CN208966367U - A kind of device pouring compactness for improving double-arched tunnel mid-board top - Google Patents

A kind of device pouring compactness for improving double-arched tunnel mid-board top Download PDF

Info

Publication number
CN208966367U
CN208966367U CN201821528665.XU CN201821528665U CN208966367U CN 208966367 U CN208966367 U CN 208966367U CN 201821528665 U CN201821528665 U CN 201821528665U CN 208966367 U CN208966367 U CN 208966367U
Authority
CN
China
Prior art keywords
board
mid
vault
improving
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821528665.XU
Other languages
Chinese (zh)
Inventor
杜雄伟
于大举
王斐
逯家贝
程福周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Infrastructure Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd, China Construction Third Bureau Infrastructure Construction Investment Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201821528665.XU priority Critical patent/CN208966367U/en
Application granted granted Critical
Publication of CN208966367U publication Critical patent/CN208966367U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board; including mid-board vault end head formwork, exhaust pipe, Grouting Pipe, tube bottom protective device and PE ventilated membrane; mid-board vault end template-setup is in mid-board vault end; injected hole and gas vent are offered above; the exhaust pipe is embedded in gas vent; in the reserved injected hole of the Grouting Pipe insertion mid-board vault end head formwork; bottom is provided with tube bottom protective device; PE ventilated membrane has been puted up at the top of mid-board, injected hole distal end air can be discharged.The utility model is when in use, gunite concrete is first passed through to be filled gap between mid-board wall and middle drift preliminary bracing, slip casting machine is reused to progress slip casting at the top of mid-board, the discharge of grouting port distal end air is carried out by PE ventilated membrane, prevent concrete from generating cavity, device production is simple, easy to operate, it is low in cost, the compactness of Middle Wall of Multi-Arch Highway Tunnel vault slip casting can be effectively improved.

Description

A kind of device pouring compactness for improving double-arched tunnel mid-board top
Technical field
The utility model belongs to Construction of joint arch tunnel field, and in particular to one kind is for improving double-arched tunnel interval Wall top portion pours the device of compactness.
Background technique
With the development in China town road field, tunnel construction, which also achieves, advances by leaps and bounds.It is adopted in Multi-arch Tunnel Construction When carrying out mid-board concrete construction with traditional mid-board trolley, general top will appear gap, supplement slip casting side using tradition It is not full that formula will cause slip casting again, has an adverse effect to structure.Preferably to carry out construction at the top of mid-board, for arcading tunnel The device and method that compactness is poured at the top of mid-board is invented in road.
Summary of the invention
In order to overcome in Middle Wall of Multi-Arch Highway Tunnel concrete construction in the prior art, gap, slip casting easily occur not full Etc. technological deficiencies, the utility model provide it is a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, Mid-board vault two sides are closed by mid-board vault end head formwork, PE ventilated membrane has been puted up at the top of mid-board, it will The discharge of injected hole distal end air, and gas vent is set in mid-board vault end die head, it is inserted into exhaust pipe in hole, with exhaust It manages and continues the pulp foundation closely knit as slip casting, improve and pour compactness, solve above-mentioned technical problem.
The utility model is achieved through the following technical solutions above-mentioned purpose, and one kind is for improving double-arched tunnel mid-board Top pours the device of compactness, including mid-board vault end head formwork, exhaust pipe, Grouting Pipe, tube bottom protective device and PE saturating Air film, mid-board vault end template-setup offer injected hole and gas vent in mid-board vault both side ends above, The exhaust pipe is embedded in gas vent, in the reserved injected hole of the Grouting Pipe insertion mid-board vault end head formwork, bottom It is provided with tube bottom protective device, PE ventilated membrane has been puted up at the top of mid-board, injected hole distal end air can be discharged.
Above-mentioned is a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, the pipe of the Grouting Pipe Mouth position is connected with slip casting machine, and link position carries out sealing treatment, and the nozzle position of Grouting Pipe is equipped with valve switch, guarantees Leakproofness inside entire Grouting Pipe.
Above-mentioned is a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, the tube bottom protection dress The bottom along its length in Grouting Pipe is installed, structure is taper or arc-shaped, prevents Grouting Pipe from damaging because of collision.
Above-mentioned is a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, the PE ventilated membrane Distal end is fixed at the distal tip of mid-board vault, and mid-board vault end head formwork is stretched out in proximal end.
In general, can achieve the above technical solutions conceived by the present invention are compared with the prior art, with Down the utility model has the advantages that the utility model is a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, pass through top The PE ventilated membrane that portion is puted up carries out the discharge of grouting port distal end air, prevents concrete from generating cavity, and exhaust pipe can be to interval Wall arch crown part mortar loading is monitored, and is improved the compactness that mid-board top concrete pours, is avoided mid-board Top slip casting is full, gap appearance.
Detailed description of the invention
Specific embodiment of the present utility model is further described in detail with reference to the accompanying drawing, in which:
Fig. 1 is that the utility model is a kind of for improving the whole knot for pouring compactness device at the top of double-arched tunnel mid-board Structure schematic diagram;
Fig. 2 is the mid-board end head formwork schematic diagram of device described in the utility model;
Fig. 3 is the mid-board vault slip casting schematic diagram of device described in the utility model;
In figure: 1- mid-board vault end head formwork, 2- exhaust pipe, 3- Grouting Pipe, 4- valve switch, 5- slip casting machine, 6- pipe Bottom protective device, 7-PE ventilated membrane.
Specific embodiment
As shown in Figure 1, to be a kind of for improving the overall structure for pouring compactness device at the top of double-arched tunnel mid-board Schematic diagram, including mid-board vault end head formwork 1, exhaust pipe 2, Grouting Pipe 3, tube bottom protective device 6 and PE ventilated membrane 7, it is described Mid-board vault end head formwork 1 is arranged in mid-board vault both side ends, and the nozzle position of Grouting Pipe 3 is connected with slip casting machine 5, and Link position carries out sealing treatment, and the nozzle position lower part of Grouting Pipe 3 is equipped with valve switch 4, guarantees inside entire Grouting Pipe 3 Leakproofness, the distal end of PE ventilated membrane 7 is fixed at the distal tip of mid-board vault, and mid-board vault end mould is stretched out in proximal end Plate 1.
As shown in Fig. 2, being 1 schematic diagram of mid-board end head formwork of device described in the utility model, slip casting is offered above Hole and gas vent, exhaust pipe 2 are embedded in gas vent, and Grouting Pipe 3 is inserted into the reserved injected hole of mid-board vault end head formwork 1 Interior, the bottom of Grouting Pipe 3 is provided with tube bottom protective device 6.
As shown in figure 3, being the mid-board vault slip casting schematic diagram of device described in the utility model, when specifically used, lead to It crosses valve switch 4 and carries out grout injection control, the closing of 3 nozzle position of Grouting Pipe is carried out by sealing mortar, it will be in the insertion of Grouting Pipe 3 The reserved hole location of partition wall end head formwork 1, and Grouting Pipe 3, exhaust pipe 2 are embedded at mid-board vault, note is passed through by slip casting machine 5 It starches pipe 3 and carries out slip casting to mid-board vault, slip casting uses cement mortar, and intensity is with mid-board wall concrete strength, when slip casting Valve switch 4 is connected with Grouting Pipe 3, and exhaust pipe 2 is kept open, and corresponding closing measure is taken at nozzle, solves tradition During slip casting may because slip casting duct occlusion it is not in place caused by slip casting it is not full the problems such as.
Mid-board keystone puts up PE ventilated membrane 7, prevents grouting port distal end concrete from cavity occur, in Specific construction mistake Cheng Zhong can put up 300mm wide, length is slightly larger than the PE ventilated membrane of mid-board wall on the basis of mid-board vault center line 7, vault end is provided with exhaust pipe 2, can stop slip casting after having slurries persistently to flow out in exhaust pipe 2.
Device is poured using described in the utility model, traditional construction mid-board top concrete has both been can solve and has been difficult to pour The problem built, while can guarantee that slurries are closely knit in backfilling process again, and mid-board wall pours and vault concreting Cross construction operation can be carried out, the device is Ke Xunhuanliyong, is suitable for general Middle Wall of Multi-Arch Highway Tunnel vault slip casting.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not For limiting the utility model, any modification made within the spirit and principle of the present invention, equivalent replacement and change Into etc., it should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, including mid-board vault end head formwork (1), exhaust pipe (2), Grouting Pipe (3), tube bottom protective device (6) and PE ventilated membrane (7), it is characterised in that: the mid-board arch Distal end chip template (1) is arranged in mid-board vault both side ends, offers injected hole and gas vent, the exhaust pipe (2) above It is embedded in gas vent, in the reserved injected hole of Grouting Pipe (3) insertion mid-board vault end head formwork (1), bottom setting Have tube bottom protective device (6), has puted up PE ventilated membrane (7) at the top of mid-board, injected hole distal end air can be discharged.
2. it is according to claim 1 a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, Be characterized in that: the nozzle position of the Grouting Pipe (3) is connected with slip casting machine (5), and link position carries out sealing treatment.
3. it is according to claim 2 a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, Be characterized in that: the nozzle position of the Grouting Pipe (3) is equipped with valve switch (4).
4. it is according to claim 1 a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, Be characterized in that: the bottom in Grouting Pipe (3) along its length is arranged in the tube bottom protective device (6), and structure is taper or circular arc Shape.
5. it is according to claim 1 a kind of for improving the device for pouring compactness at the top of double-arched tunnel mid-board, Be characterized in that: the distal end of the PE ventilated membrane (7) is fixed at the distal tip of mid-board vault, and mid-board vault is stretched out in proximal end End head formwork (1).
CN201821528665.XU 2018-09-19 2018-09-19 A kind of device pouring compactness for improving double-arched tunnel mid-board top Active CN208966367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821528665.XU CN208966367U (en) 2018-09-19 2018-09-19 A kind of device pouring compactness for improving double-arched tunnel mid-board top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821528665.XU CN208966367U (en) 2018-09-19 2018-09-19 A kind of device pouring compactness for improving double-arched tunnel mid-board top

Publications (1)

Publication Number Publication Date
CN208966367U true CN208966367U (en) 2019-06-11

Family

ID=66757534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821528665.XU Active CN208966367U (en) 2018-09-19 2018-09-19 A kind of device pouring compactness for improving double-arched tunnel mid-board top

Country Status (1)

Country Link
CN (1) CN208966367U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110355860A (en) * 2019-08-08 2019-10-22 上海城建预制构件有限公司 A kind of UHPC column enlarged footing mold
CN110486052A (en) * 2019-09-04 2019-11-22 中交天和机械设备制造有限公司 A kind of press injecting type concrete support method and the supporting mechanism for implementing it
CN111425222A (en) * 2020-04-27 2020-07-17 中国建筑第七工程局有限公司 Method for protecting partition wall in multi-arch tunnel
CN112253175A (en) * 2020-10-27 2021-01-22 中铁十二局集团有限公司 A model for partition wall concrete placement in double arch tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110355860A (en) * 2019-08-08 2019-10-22 上海城建预制构件有限公司 A kind of UHPC column enlarged footing mold
CN110486052A (en) * 2019-09-04 2019-11-22 中交天和机械设备制造有限公司 A kind of press injecting type concrete support method and the supporting mechanism for implementing it
CN111425222A (en) * 2020-04-27 2020-07-17 中国建筑第七工程局有限公司 Method for protecting partition wall in multi-arch tunnel
CN112253175A (en) * 2020-10-27 2021-01-22 中铁十二局集团有限公司 A model for partition wall concrete placement in double arch tunnel
CN112253175B (en) * 2020-10-27 2022-08-02 中铁十二局集团有限公司 A model for partition wall concrete placement in double arch tunnel

Similar Documents

Publication Publication Date Title
CN208966367U (en) A kind of device pouring compactness for improving double-arched tunnel mid-board top
CN207920633U (en) Tunnel-liner vault band is molded into sizing device
CN104963324B (en) A kind of diversion tunnel block head exhaust structure and its method for exhausting
CN208219657U (en) A kind of closed type plug-in type slip casting foundation pile
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN206467664U (en) A kind of device for ensureing that steel lining bottom concreting is closely knit
CN206328954U (en) Node pouring structure between prefabricated assembled post and post
CN101949273B (en) Method for plugging spring opening in drilling
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN208201648U (en) Continuous rigid frame bridge web is the same as row's vertical prestressing pipeline communicating pipe
CN109750832A (en) A kind of construction method of constructional column concrete self-compaction
CN103614998A (en) Lining wall concrete placement top-down method based on underground diaphragm wall
CN206972256U (en) One kind is used for wall rock grouting pipe in tunnel and only starches structure
CN105672208B (en) The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN208450540U (en) A kind of elbow presser device for vertically penetrating sand
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN206189365U (en) A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour
CN106939700A (en) The vacuum aided sealing off and covering anchorage construction method of back-off anchor recess
CN204662388U (en) A kind of Diversion Tunnel block head exhaust structure
CN207700686U (en) Exempt to tear constructional column shell mold open
CN105587053B (en) A kind of industrialization house wall bottom grouting construction method
CN206384325U (en) A kind of pail pack
CN204510223U (en) The two-way Grouting Pipe of vacuum-pumping
CN207728374U (en) A kind of cast of tunnel lining trolley concrete and cleaning device
CN204827355U (en) Nearly competent pressure -bearing drilling hole sealing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant