CN204000856U - The anti-side changeable ridigity pile of inner support grouting formula level base - Google Patents

The anti-side changeable ridigity pile of inner support grouting formula level base Download PDF

Info

Publication number
CN204000856U
CN204000856U CN201420408526.9U CN201420408526U CN204000856U CN 204000856 U CN204000856 U CN 204000856U CN 201420408526 U CN201420408526 U CN 201420408526U CN 204000856 U CN204000856 U CN 204000856U
Authority
CN
China
Prior art keywords
pile
inner support
steel pipe
pipe pile
ridigity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420408526.9U
Other languages
Chinese (zh)
Inventor
狄圣杰
单治钢
白福青
徐学勇
张琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina New Energy Group Co Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201420408526.9U priority Critical patent/CN204000856U/en
Application granted granted Critical
Publication of CN204000856U publication Critical patent/CN204000856U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the anti-side changeable ridigity pile of a kind of inner support grouting formula level base.The purpose of this utility model is to provide the anti-side changeable ridigity pile of a kind of inner support simple in structure, easy to make grouting formula level base, with in the situation that keeping steel pipe pile stake footpath and wall thickness constant, strengthen steel pipe pile bending rigidity, play the object that reduces pile foundation level displacement and corner.The technical solution of the utility model is: the anti-side changeable ridigity pile of a kind of inner support grouting formula level base, pile foundation is squeezed into mud face, this pile foundation comprises steel pipe pile, and the change rigidity section that is arranged at the inner predetermined elevation of steel pipe pile, become rigidity section upper cover plate and lower cover are set respectively up and down, upper and lower cover plate is fixedly welded on steel pipe pile inwall.The utility model is applicable to the anti-side pile foundation technology of level field in coastal ocean engineering, Hydraulic and Hydro-Power Engineering, port navigation engineering.

Description

The anti-side changeable ridigity pile of inner support grouting formula level base
Technical field
The utility model relates to the anti-side changeable ridigity pile of a kind of inner support grouting formula level base.Be applicable to the anti-side pile foundation technology of level field in coastal ocean engineering, Hydraulic and Hydro-Power Engineering, port navigation engineering.
Background technology
In recent decades, construction along with Open Wharf, bridge spanning the sea, offshore platform, marine wind electric field, the loads such as wave, tide, stream, wind become the significant levels design load of building, and its ringing and dynamic action are also had higher requirement to the designing and calculating of stake.As structures such as Flexible Breasting Dolphins, be that the horizontal position in-migration that makes full use of steel pipe pile absorbs the huge energy that horizontal loading produces in addition; In preventing land slide, extensively adopt antislide pile to resist the horizontal Thrust in landslide.
The normal P-Y curve method that belongs to elastic-plastic analysis that adopts of computational methods of the anti-side stake of level at present, it can carry out nonlinear analysis to stake, soil body system, the < < fixed offshore platform design and construction technical specification > > being formulated by American Petroleum Institute (API) adopts, and China standard < < port works Pile Foundation Code > > also adopts the method.
By the computational analysis of P-Y curve method, the stratum superficial part soil body to stake stressed and deformation effect comparatively crucial, by contrast, the impact of deep soil is much smaller, for steel pipe pile, mean level displacement and the Moment Influence degree of depth are about 6~8 times of the following stake of mud face footpath D, and bending rigidity EI, the formation rock Soil Engineering Geology characteristic of concrete depth bounds and pile body and the load applying are relevant, need carry out designing and calculating according to actual conditions and determine.Its desired parameters has been carried out to sensitivity analysis, find that parameters differs on the horizontal movement on stake top and corner impact, the bending rigidity EI of its king-pile is comparatively remarkable on horizontal movement and corner impact, and EI increases 20%, and the horizontal movement of pile foundation and corner approximately reduce by 13%.
Summary of the invention
The technical problems to be solved in the utility model is: the anti-side changeable ridigity pile of a kind of inner support simple in structure, easy to make grouting formula level base is provided, with in the situation that keeping steel pipe pile stake footpath and wall thickness constant, strengthen steel pipe pile bending rigidity, play the object that reduces pile foundation level displacement and corner.
The technical scheme that the utility model adopts is: the anti-side changeable ridigity pile of a kind of inner support grouting formula level base, pile foundation is squeezed into mud face, it is characterized in that: this pile foundation comprises steel pipe pile, and the change rigidity section that is arranged at the inner predetermined elevation of steel pipe pile, become rigidity section upper cover plate and lower cover are set respectively up and down, upper and lower cover plate is fixedly welded on steel pipe pile inwall;
Described change rigidity section has three kinds of form of structure: one is into being fixedly welded on the steel work inner support of steel pipe pile inwall; Its two grout compartment for cohering with steel pipe pile inwall; It three combines with grout compartment for steel work inner support, and steel work inner support is fixedly welded on steel pipe pile inwall, and grout compartment parcel steel work inner support is also cohered with steel pipe pile inwall.
Length is set described steel work inner support and described grout compartment length is that more than mud face 0.5~1D is to 6~8D below mud face, and D is steel pipe pile diameter.Mud face is following should be determined in conjunction with its displacement of P-Y curve method computational analysis and Moment Influence distance according to actual formation distribution situation, separately considers the distance that affects of above 0.5~1 times of steel pipe pile stake footpath D scope of mud face.
Described grout compartment is formed by cement mortar perfusion, and the steel pipe pile inwall that grout compartment is corresponding need be processed through frosted processing.
Described steel work inner support adopts double welded joint to be connected with steel pipe pile inwall.
Described steel work inner support adopts the forms such as cross inner support or groined type inner support.
The beneficial effects of the utility model are: 1, the utility model at pile foundation one place or many places arrange and become rigidity section, do not need change stake footpath and thickness of steel pipe, can play and strengthen steel pipe pile cross section bending rigidity, reduce pile foundation level displacement and corner, reduce rolled steel dosage, save cost and flexible arrangement; 2, steel work inner support is welded and can be prefabricated in the factory in steel pipe pile, has guaranteed quality, shortens the activity duration simultaneously; 3, can to becoming rigidity section, can select steel work inner support, grout compartment or two kinds of combined modes according to design, actual situations of construction, its flexibility and applicability are high.
Accompanying drawing explanation
Fig. 1 is the elevational schematic view of embodiment 1.
Fig. 2 is the schematic cross-section of embodiment 1.
Fig. 3 is the elevational schematic view of embodiment 2.
Fig. 4 is the schematic cross-section of embodiment 2.
Fig. 5 is the elevational schematic view of embodiment 3.
Fig. 6 is the schematic cross-section of embodiment 3.
The specific embodiment
Embodiment 1: as shown in Figure 1 and Figure 2, in steel pipe pile 1, near mud face 6 places, arrange and become rigidity section, length is that on mud face 6,1 times of stake footpath adds the lower 7 times of stake footpaths of mud face, play the effect that strengthens the anti-side rigidity of this position steel pipe pile 1 level, to reduce horizontal movement and the corner of mud face 6 place's steel pipe piles 1, the interior change rigidity of steel pipe pile 1 section arranges respectively upper cover plate 2 and lower cover 3 up and down, fixing change rigidity section inner support effect while driving piles to play, and upper and lower cover plate is fixedly welded on steel pipe pile 1 inwall.In this example, become rigidity section into steel work inner support 4, be specially cross inner support, by double welded joint, with steel pipe pile 1, connected, can prefabrication.
Embodiment 2: as shown in Figure 3, Figure 4, the present embodiment structure is substantially the same manner as Example 1, difference is to become rigidity section into grout compartment 5 in this example, and grout compartment 5 is formed by cement mortar perfusion, and this cement mortar material is easily got, densification is even, bond performance is good and bending rigidity value is large.Steel pipe pile 1 inwall of grout compartment 5 correspondences need be processed through frosted processing, and to increase its roughness, this grout compartment and steel pipe pile 1 inwall cohere.
Embodiment 3: as shown in Figure 5, Figure 6, the present embodiment structure is substantially the same manner as Example 1, difference is to become in this example rigidity section into the combining form of steel work inner support 4 (adopting cross inner support) with grout compartment 5, and cross inner support is connected with steel pipe pile 1 by double welded joint, can prefabrication; For becoming rigidity section, be in the milk, form the grout compartment 5 of parcel steel work inner support 4, steel pipe pile 1 inwall that this grout compartment is corresponding need be processed through frosted processing, and grout compartment and steel pipe pile 1 inwall cohere.
Steel pipe pile 1 cross section bending rigidity E in above-described embodiment 0i 0by following formula, calculated:
E 0 I 0 = &pi; E 0 64 ( D 4 - d 4 )
Wherein, D is steel pipe pile 1 external diameter, and d is steel pipe pile 1 internal diameter, E 0for steel modulus.
Cross inner support cross section bending rigidity E 0i 1by following formula, calculated:
E 0 I 0 = E 0 12 ( ht 3 + rh 3 )
Wherein, h is cross inner support list support length, and t is cross inner support thickness.
Grout compartment 5 cross section bending rigidity E 1i 2by following formula, calculated:
E 1 I 2 = &eta; &pi; E 1 64 d 4
Wherein, E 1for concrete modulus, η is Stiffness degradation coefficient, for affected the Stiffness degradation that causes slurries and steel to cohere by extraneous factor.
For embodiment, steel pipe pile 1 outer diameter D=120cm, inner diameter d=116.2cm, adopts C35 cement mortar, cross inner support h equals steel pipe pile inner diameter d, for 116.2cm, thickness t is also 1.9cm, Stiffness degradation coefficient η=0.8, calculating shows only to arrange cross inner support (as embodiment 1) bending rigidity increases by 20.2%, when grout compartment (as embodiment 2) bending rigidity being only set increasing by 91.7%, two kind of mode and combine settings (embodiment 3), 1.12 times of bending rigidity increases.
In addition, for the present embodiment, adopt the anti-side stake of P-Y curve method computational analysis level (cohesive soil parameter undrained shear strength Cu=54KPa, effective unit weight r '=9KN/m3, poor half the strain stress 50=0.017 of major principal stress), above steel pipe pile 1 cantilever height of mud face is 7.9m, steel pipe pile 1 embedded depth is 45m, become rigidity section and length is set into 10m, under horizontal force P=400KN, Horizontal Displacement is reduced to 9.8cm by 19.4cm, and Horizontal Displacement has approximately reduced by 49.5%, and effect is remarkable.

Claims (5)

1. the anti-side changeable ridigity pile of inner support grouting formula level base, pile foundation is squeezed into mud face (6), it is characterized in that: this pile foundation comprises steel pipe pile (1), and the change rigidity section that is arranged at the inner predetermined elevation of steel pipe pile, become rigidity section upper cover plate (2) and lower cover (3) are set respectively up and down, upper and lower cover plate is fixedly welded on steel pipe pile (1) inwall;
Described change rigidity section has three kinds of form of structure: one is into being fixedly welded on the steel work inner support (4) of steel pipe pile (1) inwall; Its two grout compartment (5) for cohering with steel pipe pile (1) inwall; It three combines with grout compartment (5) for steel work inner support (4), and steel work inner support (4) is fixedly welded on steel pipe pile (1) inwall, and grout compartment (5) parcel steel work inner support (4) is also cohered with steel pipe pile inwall.
2. the anti-side changeable ridigity pile of inner support according to claim 1 grouting formula level base, it is characterized in that: length is set described steel work inner support (4) and described grout compartment (5) length is that more than mud face (6) 0.5~1D is to 6~8D below mud face (6), and D is steel pipe pile (1) diameter.
3. the anti-side changeable ridigity pile of inner support grouting formula level according to claim 1 base, is characterized in that: described grout compartment (5) is formed by cement mortar perfusion, and steel pipe pile (1) inwall that grout compartment (5) is corresponding need be processed through frosted processing.
4. the anti-side changeable ridigity pile of inner support grouting formula level according to claim 1 base, is characterized in that: described steel work inner support (4) adopts double welded joint to be connected with steel pipe pile (1) inwall.
5. the anti-side changeable ridigity pile of inner support grouting formula level according to claim 4 base, is characterized in that: described steel work inner support (4) adopts the forms such as cross inner support or groined type inner support.
CN201420408526.9U 2014-07-23 2014-07-23 The anti-side changeable ridigity pile of inner support grouting formula level base Expired - Lifetime CN204000856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420408526.9U CN204000856U (en) 2014-07-23 2014-07-23 The anti-side changeable ridigity pile of inner support grouting formula level base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420408526.9U CN204000856U (en) 2014-07-23 2014-07-23 The anti-side changeable ridigity pile of inner support grouting formula level base

Publications (1)

Publication Number Publication Date
CN204000856U true CN204000856U (en) 2014-12-10

Family

ID=52040882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420408526.9U Expired - Lifetime CN204000856U (en) 2014-07-23 2014-07-23 The anti-side changeable ridigity pile of inner support grouting formula level base

Country Status (1)

Country Link
CN (1) CN204000856U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755745A (en) * 2018-04-26 2018-11-06 易朋莹 A kind of Novel section steel cantilever retaining structure and its design and calculation method
CN110080272A (en) * 2019-04-25 2019-08-02 上海交通大学 Offshore wind farm single-pile foundation and offshore wind farm device suitable for greater coasting area
CN112376548A (en) * 2020-09-21 2021-02-19 海洋石油工程股份有限公司 Resistance device for steel pipe pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755745A (en) * 2018-04-26 2018-11-06 易朋莹 A kind of Novel section steel cantilever retaining structure and its design and calculation method
CN110080272A (en) * 2019-04-25 2019-08-02 上海交通大学 Offshore wind farm single-pile foundation and offshore wind farm device suitable for greater coasting area
CN112376548A (en) * 2020-09-21 2021-02-19 海洋石油工程股份有限公司 Resistance device for steel pipe pile

Similar Documents

Publication Publication Date Title
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN100510283C (en) Self-weight-bearing anti-floating method and device
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN105350531A (en) Pipe pile-anchor rod composite foundation capable of bearing pulling and pressing bidirectional loads and construction technology
CN204000856U (en) The anti-side changeable ridigity pile of inner support grouting formula level base
CN102134861B (en) Method for testing precast pile in soil body
CN106087998B8 (en) A kind of construction method for combining multiple tube pile foundation
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN206035045U (en) Prefabricated assembled underground granary of endocyst plastics
CN202830936U (en) Supporting structure of foundation pit
CN102286971A (en) Concrete-filled steel tube core column socketed pile
CN203530959U (en) High-strength underground diaphragm wall
CN204898660U (en) Resistance to compression resistance to plucking composite pile under A corrosive environment
CN202989911U (en) Post-grouting pile of precast concrete
CN206035044U (en) Prefabricated assembled underground granary of plastic cover echelonment
CN201649077U (en) Variable-pile-diameter single pile foundation
Shin et al. Design of composite pile foundations for offshore wind turbines
CN204080797U (en) The composite pile of a kind of PHC stake and YTSC stake
CN201276707Y (en) Pile foundation of building foundation long/short combined pile
CN204125931U (en) Foundation pile structure
CN108505531A (en) The embedding rock of offshore wind farm mixes pile foundation
CN201943076U (en) Combined foundation pit supporting structure
CN103790190B (en) Precast hollow squeezes into pile foundation remedial Consolidation method
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA HYDROPOWER ENGINEERING CONSULTING GROUP CO.,

Free format text: FORMER OWNER: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD.

Effective date: 20150630

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150630

Address after: 100120 Beijing Xicheng District six paved Kang District

Patentee after: HYDROCHINA Corp.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230512

Address after: 100162 101, Floor 1, Building 28, Yard 1, Hongye East Road, Daxing District, Beijing

Patentee after: China Power Construction New Energy Group Co.,Ltd.

Address before: 100120 liupukang District 1, Xicheng District, Beijing

Patentee before: HYDROCHINA Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141210