CN208965520U - Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole - Google Patents

Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole Download PDF

Info

Publication number
CN208965520U
CN208965520U CN201821201810.3U CN201821201810U CN208965520U CN 208965520 U CN208965520 U CN 208965520U CN 201821201810 U CN201821201810 U CN 201821201810U CN 208965520 U CN208965520 U CN 208965520U
Authority
CN
China
Prior art keywords
tunnel
diversion
working tunnel
working
diversion tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821201810.3U
Other languages
Chinese (zh)
Inventor
张超
李永红
李家亮
付峥
陈世全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201821201810.3U priority Critical patent/CN208965520U/en
Application granted granted Critical
Publication of CN208965520U publication Critical patent/CN208965520U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Disclosed by the utility model is that diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole by a kind of of hydraulic and hydroelectric engineering field, including diversion tunnel and upper working tunnel and lower working tunnel that diversion tunnel side is arranged in, wherein the outlet of upper working tunnel and lower working tunnel is connected to diversion tunnel, the outlet end of upper working tunnel is connected by arc-shaped transition with diversion tunnel, the radius of the arc-shaped transition section is greater than the hole diameter of 5 times or more working tunnels, and is equipped with backwater gate in the junction of the upper working tunnel and diversion tunnel.The beneficial effects of the utility model are: eliminating dedicated ecology for water hole, cost and duration have been saved;In the construction time of diversion tunnel, access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal diversion function of diversion tunnel;The dam water storage phase, solve that the lock water storage phase under high earth and rockfill dam diversion tunnel does not stop and reservoir level rises uppity problem.

Description

Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole
Technical field
The utility model relates to hydraulic and hydroelectric engineering field more particularly to a kind of diversion tunnel working tunnels by high earth and rockfill dam Ecology is transform as the reconstruction structure in water hole.
Background technique
Currently, the extra-high earth and rockfill dam hydroelectric project of more large sizes is built in Southwestern China region high mountain and steep gorge area, such as double Jiangkous, two River mouth, long sill may, monkey rock etc., the construction diversion of these engineerings is all in such a way that disconnected+diversion tunnel aerial drainage is once blocked in cofferdam.
High earth-rock works are large-scale, and the construction period is very long, and lower lock water storage difficulty is high, involve numerous factors, have Have following difficult point: downstream does not stop, and letdown flow needs to meet the requirement of ecological water supply flow;The water storage phase needs to control on water level Lifting speed is to guarantee the safety of earth and rockfill dam dam body.Currently, high earth and rockfill dam is typically necessary specially one ecology of setting expires for water hole Sufficient above-mentioned requirements.However, specially one ecology of setting is big for the project scale in water hole, investment is high, and the construction period is long.
Utility model content
To overcome existing high earth and rockfill dam to need to be arranged special ecology for water hole, cause at high cost, long construction period etc. is no Diversion tunnel working tunnel, can be transformed, with diversion tunnel by foot the technical problem to be solved by the utility model is to provide a kind of Together as the reconstruction structure in the hole that ecology supplies water.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, and including diversion tunnel and diversion tunnel side is arranged in Working tunnel, the working tunnel are divided into working tunnel and lower working tunnel, wherein the entrance and river of upper working tunnel connect Logical, outlet is connected to diversion tunnel, and the entrance of lower working tunnel is connected with upper working tunnel, is exported and is connected to diversion tunnel, it is described on One end that working tunnel is connected with diversion tunnel be equipped with gate, gate upstream side be equipped with arc-shaped door lock chamber, the lower working tunnel with The junction of diversion tunnel, which is equipped with, blocks plug, and the junction of the upper working tunnel and lower working tunnel is equipped with connection plug.
Further, the outlet end of the upper working tunnel is connected by arc-shaped transition with diversion tunnel.
Further, the radius of the arc-shaped transition section is greater than the hole diameter of 5 times or more working tunnels, corner is less than 60 °.
Further, the entrance of the lower working tunnel is connected with the arc-shaped transition section of upper working tunnel, the connection The upstream face of plug is the cambered surface to match with the arc-shaped transition section of upper working tunnel.
Further, being equipped with liner structure section, the gate and arc door lock in the outlet end of the upper working tunnel Room is arranged in liner structure section, and the liner structure section is equipped with gradual transition section far from one end of diversion tunnel.
The beneficial effects of the utility model are:
1, it by being ecological water supply hole by working tunnel reconstruction, eliminates and resets an ecology for the engineering in water hole, It is with good economic efficiency, and the duration is greatly shortened;
2, working tunnel different times are made to have different functions, the construction time of diversion tunnel, working tunnel is as water conservancy diversion The access tunnel of hole construction;The construction time of dam blocks plug and backwater gate by setting, ensure that the normal water conservancy diversion of diversion tunnel Function;Dam water storage phase, the lock water storage phase under high earth and rockfill dam diversion tunnel that preferably resolves do not stop, and meet downstream ecology flow It is required that while solving the uppity problem of high earth and rockfill dam reservoir level rising;
3, the characteristics of being gradually transformed, making full use of different times high rock fill dam construction water conservancy diversion, subsequent adaptation is in previous transformation On the basis of carry out, can greatly alleviate the duration pressure of construction in later period in this way, shorten the construction period of critical circuits.
Detailed description of the invention
Fig. 1 is diversion tunnel construction time structural schematic diagram.
Fig. 2 is dam construction phase structural schematic diagram.
Fig. 3 is lock water storage phase structural schematic diagram under diversion tunnel.
Fig. 4 is the structural schematic diagram after water storage.
Fig. 5 is gates of segmental shape structural sections schematic diagram.
Marking in figure is 1- diversion tunnel, the upper working tunnel of 2-, working tunnel under 3-, 21- gate, 22- arc-shaped transition section, 23- liner structure section, the permanent plug of 24-, 25- arc-shaped door lock chamber, 31- block plug, 32- connection plug.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1, Figure 2, Figure 3 shows, diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, including diversion tunnel 1 With the working tunnel that 1 side of diversion tunnel is arranged in, the working tunnel is divided into working tunnel 2 and lower working tunnel 3, wherein on The entrance of working tunnel 2 is connected to river, and outlet is connected to diversion tunnel 1, the entrance of lower working tunnel 3 and upper 2 phase of working tunnel Even, outlet is connected to diversion tunnel 1, and one end that the upper working tunnel 2 is connected with diversion tunnel 1 is equipped with gate 21,21 upstream of gate Side is equipped with arc-shaped door lock chamber 25, and the junction of the lower working tunnel 3 and diversion tunnel 1 is equipped with closure plug 31, the upper construction Branch hole 2 and the junction of lower working tunnel 3 are equipped with connection plug 32.After the completion of structure of modification construction, it's the water phase pasts diversion tunnel, can Upper working tunnel 2 is blocked using gate 21, lower working tunnel 3 is blocked using plug 31 is blocked;In diversion tunnel 1 Lower lock water storage phase, dismountable gate 21 are controlled using arc-shaped door lock chamber 25, make upstream river water along upper working tunnel 2 into Enter diversion tunnel 1, then flow to downstream and form ecological water supply, eliminates and reset an ecology for the engineering in water hole, have good Economic benefit, the duration is greatly shortened.The specific structure of arc-shaped door lock chamber 25 is convenient for as shown in figure 5, its top is open type Installation and adjusting arc-shaped door lock chamber 25.
Be arranged connection plug 32 purpose be, if not connecting plug 32, when carrying out ecological water overcurrent, although under apply The outlet end in work branch hole 3, which has passed through, to be blocked plug 31 and seals, water flow can not overcurrent, but in river water full of after lower working tunnel 3, Newly into water flow still can form impact turbulent in upper working tunnel 2 and the junction of lower working tunnel 3, it is raw not to be able to satisfy downstream State water supply requirement, and since lower 3 position of working tunnel is lower, it is subsequent also to need to pull water out, it is more troublesome, increases without recruitment Journey.And after being provided with connection plug 32, water flow directly from upper 2 overcurrent of working tunnel, reduces path, also just reduces and apply The engineerings such as reconstruction, the reinforcing in work branch hole.
The construction method of the reconstruction structure, comprising the following steps:
A, the access tunnel constructed in diversion tunnel construction time, the above working tunnel 2 and lower working tunnel 3 as diversion tunnel 1, it is complete Structure after is as shown in Figure 1;
B, after the completion of diversion tunnel construction, in the outlet end of lower working tunnel 3, setting blocks plug 31, in upper working tunnel 2 Outlet end setting gate 21 and with arc-shaped door lock chamber 25, structure after the completion is as shown in Figure 2;
C, the dam construction phase first blocks upper working tunnel 2 with gate 21, using 1 overcurrent river water of diversion tunnel, then builds big Dam cofferdam carries out dam construction;
D, after the completion of dam construction, the 1 lower lock water storage phase of diversion tunnel first removes the gate 21 in upper working tunnel 2, then leads to Overregulate in working tunnel 2 arc-shaped door lock chamber 25 make ecology supply water through upper working tunnel 2 to diversion tunnel 1 carry out overcurrent, Reservoir level can be risen simultaneously and be controlled, as shown in Figure 3;
E, after dam reaches water storage requirement, 2 arc-shaped door lock chamber 25 of working tunnel stops supplying water in closing, then in upper construction Permanent plug 24 is set between the arc-shaped door lock chamber 25 and diversion tunnel 1 in branch hole 2, and reconstruction is completed, such as Fig. 4 of structure after the completion institute Show.
By being transformed to traditional working tunnel, so that working tunnel different times have different functions, water conservancy diversion The construction time in hole 1, the access tunnel that working tunnel is constructed as diversion tunnel;The construction time of dam blocks 31 He of plug by setting Gate 21 ensure that the normal diversion function of diversion tunnel 1;The dam water storage phase preferably resolves lock under high earth and rockfill dam diversion tunnel The water storage phase does not stop, and meets the requirement of downstream ecology flow, while it is uppity to solve high earth and rockfill dam reservoir level rising Problem.And the characteristics of entire improvement project is gradually to be transformed, and makes full use of different times high rock fill dam construction water conservancy diversion, it is subsequent to change It makes and is carried out on the basis of previous transformation, can greatly alleviate the duration pressure of construction in later period in this way, shorten critical circuits Construction period.
Since the trunk roads of working tunnel are generally parallel with diversion tunnel 1, then need to be arranged when needing and being connected to diversion tunnel 1 Corner is turned to diversion tunnel 1, and right-angled bend is usually used in currently existing scheme, but in order to reduce water when subsequent overcurrent ecology supplies water The impact to working tunnel is flowed, is connected by arc-shaped transition section 22 with diversion tunnel 1 in the outlet end of the upper working tunnel 2.Into One step, in order to reach most smooth overcurrent, the radius of the arc-shaped transition section 22 should be greater than the hole diameter of 5 times of upper working tunnels 2, Corner is less than 60 °.
As shown in figure 3, the entrance of the lower working tunnel 3 is connected with the arc-shaped transition section 22 of upper working tunnel 2, in order to 22 phase of arc-shaped transition section of upper working tunnel 2 is agreed with, and sets the upstream face of the connection plug 32 to and upper working tunnel 2 The cambered surface that arc-shaped transition section 22 matches.
Punching is formed to the outlet of upper working tunnel 2 when entering diversion tunnel 1 from upper working tunnel 2 in order to avoid ecological water flow Brush, is equipped with liner structure section 23 in the outlet end of the upper working tunnel 2, and the gate 21 and the setting of arc-shaped door lock chamber 25 exist In liner structure section 23, the liner structure section 23 is equipped with gradual transition section far from one end of diversion tunnel 1.The liner structure section 23 Simultaneously construction basis can be provided for the subsequent permanent plug 24 of setting.
In view of entire duration situation, to reconstructing preferably during carrying out water using diversion tunnel 1 for upper working tunnel 2 Dry season carries out, specifically, cofferdam is arranged in the entrance in upper working tunnel 2, then reconstructs to upper working tunnel 2, including In junction setting connection plug 32, arc-shaped door lock chamber 25 and the liner structure section 23 of upper working tunnel 2 and lower working tunnel 3 Transition construction so that upper working tunnel meet ecology supply water overcurrent requirement.
The reconstruction structure of the application takes full advantage of the design feature of working tunnel and water conservancy diversion, is made by transformation gradually whole A engineering not only meets ecological water supply requirement, has saved cost and duration, even more plays different works in the different construction stages With, or even solve high earth and rockfill dam reservoir level and rise uppity problem, there is good practicability and application prospect, be Similar engineering provides good reference.

Claims (5)

1. diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole, including diversion tunnel (1) and setting are on diversion tunnel (1) side The working tunnel of side, it is characterized in that: the working tunnel is divided into working tunnel (2) and lower working tunnel (3), wherein upper construction The entrance in branch hole (2) is connected to river, and outlet is connected to diversion tunnel (1), the entrance and upper working tunnel of lower working tunnel (3) (2) it is connected, outlet is connected to diversion tunnel (1), and one end that the upper working tunnel (2) is connected with diversion tunnel (1) is equipped with gate (21), gate (21) upstream side is equipped with arc-shaped door lock chamber (25), and the lower working tunnel (3) and the junction of diversion tunnel (1) are set Have closure plug (31), the junction of the upper working tunnel (2) and lower working tunnel (3) is equipped with connection plug (32).
2. diversion tunnel working tunnel as described in claim 1 is used as ecology for the reconstruction structure in water hole, it is characterized in that: on described The outlet end of working tunnel (2) is connected by arc-shaped transition section (22) with diversion tunnel (1).
3. diversion tunnel working tunnel as claimed in claim 2 is used as ecology for the reconstruction structure in water hole, it is characterized in that: the arc The radius of shape changeover portion (22) is greater than the hole diameter of 5 times upper working tunnel (2), and corner is less than 60 °.
4. diversion tunnel working tunnel as claimed in claim 2 is used as ecology for the reconstruction structure in water hole, it is characterized in that: under described The entrance of working tunnel (3) is connected with the arc-shaped transition section (22) of upper working tunnel (2), the upstream face of connection plug (32) For the cambered surface to match with the arc-shaped transition section (22) of upper working tunnel (2).
5. the diversion tunnel working tunnel as described in Claims 1 to 4 any one claim is used as ecology for the transformation in water hole Structure, it is characterized in that: being equipped with liner structure section (23), the gate (21) and arc in the outlet end of the upper working tunnel (2) In liner structure section (23), the liner structure section (23) is equipped with far from the one end of diversion tunnel (1) for shape door lock room (25) setting Gradual transition section.
CN201821201810.3U 2018-07-27 2018-07-27 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole Withdrawn - After Issue CN208965520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821201810.3U CN208965520U (en) 2018-07-27 2018-07-27 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821201810.3U CN208965520U (en) 2018-07-27 2018-07-27 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Publications (1)

Publication Number Publication Date
CN208965520U true CN208965520U (en) 2019-06-11

Family

ID=66749147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821201810.3U Withdrawn - After Issue CN208965520U (en) 2018-07-27 2018-07-27 Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Country Status (1)

Country Link
CN (1) CN208965520U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677892A (en) * 2018-07-27 2018-10-19 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677892A (en) * 2018-07-27 2018-10-19 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
CN108677892B (en) * 2018-07-27 2024-04-19 中国电建集团成都勘测设计研究院有限公司 Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel

Similar Documents

Publication Publication Date Title
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN208965520U (en) Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole
CN107740389A (en) A kind of diversion tunnel structure and its plugging construction method
CN104120692A (en) Construction layout method for one-cavity and double-layer combination of guiding cavity and emptying cavity
CN207314299U (en) A kind of arrangement of the narrow steep full tunnel-spillway in river valley bank
CN204608713U (en) A kind of overflow dam of regulating flow quantity
CN108316259A (en) Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method
CN108677892A (en) Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
CN105672208B (en) The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN203905031U (en) Drainage structure used during concrete plug construction period
CN204662388U (en) A kind of Diversion Tunnel block head exhaust structure
CN203113359U (en) Earth rock cofferdam structure
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN205501940U (en) A drainage structures for blocking disconnected valley construction sediment field
CN204715318U (en) A kind of massif Inner guide hole gate shaft structure
CN102505671B (en) Overhead maintenance passage for diversion tunnels
CN206189365U (en) A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN205152918U (en) Structure that diversion tunnel and flood discharge hole combine
CN205530166U (en) Full pipeline diversion power generation facility
CN205348131U (en) Diversion tunnel rebuilds to air vent after radial gate control
CN105386426A (en) Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction
CN207775844U (en) A kind of diversion tunnel concrete stopper structure
CN205314072U (en) Ecology that diversion tunnel reconstruction was controlled for radial gate hole of draining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190611

Effective date of abandoning: 20240419

AV01 Patent right actively abandoned

Granted publication date: 20190611

Effective date of abandoning: 20240419

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned