CN203905031U - Drainage structure used during concrete plug construction period - Google Patents

Drainage structure used during concrete plug construction period Download PDF

Info

Publication number
CN203905031U
CN203905031U CN201420284684.8U CN201420284684U CN203905031U CN 203905031 U CN203905031 U CN 203905031U CN 201420284684 U CN201420284684 U CN 201420284684U CN 203905031 U CN203905031 U CN 203905031U
Authority
CN
China
Prior art keywords
concrete plug
concrete
steel pipe
downstream
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420284684.8U
Other languages
Chinese (zh)
Inventor
周先练
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201420284684.8U priority Critical patent/CN203905031U/en
Application granted granted Critical
Publication of CN203905031U publication Critical patent/CN203905031U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a drainage structure used during the concrete plug construction period. The drainage structure comprises a concrete plug (2), and an upstream temporary cofferdam (7) and a downstream temporary cofferdam (8) are arranged on the upstream and the downstream of the concrete plug (2). The drainage structure is characterized in that at least one drainage steel pipe (1) is arranged at the bottom of the concrete plug (2), the upstream end of each drainage steel pipe (1) is located at the upstream of the upstream temporary cofferdam (7), and the downstream end of each drainage steel pipe (1) is located at the downstream of the downstream temporary cofferdam (8). According to the drainage structure, the drainage steel pipes are embedded into the concrete plug so as to guarantee drainage during the concrete plug construction period, and the drainage structure is simple in structure, rapid and convenient to construct, safe and reliable; due to the fact that late drainage steel pipes are closed through valves and micro-expansion concrete is used for plugging the drainage steel pipes and the valves, the construction technology is simple, the sealing effect is good, and it is guaranteed that the drainage steel pipes cannot leak water when a project runs perpetually.

Description

The discharge structure of a kind of concrete plug construction period
Technical field
The utility model belongs to Hydraulic and Hydro-Power Engineering technical field, relates to a kind of discharge structure, particularly relates to the discharge structure of a kind of concrete plug construction period.
Background technology
According to lock retaining requirement under Hydraulic and Hydro-Power Engineering, must be by Diversion Tunnel or construction the permanent shutoff in hole after lower lock retaining, guarantee engineering safety operation after lower lock.Because reservoir area after lower lock starts retaining, in concrete plug construction period cavern, will produce a large amount of infiltrations, meanwhile, the construction waste water when construction of concrete plug also will affect plug engineering construction.At present, hydroelectric project is generally taked, at the upstream side of concrete plug, water-pumping/draining equipment is set infiltration and construction waste water is carried out to pump drainage to meet concrete plug dry work requirement, or changes concrete plug material into underwater concreting.But, adopt water-pumping/draining equipment construction electricity consumption power supply must be embedded in concrete plug, affect concrete stopper structure integrality, and water-pumping/draining expends electric weight, increase construction investment; If take underwater concreting, its pouring quality is difficult to ensure, affects concrete plug construction quality, has hidden danger of quality.
Utility model content
For addressing the above problem, the utility model provides the discharge structure of a kind of concrete plug construction period, make concrete plug construction period without taking pumping equipment to carry out pump drainage to infiltration, construction waste water etc., also needn't take underwater concreting mode, by adopting draining steel pipe to reach the object of free-draining, implement convenient and easy, safe and reliable.
For realizing the purpose of this utility model, the discharge structure of concrete plug construction period of the present utility model, comprise concrete plug, concrete plug is Diversion Tunnel or a construction permanent water-retaining structure in hole, the upstream and downstream of this concrete plug is respectively equipped with upstream Temporary Cofferdam and downstream Temporary Cofferdam, wherein, is provided with at least one draining steel pipe in the bottom of concrete plug, the upstream extremity of this draining steel pipe is positioned at the upstream of upstream Temporary Cofferdam, and downstream is positioned at the downstream of downstream Temporary Cofferdam.
Further, in concrete plug, be provided with the current that can control in draining steel pipe by or the valve of closing.Valve be located at one can for people up and down current in case control described valve open or the valve well of closing in.Valve well is in communication with the outside by the gallery of being located in concrete plug.The opening of gallery is positioned at the downstream of described concrete plug, and gallery extends to concrete plug inside, and valve well is located at gallery and is positioned at the end of concrete plug.Valve well extends downward described draining steel pipe from described gallery.
After construction finishes, draining steel pipe is provided with slightly expanded concrete shutoff to downstream tail end from valve, and valve well inside is also provided with slightly expanded concrete shutoff.
Compared with prior art, the utility model is embedded in concrete plug in advance by employing draining steel pipe, to ensure the construction period draining of concrete plug, and simple in structure, quick construction convenience, safe and reliable; Because later stage draining steel pipe adopts valve closing, adopt slightly expanded concrete to carry out shutoff to draining steel pipe and valve well, not only construction technology is simple, good sealing effect, and while guaranteeing that engineering is forever moved, draining steel pipe is water-tight.The utility model is in the time of application, without taking pumping equipment to carry out pump drainage to infiltration, construction waste water etc., also needn't take underwater concreting mode, by adopting draining steel pipe to reach the object of free-draining, implement convenient and easy, economic and practical, in Construction for Hydroelectric Project technical field wide popularization and application.
brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is draining steel pipe and valve well plugging structure schematic diagram in the utility model.
Description of reference numerals: 1-draining steel pipe, 2-concrete plug, 3-gallery, 4-valve, 5-valve well, 6-slightly expanded concrete, 7-upstream Temporary Cofferdam, 8-downstream Temporary Cofferdam.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, the discharge structure of concrete plug construction period of the present utility model, wherein concrete plug 2 is Diversion Tunnel or a construction permanent water-retaining structure in hole, draining steel pipe 1 is embedded in concrete plug 2 bottoms in advance, is provided with valve 4 on draining steel pipe 1.In actual applications, the diameter of draining steel pipe 1 and usage quantity thereof are determined by the wastewater flow size that seeps water and construct.Because draining steel pipe 1 is embedded in concrete plug 2 bottoms in advance, and draining steel pipe 1 is imported and exported through Temporary Cofferdam, to meet the drainage requirement of concrete plug construction period.Temporary Cofferdam is arranged at concrete plug 2 upstream and downstream, and as shown in Figure 1, 2, what be located at concrete plug 2 upstreams is upstream Temporary Cofferdam 7, and what be provided with concrete plug 2 downstreams is downstream Temporary Cofferdam 8.In concrete plug 2, be provided with gallery 3.Gallery 3 upstream sides are provided with valve well 5.Valve 4 is arranged in valve well 5.
Draining steel pipe 1 tract and valve well 5 inside are provided with slightly expanded concrete 6.The concrete that added expansion agent owing to adopting slightly expanded concrete 6, therefore concrete dry after can not produce contraction, and As time goes on, have certain free wxpansion amount.Utilize slightly expanded concrete 6 these characteristics, can make draining steel pipe 1 and valve well 5 good seals, while guaranteeing that engineering is forever moved, draining steel pipe 1 and valve well 5 are water-tight.
Adopt technique scheme, by valve 4 is set on draining steel pipe 1, and valve 4 is arranged in the valve well 5 of gallery 3 upstream sides of concrete plug 2 inside to the construction transportation that can utilize like this gallery 3 to close as later stage draining steel pipe 1.After draining steel pipe 1 is closed by valve 4, utilize slightly expanded concrete 6 by the draining steel pipe 1 of valve 4 tracts and valve well 5 shutoff, while guaranteeing that engineering is forever moved, draining steel pipe 1 and valve well 5 are water-tight.
The utility model, in the time implementing, as shown in Figure 1, is first embedded in draining steel pipe 1 concrete plug 2 bottoms in advance, at the interior valve 4 that arranges of draining steel pipe 1, and at gallery 3 upstream sides of concrete plug 2 inside, valve well 5 is set, and valve 4 is arranged in valve well 5.As shown in Figure 2, in the time that concrete plug is constructed, being flow automatically by draining steel pipe 1, ejectment is seeped water and construction waste water; After concrete plug 2 has been constructed, utilize gallery 3 and valve well 5 as construction passage, by valve 4, draining steel pipe 1 is closed, and utilize slightly expanded concrete 6 by draining steel pipe 1 tract and valve well 5 shutoff.The utility model is simple in structure, quick construction is convenient, safe and reliable, economic and practical, can be in Construction for Hydroelectric Project technical field wide popularization and application.
Certainly, be more than concrete exemplary applications of the present utility model, the utility model also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, within all dropping on the desired protection domain of the utility model.

Claims (7)

1. the discharge structure of a concrete plug construction period, comprise concrete plug (2), the upstream and downstream of this concrete plug (2) is respectively equipped with upstream Temporary Cofferdam (7) and downstream Temporary Cofferdam (8), it is characterized in that: be provided with at least one draining steel pipe (1) in the bottom of described concrete plug (2), the upstream extremity of this draining steel pipe (1) is positioned at the upstream of upstream Temporary Cofferdam (7), and downstream is positioned at the downstream of downstream Temporary Cofferdam (8).
2. the discharge structure of concrete plug construction period according to claim 1, is characterized in that: in described concrete plug (2), be provided with the current that can control in draining steel pipe (1) by or the valve (4) of closing.
3. the discharge structure of concrete plug construction period according to claim 2, is characterized in that: described valve (4) is located at one can be current to control in the valve well (5) that described valve (4) opens or close up and down for people.
4. the discharge structure of concrete plug construction period according to claim 3, is characterized in that: described valve well (5) is in communication with the outside by the gallery (3) of being located in described concrete plug (2).
5. the discharge structure of concrete plug construction period according to claim 4, it is characterized in that: the opening of described gallery (3) is positioned at the downstream of described concrete plug (2), described gallery (3) extends to described concrete plug (2) inside, and described valve well (5) is located at described gallery (3) and is positioned at the end of described concrete plug (2).
6. the discharge structure of concrete plug construction period according to claim 5, is characterized in that: described valve well (5) extends downward described draining steel pipe (1) from described gallery (3).
7. the discharge structure of a kind of concrete plug construction period according to claim 1, it is characterized in that: after construction finishes, described draining steel pipe (1) is provided with slightly expanded concrete (6) shutoff to downstream tail end from described valve (4), and described valve well (5) inside is also provided with slightly expanded concrete (6) shutoff.
CN201420284684.8U 2014-05-30 2014-05-30 Drainage structure used during concrete plug construction period Expired - Lifetime CN203905031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420284684.8U CN203905031U (en) 2014-05-30 2014-05-30 Drainage structure used during concrete plug construction period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420284684.8U CN203905031U (en) 2014-05-30 2014-05-30 Drainage structure used during concrete plug construction period

Publications (1)

Publication Number Publication Date
CN203905031U true CN203905031U (en) 2014-10-29

Family

ID=51779322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420284684.8U Expired - Lifetime CN203905031U (en) 2014-05-30 2014-05-30 Drainage structure used during concrete plug construction period

Country Status (1)

Country Link
CN (1) CN203905031U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700440A (en) * 2017-10-31 2018-02-16 广东水电二局股份有限公司 A kind of diversion tunnel concrete plug and its construction method
CN109853490A (en) * 2019-03-15 2019-06-07 中国电建集团贵阳勘测设计研究院有限公司 Method and device for temporarily lowering ecological flow in water storage period of concrete dam
CN112323740A (en) * 2020-10-26 2021-02-05 长江勘测规划设计研究有限责任公司 Integrated 'leading-blocking-leading' multifunctional temporary ecological water drainage device and method
CN114673125A (en) * 2022-03-15 2022-06-28 长江岩土工程有限公司 Plugging construction method for diversion tunnel of hydraulic engineering

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700440A (en) * 2017-10-31 2018-02-16 广东水电二局股份有限公司 A kind of diversion tunnel concrete plug and its construction method
CN109853490A (en) * 2019-03-15 2019-06-07 中国电建集团贵阳勘测设计研究院有限公司 Method and device for temporarily lowering ecological flow in water storage period of concrete dam
CN109853490B (en) * 2019-03-15 2024-03-01 中国电建集团贵阳勘测设计研究院有限公司 Method and device for temporarily lowering ecological flow in water storage period of concrete dam
CN112323740A (en) * 2020-10-26 2021-02-05 长江勘测规划设计研究有限责任公司 Integrated 'leading-blocking-leading' multifunctional temporary ecological water drainage device and method
CN114673125A (en) * 2022-03-15 2022-06-28 长江岩土工程有限公司 Plugging construction method for diversion tunnel of hydraulic engineering
CN114673125B (en) * 2022-03-15 2024-06-04 长江岩土工程有限公司 Hydraulic engineering diversion tunnel plugging construction method

Similar Documents

Publication Publication Date Title
CN203905031U (en) Drainage structure used during concrete plug construction period
CN204552818U (en) The drainage system of ditch, side, anti-tunnel bottom leaky
CN203594007U (en) Power station hub downstream water supply structure
CN203846465U (en) Emptying tunnel or non-normal spillway tunnel arrangement system
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN203270527U (en) Device for preventing gas explosion after gate closing and plugging of diversion tunnel
CN204023486U (en) Structure for providing downward discharge ecological flow for initial reservoir storage
CN204715426U (en) A kind of water burst drainage system for closed deep foundation ditch exploratory hole
CN203320497U (en) Tail water maintenance gate for power station
CN105386426A (en) Construction for transforming diversion tunnel into ecological drainage tunnel controlled by radial gate and method for construction
CN204570634U (en) The siphon discharging device in power station
CN206289595U (en) Dam body ecological flow lowering device
CN103290804B (en) Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works
CN202440787U (en) Riverway diversion device
CN204676504U (en) The emptying maintenance structure of a kind of long tailwater tunnel group without gravity flow ejectment condition
CN204662388U (en) Diversion tunnel shutoff head exhaust structure
CN204023523U (en) Internal gate valve chamber structure of dam body
CN203768880U (en) Device for gate closing water stopping of temporary gate
CN204023592U (en) The advanced quick blocking structure of a kind of foundation ditch drainage well
CN104005387A (en) Emptying tunnel or special flood discharging tunnel arranging system and opening and closing method thereof
CN205100175U (en) Structure for providing ecological flow of downstream river reach of hydraulic and hydroelectric engineering
CN203049554U (en) Structure used for gate lock of diversion tunnel
CN206189365U (en) A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour
CN205530166U (en) Full pipeline diversion power generation facility
CN208965520U (en) Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20141029

CX01 Expiry of patent term