A kind of device for ensureing that steel lining bottom concreting is closely knit Download PDFInfo
- Publication number
- CN206467664U CN206467664U CN201720132470.2U CN201720132470U CN206467664U CN 206467664 U CN206467664 U CN 206467664U CN 201720132470 U CN201720132470 U CN 201720132470U CN 206467664 U CN206467664 U CN 206467664U
- Authority
- CN
- China
- Prior art keywords
- steel lining
- vibrating
- ensureing
- closely knit
- concreting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of device for ensureing that steel lining bottom concreting is closely knit, it includes steel lining, multiple holes of vibrating equidistantly are machined with the steel lining, multiple blanking funnel devices are fitted with hole vibrating, flexible tremie pipe is provided with the top of the blanking funnel device, the flexible tremie pipe is connected with the concrete pump set.The device can effectively solve the problem that steel lining and concrete surface are also easy to produce the problem of gravity comes to nothing, steel lining is prevented to be deformed in concreting and displacement, improve concrete pouring quality, it is to avoid the vibrating fatigue destruction that high-velocity flow is produced to steel liner structure, it is ensured that construction quality and operation safety.
Description
Technical field
The utility model is related to concrete casting device field, and in particular to one kind ensures that steel lining bottom concreting is close
Real device.
Background technology
White crane beach power station flood discharging tunnel totally 3,29.0~25.2m/s of flow velocity in flood discharging tunnel, ogee section end Peak Flow Rate
45m/s.Flood discharging tunnel intake tower emergency repair gate to the runner periphery between main gate sets steel plate lining shield, flow-passing surface bottom plate bottom
Steel lining size 19m × 15m(It is long × wide).The bottom concreting of design requirement steel lining is closely knit firm, it is ensured that high-velocity flow excessively stream
The erosion resistance in face, it is ensured that construction quality and operation safety.Higher requirement is proposed to pouring quality.Steel lining bottom area
And be four sides closing space, conventional concrete pours means and is difficult to the requirement that steel lining bottom pours density.
Utility model content
The utility model provides a kind of device for ensureing that steel lining bottom concreting is closely knit, and the device can be solved effectively
Certainly steel lining and concrete surface are also easy to produce the problem of gravity comes to nothing, and prevent steel lining to be deformed in concreting and position
Move, improve concrete pouring quality, it is to avoid vibrating fatigue that high-velocity flow is produced to steel liner structure is destroyed, it is ensured that construction quality and
Operation safety.
In order to solve the above-mentioned technical problem, the utility model proposes following technical scheme:One kind ensures steel lining bottom coagulation
Soil pours closely knit device, and it includes equidistantly being machined with multiple holes of vibrating on steel lining, the steel lining, is fitted with vibrating on hole
Flexible tremie pipe, the flexible tremie pipe and coagulation are provided with the top of multiple blanking funnel devices, the blanking funnel device
Native pumping installations is connected.
The blanking funnel device includes infundibular body, and the bottom of infundibular body is connected with pipe, the pipe and steel lining
Hole of vibrating is engaged carry out blanking.
Vibrating spear is additionally provided with the hole of vibrating, the vibrating spear is connected by power line with supply unit.
The exterior lateral sides of the steel lining are provided with plasma discharge hole, and the plasma discharge hole is with waiting that pouring top storehouse is connected.
The utility model has the advantages that:
The device is through practice test, first, can avoid completely traditional means steel lining is caused to lift and displacement risk.Its
It is secondary, inner air and concrete laitance are replaced using minute-pressure method realized and pour closely knit, and secondary phenomenon of coming to nothing will not be formed, really
The density of concrete one-time-concreting filling is protected, effect is obvious.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is overall structure diagram of the present utility model.
Fig. 2 is blanking funnel apparatus structure schematic diagram of the present utility model.
In figure:Steel lining 1, hole 2 of vibrating, plasma discharge hole 3, wait to pour top storehouse 4, blanking funnel device 5, infundibular body 6, pipe 7,
Pouring area 8, flexible tremie pipe 9, the concrete pump set 10, vibrating spear 11, power line 12.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in Figure 1-2, a kind of device for ensureing that steel lining bottom concreting is closely knit, it includes steel lining 1, the steel lining
Multiple holes 2 of vibrating equidistantly are machined with 1, multiple blanking funnel devices 5 are fitted with hole 2 vibrating, the blanking funnel dress
The top for putting 5 is provided with flexible tremie pipe 9, and the flexible tremie pipe 9 is connected with the concrete pump set 10.
Further, the blanking funnel device 5 includes infundibular body 6, and the bottom of infundibular body 6 is connected with pipe 7, the circle
Pipe 7 is engaged carry out blanking with the hole 2 of vibrating on steel lining 1.
Further, vibrating spear 11 is additionally provided with the hole 2 of vibrating, the vibrating spear 11 passes through power line 12 and power supply
Device is connected.
Further, the exterior lateral sides of the steel lining 1 are provided with plasma discharge hole 3, and the plasma discharge hole 3 pours the top phase of storehouse 4 with waiting
Connection.
Embodiment 2:
In order to solve the problem of steel lining bottom self-compacting concrete pours compactness, following methods are taken to be solved:
Utilize the hole 2 of vibrating set on steel lining 1, design specialized blanking funnel device 5, as shown in figure 1, blanking funnel device
5 set height control 1.2m, setting length suitable for reading and width 1.0m × 1.0m, and lower mouth sets diameter 110mm pipes 7 to be vibrated with steel lining
Hole grafting.The size of blanking funnel device 5 determines that lower port diameter can meet self-compacting concrete diffusion requirement by field experiment,
Material head pressure energy, which is met, pours density requirement.
Control principle, as shown in Figure 1:Steel lining bottom pours self-compacting concrete, first certain with conventional pumping means filling
The concrete of volume forms pouring area 8, and pump concrete is poured to be stopped pumping from steel lining bottom 20cm or so, utilizes the device
The reserved hole blanking of vibrating at the top of the steel lining, is gradually extended to untill steel lining bottom is all filled with by blanking order from side.
Using the device in last space filling process, note observing the exhaust at plasma discharge hole 3 and arrange laitance fully, blanking is completed
Ensure the concrete potential energy for having 1 meter or so height in blanking funnel device 5 afterwards, steel lining bottom is remained certain minute-pressure,
Secondary the coming to nothing of concrete gravity sinking generation is avoided, when concrete initial set loses flowability, the device is removed.
The device is through practice test, first, can avoid completely traditional means steel lining is caused to lift and displacement risk.Its
It is secondary, inner air and concrete laitance are replaced using minute-pressure method realized and pour closely knit, and secondary phenomenon of coming to nothing will not be formed, really
The density of concrete one-time-concreting filling is protected, effect is obvious.
By above-mentioned description, those skilled in the art completely can be without departing from this utility model technological thought
In the range of, various changes and amendments are carried out all within protection domain of the present utility model.It is of the present utility model not most
Matters, belong to the common knowledge of those skilled in the art.
Claims (4)
1. a kind of device for ensureing that steel lining bottom concreting is closely knit, it is characterised in that:It includes steel lining(1), the steel lining
(1)On be equidistantly machined with multiple holes of vibrating(2), in hole of vibrating(2)On be fitted with multiple blanking funnel devices(5), it is described under
Funnel device(5)Top be provided with flexible tremie pipe(9), the flexible tremie pipe(9)With the concrete pump set(10)
It is connected.
2. a kind of device for ensureing that steel lining bottom concreting is closely knit according to claim 1, it is characterised in that:It is described
Blanking funnel device(5)Including infundibular body(6), infundibular body(6)Bottom be connected with pipe(7), the pipe(7)With steel lining
(1)On hole of vibrating(2)It is engaged carry out blanking.
3. a kind of device for ensureing that steel lining bottom concreting is closely knit according to claim 1, it is characterised in that:It is described
Vibrate hole(2)On be additionally provided with vibrating spear(11), the vibrating spear(11)Pass through power line(12)It is connected with supply unit.
4. a kind of device for ensureing that steel lining bottom concreting is closely knit according to claim 1, it is characterised in that:It is described
Steel lining(1)Exterior lateral sides be provided with plasma discharge hole(3), the plasma discharge hole(3)With waiting to pour top storehouse(4)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720132470.2U CN206467664U (en) | 2017-02-14 | 2017-02-14 | A kind of device for ensureing that steel lining bottom concreting is closely knit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720132470.2U CN206467664U (en) | 2017-02-14 | 2017-02-14 | A kind of device for ensureing that steel lining bottom concreting is closely knit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206467664U true CN206467664U (en) | 2017-09-05 |
Family
ID=59707796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720132470.2U Active CN206467664U (en) | 2017-02-14 | 2017-02-14 | A kind of device for ensureing that steel lining bottom concreting is closely knit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206467664U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485729A (en) * | 2018-07-23 | 2019-11-22 | 李藏柱 | One kind pouring device and casting method |
CN110804949A (en) * | 2019-11-04 | 2020-02-18 | 南京毛勒工程材料有限公司 | Pouring method for filler in anchoring area of expansion joint |
CN112554564A (en) * | 2020-12-11 | 2021-03-26 | 南通市达欣工程股份有限公司 | Concrete pouring device |
CN116254739A (en) * | 2023-02-01 | 2023-06-13 | 中国一冶集团有限公司 | Integral cast-in-situ tool for highway drainage ditch and construction method thereof |
-
2017
- 2017-02-14 CN CN201720132470.2U patent/CN206467664U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485729A (en) * | 2018-07-23 | 2019-11-22 | 李藏柱 | One kind pouring device and casting method |
CN110485729B (en) * | 2018-07-23 | 2022-08-05 | 李藏柱 | Pouring device and pouring method |
CN110804949A (en) * | 2019-11-04 | 2020-02-18 | 南京毛勒工程材料有限公司 | Pouring method for filler in anchoring area of expansion joint |
CN112554564A (en) * | 2020-12-11 | 2021-03-26 | 南通市达欣工程股份有限公司 | Concrete pouring device |
CN116254739A (en) * | 2023-02-01 | 2023-06-13 | 中国一冶集团有限公司 | Integral cast-in-situ tool for highway drainage ditch and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206467664U (en) | A kind of device for ensureing that steel lining bottom concreting is closely knit | |
CN103470046B (en) | The casting method of ultra-high steel tube concrete column tremie method concrete casting device | |
CN106284362B (en) | A kind of construction method of single catheter perfusion Large Underwater bottom concrete | |
CN104790381B (en) | Lining wall concrete pouring inversing method based on UEA micro-expanding agent | |
CN204023521U (en) | For the drain cavern structure of rotational flow silo | |
CN202131618U (en) | Seepage-prevention joint device for underground diaphragm wall | |
CN207260441U (en) | A kind of grout sleeve of mortar leakage prevention | |
CN103741651B (en) | A kind of concrete teeth groove stiling basin and construction method thereof | |
CN207419408U (en) | A kind of high water head delays base slope sluicing tunnel build | |
CN205242407U (en) | A cluster pipe, chute combination system for deep basal pit concrete placement | |
CN206329043U (en) | A kind of concrete shunts slot device | |
CN104975597B (en) | Cast-in situ bored pile post-inserted steel reinforcement cage multi-point delivery device and use method | |
CN204976997U (en) | Slip casting device and prefabricated component battery mould | |
CN108612059A (en) | Efficient energy dissipating and the embedded overfall dam structure for not generating supersaturated water body | |
CN206052719U (en) | The scalable dual-caliber combination string tubular construction of foundation ditch concreting | |
CN207144496U (en) | Concrete filled steel tubular column concrete lift-up device for casting | |
CN207211152U (en) | A kind of device for ensureing that steel lining bottom concreting is closely knit | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN203188631U (en) | Guiding device suitable for pouring steel pipe concrete structure and steel pipe concrete structure | |
CN206768930U (en) | A kind of anti-whirlpool post vortex reducing means of closed intake pool rear wall | |
CN206320079U (en) | Grouting device | |
CN103541351B (en) | Device for densification of concrete under arms of annular plates of steel pipe concrete structure and steel pipe concrete structure | |
CN205653793U (en) | Vibration helps filling to put | |
CN202273232U (en) | Foldable mobile feed hopper for driven cast-in-place piles | |
CN203639921U (en) | Obturator for underwater anchor rod grouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |