CN208965520U - Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole - Google Patents
Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole Download PDFInfo
- Publication number
- CN208965520U CN208965520U CN201821201810.3U CN201821201810U CN208965520U CN 208965520 U CN208965520 U CN 208965520U CN 201821201810 U CN201821201810 U CN 201821201810U CN 208965520 U CN208965520 U CN 208965520U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- diversion
- working tunnel
- working
- diversion tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 57
- 238000010276 construction Methods 0.000 claims abstract description 32
- 230000007704 transition Effects 0.000 claims abstract description 19
- 238000011144 upstream manufacturing Methods 0.000 claims description 7
- 230000009466 transformation Effects 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 239000011435 rock Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 239000008400 supply water Substances 0.000 description 2
- 241000282693 Cercopithecidae Species 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Disclosed by the utility model is that diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole by a kind of of hydraulic and hydroelectric engineering field, including diversion tunnel and upper working tunnel and lower working tunnel that diversion tunnel side is arranged in, wherein the outlet of upper working tunnel and lower working tunnel is connected to diversion tunnel, the outlet end of upper working tunnel is connected by arc-shaped transition with diversion tunnel, the radius of the arc-shaped transition section is greater than the hole diameter of 5 times or more working tunnels, and is equipped with backwater gate in the junction of the upper working tunnel and diversion tunnel.The beneficial effects of the utility model are: eliminating dedicated ecology for water hole, cost and duration have been saved;In the construction time of diversion tunnel, access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal diversion function of diversion tunnel;The dam water storage phase, solve that the lock water storage phase under high earth and rockfill dam diversion tunnel does not stop and reservoir level rises uppity problem.
Description
Technical field
The utility model relates to hydraulic and hydroelectric engineering field more particularly to a kind of diversion tunnel working tunnels by high earth and rockfill dam
Ecology is transform as the reconstruction structure in water hole.
Background technique
Currently, the extra-high earth and rockfill dam hydroelectric project of more large sizes is built in Southwestern China region high mountain and steep gorge area, such as double Jiangkous, two
River mouth, long sill may, monkey rock etc., the construction diversion of these engineerings is all in such a way that disconnected+diversion tunnel aerial drainage is once blocked in cofferdam.
High earth-rock works are large-scale, and the construction period is very long, and lower lock water storage difficulty is high, involve numerous factors, have
Have following difficult point: downstream does not stop, and letdown flow needs to meet the requirement of ecological water supply flow;The water storage phase needs to control on water level
Lifting speed is to guarantee the safety of earth and rockfill dam dam body.Currently, high earth and rockfill dam is typically necessary specially one ecology of setting expires for water hole
Sufficient above-mentioned requirements.However, specially one ecology of setting is big for the project scale in water hole, investment is high, and the construction period is long.
Utility model content
To overcome existing high earth and rockfill dam to need to be arranged special ecology for water hole, cause at high cost, long construction period etc. is no
Diversion tunnel working tunnel, can be transformed, with diversion tunnel by foot the technical problem to be solved by the utility model is to provide a kind of
Together as the reconstruction structure in the hole that ecology supplies water.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, and including diversion tunnel and diversion tunnel side is arranged in
Working tunnel, the working tunnel are divided into working tunnel and lower working tunnel, wherein the entrance and river of upper working tunnel connect
Logical, outlet is connected to diversion tunnel, and the entrance of lower working tunnel is connected with upper working tunnel, is exported and is connected to diversion tunnel, it is described on
One end that working tunnel is connected with diversion tunnel be equipped with gate, gate upstream side be equipped with arc-shaped door lock chamber, the lower working tunnel with
The junction of diversion tunnel, which is equipped with, blocks plug, and the junction of the upper working tunnel and lower working tunnel is equipped with connection plug.
Further, the outlet end of the upper working tunnel is connected by arc-shaped transition with diversion tunnel.
Further, the radius of the arc-shaped transition section is greater than the hole diameter of 5 times or more working tunnels, corner is less than 60 °.
Further, the entrance of the lower working tunnel is connected with the arc-shaped transition section of upper working tunnel, the connection
The upstream face of plug is the cambered surface to match with the arc-shaped transition section of upper working tunnel.
Further, being equipped with liner structure section, the gate and arc door lock in the outlet end of the upper working tunnel
Room is arranged in liner structure section, and the liner structure section is equipped with gradual transition section far from one end of diversion tunnel.
The beneficial effects of the utility model are:
1, it by being ecological water supply hole by working tunnel reconstruction, eliminates and resets an ecology for the engineering in water hole,
It is with good economic efficiency, and the duration is greatly shortened;
2, working tunnel different times are made to have different functions, the construction time of diversion tunnel, working tunnel is as water conservancy diversion
The access tunnel of hole construction;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal water conservancy diversion of diversion tunnel
Function;Dam water storage phase, the lock water storage phase under high earth and rockfill dam diversion tunnel that preferably resolves do not stop, and meet downstream ecology flow
It is required that while solving the uppity problem of high earth and rockfill dam reservoir level rising;
3, the characteristics of being gradually transformed, making full use of different times high rock fill dam construction water conservancy diversion, subsequent adaptation is in previous transformation
On the basis of carry out, can greatly alleviate the duration pressure of construction in later period in this way, shorten the construction period of critical circuits.
Detailed description of the invention
Fig. 1 is diversion tunnel construction time structural schematic diagram.
Fig. 2 is dam construction phase structural schematic diagram.
Fig. 3 is lock water storage phase structural schematic diagram under diversion tunnel.
Fig. 4 is the structural schematic diagram after water storage.
Fig. 5 is gates of segmental shape structural sections schematic diagram.
Marking in figure is 1- diversion tunnel, the upper working tunnel of 2-, working tunnel under 3-, 21- gate, 22- arc-shaped transition section,
23- liner structure section, the permanent plug of 24-, 25- arc-shaped door lock chamber, 31- block plug, 32- connection plug.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1, Figure 2, Figure 3 shows, diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, including diversion tunnel 1
With the working tunnel that 1 side of diversion tunnel is arranged in, the working tunnel is divided into working tunnel 2 and lower working tunnel 3, wherein on
The entrance of working tunnel 2 is connected to river, and outlet is connected to diversion tunnel 1, the entrance of lower working tunnel 3 and upper 2 phase of working tunnel
Even, outlet is connected to diversion tunnel 1, and one end that the upper working tunnel 2 is connected with diversion tunnel 1 is equipped with gate 21,21 upstream of gate
Side is equipped with arc-shaped door lock chamber 25, and the junction of the lower working tunnel 3 and diversion tunnel 1 is equipped with closure plug 31, the upper construction
Branch hole 2 and the junction of lower working tunnel 3 are equipped with connection plug 32.After the completion of structure of modification construction, it's the water phase pasts diversion tunnel, can
Upper working tunnel 2 is blocked using gate 21, lower working tunnel 3 is blocked using plug 31 is blocked;In diversion tunnel 1
Lower lock water storage phase, dismountable gate 21 are controlled using arc-shaped door lock chamber 25, make upstream river water along upper working tunnel 2 into
Enter diversion tunnel 1, then flow to downstream and form ecological water supply, eliminates and reset an ecology for the engineering in water hole, have good
Economic benefit, the duration is greatly shortened.The specific structure of arc-shaped door lock chamber 25 is convenient for as shown in figure 5, its top is open type
Installation and adjusting arc-shaped door lock chamber 25.
Be arranged connection plug 32 purpose be, if not connecting plug 32, when carrying out ecological water overcurrent, although under apply
The outlet end in work branch hole 3, which has passed through, to be blocked plug 31 and seals, water flow can not overcurrent, but in river water full of after lower working tunnel 3,
Newly into water flow still can form impact turbulent in upper working tunnel 2 and the junction of lower working tunnel 3, it is raw not to be able to satisfy downstream
State water supply requirement, and since lower 3 position of working tunnel is lower, it is subsequent also to need to pull water out, it is more troublesome, increases without recruitment
Journey.And after being provided with connection plug 32, water flow directly from upper 2 overcurrent of working tunnel, reduces path, also just reduces and apply
The engineerings such as reconstruction, the reinforcing in work branch hole.
The construction method of the reconstruction structure, comprising the following steps:
A, the access tunnel constructed in diversion tunnel construction time, the above working tunnel 2 and lower working tunnel 3 as diversion tunnel 1, it is complete
Structure after is as shown in Figure 1;
B, after the completion of diversion tunnel construction, in the outlet end of lower working tunnel 3, setting blocks plug 31, in upper working tunnel 2
Outlet end setting gate 21 and with arc-shaped door lock chamber 25, structure after the completion is as shown in Figure 2;
C, the dam construction phase first blocks upper working tunnel 2 with gate 21, using 1 overcurrent river water of diversion tunnel, then builds big
Dam cofferdam carries out dam construction;
D, after the completion of dam construction, the 1 lower lock water storage phase of diversion tunnel first removes the gate 21 in upper working tunnel 2, then leads to
Overregulate in working tunnel 2 arc-shaped door lock chamber 25 make ecology supply water through upper working tunnel 2 to diversion tunnel 1 carry out overcurrent,
Reservoir level can be risen simultaneously and be controlled, as shown in Figure 3;
E, after dam reaches water storage requirement, 2 arc-shaped door lock chamber 25 of working tunnel stops supplying water in closing, then in upper construction
Permanent plug 24 is set between the arc-shaped door lock chamber 25 and diversion tunnel 1 in branch hole 2, and reconstruction is completed, such as Fig. 4 of structure after the completion institute
Show.
By being transformed to traditional working tunnel, so that working tunnel different times have different functions, water conservancy diversion
The construction time in hole 1, the access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks 31 He of plug by setting
Gate 21 ensure that the normal diversion function of diversion tunnel 1;The dam water storage phase preferably resolves lock under high earth and rockfill dam diversion tunnel
The water storage phase does not stop, and meets the requirement of downstream ecology flow, while it is uppity to solve high earth and rockfill dam reservoir level rising
Problem.And the characteristics of entire improvement project is gradually to be transformed, and makes full use of different times high rock fill dam construction water conservancy diversion, it is subsequent to change
It makes and is carried out on the basis of previous transformation, can greatly alleviate the duration pressure of construction in later period in this way, shorten critical circuits
Construction period.
Since the trunk roads of working tunnel are generally parallel with diversion tunnel 1, then need to be arranged when needing and being connected to diversion tunnel 1
Corner is turned to diversion tunnel 1, and right-angled bend is usually used in currently existing scheme, but in order to reduce water when subsequent overcurrent ecology supplies water
The impact to working tunnel is flowed, is connected by arc-shaped transition section 22 with diversion tunnel 1 in the outlet end of the upper working tunnel 2.Into
One step, in order to reach most smooth overcurrent, the radius of the arc-shaped transition section 22 should be greater than the hole diameter of 5 times of upper working tunnels 2,
Corner is less than 60 °.
As shown in figure 3, the entrance of the lower working tunnel 3 is connected with the arc-shaped transition section 22 of upper working tunnel 2, in order to
22 phase of arc-shaped transition section of upper working tunnel 2 is agreed with, and sets the upstream face of the connection plug 32 to and upper working tunnel 2
The cambered surface that arc-shaped transition section 22 matches.
Punching is formed to the outlet of upper working tunnel 2 when entering diversion tunnel 1 from upper working tunnel 2 in order to avoid ecological water flow
Brush, is equipped with liner structure section 23 in the outlet end of the upper working tunnel 2, and the gate 21 and the setting of arc-shaped door lock chamber 25 exist
In liner structure section 23, the liner structure section 23 is equipped with gradual transition section far from one end of diversion tunnel 1.The liner structure section 23
Simultaneously construction basis can be provided for the subsequent permanent plug 24 of setting.
In view of entire duration situation, to reconstructing preferably during carrying out water using diversion tunnel 1 for upper working tunnel 2
Dry season carries out, specifically, cofferdam is arranged in the entrance in upper working tunnel 2, then reconstructs to upper working tunnel 2, including
In junction setting connection plug 32, arc-shaped door lock chamber 25 and the liner structure section 23 of upper working tunnel 2 and lower working tunnel 3
Transition construction so that upper working tunnel meet ecology supply water overcurrent requirement.
The reconstruction structure of the application takes full advantage of the design feature of working tunnel and water conservancy diversion, is made by transformation gradually whole
A engineering not only meets ecological water supply requirement, has saved cost and duration, even more plays different works in the different construction stages
With, or even solve high earth and rockfill dam reservoir level and rise uppity problem, there is good practicability and application prospect, be
Similar engineering provides good reference.
Claims (5)
1. diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, including diversion tunnel (1) and setting are on diversion tunnel (1) side
The working tunnel of side, it is characterized in that: the working tunnel is divided into working tunnel (2) and lower working tunnel (3), wherein upper construction
The entrance in branch hole (2) is connected to river, and outlet is connected to diversion tunnel (1), the entrance and upper working tunnel of lower working tunnel (3)
(2) it is connected, outlet is connected to diversion tunnel (1), and one end that the upper working tunnel (2) is connected with diversion tunnel (1) is equipped with gate
(21), gate (21) upstream side is equipped with arc-shaped door lock chamber (25), and the lower working tunnel (3) and the junction of diversion tunnel (1) are set
Have closure plug (31), the junction of the upper working tunnel (2) and lower working tunnel (3) is equipped with connection plug (32).
2. diversion tunnel working tunnel as described in claim 1 is used as ecology for the reconstruction structure in water hole, it is characterized in that: on described
The outlet end of working tunnel (2) is connected by arc-shaped transition section (22) with diversion tunnel (1).
3. diversion tunnel working tunnel as claimed in claim 2 is used as ecology for the reconstruction structure in water hole, it is characterized in that: the arc
The radius of shape changeover portion (22) is greater than the hole diameter of 5 times upper working tunnel (2), and corner is less than 60 °.
4. diversion tunnel working tunnel as claimed in claim 2 is used as ecology for the reconstruction structure in water hole, it is characterized in that: under described
The entrance of working tunnel (3) is connected with the arc-shaped transition section (22) of upper working tunnel (2), the upstream face of connection plug (32)
For the cambered surface to match with the arc-shaped transition section (22) of upper working tunnel (2).
5. the diversion tunnel working tunnel as described in Claims 1 to 4 any one claim is used as ecology for the transformation in water hole
Structure, it is characterized in that: being equipped with liner structure section (23), the gate (21) and arc in the outlet end of the upper working tunnel (2)
In liner structure section (23), the liner structure section (23) is equipped with far from the one end of diversion tunnel (1) for shape door lock room (25) setting
Gradual transition section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821201810.3U CN208965520U (en) | 2018-07-27 | 2018-07-27 | Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821201810.3U CN208965520U (en) | 2018-07-27 | 2018-07-27 | Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208965520U true CN208965520U (en) | 2019-06-11 |
Family
ID=66749147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821201810.3U Withdrawn - After Issue CN208965520U (en) | 2018-07-27 | 2018-07-27 | Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208965520U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677892A (en) * | 2018-07-27 | 2018-10-19 | 中国电建集团成都勘测设计研究院有限公司 | Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole |
-
2018
- 2018-07-27 CN CN201821201810.3U patent/CN208965520U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677892A (en) * | 2018-07-27 | 2018-10-19 | 中国电建集团成都勘测设计研究院有限公司 | Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole |
CN108677892B (en) * | 2018-07-27 | 2024-04-19 | 中国电建集团成都勘测设计研究院有限公司 | Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108677892A (en) | Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole | |
CN205205793U (en) | Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously | |
CN107740389A (en) | A kind of diversion tunnel structure and its plugging construction method | |
CN208965520U (en) | Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole | |
CN105386426A (en) | Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction | |
CN105672208B (en) | The discharge structure and its construction method of slag are built for blocking disconnected cheuch | |
CN206529752U (en) | A kind of double down stream surge-chamber arrangements combined with diversion tunnel | |
CN203905031U (en) | Drainage structure used during concrete plug construction period | |
CN204919482U (en) | Utilize steel pipe to clap quick block structure of diversion tunnel of door | |
CN204608713U (en) | A kind of overflow dam of regulating flow quantity | |
CN108316259A (en) | Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method | |
CN204662388U (en) | A kind of Diversion Tunnel block head exhaust structure | |
CN203113359U (en) | Earth rock cofferdam structure | |
CN107893406B (en) | Diversion tunnel group lower brake plugging program | |
CN210262966U (en) | Reconstruction ecological water drainage hole structure combined with permanent plug | |
CN204715318U (en) | A kind of massif Inner guide hole gate shaft structure | |
CN102505671B (en) | Overhead maintenance passage for diversion tunnels | |
CN206189365U (en) | A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour | |
CN202718071U (en) | Barrage structure capable of lowering silt of reservoir area | |
CN207919510U (en) | Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate | |
CN205152918U (en) | Structure that diversion tunnel and flood discharge hole combine | |
CN205348131U (en) | Diversion tunnel rebuilds to air vent after radial gate control | |
CN205100175U (en) | A structure of ecological flow of hydraulic and hydroelectric engineering lower reache is provided | |
CN103526767B (en) | A kind of method of plugging dewatering well device and shutoff dewatering well | |
CN207775844U (en) | A kind of diversion tunnel concrete stopper structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190611 Effective date of abandoning: 20240419 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190611 Effective date of abandoning: 20240419 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |