CN203947564U - Transformer station's sewage collecting basin - Google Patents

Transformer station's sewage collecting basin Download PDF

Info

Publication number
CN203947564U
CN203947564U CN201420339315.4U CN201420339315U CN203947564U CN 203947564 U CN203947564 U CN 203947564U CN 201420339315 U CN201420339315 U CN 201420339315U CN 203947564 U CN203947564 U CN 203947564U
Authority
CN
China
Prior art keywords
sewage
transformer station
collecting basin
sewage collecting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420339315.4U
Other languages
Chinese (zh)
Inventor
聂建春
张耀
陈远
徐钦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Original Assignee
Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Electric Power Survey and Design Institute Co Ltd filed Critical Inner Mongolia Electric Power Survey and Design Institute Co Ltd
Priority to CN201420339315.4U priority Critical patent/CN203947564U/en
Application granted granted Critical
Publication of CN203947564U publication Critical patent/CN203947564U/en
Anticipated expiration legal-status Critical
Active legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

Propose a kind of Novel transformer substation sewage collecting basin, belonged to technical field of sewage.Described transformer station sewage collecting basin comprises four sidewalls, on one or more sidewalls, reserve therein one or more pipe joints, at described pipe joint place, with blind flange shutoff, prepare against any one direction Zhan district sewage pipe of access, wherein said station district sewage pipe has check (non-return) valve to prevent backing up of sewage Hui Zhanqu; One jiao of proof submersible sand discharging pump of installation and a standby dredge pump at described transformer station sewage collecting basin, described proof submersible sand discharging pump has blow-off pipe, described blow-off pipe stretches out that from a sidewall of described transformer station sewage collecting basin sewage is discharged, and described blow-off pipe is provided with check (non-return) valve and returns transformer station's sewage collecting basin to prevent backing up of sewage; One jiao of floating ball lever meter that is also provided with the water level that detects transformer station's sewage collecting basin of described transformer station sewage collecting basin, described floating ball lever meter is arranged on manhole place, and described manhole place also arranges cat ladder.This programme meeting the reasonable water storage utilization of transformer station's sewage, the hidden danger of avoiding the underground water to pollute, realize under the prerequisite of storing away in winter the comprehensive utilization that the summer fills with, reduced greatly and taken up an area and saved construction cost.

Description

Transformer station's sewage collecting basin
Technical field
The utility model belongs to technical field of sewage, relates in particular to a kind of transformer station sewage collecting basin.
Background technology
Flourish along with the exploitation of all kinds of resources and economic construction, power construction cause is rapidly developed, all kinds of large-scale substation engineerings put into operation in succession, especially transformer substation in city builds up successively, in substation operation process, can produce a certain amount of sewage, if improper in processing, will pollute the water of quoting of surrounding resident, storage and the comprehensive utilization of how to do well transformer station sewage, just become particularly crucial.Building green substation is the objective requirement of " resource-conserving, environmentally friendly " social construction, is also the inexorable trend of modern transformer station development.Existing 110kV transformer station, 220kV transformer station, sanitary sewage adopts the mode that drains into the outer negative well in station conventionally.But according to the requirement of Law on the Prevention and Treatment of Water Pollution, can not, with crack and seepage pit discharge effluent sewage, therefore, just need in station, sewage storage device be set.
Existing 110kV transformer station, 220kV transformer station be normal adopts complete sewage treatment facility, with collecting-tank and these three kinds of modes of negative well of grille well, but all there is shortcoming separately.
First complete sewage treatment facility cost is high, a complete set of expense 170,000 left and right, and personnel are less due to 110kV transformer station, 220kV substation operation, the sewage quantity producing does not reach the priming level of sewage treatment facility conventionally, equipment is throughout the year idle, cause great waste, and floor space is large, land resources has also been formed to waste.Secondly, with the collecting-tank with grille well, exist equally floor space large, the problem that cost is high, and because septic tank is had conventionally in transformer station, so grille well meaning is also little, belong to repeated construction measure.For negative well, it not only easily pollutes underground water, and can not realize the circulation comprehensive utilization of sewage.
Utility model content
The problems referred to above that exist in order to solve prior art, the utility model proposes a kind of Novel transformer substation sewage collecting basin, avoid being stored in sewage in collecting-tank underground water is polluted, realize the comprehensive utilization of sewage, reach energy-saving and emission-reduction, sewage is stored away in winter the object of summer filling.
For realizing above object, the utility model proposes a kind of transformer station sewage collecting basin, described transformer station sewage collecting basin comprises four sidewalls, on one or more sidewalls, reserve therein one or more pipe joints, at described pipe joint place, with blind flange shutoff, prepare against any one direction Zhan district sewage pipe of access, wherein said station district sewage pipe has check (non-return) valve to prevent backing up of sewage Hui Zhanqu; One jiao of proof submersible sand discharging pump of installation and a standby dredge pump at described transformer station sewage collecting basin, described proof submersible sand discharging pump has blow-off pipe, described blow-off pipe stretches out that from a sidewall of described transformer station sewage collecting basin sewage is discharged, and described blow-off pipe is provided with check (non-return) valve and returns transformer station's sewage collecting basin to prevent backing up of sewage; One jiao of floating ball lever meter that is also provided with the water level that detects transformer station's sewage collecting basin of described transformer station sewage collecting basin, described floating ball lever meter is arranged on manhole place, and described manhole place also arranges cat ladder.
According to an aspect of the present utility model, described proof submersible sand discharging pump is fixed in described transformer station sewage collecting basin, and described submersible sewage pump holder is fixed to transformer station's sewage collecting basin bottom by being soldered to the stone bolt of embedded part at the bottom of pond; And described proof submersible sand discharging pump top is fixed to top at the bottom of transformer station's sewage collecting basin by expansion bolt.
According to an aspect of the present utility model, described proof submersible sand discharging pump is fixing or movable submersible dredge pump.
According to an aspect of the present utility model, described transformer station sewage collecting basin inwall and direct-burried steel pipe outer wall have thick slurry type of epoxide coal bituminous Cold winding band.
According to an aspect of the present utility model, described transformer station sewage collecting basin length and width are respectively 4.6 meters, and height is 4.25 meters; Described pipe joint and described blow-off pipe are 3.15 meters apart from the distance at the bottom of pond.
The transformer station's sewage collecting basin the utility model proposes, meeting the reasonable water storage utilization of transformer station's sewage, the hidden danger of avoiding the underground water to pollute, realize under the prerequisite of storing away in winter the comprehensive utilization that the summer fills with, has reduced greatly and has taken up an area and saved construction cost.
Accompanying drawing explanation
Fig. 1 is the schematic top plan view of the transformer station's sewage collecting basin that the utility model proposes;
Fig. 2 is the side-looking generalized section of the transformer station's sewage collecting basin that the utility model proposes.
The specific embodiment
The following stated is better embodiment of the present utility model, does not therefore limit protection domain of the present utility model.
Fig. 1 and Fig. 2 show the transformer station's sewage collecting basin the utility model proposes.Wherein, Fig. 1 is top view; Fig. 2 is the side cutaway view along A-A direction.
As Fig. 1, shown in 2, described transformer station sewage collecting basin 100 comprises four sidewalls, preserved pipeline interface on three sidewalls therein, in the shutoff of interface temporary blind flange, in order to any one direction Zhan district sewage pipe 101 of access, described station district sewage pipe has check (non-return) valve, prevents backing up of sewage Hui Zhanqu.In Fig. 1, illustrated and on three sidewalls, all only stayed an interface, but interface quantity can arbitrarily arrange as the case may be.
One jiao of proof submersible sand discharging pump 102 of installation and a standby proof submersible sand discharging pump (not shown) at described transformer station sewage collecting basin, described proof submersible sand discharging pump has blow-off pipe, described blow-off pipe stretches out from a sidewall of described transformer station sewage collecting basin, sewage discharged for greening, to concentrate and send or drain into sewage network outside.Described blow-off pipe is provided with check (non-return) valve, prevents that backing up of sewage from returning transformer station's sewage collecting basin 100.
One jiao of described transformer station sewage collecting basin is also provided with floating ball lever meter, for detection of the water level of transformer station's sewage collecting basin.Described floating ball lever meter is arranged on manhole place, and described manhole place also arranges cat ladder so that safeguard.
For preventing corrosion in water, described transformer station sewage collecting basin inwall and direct-burried steel pipe outer wall adopt thick slurry type of epoxide coal bituminous Cold winding band anticorrosion (ends two face).
In one embodiment, described proof submersible sand discharging pump 102 is fixed in described transformer station sewage collecting basin, described submersible sewage pump holder is fixed to transformer station's sewage collecting basin bottom by being soldered to the stone bolt of embedded part at the bottom of pond, in one embodiment, after submersible sewage pump holder is in place, carry out back-grouting 106; Described proof submersible sand discharging pump top is fixed to top at the bottom of transformer station's sewage collecting basin by expansion bolt 107.
In one embodiment, described proof submersible sand discharging pump 102 adopts fixing or movable submersible dredge pump, be, at the bottom of proof submersible sand discharging pump can be arranged on and also can not be arranged on pond at the bottom of collecting-tank, only, when needs are arranged, just by sus-pension, proof submersible sand discharging pump to be put into collecting-tank outward.
In one embodiment, described transformer station sewage collecting basin length and width are respectively 4.6 meters, and height is 4.25 meters; Described pipe joint and described blow-off pipe are 3.15 meters apart from the distance at the bottom of pond, higher than proof submersible sand discharging pump 102, open pump water level.
When described floating ball lever meter detects in collecting-tank sewage, reach while opening pump water level, submersible sewage pump startup, discharges sewage in collecting-tank, for transformer station's greening or row outward, and when water level is down to termination of pumping water level, proof submersible sand discharging pump termination of pumping.
The utility model is by investigation and Exact calculation to existing 110kV transformer station, 220kV transformer station productive life water supply volume, and the dischargeable capacity of the collecting-tank of designing is complete can meet this collecting-tank just as water storage device, realizes the summer of storing away in winter of sewage and fills with.Reach the fixedly automatic outer row of water level, the accident generation of saving manpower monitoring and sewage outflow.Collecting-tank is as water storage device; the storage of sanitary sewage autumn and winter wherein; spring and summer can be used as the inside and outside greening in station water; both can reduce the use amount at clean water source; can prevent that again sanitary sewage from draining into the outer contaminated environment in station; reach the object of water-saving and emission-reducing, protection of the environment, local use, simultaneously unnecessary sewage or in case of emergency can concentrate and send processing outside.The utility model had obvious advantage in environmental protection and energy conservation aspect utilizing more in the past.
Should note; the specific embodiment that the utility model proposes and application be the object for illustrating only;, as the restriction to the utility model protection domain, those skilled in the art can not modify to meet actual needs to the specific embodiment of the present utility model.

Claims (5)

1.Yi Zhong transformer station sewage collecting basin, is characterized in that:
Described transformer station sewage collecting basin comprises four sidewalls, on one or more sidewalls, reserve therein one or more pipe joints, at described pipe joint place, with blind flange shutoff, prepare against any one direction Zhan district sewage pipe of access, wherein said station district sewage pipe has check (non-return) valve to prevent backing up of sewage Hui Zhanqu;
One jiao of proof submersible sand discharging pump of installation and a standby dredge pump at described transformer station sewage collecting basin, described proof submersible sand discharging pump has blow-off pipe, described blow-off pipe stretches out that from a sidewall of described transformer station sewage collecting basin sewage is discharged, and described blow-off pipe is provided with check (non-return) valve and returns transformer station's sewage collecting basin to prevent backing up of sewage;
One jiao of floating ball lever meter that is also provided with the water level that detects transformer station's sewage collecting basin of described transformer station sewage collecting basin, described floating ball lever meter is arranged on manhole place, and described manhole place also arranges cat ladder.
2. transformer station according to claim 1 sewage collecting basin, is characterized in that:
Described proof submersible sand discharging pump is fixed in described transformer station sewage collecting basin, and described submersible sewage pump holder is fixed to transformer station's sewage collecting basin bottom by being soldered to the stone bolt of embedded part at the bottom of pond; And described proof submersible sand discharging pump top is fixed to top at the bottom of transformer station's sewage collecting basin by expansion bolt.
3. transformer station according to claim 1 sewage collecting basin, is characterized in that:
Described proof submersible sand discharging pump is movable submersible dredge pump.
4. transformer station according to claim 1 sewage collecting basin, is characterized in that:
Described transformer station sewage collecting basin inwall and direct-burried steel pipe outer wall have thick slurry type of epoxide coal bituminous Cold winding band.
5. transformer station according to claim 1 sewage collecting basin, is characterized in that:
Described transformer station sewage collecting basin length and width are respectively 4.6 meters, and height is 4.25 meters; Described pipe joint and described blow-off pipe are 3.15 meters apart from the distance at the bottom of pond.
CN201420339315.4U 2014-06-24 2014-06-24 Transformer station's sewage collecting basin Active CN203947564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420339315.4U CN203947564U (en) 2014-06-24 2014-06-24 Transformer station's sewage collecting basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420339315.4U CN203947564U (en) 2014-06-24 2014-06-24 Transformer station's sewage collecting basin

Publications (1)

Publication Number Publication Date
CN203947564U true CN203947564U (en) 2014-11-19

Family

ID=51889610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420339315.4U Active CN203947564U (en) 2014-06-24 2014-06-24 Transformer station's sewage collecting basin

Country Status (1)

Country Link
CN (1) CN203947564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638922A (en) * 2016-12-30 2017-05-10 安顺汇景卫生材料科技有限公司 Sewage collection tank system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638922A (en) * 2016-12-30 2017-05-10 安顺汇景卫生材料科技有限公司 Sewage collection tank system

Similar Documents

Publication Publication Date Title
CN105735449B (en) A kind of urban road rainwater collecting and treating system
CN202227456U (en) Rainwater collection and recycling system for environment-friendly transformer station
CN111236408A (en) Joint construction structure of drainage pump station and regulation and storage tank and operation method thereof
CN203878608U (en) Underground utility tunnel structure
CN203947564U (en) Transformer station's sewage collecting basin
CN206052492U (en) A kind of shunting water absorber for both sides of the road draining
CN202157297U (en) Gate control type urban rain and flood regulation, control and utilization system
CN204401778U (en) Integrated sewage water Boosting pumping station
CN104775481B (en) Water self-circulation system in building community
CN204418350U (en) A kind of garage floor discharge structure with underground people's air defense
CN203947519U (en) Multifunctional rain storage pool
CN109763552A (en) A kind of basis is dark to apply gravity type draining regeneration application system and its construction method
CN211873292U (en) Drainage pumping station and regulation and storage tank jointly build structure
CN201778388U (en) Automatic rainwater-sewage intercepting device
CN213477127U (en) Rainwater regulation and storage system
CN204530869U (en) Water self-circulation system in a kind of building
CN203795512U (en) Rainwater recycling device
CN203487619U (en) Water resource recycling system for city underground engineering construction
Chu Study on comprehensive utilization of water resource environment in water-saving design of buildings
CN202355908U (en) Wastewater treating and recycling device
CN216075468U (en) Water-sealed diesel leakage emergency pool
CN203846595U (en) Novel energy efficient house
CN202139680U (en) Drainage ditch for ash storage yard of power plant
CN206737108U (en) A kind of urban underground water drainage pipe net self-stripping system
CN110397097A (en) A kind of garbage leachate and Groundwater Comprehensive pump-drainage well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant