Drainage box culvert maintenance well and method for maintaining drainage box culvert Download PDFInfo
- Publication number
- CN111809711A CN111809711A CN202010531526.8A CN202010531526A CN111809711A CN 111809711 A CN111809711 A CN 111809711A CN 202010531526 A CN202010531526 A CN 202010531526A CN 111809711 A CN111809711 A CN 111809711A
- Authority
- CN
- China
- Prior art keywords
- box culvert
- drainage box
- floodgate
- picture peg
- manhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000012423 maintenance Methods 0.000 title abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 22
- 238000012546 transfer Methods 0.000 claims description 9
- 230000008439 repair process Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 5
- 230000008569 process Effects 0.000 abstract description 3
- 238000005086 pumping Methods 0.000 abstract 1
- 238000007689 inspection Methods 0.000 description 4
- 230000006872 improvement Effects 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
- E02D29/1418—Covers for manholes or the like; Frames for covers with implements to assist in lifting, e.g. counterweights, springs
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
- E03F7/02—Shut-off devices
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sewage (AREA)
Abstract
The invention relates to a drainage box culvert maintenance well which is characterized in that a maintenance well is arranged in a drainage box culvert at intervals, an inserting plate gate slot is arranged in the maintenance well, a detachable inserting plate gate matched with the inserting plate gate is arranged in the inserting plate gate slot, an inserting plate gate opening matched with the inserting plate gate is arranged at the top of the box culvert above the inserting plate gate slot, a first pressure cover plate is arranged on the inserting plate gate opening, square openings are further arranged at the tops of the box culvert in front of and behind the slot, and a second pressure cover plate is arranged on the square opening. The invention can realize rapid water cut-off, basically realize water-free operation, avoid the risk brought by water-carrying construction, does not need a branch pumping station to cut off water, and has the advantages of reducing the operation complexity and influence in the process of dredging or overhauling the box culvert, and the like.
Description
Technical Field
The invention belongs to the technical field of drainage, and particularly relates to an inspection and repair well for a drainage box culvert and a method for inspecting and repairing the box culvert.
Background
Along with the three-year action of upgrading and efficiency improvement of town sewage treatment and the improvement of the standards of rainwater drainage design in the reappearance period, the requirements for building and modifying town drainage pipelines are increasing day by day. Due to the requirements of urban construction, water treatment facilities are far away from the city center, drainage needs to be conveyed in a long distance, and part of drainage pipelines need to adopt a box culvert form. The construction of the drainage box culvert basically cannot realize one use and one standby, otherwise, the construction investment is huge. And the drainage box culvert is continuously operated after being put into operation, and certain difficulty is brought if the drainage box culvert needs to be dredged or overhauled.
In order to realize dredging or maintenance, the water transfer is usually carried out after the underwater temporary plugging in the box culvert is carried out at low flow, if the pressure box culvert needs a branch pump station to be matched with water stop, the operation process is complex, and the influence surface is large.
Disclosure of Invention
The invention aims to provide a drainage box culvert manhole which can overcome some defects in the prior art.
In order to achieve the purpose, the technical scheme of the invention is as follows: the utility model provides a drainage box culvert manhole, during its characterized in that drainage box culvert, every certain distance apart sets up one and examines and repair the well, establishes the picture peg floodgate slot in the examine and repair well, be equipped with the picture peg floodgate of dismantling with it complex in the picture peg floodgate slot, the picture peg floodgate entrance to a cave of establishing with picture peg floodgate complex is established at picture peg floodgate slot top box culvert top, establishes first pressure apron on the picture peg floodgate entrance to a cave, and the box culvert top around the slot still is equipped with the square entrance to a cave, establishes second pressure apron on the square entrance to a cave.
Furthermore, an access well is arranged every 500-2000 m in the drainage box culvert.
Furthermore, lifting hooks are arranged on the first pressure cover plate and the second pressure cover plate and used for lifting the cover plates.
Further, the width of the plug board gate opening is 500-1200 mm, the length of the plug board gate opening is matched with that of the plug board gate opening, and the length and the width of the square opening are both 1000-2000 mm.
Furthermore, a flange opening is arranged on the pressure cover plate, a detachable blind plate is arranged on the flange opening, the flange opening is plugged by the blind plate when the box culvert normally operates, and the pressure cover plate is opened when ventilation is needed.
The method for overhauling the drainage box culvert by using the drainage box culvert overhaul well is characterized by comprising the following steps of:
A. reducing the running water level of the pressure drainage box culvert to be below the ground elevation;
B. opening the second pressure cover plate 1, installing a water transfer pump and starting;
C. opening the first pressure cover plate 2 and inserting the flashboard 5;
D. overhauling the box culvert on the downstream water flow side of the spile gate, and taking out the spile gate 5 and the water transfer pump after the overhauling is finished;
E. and recovering the second pressure cover plate 1 and the first pressure cover plate 2, and recovering the normal operation of the box culvert.
Compared with the prior art, the invention has the following advantages and beneficial effects:
according to the technical scheme, underwater plugging is not needed in the arrangement of the inspection well, and the risk of water cut-off construction is greatly reduced. Meanwhile, the system can basically realize the operation without stopping water, does not need a branch pump station to stop water, reduces the operation complexity and influence in the dredging or overhauling process, and has practical application value.
Drawings
FIG. 1 is a plan view of a layer in a manhole.
Fig. 2 is a plan view of a lower layer of the manhole.
Fig. 3 is a sectional view taken along line a-a of fig. 1.
Detailed Description
The invention is described in further detail below with reference to the figures and specific examples. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention.
The invention relates to a drainage box culvert manhole, which is characterized in that:
every 500~2000m of drainage box culvert sets up an inspection shaft, establishes the picture peg floodgate slot 6 in the inspection shaft, be equipped with the detachable picture peg floodgate 5 of complex with it in the picture peg floodgate slot 6, the picture peg floodgate entrance to a cave of establishing with picture peg floodgate complex is established at box culvert top above the picture peg floodgate slot, establishes first pressure apron 2 on the picture peg floodgate entrance to a cave, and the box culvert top around the slot still is equipped with the square entrance to a cave, establishes second pressure apron 1 on the square entrance to a cave.
The use method of the invention comprises the following steps:
A. reducing the running water level of the pressure drainage box culvert to be below the ground elevation;
B. opening the second pressure cover plate 1, installing a water transfer pump and starting;
C. opening the first pressure cover plate 2 and inserting the flashboard 5;
D. overhauling the box culvert on the downstream water flow side of the spile gate, and taking out the spile gate 5 and the water transfer pump after the overhauling is finished;
E. and recovering the second pressure cover plate 1 and the first pressure cover plate 2, and recovering the normal operation of the box culvert.
The water transfer pump is a submersible centrifugal pump.
The flashboard gate 5 determines whether to be installed or not according to the working condition requirement, and is stored in a warehouse when in normal operation, and the size of the flashboard is determined according to the size of a box culvert; the width of the first pressure cover plate 2 is matched with the slot size, and is usually 500-1200 mm. The square hole is established at the box culvert top around the slot, and the square hole size satisfies water transfer pump installation and manhole user demand, and length/width is 1000~2000mm usually, establishes second pressure cap 1 on the hole. The pressure cover plate is provided with a lifting hook 4 for lifting the cover plate. A flange opening 3 is arranged on the pressure cover plate, the blind plate is plugged when the box culvert normally operates, and the pressure cover plate is opened when ventilation is needed.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, and any variations and modifications made by those skilled in the art based on the above disclosure are within the scope of the appended claims.
Claims (6)
1. The utility model provides a drainage box culvert manhole, during its characterized in that drainage box culvert, every certain distance apart sets up one and examines and repair the well, establishes the picture peg floodgate slot in the examine and repair well, be equipped with the picture peg floodgate of dismantling with it complex in the picture peg floodgate slot, the picture peg floodgate entrance to a cave of establishing with picture peg floodgate complex is established at picture peg floodgate slot top box culvert top, establishes first pressure apron on the picture peg floodgate entrance to a cave, and the box culvert top around the slot still is equipped with the square entrance to a cave, establishes second pressure apron on the square entrance to a cave.
2. The drainage box culvert manhole as claimed in claim 1, wherein every 500-2000 m of the drainage box culvert is provided with a manhole.
3. The drainage box culvert manhole of claim 1 wherein the first pressure cap plate and the second pressure cap plate are provided with hooks.
4. The drainage box culvert manhole as claimed in claim 1, wherein the width of the plug gate opening is 500-1200 mm, and the length and width of the square opening are 1000-2000 mm.
5. The drainage box culvert manhole of claim 1 wherein the pressure cover plate has a flange opening, and the flange opening is provided with a detachable blind plate.
6. A method of servicing a drainage box culvert using the drainage box culvert manhole of claim 1, the method comprising the steps of:
A. reducing the running water level of the pressure drainage box culvert to be below the ground elevation;
B. opening the second pressure cover plate 1, installing a water transfer pump and starting;
C. opening the first pressure cover plate 2 and inserting the flashboard 5;
D. overhauling the box culvert on the downstream water flow side of the spile gate, and taking out the spile gate 5 and the water transfer pump after the overhauling is finished;
E. and recovering the second pressure cover plate 1 and the first pressure cover plate 2, and recovering the normal operation of the box culvert.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010531526.8A CN111809711A (en) | 2020-06-11 | 2020-06-11 | Drainage box culvert maintenance well and method for maintaining drainage box culvert |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010531526.8A CN111809711A (en) | 2020-06-11 | 2020-06-11 | Drainage box culvert maintenance well and method for maintaining drainage box culvert |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111809711A true CN111809711A (en) | 2020-10-23 |
Family
ID=72846004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010531526.8A Pending CN111809711A (en) | 2020-06-11 | 2020-06-11 | Drainage box culvert maintenance well and method for maintaining drainage box culvert |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111809711A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112458931A (en) * | 2020-10-29 | 2021-03-09 | 上海市政工程设计研究总院(集团)有限公司 | Non-cutoff connection method for double-hole water diversion box culvert |
CN112854032A (en) * | 2021-01-15 | 2021-05-28 | 上海市政工程设计研究总院(集团)有限公司 | Method for repairing double-hole pressure box culvert without water supply interruption by adopting high-level well bin-dividing switching |
CN114232526A (en) * | 2022-01-25 | 2022-03-25 | 中建三局绿色产业投资有限公司 | Urban combined concealed culvert fast-assembling and fast-disassembling plugging system and fast-assembling and fast-disassembling plugging method thereof |
CN115467257A (en) * | 2022-08-25 | 2022-12-13 | 安徽省水利水电勘测设计研究总院有限公司 | Prefabricated box culvert of assembled |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004092356A (en) * | 2002-08-31 | 2004-03-25 | Tsutomu Odawara | Check valve |
US6743354B1 (en) * | 2001-03-30 | 2004-06-01 | New Pig Corporation | Drain guard catch basin |
CN103469883A (en) * | 2013-09-12 | 2013-12-25 | 中国能源建设集团广东省电力设计研究院 | Drainage laminated beam well for connecting drainage box culvert with sea area |
CN207260295U (en) * | 2017-08-31 | 2018-04-20 | 无锡市交通工程有限公司 | A kind of steel caisson template for being used for underwater big permeable geology drainage inspection well and pouring |
CN207376762U (en) * | 2017-11-06 | 2018-05-18 | 东莞市水利勘测设计院有限公司 | A kind of flood control electricity row station |
CN207469425U (en) * | 2017-11-17 | 2018-06-08 | 广州自来水专业建安有限公司 | A kind of underwater plugging device of drainpipe |
CN208792268U (en) * | 2018-08-28 | 2019-04-26 | 扬州清雨环保设备工程有限公司 | It is a kind of can multi-gear adjustment water level plug board gate |
-
2020
- 2020-06-11 CN CN202010531526.8A patent/CN111809711A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6743354B1 (en) * | 2001-03-30 | 2004-06-01 | New Pig Corporation | Drain guard catch basin |
JP2004092356A (en) * | 2002-08-31 | 2004-03-25 | Tsutomu Odawara | Check valve |
CN103469883A (en) * | 2013-09-12 | 2013-12-25 | 中国能源建设集团广东省电力设计研究院 | Drainage laminated beam well for connecting drainage box culvert with sea area |
CN207260295U (en) * | 2017-08-31 | 2018-04-20 | 无锡市交通工程有限公司 | A kind of steel caisson template for being used for underwater big permeable geology drainage inspection well and pouring |
CN207376762U (en) * | 2017-11-06 | 2018-05-18 | 东莞市水利勘测设计院有限公司 | A kind of flood control electricity row station |
CN207469425U (en) * | 2017-11-17 | 2018-06-08 | 广州自来水专业建安有限公司 | A kind of underwater plugging device of drainpipe |
CN208792268U (en) * | 2018-08-28 | 2019-04-26 | 扬州清雨环保设备工程有限公司 | It is a kind of can multi-gear adjustment water level plug board gate |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112458931A (en) * | 2020-10-29 | 2021-03-09 | 上海市政工程设计研究总院(集团)有限公司 | Non-cutoff connection method for double-hole water diversion box culvert |
CN112854032A (en) * | 2021-01-15 | 2021-05-28 | 上海市政工程设计研究总院(集团)有限公司 | Method for repairing double-hole pressure box culvert without water supply interruption by adopting high-level well bin-dividing switching |
CN114232526A (en) * | 2022-01-25 | 2022-03-25 | 中建三局绿色产业投资有限公司 | Urban combined concealed culvert fast-assembling and fast-disassembling plugging system and fast-assembling and fast-disassembling plugging method thereof |
CN115467257A (en) * | 2022-08-25 | 2022-12-13 | 安徽省水利水电勘测设计研究总院有限公司 | Prefabricated box culvert of assembled |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111809711A (en) | Drainage box culvert maintenance well and method for maintaining drainage box culvert | |
CN204163745U (en) | A kind of tunnel props up hole counter-slope drainage system | |
CN205444311U (en) | City river pump station that gate combines | |
CN110307017B (en) | Intelligent regulation and control system and method for seepage field of underground water sealed cave depot | |
CN206396785U (en) | The common cabin pattern synthesis piping lane section structure of the rain sewage of easy access | |
CN213358867U (en) | Drainage box culvert manhole | |
CN105735399A (en) | Irrigation and drainage complete device of multifunctional submersible sewage pump station | |
CN201588294U (en) | Backflow-preventing type drainage structure of circulating water pump room | |
CN111305369A (en) | Intelligent integrated prefabricated pump station | |
CN211368787U (en) | Municipal administration heating power pipeline sluicing device | |
CN201043475Y (en) | Drainage device for deep well in mine | |
CN212641711U (en) | Prevent flowing backward rainwater box culvert and cut dirty pump station | |
CN211082301U (en) | Mixed flow type water pump of inclined installation | |
CN208517904U (en) | A kind of hydraulic engineering drainage gate | |
CN209620172U (en) | Novel inverted siphon water pipeline mud discharging and emptying structure | |
CN101858323A (en) | Siphon type water-discharging shaft tubular pump structure form | |
CN217053592U (en) | Nuclear power plant is with interim water intake device of sea water | |
CN215371539U (en) | Large buried water supply pipeline inspection drainage device | |
CN211499104U (en) | Emergency drainage system for hydropower station workshop | |
CN215842058U (en) | A one-level sedimentation tank for scroll filter | |
CN111155498A (en) | Sand blowing and dredging system and method for top cover of water turbine | |
CN204402916U (en) | A kind of water drainage water pump | |
CN108560694A (en) | Rainfall pumping station with test run function | |
CN105604135B (en) | The overflow mechanism of pumping plant circulating cooling water tank | |
CN218204697U (en) | Water taking pump room with pressure bearing top plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201023 |