CN203320497U - Tail water maintenance gate for power station - Google Patents

Tail water maintenance gate for power station Download PDF

Info

Publication number
CN203320497U
CN203320497U CN2013203300831U CN201320330083U CN203320497U CN 203320497 U CN203320497 U CN 203320497U CN 2013203300831 U CN2013203300831 U CN 2013203300831U CN 201320330083 U CN201320330083 U CN 201320330083U CN 203320497 U CN203320497 U CN 203320497U
Authority
CN
China
Prior art keywords
gate
tail water
water
tail
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203300831U
Other languages
Chinese (zh)
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN2013203300831U priority Critical patent/CN203320497U/en
Application granted granted Critical
Publication of CN203320497U publication Critical patent/CN203320497U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses a tail water maintenance gate for a power station. The tail water maintenance gate comprises a gate body and a gate groove of the gate body, wherein the gate body is provided with a panel and a water seal; the gate groove is arranged at a tail water pipe outlet and is provided with an lintel; the panel and the water seal are arranged at a tail water side; the lintel is arranged on a breast wall of the tail water side. The tail water maintenance gate has the beneficial effects that sewage is prevented from being injected into the tail water maintenance gate through the top of the gate, and water is prevented from flowing into the top of the gate, so that a gate unit side and the tail water side are avoided loosing water retaining effect due to two-side flat pressure; the waste slag is prevented from flooding into a beam grillage of the tail water maintenance gate, so that the self weight of the gate is prevented from being increased, and the gate is guaranteed to be opened and closed normally.

Description

A kind of tail water overhauling gate of power station
Technical field
The utility model relates to a kind of tail water overhauling gate of power station, belongs to Hydraulic and Hydro-Power Engineering gate technical field.
Background technology
In existing power station, consider the demand of the maintenance hydraulic turbine, need to Emergency Gate be set at tailrace outlet, for the power station more than a unit, if consider generating by stages, when first unit generation, due to all the other unit Hot work in progress, therefore gate has the temporary water dash requirement, first unit will generate electricity and need to remove cofferdam, this will cause the meetings such as a large amount of slag stone and dirt to be poured in down a chimney under flow action into the tail sluice opening, the panel of conventional tail water overhauling gate, water seal and lintel all are arranged on the unit side, this can make a large amount of wastes pour in the Liang Geshang of tail water overhauling gate, cause the deadweight of gate to increase more, the keying of gate is more difficult, sometimes even can't open and close, so prior art is still perfect not.
Summary of the invention
The purpose of this utility model is to provide a kind of tail water overhauling gate of power station, can prevent that water from flowing into the lock top and making gate unit side and tail water side two sides concora crush lose the dash effect, prevent that waste pours in the Liang Geshang of tail water overhauling gate in maintenance simultaneously, can not increase the deadweight of gate, make the keying of gate normal.
The purpose of this utility model is achieved through the following technical solutions: a kind of tail water overhauling gate of power station, comprise a body and gate slot thereof, be provided with panel, water seal on described door body, described gate slot is provided with lintel, wherein, gate slot is arranged on the draft tube exit of tail water overhauling platform, and panel and water seal are arranged on the tail water side of tail water overhauling platform, and lintel is arranged on the breastwork of tail water overhauling platform.
Described breastwork is positioned at the tail water side of tail water overhauling platform.
The beneficial effects of the utility model are: the gate slot tail water side of (1), tail water overhauling gate arranges breastwork, gate slot passes on tail water overhauling platform, checking under water level, can prevent that dirt from pushing up and pouring into the tail water overhauling gate by lock, prevent that water from flowing into the lock top and making gate unit side and tail water side two sides concora crush lose the dash effect simultaneously; (2), panel and the water seal of tail water overhauling gate be arranged on the tail water side, when first unit generation removed cofferdam, can prevent that waste from pouring on the beam lattice of tail water overhauling gate increases the gate deadweight, makes the keying of gate normal.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
The partial enlarged drawing that Fig. 2 is regional K in Fig. 1.
Wherein: 1-door body, 2-gate slot, 3-panel, 4-water seal, 5-tail water overhauling platform, 6-lintel, 7-breastwork.
The specific embodiment
Further describe the technical solution of the utility model below in conjunction with accompanying drawing, but that claimed scope is not limited to is described.
As shown in Figure 1, Figure 2, a kind of tail water overhauling gate of power station, comprise a body 1 and gate slot 2 thereof, on described door body 1, is provided with panel 3, water seal 4; Be provided with lintel 6 on described gate slot 2, wherein, gate slot 2 is arranged on the draft tube exit of tail water overhauling platform 5, and panel 3 and water seal 4 are arranged on the tail water side of tail water overhauling platform 5, and lintel 6 is arranged on the breastwork 7 of tail water overhauling platform 5.
Described breastwork 7 is positioned at the tail water side of tail water overhauling platform 5.
Owing to having adopted technique scheme, the gate slot 2 of tail water overhauling gate door body 1 passes on tail water overhauling platform 5, checking under water level, can prevent that dirt etc. from pushing up by lock pours into the tail water overhauling gate, prevent that water from flowing into the lock top and making gate unit side and tail water side two sides concora crush lose the dash effect, in addition, panel 3 and the water seal 4 of door body 1 are arranged on the tail water side simultaneously, when first unit generation removed cofferdam, can prevent that waste from pouring on the beam lattice of tail water overhauling gate increases the gate deadweight.

Claims (2)

1. the tail water overhauling gate in a power station, comprise a body (1) and gate slot (2) thereof, it is characterized in that: on described door body (1), be provided with panel (3), water seal (4); Described gate slot (2) is arranged on the draft tube exit of tail water overhauling platform (5) and is provided with lintel (6), panel (3) and water seal (4) are arranged on the tail water side of tail water overhauling platform (5), and lintel (6) is arranged on the breastwork (7) of tail water overhauling platform (5).
2. the tail water overhauling gate in power station according to claim 1, it is characterized in that: described breastwork (7) is positioned at the tail water side of tail water overhauling platform (5).
CN2013203300831U 2013-06-07 2013-06-07 Tail water maintenance gate for power station Expired - Lifetime CN203320497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203300831U CN203320497U (en) 2013-06-07 2013-06-07 Tail water maintenance gate for power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203300831U CN203320497U (en) 2013-06-07 2013-06-07 Tail water maintenance gate for power station

Publications (1)

Publication Number Publication Date
CN203320497U true CN203320497U (en) 2013-12-04

Family

ID=49659863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203300831U Expired - Lifetime CN203320497U (en) 2013-06-07 2013-06-07 Tail water maintenance gate for power station

Country Status (1)

Country Link
CN (1) CN203320497U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105648990A (en) * 2016-01-14 2016-06-08 中国电建集团贵阳勘测设计研究院有限公司 Method for preventing silt from accumulating at tail water gate of power plant and gate
CN109356130A (en) * 2018-12-10 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and device of tailrace tunnel bulkhead gate
CN109853488A (en) * 2019-02-01 2019-06-07 中国电建集团贵阳勘测设计研究院有限公司 A kind of water sealing method and device of tail water cooler down-the-hole bulkhead gate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105648990A (en) * 2016-01-14 2016-06-08 中国电建集团贵阳勘测设计研究院有限公司 Method for preventing silt from accumulating at tail water gate of power plant and gate
CN109356130A (en) * 2018-12-10 2019-02-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of locking means and device of tailrace tunnel bulkhead gate
CN109356130B (en) * 2018-12-10 2023-11-14 中国电建集团贵阳勘测设计研究院有限公司 Locking method and device for tail water tunnel overhaul gate
CN109853488A (en) * 2019-02-01 2019-06-07 中国电建集团贵阳勘测设计研究院有限公司 A kind of water sealing method and device of tail water cooler down-the-hole bulkhead gate
CN109853488B (en) * 2019-02-01 2024-03-26 中国电建集团贵阳勘测设计研究院有限公司 Water sealing method and device for down-the-hole overhaul gate of tail water cooler

Similar Documents

Publication Publication Date Title
CN203320497U (en) Tail water maintenance gate for power station
CN103410130A (en) Multi-purpose tunnel arrangement structure
CN203878547U (en) Novel structure for stilling pool
CN208604556U (en) Multifunctional ecological for extra-high rock-fill dams is for water hole arragement construction
CN207092033U (en) A kind of flood discharging tunnel
CN204125907U (en) Be applicable to the ultrahigh-water head classification water-retaining structure of reservoir
CN203905031U (en) Drainage structure used during concrete plug construction period
CN104674772A (en) Method and structure for improving sand pull effect of entry of gate dam
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN204982820U (en) A lock chamber arrangement structure that is used for high arch dam water conservancy diversion bottom outlet
CN101165277B (en) Reservoir dredging method
CN210262966U (en) Reconstruction ecological water drainage hole structure combined with permanent plug
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN205776115U (en) Diversion tunnel lock chamber maintenance structure
CN204715318U (en) A kind of massif Inner guide hole gate shaft structure
CN204000796U (en) Power station in river channel's structure
CN202265807U (en) Gate chamber of building for flow guide and drainage
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN203846463U (en) Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction
CN208533449U (en) A kind of device for flood retarding project decentralization ecological water
CN102352617B (en) Bulb-tubular hydropower station plant diverting constructing method
CN203346860U (en) Structure for solving problem of sediment accumulation at the back of diversion tunnel maintenance mandoor
CN107859009A (en) Diversion tunnel utilizes lock closure arrangement and method under permanent plug first section joint gate
CN206721845U (en) A kind of diversion tunnel
CN205062776U (en) Pivot arrangement structure of power station in river channel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: FORMER NAME: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUP

Owner name: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + R

Free format text: FORMER NAME: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

CP01 Change in the name or title of a patent holder

Address after: 550004 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: CHINA POWER CONSRTUCTION GROUP GUIYANG SURVEY AND DESIGN INSTITUTE Co.,Ltd.

Address before: 550004 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address after: 550004 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550004 Guizhou Province, Guiyang City Lake District Xingqian Road No. 16

Patentee before: HydroChina Guiyang Engineering Corp.

CX01 Expiry of patent term

Granted publication date: 20131204

CX01 Expiry of patent term