CN206529752U - A kind of double down stream surge-chamber arrangements combined with diversion tunnel - Google Patents

A kind of double down stream surge-chamber arrangements combined with diversion tunnel Download PDF

Info

Publication number
CN206529752U
CN206529752U CN201720007568.5U CN201720007568U CN206529752U CN 206529752 U CN206529752 U CN 206529752U CN 201720007568 U CN201720007568 U CN 201720007568U CN 206529752 U CN206529752 U CN 206529752U
Authority
CN
China
Prior art keywords
chamber
surge
built
tunnel
down stream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720007568.5U
Other languages
Chinese (zh)
Inventor
杨嵘
李高会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201720007568.5U priority Critical patent/CN206529752U/en
Application granted granted Critical
Publication of CN206529752U publication Critical patent/CN206529752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model is related to a kind of double down stream surge-chamber arrangements combined with diversion tunnel.The purpose of this utility model is to propose a kind of double down stream surge-chamber arrangements combined with diversion tunnel, can preferably improve that down stream surge-chamber is minimum to surge, while the minimum internal water pressure of raising draft tube, and will not increase construction investment.The technical solution of the utility model is:The structure has built diversion tunnel and newly-built tailwater tunnel, the upstream of the newly-built tailwater tunnel has down stream surge-chamber and is connected by tail water branch pipe with unit, the downstream hole section of the built diversion tunnel is combined to form shared tailwater tunnel with the downstream hole section of newly-built tailwater tunnel, and the upstream hole section reconstruction of built diversion tunnel is surge-chamber;The upstream end and downstream of the surge-chamber are blocked by solid plug, and the solid plug downstream correct position of upstream end sets a passage, and the solid plug of downstream reserves impedance hole and connects the surge-chamber and newly-built tailwater tunnel.The utility model is applied to Hydraulic and Hydro-Power Engineering.

Description

A kind of double down stream surge-chamber arrangements combined with diversion tunnel
Technical field
The utility model is related to a kind of double down stream surge-chamber arrangements combined with diversion tunnel, it is adaptable to water conservancy and hydropower work Journey.
Background technology
Power station water-carriage system regulating guarantee design is the important component of water-carriage system design, and wherein draft tube is minimum Internal water pressure and minimum surge of down stream surge-chamber are one of key contents of regulating guarantee design concern, if draft tube minimum pressure It is too low, occur water column separation phenomenon, it is minimum to surge too low, surge-chamber bottom may be caused to draw empty;In order to avoid this problem Appearance, it is some when using the lower room of setting, increase turbine generator inertia to ensure that rotating speed is closed no more than controlling value to extend unit Between or increase surge-chamber cross dimensions or impedance hole area, improve its water hammer reflecting effect, but these measures can increase Certain construction investment.
The content of the invention
The technical problems to be solved in the utility model is:For above-mentioned problem, propose that one kind is combined with diversion tunnel Double down stream surge-chamber arrangements, can preferably improve down stream surge-chamber it is minimum surge, while improve draft tube minimum in Water pressure, and construction investment will not be increased.
The technical scheme that the utility model is used is:A kind of double down stream surge-chamber arrangements combined with diversion tunnel, With built diversion tunnel and newly-built tailwater tunnel, the upstream of the newly-built tailwater tunnel has down stream surge-chamber and by tail water Branch pipe is connected with unit, it is characterised in that the downstream hole section of the built diversion tunnel and the downstream hole section phase of newly-built tailwater tunnel Shared tailwater tunnel is combined to form, the upstream hole section reconstruction of built diversion tunnel is surge-chamber;The upstream end of the surge-chamber is with Trip end is blocked by solid plug, and the solid plug downstream correct position of upstream end sets a passage, and the solid of downstream is blocked up Reserved impedance hole connects the surge-chamber and newly-built tailwater tunnel.
The passage is connected with the ventilation hole of down stream surge-chamber or communication chamber.
The beneficial effects of the utility model are:The diversion tunnel section between two Diversion tunnel plugs is reconstructed in the utility model For surge-chamber, it can be mended in load rejection with the down stream surge-chamber formation differential effect close to unit position into tunnel Water, reduces the rate of water make-up of down stream surge-chamber, and lower room is additionally arranged equivalent to existing down stream surge-chamber, can effectively improve The minimum of some down stream surge-chambers is surged, while improving the minimum internal water pressure of draft tube, is realized a hole and is used, and reconstruct into This is smaller, and benefit is obvious.
Brief description of the drawings
Fig. 1 is structural plan of the present utility model.
Embodiment
The power station built on great rivers is passed through frequently with diversion tunnel water conservancy diversion, to save construction investment, often considers to lead A part of hole section for flowing hole is combined with tailwater tunnel, is formed and is shared tailwater tunnel, to reach the purpose for saving construction investment.
As shown in figure 1, the present embodiment is a kind of double down stream surge-chamber arrangements combined with diversion tunnel, it is adaptable to tail water Tunnel is combined the Long tunnels of construction with diversion tunnel, with built diversion tunnel 1, newly-built tailwater tunnel 2, newly-built tailwater tunnel 2 The down stream surge-chamber 6 that upstream has, and the unit 7 being connected by tail water branch pipe with tailwater tunnel.Work is specifically being built with western part Exemplified by journey, the downstream hole of built diversion tunnel 1 section is combined with newly-built tailwater tunnel 2 to form shared tailwater tunnel 2-1 and (can save Construction investment about is up to more than 3,000 ten thousand yuan), and be surge-chamber 1-1 by the upstream hole section reconstruction of built diversion tunnel 1, with tail water Surge-chamber 6 forms double surge-chamber structures, to reduce the size of down stream surge-chamber 6;Surge-chamber 1-1 upstream end and downstream is equal Blocked by solid plug 4, the downstream correct position of solid plug 4 of upstream end sets a passage 5, the solid plug 4 of downstream Lower section reserves an impedance hole 3 and connects the surge-chamber 1-1 and newly-built tailwater tunnel 2, the fluctuating range for reducing surge-chamber; The caverns such as passage 5 and the ventilation hole of down stream surge-chamber 6 or communication chamber are connected, and are had surge-chamber 1-1 and are connected with outdoor Table, double down stream surge-chambers are formed with down stream surge-chamber 6.
In the present embodiment, surge-chamber 1-1 can form differential effect in load rejection with down stream surge-chamber 6, to tunnel Moisturizing in hole, reduces the rate of water make-up close to down stream surge-chamber 6, is additionally arranged lower room equivalent to down stream surge-chamber 6, can effectively change Kind the minimum of down stream surge-chamber 6 is surged, while improving draft tube import minimum pressure, reduces the size of existing down stream surge-chamber.
Though the utility model is described by previous examples, but still its form of alterable and details, new not departing from this practicality Implement under the spirit of type.Foregoing is the most rational technical scheme of the utility model, the side of specific implementation only of the present utility model One of formula, but be not limited thereto.

Claims (2)

1. a kind of double down stream surge-chamber arrangements combined with diversion tunnel, with built diversion tunnel (1) and newly-built tailwater tunnel (2), the upstream of the newly-built tailwater tunnel (2) has down stream surge-chamber (6) and is connected by tail water branch pipe with unit (7), its It is characterised by:The downstream hole section of the built diversion tunnel (1) is combined to form shared with the downstream hole section of newly-built tailwater tunnel (2) Tailwater tunnel (2-1), the upstream hole section reconstruction of built diversion tunnel is surge-chamber (1-1);The upstream of the surge-chamber (1-1) End and downstream are blocked by solid plug (4), and solid plug (4) downstream correct position of upstream end sets a passage (5), The solid plug (4) of downstream reserves impedance hole (3) and connects the surge-chamber (1-1) and newly-built tailwater tunnel (2).
2. a kind of double down stream surge-chamber arrangements combined with diversion tunnel according to claim 1, it is characterised in that:Institute Passage (5) is stated with the ventilation hole of down stream surge-chamber (6) or communication chamber to be connected.
CN201720007568.5U 2017-01-04 2017-01-04 A kind of double down stream surge-chamber arrangements combined with diversion tunnel Active CN206529752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720007568.5U CN206529752U (en) 2017-01-04 2017-01-04 A kind of double down stream surge-chamber arrangements combined with diversion tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720007568.5U CN206529752U (en) 2017-01-04 2017-01-04 A kind of double down stream surge-chamber arrangements combined with diversion tunnel

Publications (1)

Publication Number Publication Date
CN206529752U true CN206529752U (en) 2017-09-29

Family

ID=59917619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720007568.5U Active CN206529752U (en) 2017-01-04 2017-01-04 A kind of double down stream surge-chamber arrangements combined with diversion tunnel

Country Status (1)

Country Link
CN (1) CN206529752U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356124A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Cavern usual friendship fork structure
CN109385988A (en) * 2018-11-22 2019-02-26 中国电建集团成都勘测设计研究院有限公司 For high water head, big flow, short diversion and power workshop tailrace tunnel discharge structure
CN114960483A (en) * 2022-04-22 2022-08-30 浙江华东工程建设管理有限公司 Diversion tail water tunnel reconstruction plug upstream permanent drainage structure and drainage method
CN115094845A (en) * 2022-05-21 2022-09-23 徐康瑞 Pumped storage chamber suitable for TBM construction and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356124A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Cavern usual friendship fork structure
CN109356124B (en) * 2018-11-21 2023-11-21 中国电建集团成都勘测设计研究院有限公司 Chamber level crossing fork structure
CN109385988A (en) * 2018-11-22 2019-02-26 中国电建集团成都勘测设计研究院有限公司 For high water head, big flow, short diversion and power workshop tailrace tunnel discharge structure
CN114960483A (en) * 2022-04-22 2022-08-30 浙江华东工程建设管理有限公司 Diversion tail water tunnel reconstruction plug upstream permanent drainage structure and drainage method
CN114960483B (en) * 2022-04-22 2024-01-12 浙江华东工程建设管理有限公司 Diversion tail water hole reconstruction plugging head upstream permanent drainage structure and drainage method
CN115094845A (en) * 2022-05-21 2022-09-23 徐康瑞 Pumped storage chamber suitable for TBM construction and construction method

Similar Documents

Publication Publication Date Title
CN206529752U (en) A kind of double down stream surge-chamber arrangements combined with diversion tunnel
CN203546687U (en) Hydropower station tail water surge chamber capable of automatically adapting to changes in tail water level
CN103742337B (en) A kind of bilateral stator tubular turbine being provided with oval runner
CN104179159B (en) Power station bright flowing full tail water system
CN105155484A (en) Method for reconstructing temporary diversion tunnel into permanent flood discharge facility
CN204185835U (en) Power station free pressure flow tail water discharge
CN203429610U (en) Arrangement structure capable of improving minimum pressure of inlet of draft tube and decreasing tailrace surge chamber
CN108677892B (en) Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel
CN207314299U (en) A kind of arrangement of the narrow steep full tunnel-spillway in river valley bank
CN103742334B (en) A kind of tubular turbine with the symmetrical wide movable guide vane in front and back
CN205742110U (en) A kind of arrangement improving long diversion system power station unit operational flexibility
CN104234019B (en) Variable-section surge chamber
CN204282317U (en) Power station free pressure flow replaces tailrace tunnel
CN205134292U (en) High arch dam construction diversion hole structure
CN104099909B (en) Based on the flood discharge generating sync energy dissipater of flood-discharge tunnel
CN204151762U (en) Semi cylindrical type surge-chamber
CN211922550U (en) Improve power station tailrace tunnel open-full flow influence's adverse slope weir structure
CN203113359U (en) Earth rock cofferdam structure
CN206503670U (en) Draw water generating new equipment on plateau
CN207092036U (en) A kind of Diversion system of hydropower station layout pattern
CN204185836U (en) Variable-section surge chamber
CN204000796U (en) Power station in river channel's structure
CN209277132U (en) A kind of hydraulic and hydroelectric engineering water conservancy diversion, tail water, emptying tunnel structure
CN202865809U (en) Hydropower station pressure regulating structure
CN204803854U (en) It stabilizes structure of sectional area to reduce surge -chamber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant