CN110761307B - Earth-rock cofferdam water seepage treatment structure and construction method - Google Patents

Earth-rock cofferdam water seepage treatment structure and construction method Download PDF

Info

Publication number
CN110761307B
CN110761307B CN201910969622.8A CN201910969622A CN110761307B CN 110761307 B CN110761307 B CN 110761307B CN 201910969622 A CN201910969622 A CN 201910969622A CN 110761307 B CN110761307 B CN 110761307B
Authority
CN
China
Prior art keywords
cofferdam
closure
water seepage
dike
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910969622.8A
Other languages
Chinese (zh)
Other versions
CN110761307A (en
Inventor
陈育权
章琦云
吴世然
李进军
谢立彬
程启富
佘伟威
徐寒
柯昌佳
赵栋
黄远流
钱金辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
China International Water and Electric Corp
Original Assignee
Sinohydro Bureau 3 Co Ltd
China International Water and Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd, China International Water and Electric Corp filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN201910969622.8A priority Critical patent/CN110761307B/en
Publication of CN110761307A publication Critical patent/CN110761307A/en
Application granted granted Critical
Publication of CN110761307B publication Critical patent/CN110761307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0037Clays

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

A water seepage processing structure of an earth-rock cofferdam comprises a closure dike, wherein a sub cofferdam is arranged at the position of a downstream slope foot of the closure dike, underwater concrete is poured on a river bed between the sub cofferdam and the closure dike, and a clay core wall is filled above the underwater concrete. The construction method of the water seepage treatment structure comprises the following steps: 1) filling the prop dam: adopting a one-way single prop vertical plugging method to fill the dike; 2) closing the cofferdam: building a sub cofferdam at the position of a downstream slope toe of the closure prop bank, and pouring underwater concrete on a river bed between the sub cofferdam and the closure prop bank; 3) laying a drain pipe: laying a plurality of drainage pipes along the direction of a riverbed above the underwater concrete, and draining the seepage water in the weir body; 4) filling a clay core wall: and filling a clay core wall above the underwater concrete, and filling an inverted filter layer on the two sides of the upstream and downstream of the clay core wall. By adopting the structure and the construction method, the anti-seepage effect can be improved after the cofferdam is closed on the riverbed, the water seepage of the weir body is effectively reduced, and the frequent drainage cost is reduced.

Description

Earth-rock cofferdam water seepage treatment structure and construction method
Technical Field
The invention relates to the technical field of hydropower station closure construction, in particular to an earth-rock cofferdam water seepage treatment structure and a construction method.
Background
In the construction of water conservancy and hydropower engineering in high mountain canyon areas, a construction method of diversion tunnel diversion and river bed one-time interception is generally adopted. Before the dam construction, the construction of upstream and downstream cofferdams needs to be carried out, and the dam construction in dry land is guaranteed. The key problem of cofferdam construction is seepage prevention treatment, and seepage prevention parts mainly comprise a contact surface of a weir body and a river bed, a contact surface of the weir body and a bank slope and the like. The method of clay inclined wall seepage control, clay core wall seepage control and the like is generally adopted, but the two seepage control methods have the following defects:
1. the stacking phenomenon of stones exists in the cofferdam weir body, so that a leakage channel is easy to form;
the cofferdam generally needs to be constructed underwater, and the underwater condition is difficult to find. In the construction of the cofferdam and the dike, the dike meets the uneven foundation section. The connection of the stones in the filled cofferdam stones and the rugged foundation can form stone stacking phenomenon to form a leakage channel; particularly, larger stones are required to be used for closure at the closure opening, so that the possibility of forming a leakage channel is high, water seepage is high, and the cofferdam is difficult to close.
2. The position of a cofferdam weir body leakage channel cannot be accurately judged, and a targeted measure is difficult to take;
after the weir body is filled, the slope angle of the upstream surface of the weir body is basically below the water surface, the leakage channel is difficult to find, and even if the upstream surface is filled with clay for plugging, the leakage channel still hidden in the weir body cannot take corresponding countermeasures, and the treatment effect is poor.
3. The frequent drainage cost is increased, the equipment investment is large, and the engineering cost is increased;
after the cofferdam is filled, the water seepage phenomenon exists in the cofferdam under the common condition, if the seepage-proofing effect is poor, the frequent water discharge in the foundation pit is large, the equipment investment is large, and the water discharge cost is correspondingly increased.
Disclosure of Invention
The invention aims to solve the technical problem of providing an earth-rock cofferdam water seepage treatment structure and a construction method, which can improve the seepage prevention effect, effectively reduce the water seepage of a weir body and reduce the frequent drainage cost after the cofferdam on a riverbed is closed.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: the utility model provides an earth-rock cofferdam infiltration processing structure, includes closure dike, characterized by: the closure hip is characterized in that a sub cofferdam is arranged at the downstream toe position of the closure hip, underwater concrete is poured on a riverbed between the sub cofferdam and the closure hip, and a clay core wall is filled above the underwater concrete.
In a preferable scheme, a plurality of drainage pipes along the direction of the riverbed penetrate through the clay core wall at a position close to the bottom, and the drainage pipes are communicated with the lower reaches of the clay core wall.
In a preferred scheme, a flange plate is arranged at one end of the drain pipe positioned at the downstream.
In a preferred scheme, reverse filtering layers are arranged on the two sides of the upstream and downstream of the clay core wall.
In the preferred scheme, underwater cast-fill stone slag, underwater cast-fill clay and slope protection block stones are sequentially filled on the upstream slope surface of the closure dike from bottom to top, and underwater cast-fill clay is filled between the downstream slope surface of the closure dike and a clay core wall.
A construction method of an earth-rock cofferdam water seepage processing structure comprises the following steps:
1) dam filling
Adopting a one-way single prop vertical plugging method to fill the dike;
2) cofferdam airtight device
Building a sub cofferdam at the downstream toe position of the closure prop bank, and pouring underwater concrete on a river bed between the sub cofferdam and the closure prop bank by using a conduit method until the underwater concrete is flush with the top surface of the sub cofferdam;
3) laying of drainage pipes
After the strength of the poured underwater concrete reaches the standard, laying a plurality of drainage pipes along the direction of the riverbed above the underwater concrete, and draining the seepage water in the weir body;
4) clay core wall filling
And filling a clay core wall above the underwater concrete, and filling an inverted filter layer on the two sides of the upstream and downstream of the clay core wall.
In the preferable scheme, in the step 1), after the closure embankment is filled, underwater cast-fill stone slag, underwater cast-fill clay and slope protection block stones are sequentially filled on the upstream slope surface of the closure embankment.
In a preferred embodiment, in the step 4), after the completion of the filling of the inverted filter layer, the downstream end of the drain pipe is blocked by using a flange.
In the preferable scheme, after the drainage pipe is plugged, underwater throwing and filling clay is filled in the area between the downstream slope surface of the closure dike and the clay core wall.
In a preferable scheme, in the step 3), after the drainage pipe is laid, the sub cofferdams are continuously heightened to be consistent with the upstream horizontal plane of the cut-off hip dike.
The earth-rock cofferdam water seepage treatment structure and the construction method provided by the invention have the following beneficial effects by adopting the structure and the method:
(1) the construction is simple, the cost is low, the water seepage problem of the cofferdam is effectively solved, and the purpose of closing the air of the cofferdam is achieved;
(2) the frequent drainage cost is reduced, the labor can be effectively saved, the equipment investment is reduced, and the cost is saved;
(3) the construction speed is high, and the working efficiency is greatly improved;
(4) the main body construction is carried out in dry land, and the engineering quality is guaranteed;
(5) the treatment effect of the weir body water seepage problem is obvious.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is an overall cross-sectional view of the present invention.
Fig. 2 is an elevation view of a clay core of the present invention.
Fig. 3 is a top view of a clay core of the present invention.
In the figure: the underwater concrete dam comprises a closure prop dike 1, a sub cofferdam 2, underwater concrete 3, a flange plate 4, a drain pipe 5, a clay core wall 6, a reverse filtering layer 7, underwater cast-fill stone slag 8, underwater cast-fill clay 9 and slope protection block stones 10.
Detailed Description
Example 1:
as shown in fig. 1-3, the earth-rock cofferdam water seepage processing structure comprises a closure dike 1, wherein a sub cofferdam 2 is arranged at the downstream toe position of the closure dike 1, underwater concrete 3 is poured on a river bed between the sub cofferdam 2 and the closure dike 1, and a clay core wall 6 is filled above the underwater concrete 3.
In a preferred scheme, a plurality of drainage pipes 5 along the direction of the river bed are arranged on the clay core wall 6 at a position close to the bottom in a penetrating way, and the drainage pipes 5 are communicated with the upstream and the downstream of the clay core wall 6.
In a preferred scheme, a flange plate 4 is arranged at one end of the drain pipe 5 positioned at the downstream.
The flange 4 plugs the drain pipe 5 after the seepage drainage operation in the sub cofferdam 2 is finished, so that the seepage of the slope of the upstream closure dike 1 into a construction area in the subsequent work is avoided.
In a preferred scheme, the upstream and downstream sides of the clay core wall 6 are provided with inverted filter layers 7.
In the preferred scheme, underwater cast-in-place stone slag 8, underwater cast-in-place clay 9 and slope protection block stones 10 are sequentially filled on the upstream slope surface of the closure dike 1 from bottom to top, and the underwater cast-in-place clay 9 is filled between the downstream slope surface of the closure dike 1 and the clay core wall 6.
Example 2:
as shown in fig. 1, a construction method of an earth-rock cofferdam water seepage treatment structure is characterized by comprising the following steps:
1) dam filling
Adopting a one-way single prop vertical plugging method to fill the dike;
2) cofferdam airtight device
Building a sub cofferdam 2 at the downstream toe position of the closure hip 1, and pouring underwater concrete 3 on the river bed between the sub cofferdam 2 and the closure hip 1 by using a conduit method until the underwater concrete is flush with the top surface of the sub cofferdam 2;
3) laying of drainage pipes
After the strength of the poured underwater concrete 3 reaches the standard, a plurality of drainage pipes 5 along the direction of the riverbed are laid above the underwater concrete 3, and water seepage in the weir body is discharged;
4) clay core wall filling
And a clay core wall 6 is filled above the underwater concrete 3, and an inverted filter layer 7 is filled on the two sides of the upstream and downstream of the clay core wall 6.
In the preferable scheme, in the step 1), after the closure dike 1 is filled, underwater cast-fill stone slag 8, underwater cast-fill clay 9 and slope protection block stones 10 are sequentially filled on the upstream slope surface of the closure dike 1.
In a preferred embodiment, in the step 4), after the completion of the filling of the inverted filter 7, the downstream end of the drain pipe 5 is sealed by a flange.
In the preferable scheme, after the drain pipe 5 is plugged, underwater clay 9 is filled in the area between the downstream slope surface of the closure dike 1 and the clay core wall 6.
In a preferable scheme, in the step 3), after the drain pipe 5 is laid, the sub-cofferdam 2 is continuously raised to be consistent with the upstream horizontal plane of the cut-off hip dam 1.
In a preferred embodiment, when the clay core wall 6 is filled, the upstream cofferdam is raised and thickened at the same time until the design size is reached.
By adopting the mode, the construction steps of the anti-seepage structure are simplified, the cost for arranging the anti-seepage structure is reduced, the water seepage problem of the cofferdam is effectively solved, and the aim of closing the air of the cofferdam is finally fulfilled; in practical application, the seepage-proofing efficiency of the seepage-proofing structure is greatly improved, so that main construction engineering is carried out in dry land, the engineering quality is guaranteed, and the manpower and material resource investment for frequent drainage is reduced.

Claims (8)

1. A construction method of an earth-rock cofferdam water seepage treatment structure is characterized by comprising the following steps: the earth-rock cofferdam water seepage processing structure comprises a closure dike (1), wherein a sub cofferdam (2) is arranged at the downstream toe position of the closure dike (1), underwater concrete (3) is poured on a river bed between the sub cofferdam (2) and the closure dike (1), and a clay core wall (6) is filled above the underwater concrete (3);
the construction method of the earth-rock cofferdam water seepage treatment structure comprises the following steps:
1) dam filling
Adopting a one-way single prop vertical plugging method to fill the dike;
2) cofferdam airtight device
Building a sub cofferdam (2) at the downstream toe position of the closure prop bank (1), and pouring underwater concrete (3) on the river bed between the sub cofferdam (2) and the closure prop bank (1) by using a conduit method until the underwater concrete is flush with the top surface of the sub cofferdam (2);
3) laying of drainage pipes
After the strength of the poured underwater concrete (3) reaches the standard, laying a plurality of drainage pipes (5) along the direction of the riverbed above the underwater concrete (3) to drain the water seepage in the closure dike (1);
4) clay core wall filling
And a clay core wall (6) is filled above the underwater concrete (3), and an inverted filter layer (7) is filled on the two sides of the upstream and downstream of the clay core wall (6).
2. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 1, characterized in that: the water drainage pipe (5) penetrates through the position, close to the bottom, of the clay core wall (6), and the water drainage pipe (5) is communicated with the upstream and the downstream of the clay core wall (6).
3. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 2, characterized in that: one end of the drain pipe (5) positioned at the downstream is provided with a flange plate (4).
4. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 1, characterized in that: underwater cast-filling stone slag materials (8), underwater cast-filling clay (9) and slope protection block stones (10) are sequentially filled on the upstream slope surface of the closure dike (1) from bottom to top, and the underwater cast-filling clay (9) is filled between the downstream slope surface of the closure dike (1) and the clay core wall (6).
5. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 1, characterized in that: in the step 1), after the closure dike (1) is filled, underwater cast-fill stone slag materials (8), underwater cast-fill clay (9) and slope protection block stones (10) are sequentially filled on the upstream slope surface of the closure dike (1).
6. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 1, characterized in that: and in the step 4), after the reverse filter layer (7) is filled, the downstream end of the drain pipe (5) is sealed by using a flange.
7. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 6, characterized in that: and after the drainage pipe (5) is plugged, filling underwater throwing and filling clay (9) in an area between the downstream slope surface of the closure dike (1) and the clay core wall (6).
8. The construction method of the earth-rock cofferdam water seepage treatment structure of claim 1, characterized in that: in the step 3), after the drain pipe (5) is laid, the sub cofferdam (2) is continuously heightened to be consistent with the upstream horizontal plane of the closure dike (1).
CN201910969622.8A 2019-10-12 2019-10-12 Earth-rock cofferdam water seepage treatment structure and construction method Active CN110761307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910969622.8A CN110761307B (en) 2019-10-12 2019-10-12 Earth-rock cofferdam water seepage treatment structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910969622.8A CN110761307B (en) 2019-10-12 2019-10-12 Earth-rock cofferdam water seepage treatment structure and construction method

Publications (2)

Publication Number Publication Date
CN110761307A CN110761307A (en) 2020-02-07
CN110761307B true CN110761307B (en) 2021-07-23

Family

ID=69331833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910969622.8A Active CN110761307B (en) 2019-10-12 2019-10-12 Earth-rock cofferdam water seepage treatment structure and construction method

Country Status (1)

Country Link
CN (1) CN110761307B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529761B (en) * 2020-04-22 2023-08-18 中国电建集团华东勘测设计研究院有限公司 Cofferdam group structure with broken line type earth-rock cofferdam and construction method
CN113073665A (en) * 2021-03-19 2021-07-06 中国葛洲坝集团市政工程有限公司 Cofferdam dike dam filling and closure construction method
CN115450236A (en) * 2022-09-15 2022-12-09 中国葛洲坝集团国际工程有限公司 Cofferdam anti-seepage structure and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264698A (en) * 2014-09-05 2015-01-07 中国葛洲坝集团国际工程有限公司 Construction method of clay core earth rock cofferdam
JP6266821B2 (en) * 2017-03-13 2018-01-24 五洋建設株式会社 Deadline structure and deadline method
CN208201895U (en) * 2018-05-09 2018-12-07 中建三局基础设施建设投资有限公司 A kind of shallow water soft base jumbo bag cofferdam
CN208346835U (en) * 2018-06-06 2019-01-08 中国葛洲坝集团基础工程有限公司 Environmental type earth-rock cofferdam structure

Also Published As

Publication number Publication date
CN110761307A (en) 2020-02-07

Similar Documents

Publication Publication Date Title
CN110761307B (en) Earth-rock cofferdam water seepage treatment structure and construction method
CN105201002B (en) A kind of underground structure oozes drainage system and its construction method
CN104963324B (en) Diversion tunnel plugging head exhaust structure and exhaust method thereof
CN207537993U (en) A kind of diversion tunnel concrete plug
CN104060619A (en) Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN109853477B (en) Centralized leakage blocking structure and method for changing dynamic water into static water in gallery
CN207003440U (en) Foundation pit spring hole water treatment system
CN106801414A (en) Dyke and dyke construction method of a kind of band from discharge structure
CN208455573U (en) Karst area reservoir basin seepage prevention processing structure
CN210216332U (en) Retaining dam structure for overhauling whole tunnel section of hydroelectric engineering diversion tunnel in canyon region
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
CN105019466A (en) Construction method and structure of earth-rock cofferdam seepage-proofing system
CN203383193U (en) Core-wall rockfill dam structure without cofferdams
CN104695455A (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN204849791U (en) Structure of earth-rock cofferdam seepage-proofing system
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN212388475U (en) Structure for preventing concrete dam bank slope dam section fracture water leakage
CN113445470A (en) Water seepage blocking structure for settlement joint of flood wall and construction process
CN109610412B (en) Blocking structure and blocking method for underground river in karst area
CN203080480U (en) Upstream blanket structure of concrete face rockfill dam
CN207211173U (en) CFRD reverse drainage system
CN110512571A (en) A kind of RCC dam and its construction method containing rock-fill concrete core-wall
CN111636385A (en) Structure for preventing concrete dam bank slope dam section fracture water leakage
CN104264656A (en) Method of reinforcing soft soil foundations through downward drainage during vacuum preloading
CN112609672A (en) Prevention and treatment remediation method for directional drilling pipeline to penetrate through soft dike foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210629

Address after: 100120 Sinohydro building, No.3 liupukang street, Xicheng District, Beijing

Applicant after: CHINA INTERNATIONAL WATER & ELECTRIC Corp.

Applicant after: SINOHYDRO BUREAU 3 Co.,Ltd.

Address before: 100120 Sinohydro building, No.3 liupukang street, Xicheng District, Beijing

Applicant before: CHINA INTERNATIONAL WATER & ELECTRIC Corp.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant