CN106638628A - Soft rhizome-nelumbinis-shaped anchor rod - Google Patents

Soft rhizome-nelumbinis-shaped anchor rod Download PDF

Info

Publication number
CN106638628A
CN106638628A CN201611083490.1A CN201611083490A CN106638628A CN 106638628 A CN106638628 A CN 106638628A CN 201611083490 A CN201611083490 A CN 201611083490A CN 106638628 A CN106638628 A CN 106638628A
Authority
CN
China
Prior art keywords
cloth bag
head end
geotechnological cloth
dowel
fixed body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611083490.1A
Other languages
Chinese (zh)
Inventor
杜华
杨红春
李金路
黄延军
田志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN106638628A publication Critical patent/CN106638628A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

The invention relates a soft rhizome-nelumbinis-shaped anchor rod. The soft rhizome-nelumbinis-shaped anchor rod is characterized in that a anchor bar (5) and a grout pipe (6) are sleeved with a geo-textile sack (3), the diameter of the geo-textile sack (3) gradually increases from the head end to the tail end, the tail end of the geo-textile sack (3) is banded on a tail end fixing body (1) through a tail end hose clamp (2), and a grout outlet (9) of the grout pipe (6) is formed in the tail end of the geo-textile sack (3); and a head end fixing body (8) is installed on the anchor bar (5) and the head end of the grout pipe (6) to fix the anchor bar (5) and the grout pipe (6), the head end of the geo-textile sack (3) is banded on the head end fixing body (8) through a head end hose clamp (7), and the geo-textile sack (3) is fixed in the way that tightening belts (4) are fixed to the geo-textile sack (3) from the head end to the tail end according to the diameters in the order from small to large. According to the soft rhizome-nelumbinis-shaped anchor rod, the anchorage force in soft clay of the anchor rod is improved by times, and because the shape of an anchoring body is regular, reliability is greatly improved.

