CN211873292U - Drainage pumping station and regulation and storage tank jointly build structure - Google Patents

Drainage pumping station and regulation and storage tank jointly build structure Download PDF

Info

Publication number
CN211873292U
CN211873292U CN202020271963.6U CN202020271963U CN211873292U CN 211873292 U CN211873292 U CN 211873292U CN 202020271963 U CN202020271963 U CN 202020271963U CN 211873292 U CN211873292 U CN 211873292U
Authority
CN
China
Prior art keywords
rainwater
pump station
gate
storage tank
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020271963.6U
Other languages
Chinese (zh)
Inventor
牟晋铭
郁片红
赵国志
耿晓洒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN202020271963.6U priority Critical patent/CN211873292U/en
Application granted granted Critical
Publication of CN211873292U publication Critical patent/CN211873292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a combined construction structure of a drainage pump station and a regulation and storage pool, which comprises a rainwater pump station and a primary rainwater regulation and storage pool; the rainwater pump station comprises a rainwater gate well, a rainwater collecting tank and a high-level water outlet well; a rainwater pump station grid is arranged between the rainwater gate well and the rainwater collecting tank; a regulating storage pool water inlet gate is arranged between the rainwater collecting pool and the primary rainwater regulating storage pool; the primary rain storage tank is positioned below the rain pump station; a plurality of gate type flushing devices and storage tank emptying pumps are arranged in the primary rain storage tank; the storage tank emptying pump is used for emptying the primary rain storage tank; a plurality of gate-type flushing devices are used for, after first rain regulation pond is emptied, washing first rain regulation pond. In dry seasons, treating mixed sewage; and in rainy season, treating rainfall collected by the rainwater collecting tank. The utility model discloses an use drainage structures rainwater pump station, sewage pump station and just rain regulation pond and build jointly, effectively practice thrift the pump station construction land, solve city pump station and regulation pond and be difficult to the difficult problem of synchronous implementation.

Description

Drainage pumping station and regulation and storage tank jointly build structure
Technical Field
The utility model relates to a water treatment technical field, in particular to drainage pump station constructs with jointly of regulation pond.
Background
In recent years, urban inland inundation disasters in China are becoming more serious, and a forced drainage pump station is an important guarantee measure for ensuring drainage safety for areas without gravity drainage conditions.
However, since the pollution load on the surface of the urban area is high, the rainwater runoff contains a large amount of surface runoff pollutants, and the untreated direct drainage river channel of a large amount of rainwater runoff sewage can cause serious pollution to the receiving water body.
In prior art, for reducing the influence of the initial rainfall runoff pollution to the river channel environment through the lifting and discharging of a pump station, the initial rainfall runoff pollution is reduced through setting up a regulation pool, the river discharge pollution of the pump station is relieved, and the water environment of the effective environment area of the initial rainfall regulation pool is synchronously set when the municipal drainage pump station is implemented.
And with the remarkable improvement effect of municipal drainage pump stations and the primary rain storage tanks on regional water safety and water environment, more and more cases are applied to the synchronous implementation of newly-built municipal drainage pump stations and the primary rain storage tanks, and the shortage of urban land is caused.
Therefore, how to effectively save urban construction land and improve the land utilization rate while ensuring the respective functions becomes a technical problem which needs to be solved urgently by technical personnel in the field.
SUMMERY OF THE UTILITY MODEL
In view of prior art's above-mentioned defect, the utility model provides a joint construction structure of drainage pump station and regulation pond, the purpose of realization is to carry out integration combination and optimization through upper and lower superimposed structural style with drainage pump station and regulation pond, reduces structure area, effectively utilizes the soil space, satisfies pump station and regulation pond self operation demand simultaneously, optimizes pump station and regulation pond operation condition.
In order to realize the aim, the utility model discloses a combined construction structure of a drainage pump station and a regulation and storage pool, which comprises a rainwater pump station and a primary rainwater regulation and storage pool; the method is characterized in that: the rainwater pump station is arranged on the first underground layer, and the primary rainwater storage tank is arranged on the second underground layer;
the rainwater pump station comprises a rainwater gate well, a rainwater collecting tank and a high-level water outlet well which are connected in sequence;
a rainwater pump station grid is arranged between the rainwater gate well and the rainwater collecting pool and is a water inlet grid of the rainwater collecting pool;
a storage pond water inlet gate is arranged between the rainwater collecting pond and the primary rainwater storage pond and is used for controlling the water inlet of the primary rainwater storage pond;
the initial rain storage tank is positioned below the rainwater pump station, and water is fed from the rainwater collecting tank through the storage tank water inlet gate;
a plurality of gate type flushing devices and storage tank emptying pumps are arranged in the primary rain storage tank;
the adjusting and storing tank emptying pump is used for emptying the primary rain adjusting and storing tank; and the door type washing equipment is used for washing the primary rain storage tank after the primary rain storage tank is emptied.
Preferably, the regulating reservoir water inlet gate is a quick-closing gate.
Preferably, a return cage water pipe is arranged between the high-level water outlet well and the rainwater gate well and used for avoiding river discharge of the rainwater pump station during test of the rainwater pump station.
Preferably, a sewage pump station is arranged on one side of the rainwater pump station grid and the gradually-expanded section of the rainwater collecting tank of the rainwater pump station;
the sewage pump station comprises a sewage gate well and a sewage collecting tank; a dry season cut-off gate is arranged between the sewage gate well and the rainwater gate well; the sewage gate well and the rainwater gate well are controlled by the closure gate in dry seasons to be communicated or not; the dry season closure gate is used for intercepting the sewage of the rainwater pump station in dry seasons.
The utility model has the advantages that:
the utility model discloses an use drainage structures rainwater pump station, sewage pump station and just rain regulation pond and build jointly, effectively practice thrift the pump station construction land, solve city pump station and regulation pond and be difficult to the difficult problem of synchronous implementation.
The utility model discloses a pump station and regulation pond configuration optimization design, sewage pump station have rainwater pump station drought season concurrently and cut dirty function, and the reducible grid setting of intaking behind the regulation pond rainwater pump station grid well improves equipment utilization efficiency.
The utility model discloses jointly build rainwater pump station, sewage pump station and just rain regulation pond, reducible foundation ditch excavation volume reduces the pump station land, reduces the engineering investment.
The utility model discloses jointly build rainwater pump station, sewage pump station and first rain regulation pond, when practicing thrift the space, optimize each unit function, each technology unit benefit of better performance.
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings, so as to fully understand the objects, the features and the effects of the present invention.
Drawings
Fig. 1 shows a schematic plan structure diagram of a sub-floor according to an embodiment of the present invention.
Fig. 2 is a schematic plan view of the underground second floor according to an embodiment of the present invention.
Fig. 3 is a schematic cross-sectional view of an embodiment of the present invention.
Fig. 4 shows a flow chart of the operation of an embodiment of the present invention.
Detailed Description
Examples
As shown in fig. 1 to 3, the combined structure of the drainage pump station and the regulation and storage tank comprises a rainwater pump station 1 and a primary rainwater regulation and storage tank 2; the method is characterized in that: the rainwater pump station 1 is arranged on the first underground layer, and the primary rainwater storage tank 2 is arranged on the second underground layer;
the rainwater pump station 1 comprises a rainwater gate well 11, a rainwater collecting tank 12 and a high-level water outlet well 13 which are connected in sequence;
a rainwater pump station grid 14 is arranged between the rainwater gate well 11 and the rainwater collecting tank 12, and the rainwater pump station grid 14 is a water inlet grid of the rainwater collecting tank 12;
a storage pond water inlet gate 15 is arranged between the rainwater collecting pond 12 and the primary rainwater storage pond 2 and is used for controlling the water inlet of the primary rainwater storage pond 2;
the primary rain storage tank 2 is positioned below the rainwater pump station 1, and water is fed from the rainwater collecting tank 12 through a storage tank water inlet gate 15;
a plurality of gate type flushing devices 21 and a storage tank emptying pump 22 are arranged in the primary rain storage tank 2;
the storage tank emptying pump 22 is used for emptying the primary rain storage tank 2; the door type flushing devices 21 are used for flushing the first rain regulation pool 2 after the first rain regulation pool 2 is emptied.
The principle of the utility model lies in that the primary rain storage pond 2 of the rain pump station 1 is combined and designed into a building, and the concrete size is comprehensively determined by combining the scale of each unit and the land of the pump station; rainwater pump station 1 and 2 parallel arrangement in first rain regulation pond, a bottom plate altogether, at rainwater pump station 1 land used restriction, when 2 volumes in first rain regulation pond are not enough, can set up in rainwater pump station 1 below with 2 partial volumes in first rain regulation pond.
In certain embodiments, the storage tank inlet gate 15 is a quick-closing gate.
In some embodiments, a return water pipe 3 is arranged between the high-level water outlet well 13 and the rainwater gate well 11, and the return water pipe 3 is used for preventing the rainwater pump station 1 from releasing into the river during the test run of the rainwater pump station 1.
In some embodiments, a sewage pump station 4 is arranged at one side of the gradually expanding section of the rainwater pump station grids 14 and the rainwater collecting tank 12 of the rainwater pump station 1;
the sewage pump station 4 comprises a sewage gate shaft 41 and a sewage collecting tank 42; a dry season cut-off gate 43 is arranged between the sewage gate well 41 and the rainwater gate well 11; whether the sewage gate well 41 is communicated with the rainwater gate well 11 is controlled by a dry-season cut-off gate 43; the dry season cut-off gate 43 is used for cutting off the sewage of the rainwater pump station 1 in dry seasons.
The sewage pump station 4 utilizes the invalid space at one side of the gradually expanding section of the rainwater pump station grid 14 and the rainwater collecting tank 12, so that land resources are saved; and the sewage pump station 4 is not only responsible for regional sewage lifting, but also has the function of a sewage intercepting pump station in dry seasons of the rainwater pump station.
As shown in fig. 4, the utility model also provides an operation method of the joint construction structure of above-mentioned drainage pumping station and regulation pond, the step is as follows:
in dry seasons, the rainwater gate well 11 and the dry-season sewage interception gate 43 are opened, and dry-season mixed sewage enters the sewage pump station 4;
in rainy season, the rainwater gate well 11 and the dry season sewage interception gate 43 are closed, and in the early stage of rainfall, when the water level of the rainwater collecting tank 12 reaches the top elevation of the water inlet pipe of the primary rainwater storage tank 2, the water inlet gate 15 of the storage tank is opened to feed water into the primary rainwater storage tank 2; when the water level of the first rain storage tank 2 reaches the highest water level, the water inlet gate 15 of the storage tank is rapidly closed;
when the water level of the rainwater collecting tank 12 reaches the designed highest water level of the pump station, starting rainwater pumps one by one; lifting the rainwater in the rainwater collecting tank 12 to a receiving water body for discharging;
after the water in the primary rain storage tank 2 is completely fed, emptying the water in the primary rain storage tank 2 to the established sewage pipeline within 24-48 hours by using a storage tank emptying pump 22; and the first rain regulation and storage tank 2 is washed;
after the primary rain storage tank 2 is emptied, a plurality of gate type washing devices 21 are used for washing galleries by rainwater in each water collecting tank for primary rain storage; the waste water generated after flushing is discharged to the established sewage pipeline by using the storage tank emptying pump 22.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.

Claims (4)

1. The combined construction structure of the drainage pump station and the regulation and storage pool comprises a rainwater pump station (1) and a primary rainwater regulation and storage pool (2); the method is characterized in that: the rainwater pump station (1) is arranged on the first underground layer, and the primary rainwater storage tank (2) is arranged on the second underground layer;
the rainwater pump station (1) comprises a rainwater gate well (11), a rainwater collecting tank (12) and a high-level water outlet well (13) which are connected in sequence;
a rainwater pump station grid (14) is arranged between the rainwater gate well (11) and the rainwater collecting tank (12), and the rainwater pump station grid (14) is a water inlet grid of the rainwater collecting tank (12);
a storage pond water inlet gate (15) is arranged between the rainwater collecting pond (12) and the primary rainwater storage pond (2) and is used for controlling the water inlet of the primary rainwater storage pond (2);
the initial rain storage tank (2) is positioned below the rainwater pump station (1), and water is fed from the rainwater collecting tank (12) through the storage tank water inlet gate (15);
a plurality of gate type flushing devices (21) and a storage tank emptying pump (22) are arranged in the initial rain storage tank (2);
the storage tank emptying pump (22) is used for emptying the initial rain storage tank (2); and the door type washing equipment (21) is used for washing the primary rain storage tank (2) after the primary rain storage tank (2) is emptied.
2. The drainage pumping station and storage tank co-building structure according to claim 1, wherein the storage tank inlet gate (15) is a quick-closing gate.
3. The combined construction structure of the drainage pump station and the storage pond according to claim 1, wherein a return cage water pipe (3) is arranged between the high-level water outlet well (13) and the rainwater gate well (11), and the return cage water pipe (3) is used for avoiding river discharge of the rainwater pump station (1) during test of the rainwater pump station (1).
4. The combined structure of the drainage pump station and the regulation and storage tank according to claim 1, wherein a sewage pump station (4) is arranged on one side of the gradually expanding section of the rainwater pump station grids (14) and the rainwater collecting tank (12) of the rainwater pump station (1);
the sewage pump station (4) comprises a sewage gate well (41) and a sewage collecting tank (42); a dry season cut-off gate (43) is arranged between the sewage gate well (41) and the rainwater gate well (11); whether the sewage gate well (41) is communicated with the rainwater gate well (11) is controlled by the dry season cut-off gate (43); the dry season closure gate (43) is used for intercepting the sewage of the rainwater pump station (1) in dry seasons.
CN202020271963.6U 2020-03-09 2020-03-09 Drainage pumping station and regulation and storage tank jointly build structure Active CN211873292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020271963.6U CN211873292U (en) 2020-03-09 2020-03-09 Drainage pumping station and regulation and storage tank jointly build structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020271963.6U CN211873292U (en) 2020-03-09 2020-03-09 Drainage pumping station and regulation and storage tank jointly build structure

Publications (1)

Publication Number Publication Date
CN211873292U true CN211873292U (en) 2020-11-06

Family

ID=73254933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020271963.6U Active CN211873292U (en) 2020-03-09 2020-03-09 Drainage pumping station and regulation and storage tank jointly build structure

Country Status (1)

Country Link
CN (1) CN211873292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236408A (en) * 2020-03-09 2020-06-05 上海市城市建设设计研究总院(集团)有限公司 Joint construction structure of drainage pump station and regulation and storage tank and operation method thereof
CN113006231A (en) * 2021-02-22 2021-06-22 上海碧波水务设计研发中心 Model-based method for determining regional drainage standard-raising pollution-control operation scheduling mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236408A (en) * 2020-03-09 2020-06-05 上海市城市建设设计研究总院(集团)有限公司 Joint construction structure of drainage pump station and regulation and storage tank and operation method thereof
CN113006231A (en) * 2021-02-22 2021-06-22 上海碧波水务设计研发中心 Model-based method for determining regional drainage standard-raising pollution-control operation scheduling mode
CN113006231B (en) * 2021-02-22 2022-11-15 上海碧波水务设计研发中心 Model-based method for determining regional drainage standard-raising pollution-control operation scheduling mode

Similar Documents

Publication Publication Date Title
CN111236408A (en) Joint construction structure of drainage pump station and regulation and storage tank and operation method thereof
CN107989151A (en) A kind of region rainwater catchment system engineering system and concocting method
CN105714723B (en) A kind of urban road rainwater-collecting processing and application system
CN211873292U (en) Drainage pumping station and regulation and storage tank jointly build structure
CN105735449B (en) A kind of urban road rainwater collecting and treating system
CN205875342U (en) Urban rainwater filters storage leakage system
CN103696481A (en) Rainwater regulating, storing and recycling system
CN100485130C (en) Overground step reservoir and building method thereof
CN203782850U (en) Rainwater regulation, storage and reuse system
CN201874083U (en) Land-saving and energy-saving reservoir type pumping station drainage device for down digging channels
CN202157297U (en) Gate control type urban rain and flood regulation, control and utilization system
CN111362467A (en) Intensive regulation and storage tank with treatment function
CN207998907U (en) A kind of region rainwater catchment system engineering system
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN212336273U (en) Reduce rainwater regulation pump station of initial stage rainwater pollution and flood peak flow simultaneously
CN210117787U (en) Underground garage drainage system
CN113846740A (en) Initial rainwater collecting device
CN111648303A (en) Comprehensive slope protection structure system and method for ditch head backfill measure
CN205475661U (en) Regulation pond under landscape water body
CN211499096U (en) Ecological water bank with river-following pollution self-control function
CN110700374A (en) Ecological water bank with river-following pollution self-control function
CN206128253U (en) Urban drainage pipe network collection yu jiao pond
CN111576334A (en) River course cuts dirty bank wall structure
CN211690710U (en) Bury formula rainwater pump station
CN214832334U (en) Dyke type capable of separating flood and supplying river

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant