CN206189365U - A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour - Google Patents

A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour Download PDF

Info

Publication number
CN206189365U
CN206189365U CN201621250429.7U CN201621250429U CN206189365U CN 206189365 U CN206189365 U CN 206189365U CN 201621250429 U CN201621250429 U CN 201621250429U CN 206189365 U CN206189365 U CN 206189365U
Authority
CN
China
Prior art keywords
water conservancy
diversion
mozzle
conservancy diversion
occluding body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621250429.7U
Other languages
Chinese (zh)
Inventor
易文明
蒲建平
付峥
杨理乾
乔娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201621250429.7U priority Critical patent/CN206189365U/en
Application granted granted Critical
Publication of CN206189365U publication Critical patent/CN206189365U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour. The utility model provides a shutoff construction is reliable, the effectual a water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour of shutoff. Water conservancy diversion block structure including the diversion tunnel shutoff body of pouring the completion and arrange at the internal honeycomb duct of this diversion tunnel shutoff along the water conservancy diversion direction, pour the lower sluicing of in -process and circulated the honeycomb duct lead to low reaches from the upper reaches, water conservancy diversion block structure still including the import cut the device with the export retention device, the import cut the device with export retention device all can open and close, be located the permanent placing body in the honeycomb duct passed through at the placing initial stage the import cut the device with export retention device inject the honeycomb duct in.

Description

For the water conservancy diversion plugging structure that diversion tunnel occluding body is poured
Technical field
The utility model is related to a kind of water conservancy diversion plugging structure, more particularly, to a kind of for leading that diversion tunnel occluding body is poured Stream plugging structure, belongs to Design of The Hydraulic Structure building technology field.
Background technology
At present in Hydraulic and Hydro-Power Engineering, influenceed by closure gate installation precision and water-stagnating effect, by geological conditions Influence and the influence of liner structure, before the closure of diversion tunnel occluding body, have come from the closure leak of gate, osculum and The infiltration of Lining Crack.In order to create the condition of dry work for blocking concrete for diversion tunnel, it is necessary to which the row of taking leads measure.It is existing Generally excessively stream is let out in technology using draining steel pipe is spacious.When the outer water head born when the closure phase is higher, often water percolating capacity is larger, needs Led using many Large Diameter Steel Drainage Pipe rows.
Traditional method for blocking is that draining steel pipe in water is first exported closing gate, and is wrapped in afterbody casting concrete Wrap up in, then this section of draining steel pipe is blocked.The subject matter that this method for blocking is present is:1 draining steel pipe is more long, and steel pipe Upstream end lacks control measure, and it is uniform closely knit that steel pipe is difficult backfill;2 draining steel pipe plugging construction quality are difficult to ensure that, and do not have Standby maintenance condition;3 storehouse water are introduced directly into occluding body, and occluding body structure stress condition changes under high water head effect, seals Stifled body structure is difficult to ensure that safely.
Utility model content
Technical problem to be solved in the utility model is:A kind of plugging construction reliability is provided, plugging effect is good to be used for The water conservancy diversion plugging structure that diversion tunnel occluding body is poured.
For the technical scheme that solution above-mentioned technical problem is used is:A kind of water conservancy diversion envelope poured for diversion tunnel occluding body Bridging structure, including pour the diversion tunnel occluding body of completion and be arranged in the water conservancy diversion in the diversion tunnel occluding body along water conservancy diversion direction Pipe, the lower sluicing stream in casting process causes downstream by described mozzle from upstream, and described water conservancy diversion plugging structure is also wrapped Include import cutting device and outlet retention device, described import cutting device and described outlet retention device can open and Close, permanent placing body in the mozzle is the placing initial stage is by described import cutting device and described goes out Mouth retention device is limited in described mozzle.
It is further that described import cutting device is to be arranged on the non-return valve on the inside of the mozzle arrival end.
It is further that described outlet retention device is to be arranged on dish valve or the closure on the inside of the draft tube outlets end Gate.
Such scheme it is preferable that, described mozzle is to be cast in the diversion tunnel occluding body along water conservancy diversion direction Steel pipe.
It is further that described steel pipe has a section of stretching out for stretching out the diversion tunnel occluding body, described import Cutting device is arranged in described section of stretching out.
Such scheme it is preferable that, on the upper side wall of the mozzle in the diversion tunnel occluding body of upstream side also It is provided with exhaust return pipe.
It is further that vertical shaft is additionally provided with described diversion tunnel occluding body, described outlet retention device arrangement On the mozzle in vertical shaft, envelope is provided with the upper side wall of the mozzle in the vertical shaft of outlet retention device upstream side Stifled material pulp-inlet pipe.
The beneficial effects of the utility model are:The application by the two ends of mozzle be respectively provided with import cutting device and The inside of the mozzle that outlet retention device will be embedded in diversion tunnel occluding body forms the placing space of sealing when closed.So Afterwards, vertical shaft and construction gallery then by being arranged in advance in the diversion tunnel occluding body, from plugging material pulp-inlet pipe to described Placing space in fill pour body formed structure matter it is close, the good permanent placing body of plugging effect.Due to described permanent Placing body is in the placing space of sealing, by prior default vertical shaft and construction gallery placing, so can guarantee that closure The reliability of construction, while also can guarantee that the placing quality of the permanent placing body, it is ensured that plugging effect.
Brief description of the drawings
Fig. 1 is the top view that the utility model is used for the water conservancy diversion plugging structure that diversion tunnel occluding body is poured;
Fig. 2 is the A-A sectional views of Fig. 1.
Marked in figure:Diversion tunnel occluding body 1, mozzle 2, import cutting device 3, outlet retention device 4, permanent filling Building body 5, section of stretching out 6, exhaust return pipe 7, vertical shaft 8, plugging material pulp-inlet pipe 9, diversion tunnel 10, construction gallery 11.
Specific embodiment
Be as shown in Figure 1 and Figure 2 the utility model provide a kind of plugging construction reliability, plugging effect it is good for water conservancy diversion The water conservancy diversion plugging structure that hole occluding body is poured, and for building the construction method of the water conservancy diversion plugging structure.Described water conservancy diversion Plugging structure includes pouring the diversion tunnel occluding body 1 of completion and is arranged in leading in the diversion tunnel occluding body 1 along water conservancy diversion direction Flow tube 2, the lower sluicing stream in casting process causes downstream, described water conservancy diversion plugging structure by described mozzle 2 from upstream Also include import cutting device 3 and outlet retention device 4, described import cutting device 3 and described outlet retention device 4 is equal Can open and close, the permanent placing body 5 in the mozzle 2 is at the placing initial stage by described import cutting device 3 and described outlet retention device 4 be limited in described mozzle 2.The application is respectively provided with by the two ends in mozzle Import cutting device 3 and outlet retention device 4 will be embedded in the inside of mozzle 2 in diversion tunnel occluding body 1 shape when closed Into the placing space of sealing.Then, vertical shaft 8 and construction gallery 11 then by being arranged in advance in the diversion tunnel occluding body 1, Filled into described placing space from plugging material pulp-inlet pipe 9 and pour body close, good permanent of plugging effect that form structure matter Placing body 5.Because described permanent placing body 5 is in the placing space of sealing, by prior default vertical shaft 8 and construction The placing of gallery 11, so the reliability of plugging construction is can guarantee that, while also can guarantee that the placing matter of the permanent placing body 5 Amount, it is ensured that plugging effect.
In above-mentioned implementation method, in order to reduce production cost, facilitate the import cutting device 3 and outlet retention device 4 Manufacture, processing, described import cutting device 3 is set to be arranged in inverse on the inside of the arrival end of the mozzle 2 by the application Only valve;Described outlet retention device 4 is set to be arranged in dish valve or closure gate on the inside of the port of export of the mozzle 2; Meanwhile, the steel pipe that described mozzle 2 is set to be cast in along water conservancy diversion direction in the diversion tunnel occluding body 1.
Further, the placing construction of postorder for convenience, and also to improve pouring for the permanent placing body 5 Quality, the application sets one on described steel pipe and stretches out the section of stretching out 6 of the diversion tunnel occluding body 1, and described is entered Mouth cutting device 3 is arranged in the section of stretching out 6.And a vertical shaft 8, institute are also set up in described diversion tunnel occluding body 1 The outlet retention device 4 stated is arranged on the mozzle 2 in vertical shaft 8, meanwhile, positioned at outlet retention device 4 upstream side Plugging material pulp-inlet pipe 9 is set again on the upper side wall of the mozzle 2 in vertical shaft 8.So, just can both facilitate described permanent The construction of property placing body 5, meanwhile, the gas being present in during placing in the mozzle 2 can be discharged the mozzle again 2, to ensure the pouring quality of the permanent placing body 5.
There is the water conservancy diversion plugging structure of said structure, so just using following methods can construct, i.e., first exist Import cutting device 3 and outlet retention device 4 are installed on described mozzle 2, and simultaneously on the upper side of the mozzle 2 Described exhaust return pipe 7 and plugging material pulp-inlet pipe 9 is installed;Then described mozzle 2 is arranged into diversion tunnel 10 again Needing to pour the position of diversion tunnel occluding body 1, and open described import cutting device 3 and described outlet retention device 4 makes The lower stream that sluices causes downstream by the mozzle 2 from upstream;Then institute is poured on the premise of reserved vertical shaft 8 and construction gallery 11 The diversion tunnel occluding body 1 stated simultaneously is conserved;After described diversion tunnel occluding body 1 conserve it is qualified after turn off described import and block dress Put 3 and outlet retention device 4, with described vertical shaft 8 and construction gallery 11 be passage by described plugging material pulp-inlet pipe 9 to Permanent placing body 5 in described mozzle 2 described in placing completes the construction working of the water conservancy diversion plugging structure.
In above-mentioned implementation method, with reference to the characteristics of the water conservancy diversion plugging structure, according to the situation at scene, described in placing It is placing end point be vented the discharge of return pipe 7 denseness to reach the underflow liquid of requirement during permanent placing body 5.So, just can be with Ensure the placing quality of permanent placing body 5 of water conservancy diversion plugging structure described herein.Meanwhile, it is described herein in order to ensure The intensity of diversion tunnel occluding body, after described permanent placing body 5 placing complete and conserve it is qualified after again permanent closure it is described Vertical shaft 8.

Claims (7)

1. a kind of water conservancy diversion plugging structure poured for diversion tunnel occluding body, including pour the diversion tunnel occluding body (1) of completion with And the mozzle (2) in the diversion tunnel occluding body (1) is arranged in along water conservancy diversion direction, the lower sluicing stream in casting process is by described Mozzle (2) cause downstream from upstream, it is characterised in that:Described water conservancy diversion plugging structure also includes import cutting device (3) With outlet retention device (4), described import cutting device (3) and described outlet retention device (4) can open and close, Permanent placing body (5) in the mozzle (2) is at the placing initial stage by described import cutting device (3) and described Outlet retention device (4) be limited in described mozzle (2).
2. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 1, it is characterised in that:Described Import cutting device (3) is the non-return valve being arranged on the inside of the mozzle (2) arrival end.
3. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 1, it is characterised in that:Described Outlet retention device (4) is the dish valve or closure gate that are arranged on the inside of the mozzle (2) port of export.
4. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 1,2 or 3, it is characterised in that: Described mozzle (2) is the steel pipe being cast in along water conservancy diversion direction in the diversion tunnel occluding body (1).
5. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 4, it is characterised in that:Described Steel pipe has a section of stretching out (6) for stretching out the diversion tunnel occluding body (1), and described import cutting device (3) is arranged in institute In the section of stretching out (6) stated.
6. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 4, it is characterised in that:Positioned at upper Exhaust return pipe (7) is additionally provided with the upper side wall of the mozzle (2) in trip side diversion tunnel occluding body (1).
7. the water conservancy diversion plugging structure poured for diversion tunnel occluding body according to claim 4, it is characterised in that:Described Diversion tunnel occluding body (1) on be additionally provided with vertical shaft (8), described outlet retention device (4) is arranged in described in vertical shaft (8) On mozzle (2), closure is provided with the upper side wall of the mozzle (2) in outlet retention device (4) upstream side vertical shaft (8) Material pulp-inlet pipe (9).
CN201621250429.7U 2016-11-18 2016-11-18 A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour Active CN206189365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621250429.7U CN206189365U (en) 2016-11-18 2016-11-18 A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621250429.7U CN206189365U (en) 2016-11-18 2016-11-18 A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour

Publications (1)

Publication Number Publication Date
CN206189365U true CN206189365U (en) 2017-05-24

Family

ID=58727414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621250429.7U Active CN206189365U (en) 2016-11-18 2016-11-18 A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour

Country Status (1)

Country Link
CN (1) CN206189365U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313785A (en) * 2017-08-23 2017-11-03 中国电建集团成都勘测设计研究院有限公司 High dam ecology water supply hole block section liner structure
CN110513112A (en) * 2019-09-04 2019-11-29 中国电建集团中南勘测设计研究院有限公司 A kind of flowing hole forms device and shaft construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313785A (en) * 2017-08-23 2017-11-03 中国电建集团成都勘测设计研究院有限公司 High dam ecology water supply hole block section liner structure
CN107313785B (en) * 2017-08-23 2023-08-22 中国电建集团成都勘测设计研究院有限公司 Lining structure of blocking section of ecological water supply hole of high dam
CN110513112A (en) * 2019-09-04 2019-11-29 中国电建集团中南勘测设计研究院有限公司 A kind of flowing hole forms device and shaft construction method

Similar Documents

Publication Publication Date Title
CN103075128B (en) A kind of method for sealing of mash gas pumping drilling
CN104963324B (en) Diversion tunnel plugging head exhaust structure and exhaust method thereof
CN103174149B (en) A kind of dam body joint circulation grouting method
CN104389623A (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN206189365U (en) A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour
CN207537993U (en) A kind of diversion tunnel concrete plug
CN203270527U (en) Device for preventing gas explosion after gate closing and plugging of diversion tunnel
CN109706934B (en) Curtain grouting water plugging device in pressure-bearing water stratum and working method thereof
CN208966367U (en) A kind of device pouring compactness for improving double-arched tunnel mid-board top
CN203362181U (en) Mud jacking film bag for water resistance and leaking stoppage in tunnel construction
CN202688943U (en) Self-suction drainage system for barrier lake
CN110761307B (en) Earth-rock cofferdam water seepage treatment structure and construction method
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN105672208B (en) The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN203905031U (en) Drainage structure used during concrete plug construction period
CN105421312B (en) Diversion tunnel reconstruction is the passage and method for arranging after gates of segmental shape control
CN204662388U (en) Diversion tunnel shutoff head exhaust structure
CN106759161B (en) A kind of big cross section diversion tunnel plugging structure and construction method by stages
CN101435266B (en) Prestress pore passage dense grouting method
CN202440787U (en) Riverway diversion device
CN104328781A (en) Unfavorable geologic body controlling infiltration chemical grouting method
CN206785350U (en) A kind of water burst drilling holes plugging device
CN109487808A (en) A kind of leak stopping system of composite paster slip casting
CN110193501A (en) One kind is wind power ganged to wash pipe method and device
CN202559321U (en) Diversion tunnel plug concrete drainage pipe device