09-30 | 2019-12-20 | 宁夏久威矿山安全工程有限责任公司 | Grouting structure with adjustable depth and grouting method |
| CN113216172A (en) * | 2021-05-25 | 2021-08-06 | 宜宾学院 | Basalt fiber anchor rod for slope support |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102493822B (en) | Method for performing curtain grouting construction on tunnel by water rich fault influence zone | |
| CN103669346B (en) | A kind of sleeve raft pipe and its application in landslide control | |
| CN105350584B (en) | A kind of construction method of anti-float anchor rod | |
| CN107288657A (en) | The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground | |
| CN102776899B (en) | Anti-floating structure of shallow-buried shield tunnel | |
| CN102322273A (en) | A kind of roadway floor anchor is annotated integrated reinforcement means | |
| CN106246188B (en) | The system and method that the prevention coal mine shaft lining shaft deformation of stratum settlement compatibility of deformation is destroyed | |
| CN102162255A (en) | Method for reinforcing existing pile foundation in collapsed loess area by slip casting | |
| CN108756809B (en) | A kind of sealing method for shield tunnel geological exploration borehole | |
| CN103321663A (en) | Roadway baseboard anchoring and top pouring type pre-stressed anchor cable strengthening device and construction method | |
| CN102011591A (en) | Grouting process for working surface of deep well | |
| CN115787693A (en) | Water stopping method for water gushing in deep foundation pit under riverside slow-dip interbed | |
| CN102296617A (en) | Post-grouting reinforcement construction method of flexible joints of diaphragm walls | |
| CN204371386U (en) | The inside and outside two note formula prestressed anchor Cable Structure of a kind of roadway floor | |
| CN102995647B (en) | A Groundwater Control Method for Pile Hole Grouting and Seepage Isolation | |
| CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
| CN207176673U (en) | Suitable for the anti-depression ground base enforcement structure of the small-sized ancient building in soft clay area | |
| CN206246122U (en) | The system of the preventing and treating coal mine shaft lining shaft deformation destruction of stratum settlement compatibility of deformation | |
| CN108914911A (en) | A kind of stratum prestress advanced excavation stability control method | |
| CN208605162U (en) | A kind of shield tunnel geological prospecting borehole hole sealing structure | |
| CN204125941U (en) | Uplift pile structure | |
| CN107975041B (en) | A casing device for anticorrosion of anchor bolts and an anticorrosion construction method for anchor bolts | |
| CN213088001U (en) | Double-layer well wall lining structure of pressure pipeline shaft | |
| CN100545357C (en) | A cement-soil embedded pile wall for foundation pit support and its construction method | |
| CN108571330A (en) | Method for treating leakage water of post-cast strip of subway bottom plate |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150603 |
|
| CX01 | Expiry of patent term |