Description

A kind of software rhizoma nelumbinis shape anchor pole
Technical field
The invention belongs to Geotechnical Engineering field, is related to the anchor pole that a kind of anchoring slight slope is used, particularly for weak soil Building slope engineering support, can increase anchor force, increase the safety coefficient of Stability of Earth Slopes.
Background technology
In slope support engineering in recent years, soft soil foundation is more and more, and soft soil slope support engineering is also just continuously increased.Institute Meaning weak soil, refers to natural void ratio more than or equal to 1.0 and natural moisture content is more than the fine grained soil of liquid limit.It is this kind of soil point be Internal friction angle and cohesive strength all very littles of the soil body, are easily deformed, liquefy, and to engineering support design and construction very big difficulty is brought, The difficulty and cost of supporting are increased considerably.Cause the Engineering Projects of bury Engineering anchor rod supporting failure a lot, mainly Bury anchor force is not enough caused.The anchor force of anchor pole how is improved, is increased reliability, and is not increased substantially engineering and make Valency is very urgent demand.What the anchor pole for being used at present, generally reinforcing bar or steel wire strand were constituted, by Grouting Pipe and anchor Muscle is combined, in putting the hole being drilled into, then slip casting.Also what is had is designed as hollow steel pipe form, from steel pipe Middle slip casting, clay soils big to rock or internal friction angle, that cohesive strength is big are preferable.But it is just very poor to the effect of weak soil.
The content of the invention
It is an object of the present invention to design a kind of anchor pole used in soft clay foundation, to increase frictional force, anchor pole is increased Breakout capacity.Realize that the purpose of the present invention is adopted the technical scheme that:A kind of software rhizoma nelumbinis shape anchor pole, include dowel and Grout pipe, it is characterised in that:The end of dowel is fixed with end fixed body, and geotechnological cloth bag loads dowel and grout pipe set, The diameter of geotechnological cloth bag is gradually increased by head end to end, and the end of geotechnological cloth bag is with end larynx hoop banding in end fixed body On, the grout outlet of grout pipe is located in the end of geotechnological cloth bag, and the head end of dowel and grout pipe is provided with head end fixed body by dowel It is fixed with grout pipe, using head end larynx hoop banding on head end fixed body, geotechnological cloth bag is by head end for the head end of geotechnological cloth bag Fastening straps are fixed on geotechnological cloth bag according to the ascending order of diameter to end direction, the spacing of fastening straps is according to calculating Anchor force determines.
The present invention can significantly improve anchor force of the anchor pole in bury, because anchoring body regular shape so that reliable Property is increased substantially.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
In figure, 1, end fixed body;2nd, end larynx hoop, 3, geotechnological cloth bag;4th, fastening straps;5th, dowel;6th, grout pipe;7th, it is first End larynx hoop;8th, head end fixed body;9th, grout outlet.
Specific embodiment
Referring to the drawings, a kind of software rhizoma nelumbinis shape anchor pole, includes dowel 5 and grout pipe 6, it is characterised in that:The end of dowel 5 End is fixed with end fixed body 1, and geotechnological cloth bag 3 loads 6 sets of dowel 5 and grout pipe, the diameter of geotechnological cloth bag 3 by head end to End gradually increases, and on end fixed body 1, the grout outlet 9 of grout pipe 6 sets the end of geotechnological cloth bag 3 banding of end larynx hoop 2 In the end of geotechnological cloth bag 3, the head end of dowel 5 and grout pipe 6 is provided with head end fixed body 8 carries out dowel 5 and grout pipe 6 admittedly Fixed, using the banding of head end larynx hoop 7 on head end fixed body 8, geotechnological cloth bag 3 is by head end to end direction for the head end of geotechnological cloth bag 3 Fastening straps 4 are fixed on geotechnological cloth bag 3 according to the ascending order of diameter, the spacing of fastening straps 4 is according to calculating anchor force It is determined that.
The structure design of the present invention is such:The sufficiently large geotextiles of use intensity make the geotechnological cloth bag 3 of cylindrical shape, The diameter of geotechnological cloth bag 3 is gradually increased by head end to end, and the property of diameter anchor force as needed and soil determines, geotextiles Intensity is sufficiently large, permeable, but impermeable slurry.In the longitudinal direction, keep at a certain distance away setting fastening straps 4, the material of fastening straps 4 and Geotextiles are identical, and thickening becomes band.Fastening straps 4 are processed circlewise, is pasted onto on geotechnological cloth bag 3 with seccotine, or by beam Taut band 4 and geotechnological cloth bag 3 are sewed in one.The diameter of fastening straps 4 is gradually increased from head end to end, geotechnological cloth bag is fixed on On.Dowel 5 is together with the colligation of Grouting Pipe 6.At the two ends of dowel 5, end fixed body 1 and head end fixed body 8 are set with fixation Geotechnological cloth bag 3, end fixed body 1 and head end fixed body 8 it is cylindrical, centre is respectively provided with groove, is easy to make larynx hoop snap in wherein, Fixed body diameter is put anchor hole into and is defined less than the diameter of geotechnological cloth bag to facilitate.By geotechnological cloth bag 3 end larynx hoop 2 and head end Larynx hoop 7 is fixed on head end fixed body 8 and end fixed body 1.The anchor pole made is put into hole, in place after, by slip casting Pipe slip casting, under the effect of slip casting pump pressure, enters into cloth bag from end grout outlet, and slurries progressively fill geotechnological cloth bag side by side Water, due to pressure field bag full of when be to be close to uniform, so slurries will form the cylinder of almost symmetry, wrap anchor Muscle.In the presence of bunching ring, the anchoring body diameter near fastening straps diminishes, and so allows for anchoring body and uniformly wraps anchor Muscle, and rhizoma nelumbinis shape structure is formed, because the diameter of fastening straps is become larger by head end to end, taper is formed, thus increase Anchor force.Because foundation soil is weak soil, easily by compression, so this anchor pole is adapted to soft clay foundation.
When using, geotechnological cloth bag 3 is processed first, require to determine the straight of the length of anchoring section and anchoring body according to anchor force Footpath, the length and anchoring section of geotechnological cloth bag 3 is essentially identical, and diameter is gradually increased by head end to end.By head end to end direction Fastening straps 4 are fixed in proper order on geotechnological cloth bag according to diameter is ascending, the spacing of fastening straps 4 is true according to anchor force is calculated It is fixed.End fixed body 1 and head end fixed body 8 are fixed on dowel 5, the geotechnological cloth bag two ends end larynx of fastening straps is installed Hoop 2 and head end larynx hoop 7 are fixed on end fixed body 1 and head end fixed body 8.Grout pipe 6 is solid through head end fixed body 8 and dowel It is scheduled on together, grout outlet end of close dowel 5 in geotechnological cloth bag 3.Anchor hole is bored according to design requirement on soft soil foundation, will be added The good dowel 5 of work is sent into anchor hole, installs and is in the milk by grout pipe 6 behind block section, in the case where slip casting pump pressure is acted on, slurries from Grout outlet 9 is entered into geotechnological cloth bag, starts to fill geotechnological cloth bag from end in the presence of grouting pressure, and extruding weak soil is side by side Moisture removal, under the constraint of geotechnological cloth bag, gradually forms taper anchoring body.Then according to normal dowel construction method installs anchor Head.

Claims (3)

1. a kind of software rhizoma nelumbinis shape anchor pole, includes dowel(5)And grout pipe(6), it is characterised in that:Dowel(5)End consolidate Surely there is end fixed body(1), geotechnological cloth bag(3)By dowel(5)And grout pipe(6)Set is loaded, geotechnological cloth bag(3)Diameter by Head end to end gradually increases, geotechnological cloth bag(3)End end larynx hoop(2)Banding is in end fixed body(1)On, grout pipe (6)Grout outlet(9)It is located at geotechnological cloth bag(3)End in, dowel(5)And grout pipe(6)Head end be provided with head end fixed body (8)By dowel(5)And grout pipe(6)It is fixed, geotechnological cloth bag(3)Head end utilize head end larynx hoop(7)Banding is solid in head end Determine body(8)On, geotechnological cloth bag(3)By head end to end direction by fastening straps(4)It is fixed on according to the ascending order of diameter Geotechnological cloth bag(3)On.
2. according to the software rhizoma nelumbinis shape anchor pole described in claim 1, it is characterised in that:Described geotechnological cloth bag(3)Upper interval one Set a distance arranges fastening straps(4), fastening straps(4)Material it is identical with geotextiles, by fastening straps(4)Process circlewise, with strength Glue is in geotechnological cloth bag(4)On, or by fastening straps(4)Sew in one with geotechnological cloth bag 3.
3. according to the software rhizoma nelumbinis shape anchor pole described in claim 1, it is characterised in that:Described end fixed body(1)And head end Fixed body(8)Cylindrical, centre is respectively provided with groove, is easy to make larynx hoop snap in wherein, and fixed body diameter is less than geotechnological cloth bag(3) Diameter, put anchor hole into and be defined to facilitate.
CN201611083490.1A 2016-04-29 2016-11-30 Soft rhizome-nelumbinis-shaped anchor rod Pending CN106638628A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610276173.5A CN105756058A (en) 2016-04-29 2016-04-29 Flexible lotus rhizome node-shaped anchor rod
CN2016102761735 2016-04-29

Publications (1)

Publication Number Publication Date
CN106638628A true CN106638628A (en) 2017-05-10

Family

ID=56324568

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610276173.5A Withdrawn CN105756058A (en) 2016-04-29 2016-04-29 Flexible lotus rhizome node-shaped anchor rod
CN201611083490.1A Pending CN106638628A (en) 2016-04-29 2016-11-30 Soft rhizome-nelumbinis-shaped anchor rod

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610276173.5A Withdrawn CN105756058A (en) 2016-04-29 2016-04-29 Flexible lotus rhizome node-shaped anchor rod

Country Status (1)

Country Link
CN (2) CN105756058A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073643A (en) * 2021-03-26 2021-07-06 吕英明 Construction process of soft soil layer reaming anchor rod

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201013018Y (en) * 2007-01-19 2008-01-30 厉瑞祥 Injection anchor bar of plasm capsule bag
KR20090113575A (en) * 2008-04-28 2009-11-02 신원특수건설(주) Earth anchor and construction method of the same
CN101929163A (en) * 2009-12-17 2010-12-29 浙江中联建设集团有限公司 Support construction process of lotus root-shaped segmental expanded soil anchor rod
CN102168419A (en) * 2011-05-31 2011-08-31 中冶集团武汉勘察研究院有限公司 Method for compounding anchor rod by geotextile reinforcing
CN104074190A (en) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN104912071A (en) * 2015-06-23 2015-09-16 新乡市嘉汇科技有限公司 Integrated double-bag enlarged anchor cable
CN104912073A (en) * 2015-06-24 2015-09-16 王帆 High-pressure grouting bag type expansion anchor bolt with sleeve valve tube
CN206448277U (en) * 2016-04-29 2017-08-29 杜华 A kind of software rhizoma nelumbinis shape anchor pole

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201013018Y (en) * 2007-01-19 2008-01-30 厉瑞祥 Injection anchor bar of plasm capsule bag
KR20090113575A (en) * 2008-04-28 2009-11-02 신원특수건설(주) Earth anchor and construction method of the same
CN101929163A (en) * 2009-12-17 2010-12-29 浙江中联建设集团有限公司 Support construction process of lotus root-shaped segmental expanded soil anchor rod
CN102168419A (en) * 2011-05-31 2011-08-31 中冶集团武汉勘察研究院有限公司 Method for compounding anchor rod by geotextile reinforcing
CN104074190A (en) * 2014-06-16 2014-10-01 成都四海岩土工程有限公司 Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN104912071A (en) * 2015-06-23 2015-09-16 新乡市嘉汇科技有限公司 Integrated double-bag enlarged anchor cable
CN104912073A (en) * 2015-06-24 2015-09-16 王帆 High-pressure grouting bag type expansion anchor bolt with sleeve valve tube
CN206448277U (en) * 2016-04-29 2017-08-29 杜华 A kind of software rhizoma nelumbinis shape anchor pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113073643A (en) * 2021-03-26 2021-07-06 吕英明 Construction process of soft soil layer reaming anchor rod

Also Published As

Publication number Publication date
CN105756058A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105464110B (en) A kind of construction technology of basalt fiber tendons material anchor pole
CN201013018Y (en) Injection anchor bar of plasm capsule bag
CN201722685U (en) No-adhesive prestress and pile side rear grouting punching pile structure
CN201099859Y (en) Multi-segment pocket type squeezing -type anchor rod
CN111005376A (en) Full-assembly pressure-bearing type variable-diameter steel reinforcement cage enlarged footing anchor pile system
CN100575615C (en) Multistage bag-type compression anchor bar
CN205663447U (en) Novel anchor net spouts compound supporting construction
CN206448277U (en) A kind of software rhizoma nelumbinis shape anchor pole
CN102704497B (en) RPW (ranked position weight) process for treating high fill slope
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN106638628A (en) Soft rhizome-nelumbinis-shaped anchor rod
CN106836217A (en) A kind of construction method of expansion end formula soil bolt or soil nailing
CN104018499B (en) A kind of grouting method saving prestress anchorage cable stretch-draw section grouting amount
CN107542086B (en) Anchor cable construction method for filling slope
CN213508499U (en) Narrow and small space upward formula full length bonding anchor rope downthehole segmentation of formula ends thick liquid structure
CN206308699U (en) Dregs area slope protection pile fixed section grouting and reinforcing device
CN107558470A (en) A kind of new grouted anchor bar and construction method with the adjustable wing
CN112252339A (en) Upward full-length bonding anchor cable hole subsection grout stopping structure and method
CN113186950B (en) Ecological protection construction method for high fill slope
CN206693220U (en) Artificial digging pile resistance to plucking structure
CN204023567U (en) A kind of tension and compression composite anchor-rod
CN106522220A (en) Partitioned high-pressure hole blockage grouting anchor rod and grouting method thereof
CN206941582U (en) A kind of more enlarged footing jet grouting anchor rod rod devices of cloth-bag type
CN202882968U (en) Multi-anchoring-point anchor rod without resin
CN210827460U (en) Drainage anchor nail for slope drainage reinforcement and drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170510