CN203846463U - Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction - Google Patents

Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction Download PDF

Info

Publication number
CN203846463U
CN203846463U CN201420251730.4U CN201420251730U CN203846463U CN 203846463 U CN203846463 U CN 203846463U CN 201420251730 U CN201420251730 U CN 201420251730U CN 203846463 U CN203846463 U CN 203846463U
Authority
CN
China
Prior art keywords
barrel
sudden
dragon
new line
diversion tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420251730.4U
Other languages
Chinese (zh)
Inventor
孙永波
张晓瑞
杜全胜
周森
何蕴华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420251730.4U priority Critical patent/CN203846463U/en
Application granted granted Critical
Publication of CN203846463U publication Critical patent/CN203846463U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction. The sudden-drop and sudden-expansion structure comprises a dragon-raise-head tunnel body which is newly and additionally constructed and an original diversion tunnel body. The height of the dragon-raise-head tunnel body decreases gradually from the starting end to the tail end. At the connecting position of the dragon-raise-head tunnel body and the diversion tunnel body, the height of the dragon-raise-head tunnel body is 0.5-1.0 m higher than the height of the diversion tunnel body, and the width of one side of the dragon-raise-head tunnel body is 0.3-0.8 m smaller than the width of the diversion tunnel body. The sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction has the advantages that when a city gate opening-shaped diversion tunnel is reconstructed into a free-flow spillway tunnel, due to the fact that the tail end of the dragon-raise-head tunnel body is higher in water flow speed and larger in Froude number, the connecting position of the dragon-raise-head tunnel body and the diversion tunnel body is designed into two different tunnel body cross sections, the sudden-drop and sudden-expansion effect is achieved, cavitation erosion damage of high-speed water flow can be effectively reduced, the effect of erosion reduction by aeration is achieved, the operation safety of the rear section of the dragon-raise-head tunnel body is protected, and the sudden-drop and sudden-expansion structure is suitable for reconstruction of high-speed water flow spillway tunnels allowing the flow speed in the tunnels to be higher than 25 m/s.

Description

The prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel
Technical field
The utility model relates to hydraulic engineering, especially relates to the prominent sudden expansion structure of falling in a kind of gateway opening type reconstruction of diversion tunnel free-flow spillway tunnel.
Background technology
Take in the Large Hydro-Junction process of construction that local material dam is dam type, according to flood discharge scale and local topographic and geologic condition situation, often need to arrange two above flood discharging tunnels.Flood discharging tunnel cost is higher, utilizes the interim reconstruction of diversion tunnel of construction period to become permanent flood discharging tunnel (utilize former Diversion Tunnel barrel structure, increase dragon and come back), can not only turn waste into wealth, reduce investment outlay, the reduction of erection time, but also can solve the difficult problem that cannot arrange many flood discharging tunnels because of landform restriction.
But, because the effect of Diversion Tunnel is the interim flood discharge of hinge construction period, be low water level operation flood discharging tunnel, its import elevation is general close with elevation at the bottom of former river course; Permanent flood discharging tunnel belongs to high water level operation flood discharging tunnel, high water level operation flood discharging tunnel especially in the hole of high water level operation free-flow spillway tunnel flow velocity higher, what have even surpasses 40m/s, far over the high-velocity flow of regulation and stipulation cavitation prevention structure.So Diversion Tunnel increases dragon new line, reconstruct into free-flow spillway tunnel, first should solve the cavitation erosion problem of high-velocity flow to barrel structure, especially at dragon new line end, contact hole section with Diversion Tunnel barrel, flow rate of water flow is the highest, and cavitation erosion possibility is maximum.
Summary of the invention
The purpose of this utility model is to provide a kind of prominent sudden expansion structure of falling for gateway opening type reconstruction of diversion tunnel free-flow spillway tunnel.
For achieving the above object, the utility model can be taked following technical proposals:
The prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel described in the utility model, comprise newly-increased dragon new line barrel and the original Diversion Tunnel barrel of building, described imperial new line barrel reduces gradually from top to end height, joining place at described imperial new line barrel and Diversion Tunnel barrel, high 0.5 ~ the 1.0m of height of the aspect ratio Diversion Tunnel barrel of dragon new line barrel, the one-sided width of imperial new line barrel is than the narrow 0.3 ~ 0.8m of Diversion Tunnel barrel.
In hole, the flow velocity of current is when 25 ~ 30m/s, at the joining place of described imperial new line barrel and Diversion Tunnel barrel, and the high 0.5 ~ 0.8m of height of the aspect ratio Diversion Tunnel barrel of imperial new line barrel, the one-sided width of imperial new line barrel is than the narrow 0.3 ~ 0.5m of Diversion Tunnel barrel.
In hole, the flow velocity of current is when 30 ~ 35m/s, at the joining place of described imperial new line barrel and Diversion Tunnel barrel, and the high 0.8 ~ 1.0m of height of the aspect ratio Diversion Tunnel barrel of imperial new line barrel, the one-sided width of imperial new line barrel is than the narrow 0.5 ~ 0.8m of Diversion Tunnel barrel.If the flow velocity of current surpasses 35m/s in hole, also need to be provided with aeration bottom outlet in the dragon new line barrel bottom near imperial new line barrel and Diversion Tunnel barrel joining place simultaneously, on the Diversion Tunnel barrel abutment wall near imperial new line barrel and Diversion Tunnel barrel joining place, be provided with aeration side opening.
The utility model has the advantage of when gateway opening shape reconstruction of diversion tunnel is free-flow spillway tunnel, consider that imperial new line end flow rate of water flow is larger, Froude number is higher, by dragon is come back, barrel and Diversion Tunnel barrel joining place are designed to two sections of different barrel sections, be about to the section width constriction (one-sided width constriction 0.3 ~ 0.8m) of the dragon new line barrel of imperial new line barrel and Diversion Tunnel barrel joining place, reduce the barrel profile height (difference in height is reduced to 0.5 ~ 1.0m) of imperial new line barrel end, produce sudden enlargement and sudden, can effectively subdue the cavitation erosion of high-velocity flow, reach the effect of air mixing corrosion reducing, protected the security of operation of imperial new line back segment barrel, in applicable hole, flow velocity is greater than the high-velocity flow flood discharging tunnel transformation of 25m/s.
Accompanying drawing explanation
Fig. 1 is the vertical face figure of barrel structure of the present utility model.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
The specific embodiment
As shown in Figure 1, 2, the prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel described in the utility model, comprise newly-increased dragon new line barrel 1 and the original Diversion Tunnel barrel 2 of building, increasing the dragon new line barrel 1 build reduces gradually from top to end height, joining place at dragon new line barrel 1 with Diversion Tunnel barrel 2, high 0.5 ~ the 1.0m of height of the aspect ratio Diversion Tunnel barrel 2 of dragon new line barrel 1, the one-sided width of dragon new line barrel 1 is than the narrow 0.3 ~ 0.8m of Diversion Tunnel barrel 2, and its joining place forms " dash forward and fall sudden expansion " structure.
During practice of construction, when the end flow rate of water flow of dragon new line barrel is less than 30m/s, high 0.5 ~ the 0.8m of height of the aspect ratio Diversion Tunnel barrel 2 of the dragon new line barrel 1 of dragon new line barrel 1 and Diversion Tunnel barrel 2 joining places, the one-sided width of dragon new line barrel 1 is than the narrow 0.3 ~ 0.5m of Diversion Tunnel barrel 2, prominent falling is highly 0.5 ~ 0.8m, one-sided sudden expansion width is 0.3 ~ 0.5m, current aeration is from gas production in width more than headroom in hole, the overflow air that air forms by both sides sudden expansion, to cavity air feed at the bottom of the lower overflow of air pressure, reaches high-velocity flow aeration effect.
When flow velocity is between 30m/s and 35m/s, prominent falling is highly 0.8 ~ 1.0m, and one-sided sudden expansion width is 0.5 ~ 0.8m, and high-velocity flow aeration principle is the same.
When flow velocity surpasses more than 35m/s, prominent falling is highly 0.8 ~ 1.0m, one-sided sudden expansion width is 0.5 ~ 0.8m, on the same basis of high-velocity flow aeration principle, increase end cavity aeration and abutment wall aeration: in dragon new line barrel 1 bottom near imperial new line barrel and Diversion Tunnel barrel joining place, aeration bottom outlet 3 is set simultaneously, on Diversion Tunnel barrel 2 abutment walls near imperial new line barrel and Diversion Tunnel barrel joining place, aeration side opening 4 is set, to reach cavitation prevention and corrosion inhibitor effect.During practice of construction, aeration bottom outlet 3 is steel plate structure, and bearing bar arranges according to actual needs.Aeration pore cross section size not only will meet aeration needs, also will meet the needs of maintenance, maintenance.

Claims (4)

1. the prominent sudden expansion structure of falling of reconstructing in free-flow spillway tunnel, comprise newly-increased dragon new line barrel (1) and the original Diversion Tunnel barrel (2) of building, it is characterized in that: described imperial new line barrel (1) reduces gradually from top to end height, joining place at described imperial new line barrel (1) with Diversion Tunnel barrel (2), high 0.5 ~ the 1.0m of height of the aspect ratio Diversion Tunnel barrel (2) of dragon new line barrel (1), the one-sided width of imperial new line barrel (1) is than the narrow 0.3 ~ 0.8m of Diversion Tunnel barrel (2).
2. the prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel according to claim 1, it is characterized in that: the joining place at described imperial new line barrel (1) with Diversion Tunnel barrel (2), high 0.5 ~ the 0.8m of height of the aspect ratio Diversion Tunnel barrel (2) of dragon new line barrel (1), the one-sided width of imperial new line barrel (1) is than the narrow 0.3 ~ 0.5m of Diversion Tunnel barrel (2).
3. the prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel according to claim 1, it is characterized in that: the joining place at described imperial new line barrel (1) with Diversion Tunnel barrel (2), high 0.8 ~ the 1.0m of height of the aspect ratio Diversion Tunnel barrel (2) of dragon new line barrel (1), the one-sided width of imperial new line barrel (1) is than the narrow 0.5 ~ 0.8m of Diversion Tunnel barrel (2).
4. the prominent sudden expansion structure of falling in reconstruction free-flow spillway tunnel according to claim 3, it is characterized in that: in dragon new line barrel (1) bottom near imperial new line barrel and Diversion Tunnel barrel joining place, be provided with aeration bottom outlet (3), on Diversion Tunnel barrel (2) abutment wall near imperial new line barrel and Diversion Tunnel barrel joining place, be provided with aeration side opening (4).
CN201420251730.4U 2014-05-16 2014-05-16 Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction Expired - Lifetime CN203846463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420251730.4U CN203846463U (en) 2014-05-16 2014-05-16 Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420251730.4U CN203846463U (en) 2014-05-16 2014-05-16 Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction

Publications (1)

Publication Number Publication Date
CN203846463U true CN203846463U (en) 2014-09-24

Family

ID=51559500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420251730.4U Expired - Lifetime CN203846463U (en) 2014-05-16 2014-05-16 Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction

Country Status (1)

Country Link
CN (1) CN203846463U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594308A (en) * 2015-01-14 2015-05-06 中国电建集团中南勘测设计研究院有限公司 Pressure sudden expansion and sudden fall circular jet flow energy dissipater
CN110424322A (en) * 2019-08-15 2019-11-08 湖北省水利水电规划勘测设计院 Deep hole test data acquisition device and the barrel selection method tested based on deep hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594308A (en) * 2015-01-14 2015-05-06 中国电建集团中南勘测设计研究院有限公司 Pressure sudden expansion and sudden fall circular jet flow energy dissipater
CN104594308B (en) * 2015-01-14 2016-02-17 中国电建集团中南勘测设计研究院有限公司 There is pressure sudden enlargement and sudden Circular Jet energy dissipater
CN110424322A (en) * 2019-08-15 2019-11-08 湖北省水利水电规划勘测设计院 Deep hole test data acquisition device and the barrel selection method tested based on deep hole

Similar Documents

Publication Publication Date Title
CN204753513U (en) Dam with from energy dissipation function
CN105155484B (en) By the method that the reconstruction of temporary diversion hole is permanent release floodwatering facility
CN203846463U (en) Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction
CN103966985B (en) A kind of side direction goes out to flow the absorption basin of rotary roll energy dissipating
CN103243685A (en) Overflow dam building structure suitable for ecological water landscape
CN202626947U (en) Picking flow type flaring pier of overflow dam
CN203411957U (en) Aerification device used for flood discharge deep hole
CN204418136U (en) There is pressure sudden enlargement and sudden Circular Jet energy dissipater
CN201933472U (en) Dam structure utilizing flaring piers and dam face small flip buckets to jointly discharge flood and dissipate energy
CN204644993U (en) A kind of shaft structure being communicated with outlet structure escape works
CN202865812U (en) Flow-isolating structure of ship-lock approach channels
CN203594005U (en) Flood discharge energy dissipater structure applied to high-arch weir body in narrow valley
CN101538842B (en) Heterotype sudden enlargement and sudden drop aerator
CN202440787U (en) Riverway diversion device
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN104895022A (en) Shaft structure communicated with release structures and flood discharge method
CN104099908A (en) Gravity type sand obstructing and guiding structure
CN204000796U (en) Power station in river channel's structure
CN203878546U (en) Culvert with energy dissipation function
CN210262967U (en) Energy dissipation structure of diversion tunnel plug
CN203755253U (en) Sand blocking and water taking gate for water conservancy project
CN203247550U (en) Overflow dam building structure suitable for ecological water area landscape
CN211898237U (en) Energy dissipation spillway
CN208183679U (en) A kind of underflow energy dissipation structure
CN204097976U (en) A kind of absorption basin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140924