CN207092033U - A kind of flood discharging tunnel - Google Patents

A kind of flood discharging tunnel Download PDF

Info

Publication number
CN207092033U
CN207092033U CN201721072639.6U CN201721072639U CN207092033U CN 207092033 U CN207092033 U CN 207092033U CN 201721072639 U CN201721072639 U CN 201721072639U CN 207092033 U CN207092033 U CN 207092033U
Authority
CN
China
Prior art keywords
lock chamber
gate
tunnel
vertical shaft
shaft type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721072639.6U
Other languages
Chinese (zh)
Inventor
刘纯
李文洪
曾雪艳
李华艳
陈安民
李翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201721072639.6U priority Critical patent/CN207092033U/en
Application granted granted Critical
Publication of CN207092033U publication Critical patent/CN207092033U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a kind of flood discharging tunnel, including pressurized tunnel, it is arranged at the front end lock chamber of pressurized tunnel upstream end, is arranged at the vertical shaft type lock chamber of pressurized tunnel downstream end, the vertical shaft type lock chamber only sets one of main gate, the front end lock chamber is provided with one of emergency repair gate, and front end lock chamber is identical with vertical shaft type lock chamber cope level.The utility model can save a fan bulkhead gate quantities, can not consider that the range of decrease of head is directly overhauled on the premise of use is not influenceed, more flexible convenience in operation, and operation is also safer.It is favourable to lock chamber Stability Analysis of Structures meanwhile vertical shaft type lock chamber is only separately provided a fan arch gate.Being particularly suitable for use in middle high water head and has longer pressurized tunnel, and pressurized tunnel front end need to set the flood discharging tunnel lock chamber structure of bulkhead gate.

Description

A kind of flood discharging tunnel
Technical field
The utility model belongs to water power water conservancy project building technical field, and in particular to a kind of flood discharging tunnel.
Background technology
In water power Hydraulic Engineering Design, the effect such as flood discharging tunnel because letting out in advance with low water level, reservoir emptying is frequently as reservoir The outlet structure escape works facility of joint flood discharge.Flood discharging tunnel hole line is returned the limitations such as groove to need plane to turn by topographic and geologic condition and lower sluicing stream When curved, turnaround section is frequently with pressurized tunnel pattern.Flood discharging tunnel lock chamber is arranged in pressurized tunnel end, is arranged in using vertical shaft pattern In massif.
In the prior art, as shown in figure 1, arrangement compared with pressure Tunnel Section 3 flood discharging tunnel be typically separately provided in front end before End brake room 4, and the dash in short-term when the interior setting bulkhead gate 9 of front end lock chamber 4 is used to overhaul.In vertical shaft type lock chamber 1 except setting work Make outside gate 2, to prevent equipment from accident occur, emergency use and maintenance need, and can also set emergency repair gate 5 simultaneously. That is one of main gate 2 with together with of emergency repair gate 5 can be set in vertical shaft type lock chamber 1, therebetween with partition wall 8 every Open, one of bulkhead gate 9 is set more in front end lock chamber 4 meeting.Following defect be present in existing structure:
1. because the elevation of front end lock chamber is less than the elevation of vertical shaft type lock chamber, the bulkhead gate 9 in the lock chamber of front end needs reservoir Water level is reduced to low water level or certain elevation and pressurized tunnel could be overhauled, and general opens and closes in hydrostatic, operates Mode underaction.
2. for the engineering of high water head in upstream, to ensure lock chamber Stability Analysis of Structures, the emergency repair lock in vertical shaft type lock chamber 1 Partition wall 8 needed between door 5 and main gate 2 is general thicker, not economical enough.Moreover, need to arrange passage between partition wall 8, every The complex structural designs of wall 8, under the interim high water head effect of length, partition wall 8 easily produces crack, brings unfavorable shadow safely to structure Ring.
3. the bulkhead gate 9 set, construction costs is of a relatively high more.
The technical term being related in this case is explained as follows:
Bulkhead gate:Dash in short-term when being overhauled for building, is typically opened and closed in hydrostatic.
Before emergency gate is located at deep hole main gate more, when there is accident for building or equipment, it can be closed in dynamic water Close and opened in hydrostatic;When also serving as bulkhead gate, also referred to as emergency repair gate.
Utility model content
In view of the above-mentioned problems, the utility model aims to provide a kind of flexible and convenient operation, operation is safer, construction costs compared with Low flood discharging tunnel.
The utility model solve problem technical scheme be:A kind of flood discharging tunnel, including pressurized tunnel, it is arranged at pressurized tunnel The front end lock chamber of upstream end, the vertical shaft type lock chamber for being arranged at pressurized tunnel downstream end, the vertical shaft type lock chamber only set one of work Make gate, the front end lock chamber is provided with one of emergency repair gate, and lock chamber top in front end is identical with vertical shaft type lock chamber elevation.
Preferably, the main gate is deep hole arch gate.
Access bridge is provided with the top of the front end lock chamber.
The utility model removes the emergency repair gate of traditional vertical shaft type lock chamber and partition wall, by the elevation of front end lock chamber Rise, and then replace original bulkhead gate and emergency repair gate twice gate with one of emergency repair gate of front end lock chamber Achievable function.On the premise of use is not influenceed, a fan bulkhead gate quantities can be saved.
Emergency repair gate after improvement can not consider that the range of decrease of head is directly overhauled, more flexible convenience in operation, fortune Row is also safer.
It is favourable to lock chamber Stability Analysis of Structures meanwhile vertical shaft type lock chamber is only separately provided a fan deep hole arch gate.Especially Suitable for middle high water head and there is longer pressurized tunnel, pressurized tunnel front end need to be separately provided the flood discharging tunnel lock chamber knot of bulkhead gate Structure.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the schematic diagram of flood discharging tunnel in the prior art.
Fig. 2 is the schematic diagram of the utility model flood discharging tunnel.
Fig. 3 is Fig. 2 profilograph.
In figure:1st, vertical shaft type lock chamber;2nd, main gate;3rd, pressurized tunnel;4th, front end lock chamber;5th, emergency repair gate;6、 Access bridge;7th, massif;8th, partition wall;9th, bulkhead gate.
Embodiment
As shown in figures 2-3, a kind of flood discharging tunnel, it is included in the pressurized tunnel 3 excavated in massif 7, is arranged at pressurized tunnel 3 The front end lock chamber 4 of upstream end, the vertical shaft type lock chamber 1 for being arranged at the downstream end of pressurized tunnel 3.The vertical shaft type lock chamber 1 only sets one Road main gate 2, the front end lock chamber 4 are provided with one of emergency repair gate 5, front end lock chamber 4 and the cope level of vertical shaft type lock chamber 1 It is identical.
The main gate 2 is deep hole arch gate.
The top of front end lock chamber 4 is provided with access bridge 6.
The present embodiment removes the emergency repair gate 5 of traditional vertical shaft type lock chamber 1 and partition wall 8, by the height of front end lock chamber 4 Cheng Shenggao, and then replace 5 liang original of bulkhead gate 9 and emergency repair gate with one of emergency repair gate 5 of front end lock chamber 4 The achievable function of road gate.

Claims (3)

1. a kind of flood discharging tunnel, including pressurized tunnel, it is arranged at the front end lock chamber of pressurized tunnel upstream end, is arranged under pressurized tunnel Swim the vertical shaft type lock chamber of end, it is characterised in that:The vertical shaft type lock chamber only sets one of main gate, and the front end lock chamber is provided with One of emergency repair gate, front end lock chamber are identical with vertical shaft type lock chamber cope level.
2. flood discharging tunnel according to claim 1, it is characterised in that:The main gate is deep hole arch gate.
3. flood discharging tunnel according to claim 1, it is characterised in that:Access bridge is provided with the top of the front end lock chamber.
CN201721072639.6U 2017-08-25 2017-08-25 A kind of flood discharging tunnel Active CN207092033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721072639.6U CN207092033U (en) 2017-08-25 2017-08-25 A kind of flood discharging tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721072639.6U CN207092033U (en) 2017-08-25 2017-08-25 A kind of flood discharging tunnel

Publications (1)

Publication Number Publication Date
CN207092033U true CN207092033U (en) 2018-03-13

Family

ID=61540105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721072639.6U Active CN207092033U (en) 2017-08-25 2017-08-25 A kind of flood discharging tunnel

Country Status (1)

Country Link
CN (1) CN207092033U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288106A (en) * 2017-08-25 2017-10-24 中国电建集团中南勘测设计研究院有限公司 A kind of flood discharging tunnel
CN109667248A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 A multistage manger plate emptying system for high dam engineering
CN111236167A (en) * 2020-03-31 2020-06-05 金华市恒通工程检测有限公司 Water conservancy project flood discharge prevention of seepage dykes and dams

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288106A (en) * 2017-08-25 2017-10-24 中国电建集团中南勘测设计研究院有限公司 A kind of flood discharging tunnel
CN109667248A (en) * 2018-12-21 2019-04-23 中国电建集团贵阳勘测设计研究院有限公司 A multistage manger plate emptying system for high dam engineering
CN111236167A (en) * 2020-03-31 2020-06-05 金华市恒通工程检测有限公司 Water conservancy project flood discharge prevention of seepage dykes and dams

Similar Documents

Publication Publication Date Title
CN207092033U (en) A kind of flood discharging tunnel
WO2020125602A1 (en) Deep water obtaining system and operating method therefor
CN203270527U (en) Device for preventing gas explosion after gate closing and plugging of diversion tunnel
CN206290281U (en) A kind of mine gas extraction pipe negative pressure automatic drainage device
CN113882322B (en) Intelligent water stopping method for repairing underwater concrete damaged dry chamber
CN201473933U (en) Combination layout structure of tail water emergency gate and tail water surge shaft in pumped storage power station
CN203320497U (en) Tail water maintenance gate for power station
CN212077859U (en) Tunnel structure capable of being used for diversion, flood discharge and emptying
CN106284240A (en) A kind of power station is in construction time downstream interim water-supply structure and method
CN107288106A (en) A kind of flood discharging tunnel
CN106368185A (en) Hydropower station water inlet gallery desilting system and method
CN208136871U (en) A kind of free overflow flood-discharge tunnel
CN204125907U (en) Hierarchical manger plate structure of super high head suitable for reservoir
CN204715318U (en) Diversion tunnel gate shaft structure in mountain
CN109356125A (en) Diversion tunnel is used as the reconstruction structure of two drain caverns
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN215977119U (en) Damaged dry chamber cabin of concrete under water restores intelligent stagnant water and equips
CN107268547B (en) Karst funnel reservoir and flood discharge building and construction method thereof
CN205604193U (en) High dam reservoir emptying device
CN204982820U (en) A lock chamber arrangement structure that is used for high arch dam water conservancy diversion bottom outlet
CN204825820U (en) Pressure regulating well structure using traffic hole as upper chamber
CN210562019U (en) Diversion tunnel group structure of extra-high rock-fill dam
CN207376762U (en) A kind of flood control electricity row station
CN209429082U (en) Diversion tunnel is used as the reconstruction structure of two drain caverns
CN107859755A (en) A kind of globe valve overhauls sealing control method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant