CN102168419A - Method for compounding anchor rod by geotextile reinforcing - Google Patents

Method for compounding anchor rod by geotextile reinforcing Download PDF

Info

Publication number
CN102168419A
CN102168419A CN 201110143282 CN201110143282A CN102168419A CN 102168419 A CN102168419 A CN 102168419A CN 201110143282 CN201110143282 CN 201110143282 CN 201110143282 A CN201110143282 A CN 201110143282A CN 102168419 A CN102168419 A CN 102168419A
Authority
CN
China
Prior art keywords
grouting
anchor rod
geotextiles
slip casting
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110143282
Other languages
Chinese (zh)
Other versions
CN102168419B (en
Inventor
王超雄
张艳军
肖玉成
张�荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN201110143282A priority Critical patent/CN102168419B/en
Publication of CN102168419A publication Critical patent/CN102168419A/en
Application granted granted Critical
Publication of CN102168419B publication Critical patent/CN102168419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a method for compounding an anchor rod by geotextile reinforcing, comprising the following steps: (1) drilling to form a hole; (2) manufacturing an anchor rod; (3) placing the anchor rod; (4) grouting; (5) stopping grouting; and (6) finishing grouting. The method has the advantages of solving two problems of anchoring and grouting in loose deposits and broken stratums. According to the method, a great quantity of cement can be saved, and the construction cost is lowered; a full anchoring body is formed by the ballooning effect of the geotextile; the uplift resistance of the anchor rod can be improved by the reinforcing performance of the geotextile; according to the practical situations in the Yangchun New Steel No.2 and 3 landslide management projects, the artificial unloading slot and double turnover system foundation pit support projects and the like of the Yangchun New Steel, the anchoring and grouting amount is about 5-10% of the common grouting amount; and the anchor rod uplift resistance can be improved by 1.5 times by the destructive anchor rod tension test.

Description

Geotextiles reinforcement Composite Bolt method
Technical field
The present invention relates to field of engineering technology, a kind of specifically geotextiles reinforcement Composite Bolt method.
Background technology
The subject study, construction technology etc. of carrying out anchor bolt grouting in loose accumulation body and kata-rocks soil layer exist not enough.Present stage carries out anchor bolt grouting and mainly adopts the compaction grouting method in loose accumulation body and broken formation, by the Grouting Pipe that is embedded in above the body of rod anchoring section, free end are carried out slip casting.Because rock crushing, cranny development is strong, rich groundwater, there are the following problems for traditional compaction grouting method: 1) slurries along the fragmented rock body crack, the crack runs off, and is difficult to form complete anchoring body; 2) rich groundwater zone slurries are washed away by underground water, are difficult to form anchoring body.
Summary of the invention
The objective of the invention is to develop a kind of geotextiles reinforcement Composite Bolt method that can solve the full anchoring body of slurries loss, economical with materials, formation, improve anti-pulling of anchor bar.
Geotextiles reinforcement Composite Bolt method of the present invention, its step is as follows:
1. drilling and forming hole: adopt in the loose accumulation body and the kata-rocks soil body that the down-the-hole hammer is eccentric to be advanced with pipe bit, reach the design hole depth after, take out drilling rod, withdraw rig; Aperture, hole depth are carried out according to designing requirement;
2. anchor pole is made: one deck geotextiles medium is set on the anchor rod body material, and pre-buried Grouting Pipe; Described geotextiles medium is the cylinder-shaped geotechnological cloth bag of being made by harmless geotextiles, and drum diameter is greater than bore diameter 2~3cm;
3. anchor pole is laid: the geotextiles Composite Bolt of making is placed in the boring, and extracts the follow-up cover;
4. slip casting: start grouting pump, by pre-buried Grouting Pipe with the slurries that modulate according to design pressure slip casting in the hole; Grouting pressure is controlled at 0.8~1.5MPa, and slurry flow rate is controlled at 1.0~2.0 * 10 -3m 3/ s;
5. stop the condition of slip casting: the pressure control table show value on the grouting pump continues to increase, and stops slip casting when its value reaches 2 times of design pressure values;
6. repeat 4.~5. step 3-5 time, finish slip casting.
The advantage of geotextiles reinforcement Composite Bolt method of the present invention is: mainly solved two difficult problems of carrying out anchor bolt grouting in loose accumulation body and broken formation; Can save a large amount of cement, reduce construction cost; Can form full anchoring body by the ballooning effect of geotextiles; Improve the uplift resistance of anchor pole by the reinforcement performance of geotextiles; According to practice situation in spring new iron and steel 2#, 3# landslide control engineering, spring engineering such as new iron and steel manual discharging groove and two overturning systems deep foundation pit support, the anchor bolt grouting amount has only about 5%~10% of conventional grouting amount; By the destructive pulling test of anchor pole, anti-pulling of anchor bar can improve 1.5 times.
Description of drawings
Fig. 1 is a geotextiles reinforcement Composite Bolt typical case cross-sectional drawing.
Fig. 2 is a geotextiles reinforcement Composite Bolt constructional drawing.
Fig. 3 is anchoring section (A-A) sectional drawing.
Fig. 4 is seal section (B-B) sectional drawing.
The specific embodiment
Embodiment one
Put into practice case in new iron and steel 2#, the 3# landslide control engineering spring
Shown in Fig. 1-4, a kind of geotextiles reinforcement Composite Bolt method, its step is as follows:
1. pore-forming: use the YG-60 jumbolter, adopt that the down-the-hole hammer is eccentric to advance the technology pore-forming with pipe bit; After reaching design hole depth 20m, take out drilling rod, withdraw rig;
2. anchor pole is made: anchor pole adopts 5 bundle f PtkThe high strength low relaxed non-bending steel cable of=1860MPa, anchor rod body total length are 21.0m, and anchoring section length is 8.0m; Adopt sealing bag that the free section of anchor pole is separated with anchoring section, the pocket type geotextiles is installed at anchoring section;
3. anchor pole is laid: the geotextiles Composite Bolt of making is placed in the boring, and extracts the follow-up sleeve pipe;
4. slip casting: at first carry out slip casting, after slurries extruding hole wall reaches to a certain degree, stop slip casting by the Grouting Pipe that is embedded in the sealing bag; After reaching certain intensity in the slurries in the sealing bag, the Grouting Pipe by being embedded in anchoring section with the slurries that modulate according to grouting pressure 0.8MPa, slurry flow rate 1.0 * 10 -3m 3/ s.
To anchoring section slip casting; Pressure control table show value on the slip casting end condition grouting pump continues to increase, and stops slip casting when its value reaches 2 times of design pressure values; After repeating 3-5 slip casting, finish slip casting;
5. stretch-draw, locking: after slurries reach the length of time, anchor pole is carried out tensioning fixation.
Embodiment two
Spring, new iron and steel manual discharging groove and two car dumper system deep foundation pit support were put into practice case
Shown in Fig. 1-4, a kind of geotextiles reinforcement Composite Bolt method, its step is as follows:
1. pore-forming: use the MD-60A jumbolter, adopt the down-the-hole hammer to advance the technology pore-forming with pipe bit with one heart; After reaching design hole depth 28m, take out drilling rod, withdraw rig;
2. anchor pole is made: anchor pole adopts 4 bundle f PtkThe high strength low relaxed non-bending steel cable of=1860MPa, anchor rod body total length are 28.0m, and anchoring section length is 16.0m; At anchoring section the pocket type geotextiles is installed;
3. anchor pole is laid: the geotextiles Composite Bolt of making is placed in the boring, and extracts with pipe;
4. slip casting: with grouting pressure be controlled at 1.0MPa, slurry flow rate is controlled at 2.0 * 10 -3m 3/ s carries out slip casting by the Grouting Pipe that is embedded in anchoring section.After slip casting a period of time, the crevice water of geotechnological cloth bag during bulging will be holed gradually ejects, and after the water in the boring drains grouting pressure is reduced to 0.8 MPa, slurry flow rate is reduced to 1.0 * 10 -3m 3/ s.The slip casting end condition is that the pressure control table show value on the grouting pump continues to increase, and stops slip casting when its value reaches 2 times of design pressure values; After repeating 3-5 slip casting, finish slip casting;
5. stretch-draw, locking: after slurries reach the length of time, anchor pole is carried out tensioning fixation.
The invention is not restricted to the foregoing description, according to the parameter of different regions, can form a plurality of embodiment, and all fall within the scope of protection of present invention.

Claims (1)

1. geotextiles reinforcement Composite Bolt method, it is characterized in that: its step is as follows:
1. drilling and forming hole: adopt in the loose accumulation body and the kata-rocks soil body that the down-the-hole hammer is eccentric to be advanced with pipe bit, reach the design hole depth after, take out drilling rod, withdraw rig; Aperture, hole depth are carried out according to designing requirement;
2. anchor pole is made: one deck geotextiles medium is set on the anchor rod body material, and pre-buried Grouting Pipe; Described geotextiles medium is the cylinder-shaped geotechnological cloth bag of being made by harmless geotextiles, and drum diameter is greater than bore diameter 2~3cm;
3. anchor pole is laid: the geotextiles Composite Bolt of making is placed in the boring, and extracts the follow-up sleeve pipe;
4. slip casting: start grouting pump, by pre-buried Grouting Pipe with the slurries that modulate according to design pressure, speed slip casting in the hole; Grouting pressure is controlled at 0.8~1.5MPa, and slurry flow rate is controlled at 1.0~2.0 * 10 -3m 3/ s;
5. stop the condition of slip casting: the pressure control table show value on the grouting pump continues to increase, and stops slip casting when its value reaches 2 times of design pressure values;
6. repeat 4.~5. step 3-5 time, finish slip casting.
CN201110143282A 2011-05-31 2011-05-31 Method for compounding anchor rod by geotextile reinforcing Active CN102168419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110143282A CN102168419B (en) 2011-05-31 2011-05-31 Method for compounding anchor rod by geotextile reinforcing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110143282A CN102168419B (en) 2011-05-31 2011-05-31 Method for compounding anchor rod by geotextile reinforcing

Publications (2)

Publication Number Publication Date
CN102168419A true CN102168419A (en) 2011-08-31
CN102168419B CN102168419B (en) 2012-10-03

Family

ID=44489723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110143282A Active CN102168419B (en) 2011-05-31 2011-05-31 Method for compounding anchor rod by geotextile reinforcing

Country Status (1)

Country Link
CN (1) CN102168419B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720196A (en) * 2012-06-26 2012-10-10 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
CN103726498A (en) * 2014-01-21 2014-04-16 山东正元建设工程有限责任公司 Grouting expanding pre-stressed anchor rod of fiber bag and using method thereof
CN105133567A (en) * 2015-08-20 2015-12-09 中冶集团武汉勘察研究院有限公司 Capsule type hydraulic vibration excitation device and method for treating saturated soil foundation through capsule type hydraulic vibration excitation device
CN106013143A (en) * 2016-05-20 2016-10-12 中铁十六局集团地铁工程有限公司 Anchor rod for underground engineering anti-floating system construction and construction method
CN106638628A (en) * 2016-04-29 2017-05-10 杜华 Soft rhizome-nelumbinis-shaped anchor rod
CN109868807A (en) * 2019-03-13 2019-06-11 岩土科技股份有限公司 A kind of expansion Pulling-Resistant Anchor Rod stake suitable for weak soil and loose ground
CN112647498A (en) * 2021-01-19 2021-04-13 中国建筑第五工程局有限公司 Construction method for anti-floating anchor cable penetrating through water-rich layer

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04309616A (en) * 1991-04-08 1992-11-02 Dai Ichi Kogyo Seiyaku Co Ltd Filling chemical composition for stabilizing soil quality and method for sealing water to stabilize for reinforcement using the same
CN1127820A (en) * 1995-09-27 1996-07-31 化学工业部地质勘探公司河北地质勘探大队 Hole-forming technology for club-footed pier pile in sand gravel stratum by chemical grouting and curtain protection of wall
CN1338543A (en) * 2001-09-29 2002-03-06 梁炯均 Anchor-tube guniting support of frame and its construction method
CN102051879A (en) * 2010-11-09 2011-05-11 中国水电顾问集团华东勘测设计研究院 Process for constructing soil anchor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04309616A (en) * 1991-04-08 1992-11-02 Dai Ichi Kogyo Seiyaku Co Ltd Filling chemical composition for stabilizing soil quality and method for sealing water to stabilize for reinforcement using the same
CN1127820A (en) * 1995-09-27 1996-07-31 化学工业部地质勘探公司河北地质勘探大队 Hole-forming technology for club-footed pier pile in sand gravel stratum by chemical grouting and curtain protection of wall
CN1338543A (en) * 2001-09-29 2002-03-06 梁炯均 Anchor-tube guniting support of frame and its construction method
CN102051879A (en) * 2010-11-09 2011-05-11 中国水电顾问集团华东勘测设计研究院 Process for constructing soil anchor

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国农村水利水电》 20100531 黄荣敏等 向家坝水电站尾水渠下游护坡注浆锚杆试验初步研究 , 第5期 2 *
《水利水电技术》 20101031 黄荣敏等 向家坝水电站尾水渠下游护坡预应力锚索工艺初步试验研究 , 第10期 2 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720196A (en) * 2012-06-26 2012-10-10 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
CN102720196B (en) * 2012-06-26 2014-06-25 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
CN103726498A (en) * 2014-01-21 2014-04-16 山东正元建设工程有限责任公司 Grouting expanding pre-stressed anchor rod of fiber bag and using method thereof
CN105133567A (en) * 2015-08-20 2015-12-09 中冶集团武汉勘察研究院有限公司 Capsule type hydraulic vibration excitation device and method for treating saturated soil foundation through capsule type hydraulic vibration excitation device
CN105133567B (en) * 2015-08-20 2017-01-18 中冶集团武汉勘察研究院有限公司 Capsule type hydraulic vibration excitation device and method for treating saturated soil foundation through capsule type hydraulic vibration excitation device
CN106638628A (en) * 2016-04-29 2017-05-10 杜华 Soft rhizome-nelumbinis-shaped anchor rod
CN106013143A (en) * 2016-05-20 2016-10-12 中铁十六局集团地铁工程有限公司 Anchor rod for underground engineering anti-floating system construction and construction method
CN106013143B (en) * 2016-05-20 2019-01-29 中铁十六局集团地铁工程有限公司 A kind of construction of underground engineering anti-floating system anchor pole and construction method
CN109868807A (en) * 2019-03-13 2019-06-11 岩土科技股份有限公司 A kind of expansion Pulling-Resistant Anchor Rod stake suitable for weak soil and loose ground
CN112647498A (en) * 2021-01-19 2021-04-13 中国建筑第五工程局有限公司 Construction method for anti-floating anchor cable penetrating through water-rich layer

Also Published As

Publication number Publication date
CN102168419B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102168419B (en) Method for compounding anchor rod by geotextile reinforcing
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN102230382B (en) Progressive shielding booster-type grouting and reinforcing technology for baseboard
CN100501011C (en) Hole drilling mudjack pile construction method
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN102418536A (en) Large-aperture pretension base plate hollow grouting device
CN101614020A (en) Flexible bladder type anti-corrosive apparatus and use the anticorrosion stake and the job practices of this device
CN103362117A (en) Full-section grouting method for grouting section
CN105756689A (en) Roadway floor reinforcing system and construction method thereof
CN101324064B (en) Controllable expansion extrusion soil body apparatus for geotechnical engineering and use thereof
CN201241344Y (en) Controllable capsule type expansion device
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN202644591U (en) A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand
CN110593254A (en) Construction method of cast-in-situ bored pile in stratum with karst cave in joint zone
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN102995647A (en) Underground water control method used for grouting and seepage insulation of pile hole
CN202969370U (en) Novel steel pipe pile
CN102979105A (en) Underground water control method of wellhole grouting and seepage insulation
CN206256920U (en) Deformed steel bar high-pressure slip casting stock
CN109024621A (en) The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method
CN101250989A (en) Surface drilling down-hole sealing technique without unpackaging condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant