CN207376762U - A kind of flood control electricity row station - Google Patents

A kind of flood control electricity row station Download PDF

Info

Publication number
CN207376762U
CN207376762U CN201721469244.XU CN201721469244U CN207376762U CN 207376762 U CN207376762 U CN 207376762U CN 201721469244 U CN201721469244 U CN 201721469244U CN 207376762 U CN207376762 U CN 207376762U
Authority
CN
China
Prior art keywords
water
flood control
flow channel
water outlet
flap valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721469244.XU
Other languages
Chinese (zh)
Inventor
符益仁
郑永挺
王振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Water Conservancy Survey And Design Institute Co Ltd
Original Assignee
Dongguan Water Conservancy Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Water Conservancy Survey And Design Institute Co Ltd filed Critical Dongguan Water Conservancy Survey And Design Institute Co Ltd
Priority to CN201721469244.XU priority Critical patent/CN207376762U/en
Application granted granted Critical
Publication of CN207376762U publication Critical patent/CN207376762U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a kind of flood control electricity row stations, it is intended to and when solving water pump operation or all standing, current repeated stock flap valve, the fixed screw for flap valve of controlling flood easily comes off, the situation that flood is caused to pour in down a chimney, its key points of the technical solution are that:It including water inlet flow channel, water outlet box culvert and is arranged between water inlet flow channel and water outlet box culvert for the water in water inlet flow channel to be evacuated to the water pump of water outlet box culvert, the water outlet of the water pump is provided with flood control flap valve, and the flood control flap valve front end is provided with emergency gate.A kind of flood control electricity row station of the utility model sets emergent emergency gate in flood control flap valve front end, has the advantages that prevent flood from pouring in down a chimney.

Description

A kind of flood control electricity row station
Technical field
The utility model is related to hydraulic engineering field, more specifically, it relates to a kind of flood control electricity row station.
Background technology
Electricity row station is the water conservancy projects of water drainage of taking precautions against drought.It is laid in flat-bottomed land more, in rainy season, low-lying land is excluded by water pump The ponding of band prevents the water conservancy projects of the generation of waterlogging.
The water outlet of water pump is usually provided with flood control flap valve, since the keying of flood control flap valve is by pump machine draining and outer river Water pressure controls, and is instantaneous keying, and during water pump operation, current impact flap valve always, and the fixed screw for flap valve of controlling flood easily takes off Fall, the situation that flood is caused to pour in down a chimney.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of flood control electricity row stations, controlling flood Flap valve front end sets emergent emergency gate, has the advantages that prevent flood from pouring in down a chimney.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of flood control electricity row station, Including water inlet flow channel, water outlet box culvert and it is arranged between water inlet flow channel and water outlet box culvert the water in water inlet flow channel being evacuated to The water pump of water outlet box culvert, the water outlet of the water pump are provided with flood control flap valve, and the flood control flap valve front end is provided with emergency brake Door.
By using above-mentioned technical proposal, when the water level on water inlet flow channel is higher than river level, water pump is by water inlet flow channel Interior water is evacuated to water outlet box culvert, is then discharged at rivers and discharges, prevents urban waterlogging, during water pump operation, water impact flood control Flap valve causes the fixed screw controlled flood on flap valve to come off, and then when so that the flood control flap valve is come off, closes the emergent of flood control flap valve front end Gate prevents flood from pouring in down a chimney, while also is used as bulkhead gate when flood control flap valve overhauls.
The utility model is further arranged to:The emergency gate is controlled by hoist engine and lifted.
By using above-mentioned technical proposal, by hoist engine emergency gate is controlled to lift, can quickly control emergency brake The keying of door.
The utility model is further arranged to:Vertical shaft venthole is provided at the pump outlet.
By using above-mentioned technical proposal, since water hammer pressure is larger at pump outlet, during water drainage, the gas that is generated between Shun It presses larger, by the vertical shaft venthole of setting, air pressure is exported, reduce the influence to flood control flap valve and emergency gate.
The utility model is further arranged to:The pipelined channel bottom and water outlet box culvert bottom are provided with reinforcing layer, The reinforcing layer includes reinforced concrete backplane level, concrete bed course and cement stone dust bed course successively.
By using above-mentioned technical proposal, in the reinforced concrete bottom plate that pipelined channel and water outlet box culvert bottom are set gradually Layer, concrete bed course and cement stone dust bed course improve the fastness of bottom, reduce the percussion of flood.
The utility model is further arranged to:The water inlet of the water inlet flow channel sets bulkhead gate.
By using above-mentioned technical proposal, in the bulkhead gate that the water inlet of water inlet flow channel is set, facilitate water inlet flow channel And the maintenance of water pump.
The utility model is further arranged to:The bulkhead gate front end sets trash rack.
By using above-mentioned technical proposal, the trash rack of setting reduces rubbish and enters in water inlet flow channel, rubbish is avoided to damage Bad water pump.
The utility model is further arranged to:The water outlet box culvert outlet is connected with rivers, and the water outlet box culvert surrounding is equal It is vertically arranged with water stop.
By using above-mentioned technical proposal, water outlet box culvert upper and lower surface is vertically arranged water stop, prevent fluviatic water from It is flowed into the soil body in the soil body of water outlet box culvert upper and lower surface, improves the stability of water outlet box culvert.
In conclusion the utility model has the advantages that:
First, when the water level on water inlet flow channel is higher than river level, the water in water inlet flow channel is evacuated to water tank by water pump Contain, be then discharged at rivers and discharge, prevent urban waterlogging, during water pump operation, water impact flood control flap valve causes flap valve of controlling flood On fixed screw come off, and then when so that the flood control flap valve is come off, close the emergency gate of flood control flap valve front end, prevent flood from falling It fills, while also is used as bulkhead gate when flood control flap valve overhauls;
Second, since water hammer pressure is larger at pump outlet, during water drainage, the air pressure generated between Shun is larger, passes through setting Vertical shaft venthole, air pressure is exported, reduce to flood control flap valve and emergency gate influence.
Description of the drawings
Fig. 1 is the overall structure diagram of the present embodiment;
Fig. 2 is the structure diagram at electricity row station in the present embodiment;
Fig. 3 is the structure diagram that water outlet box culvert is connected with rivers in the present embodiment.
In figure:1st, water inlet flow channel;2nd, rivers;3rd, water outlet box culvert;4th, water pump;5th, flood control flap valve;6th, emergency gate;7th, elevator Machine;8th, vertical shaft venthole;9th, mountain flour layer;10th, reinforced concrete backplane level;11st, concrete bed course;12nd, cement stone dust bed course;13rd, lock is overhauled Door;14th, trash rack;15th, water stop.
Specific embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
A kind of flood control electricity row station, as shown in Figure 1, including be connected with water-drawing channel water inlet flow channel 1, connect with rivers 2 It water outlet box culvert 3 and is arranged between water inlet flow channel 1 and water outlet box culvert 3 and is used to the flood in water inlet flow channel 1 being evacuated to water tank Contain 3 water pump 4, the water outlet of water pump 4 is provided with flood control flap valve 5, and 5 front end of flood control flap valve is provided with emergency gate 6, emergency brake Door 6 is controlled by QPK2 hoist engines 7 and lifted.
When the water level on water inlet flow channel 1 is higher than 2 water level of rivers, water pump 4 works is evacuated to water outlet by the water in water inlet flow channel 1 Box culvert 3 is then discharged at rivers 2 and discharges, and prevents urban waterlogging, and when water pump 4 is run, water impact flood control flap valve 5 causes to prevent Fixed screw on big vast flap valve 5 comes off, and then when so that the flood control flap valve 5 is come off, closes the emergency gate 6 of 5 front end of flood control flap valve, prevent Only flood pours in down a chimney, while also is used as the bulkhead gate 13 when flood control flap valve 5 overhauls.
As shown in Figures 2 and 3, vertical shaft venthole 8, water are provided at the top between 4 water outlet of water pump and emergency gate 6 4 water outlets are pumped since water hammer pressure is larger, during water drainage, the air pressure generated between Shun is larger, by the vertical shaft venthole 8 of setting, Reduce the influence to flood control flap valve 5 and emergency gate 6.
Pipelined channel side wall and 3 bottom of water outlet box culvert at water pump 4 are enriched by backfilling mountain flour layer 9. Pipelined channel bottom and 3 bottom of water outlet box culvert are provided with reinforcing layer, and reinforcing layer includes reinforced concrete backplane level successively from top to bottom 10th, concrete bed course 11 and cement stone dust bed course 12, and thickness is followed successively by 500mm, 100mm and 300mm.
The water inlet of water inlet flow channel 1 sets bulkhead gate 13, in the bulkhead gate that the water inlet of water inlet flow channel 1 is set 13, facilitate the maintenance of water inlet flow channel 1 and water pump 4.13 front end of bulkhead gate sets trash rack 14, and the trash rack 14 of setting subtracts Few rubbish is entered in water inlet flow channel 1, and rubbish is avoided to damage water pump 4.
3 surrounding of water outlet box culvert is vertically arranged with water stop 15 at rivers 2, prevents the water in rivers 2 from the soil body It is flowed into the soil body of 3 upper and lower surface of water outlet box culvert, improves the stability of water outlet box culvert 3.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical solutions belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, several improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (7)

1. a kind of flood control electricity row station, it is characterised in that:Including water inlet flow channel (1), water outlet box culvert (3) and it is arranged at water inlet flow channel (1) it is used to the water in water inlet flow channel (1) being evacuated to the water pump (4) of water outlet box culvert (3), the water pump between water outlet box culvert (3) (4) water outlet is provided with flood control flap valve (5), and described flood control flap valve (5) front end is provided with emergency gate (6).
2. a kind of flood control electricity row station according to claim 1, it is characterised in that:The emergency gate (6) passes through hoist engine (7) control lifting.
3. a kind of flood control electricity row station according to claim 1, it is characterised in that:Water pump (4) water outlet is provided with Vertical shaft venthole (8).
4. a kind of flood control electricity row station according to claim 1, it is characterised in that:Water inlet flow channel (1) bottom and go out Water tank contains (3) bottom and is provided with reinforcing layer, and the reinforcing layer includes reinforced concrete backplane level (10), concrete bed course (11) and water successively Mud stonework road cutting (12).
5. a kind of flood control electricity row station according to claim 1, it is characterised in that:The water inlet of the water inlet flow channel (1) Bulkhead gate (13) is set.
6. a kind of flood control electricity row station according to claim 5, it is characterised in that:Bulkhead gate (13) front end sets and blocks Dirty grid (14).
7. a kind of flood control electricity row station according to claim 1, it is characterised in that:Water outlet box culvert (3) outlet and rivers (2) connect, water outlet box culvert (3) surrounding is vertically arranged with water stop (15).
CN201721469244.XU 2017-11-06 2017-11-06 A kind of flood control electricity row station Expired - Fee Related CN207376762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721469244.XU CN207376762U (en) 2017-11-06 2017-11-06 A kind of flood control electricity row station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721469244.XU CN207376762U (en) 2017-11-06 2017-11-06 A kind of flood control electricity row station

Publications (1)

Publication Number Publication Date
CN207376762U true CN207376762U (en) 2018-05-18

Family

ID=62334505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721469244.XU Expired - Fee Related CN207376762U (en) 2017-11-06 2017-11-06 A kind of flood control electricity row station

Country Status (1)

Country Link
CN (1) CN207376762U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809711A (en) * 2020-06-11 2020-10-23 上海市政工程设计研究总院(集团)有限公司 Drainage box culvert maintenance well and method for maintaining drainage box culvert

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809711A (en) * 2020-06-11 2020-10-23 上海市政工程设计研究总院(集团)有限公司 Drainage box culvert maintenance well and method for maintaining drainage box culvert

Similar Documents

Publication Publication Date Title
CN103541345B (en) Aqueous vapor separate vacuum preloading and device
CN111236408A (en) Joint construction structure of drainage pump station and regulation and storage tank and operation method thereof
CN210637109U (en) Underground mine underground temporary drainage structure
CN207376762U (en) A kind of flood control electricity row station
CN109339006B (en) Efficient cone-type hydraulic power absorption well and construction method thereof
CN207092033U (en) A kind of flood discharging tunnel
CN211873292U (en) Drainage pumping station and regulation and storage tank jointly build structure
CN106498963A (en) A kind of tube well dewatering system that is drawn water using air compressor machine and water pump concentration
CN209025056U (en) A kind of Floater removing gate and scouring sluice integrated structure
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN106759161A (en) A kind of big cross section diversion tunnel plugging structure and construction method by stages
CN110847128A (en) Water retaining dam and method for regulating and controlling water flow
CN212926150U (en) Vertical post-cast strip structure of retaining wall
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN213038444U (en) Temporary device for screening sludge in river channel culvert
CN107268547A (en) Karst funnel reservoir and its flood releasing structure and construction method
CN201043475Y (en) Drainage device for deep well in mine
CN107288106A (en) A kind of flood discharging tunnel
CN210712774U (en) Novel structure of built-in desilting basin of dam rolls
CN205954578U (en) Stop log gate structure
CN206486900U (en) A kind of use air compressor machine and water pump concentrate the tube well dewatering system drawn water
CN108951552B (en) Pressureless tunnel overhauling channel with air vents
CN101264396B (en) Ore dressing industry solid-liquid quick disconnect device
CN206110310U (en) Bury intelligent sewage lifting pump station of formula integration
CN206655198U (en) Big cross section diversion tunnel plugging structure by stages

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

Termination date: 20191106