CN205577430U - Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground - Google Patents

Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground Download PDF

Info

Publication number
CN205577430U
CN205577430U CN201620230276.3U CN201620230276U CN205577430U CN 205577430 U CN205577430 U CN 205577430U CN 201620230276 U CN201620230276 U CN 201620230276U CN 205577430 U CN205577430 U CN 205577430U
Authority
CN
China
Prior art keywords
diameter
concrete
column body
conduit
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620230276.3U
Other languages
Chinese (zh)
Inventor
李洪杰
张强
刘旭
王志强
齐骥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620230276.3U priority Critical patent/CN205577430U/en
Application granted granted Critical
Publication of CN205577430U publication Critical patent/CN205577430U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground, relates to the concrete placement technical field of building trade. This pouring structure's the soft catheter of pouring leads to long concatenating through pipe threading snare hoop and steel wire line, plugs into mouthful and concrete hopper or pump line discharge gate joint in the bottom of steel wire line and the through -hole fixed connection of precast concrete swift current ball, the top of pouring the soft catheter, and the cluster pipe is pre -buried in the stiffener pouring hole department at composite steel concrete column body flex point position, and the osculum diameter of cluster pipe is greater than the diameter of precast concrete swift current ball. The utility model discloses a pipe concreting construction, concrete placement transfer path is independent, does not receive the space of the interior reinforcing bar of cylinder, reinforcing bar etc. To obstruct and take place the segregation, has guaranteed concrete to the mix quality and the performance of pouring the position, cylinder concrete placement can select the unloading of tower crane hopper according to the on -the -spot circumstances in a flexible way, or mode such as mechanical pump sending, has improved cylinder concrete placement's efficiency.

Description

On the ground big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure
Technical field
This utility model relates to the concreting technical field of building trade, is applicable to, particularly to a kind of, routine or the special-shaped stiffness concrete column concrete pouring structure that all kinds of steel content is big, internal structure is complicated.
Background technology
At present, large scale business engineering, public buildings are presented in the life periphery people as gush, it is while pursuing the big scale of construction, large space, constantly weed out the old and bring forth the new, do things creatively, strengthening the resolution of building from structure design and construction style, fall over each other to contend the center reference point image in city, the stiffness structure developed therewith has become the new lover of this type of architectural design especially.In order to improve the bearing capacity of this type of vertical direction spatial supporting member, and control self cross section of consequent component greatly, from heavy technological deficiency, heavy in section steel tube concrete frame puncheon and steel reinforced concrete short columns with regard to this formation.
But when concrete engineering construction, for steel core concrete column, owing to its segmental hoisting assembly welding height is higher, and in it, it has been abound with shear stud and stiffener, conventional chute or tumbling barrel can be only put at capital grouting mouth and carry out high-order cloth, in casting process, concrete easily isolates, and column body concrete pouring compaction rate and quality cannot ensure, have a strong impact on the design bearing capacity of steel core concrete column;For rigid steel reinforced concrete column, when after cylinder template matched moulds, reinforcing bar, peg and reinforcing bar in cylinder etc. are arranged intensive, concrete is under conventional capital casting craft, concrete is by deadweight dropping process, sandstone cement is easily broken up hanging fascia by its interior reinforcing bar, reinforcing bar, there is serious isolation, even cause column body concrete hollow, honeycomb, cut the major quality defects such as stifled, especially at the pouring construction of the special-shaped stiffness concrete columns such as all kinds of Y types, inverted cone-shaped, greatly have impact on concrete Survival Rate.
Therefore, on the premise of guaranteeing that tall and big special-shaped cylinder one-time-concreting survives, how to reduce concreting process isolation, improve concrete compaction pouring quality, the big technical barrier that the stiffened column having become this type of reinforcing bar to gather is constructed.
Utility model content
This utility model causes concreting isolation because reinforcing bar in it, reinforcing bar gather to overcome existing tall and big stiffened column and steel pipe column, is difficult to water quality risk and the drawbacks such as closely knit, improve column body concrete Survival Rate, on the basis of existing cylinder casting craft, carry out technological improvement, form the biggest a kind of scale of construction stiffened column body and slip ball conduit string pipe concrete pouring structure.
The taked technical scheme of this utility model is: on the ground big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure, it is characterized in that: pour flexible catheter and concatenate by conduit threading snare hoop is elongated with wire, the bottom of wire is fixed with the concrete prefabricated through hole slipping ball and is connected, the top connecting port pouring flexible catheter engages with concrete hopper or pump line discharging opening, string pipe is embedded at the stiffener pouring hole at stiffened column body flex point position in advance, and the osculum diameter of string pipe is more than the concrete prefabricated diameter slipping ball.
Further, described conduit threading snare hoop includes threading circle, conduit cuff, and threading circle is fixedly linked with conduit cuff, and in threading circle, fixing connection wire, fixes connection in conduit cuff and pour flexible catheter.
Further, 1.1 1.25 times of a diameter of wire diameter of described threading circle, a diameter of pour flexible catheter diameter 1.05 1.15 times of conduit cuff.
Further, termination, the junction sealing off and covering anchorage of the bottom of described wire and the concrete prefabricated through hole slipping ball.
Further, the described concrete prefabricated material slipping ball is identical with stiffened column body concrete, the concrete prefabricated a diameter of 60-80mm slipping ball.
Further, described in pour flexible catheter through standard connecting port segment processing, every section engages in inverted cone, and every segment length is 2.4-3.0m, pours the diameter of flexible catheter identical with the concrete prefabricated diameter slipping ball.
Further, described string pipe is the unidirectional horn mouth rigid casing of a length of 150-300mm, big mouth at upper, osculum at lower placement, a diameter of pour flexible catheter diameter 2.0-2.5 times of big mouth, and no more than stiffened column headroom inner chamber, a diameter of pour flexible catheter diameter 1.2-1.5 times of osculum.
Further, the specification of described wire is 1.0-4.0mm, be positioned at the wire at stiffness cylinder upper port be fixedly connected at stiffness cylinder upper port arrange steel wire fix on bar.
Further, the arrangement pitch of described conduit threading snare hoop is 1.2-2.0m.
This utility model has the advantages that
1, concrete is used to slip ball, auxiliary flex point string pipe design, can easily conduit be walked the bottom introducing special-shaped cylinder, the ball that simultaneously slips can forever pour disappearance as concrete;
2, owing to using tremie placing construction, concreting transmits independent in path, is not obstructed by the space of reinforcing bar, reinforcing bar etc. in cylinder and isolates, it is ensured that the mixing quality of concrete to casting position and performance;
3, column body concrete pours and can select the modes such as tower crane hopper blanking, or machinery pumping flexibly according to field condition, without taking the tower crane hopper blanking that tradition is single completely, improve the efficiency that column body concrete pours;
4, due in cylinder casting process catheter tip discharging opening be buried in below concreting face all the time, column body the most progressively can be filled close by deadweight and fill real by concrete, avoid inclusion of air to be detained the mass defect produced, can realize seamless pouring standard;
5, it is not only suitable for the concrete pouring construction of big scale of construction chapped pipe cylinder and stiff steel reinforced column, is simultaneously applicable to use big punching block pouring construction abnormity frame post to construct;Both can guarantee that the one-time-concreting of tall and big shell of column concrete, can guarantee that again that concrete poured in concealed space closely knit.
Accompanying drawing explanation
Fig. 1 is that on the ground big scale of construction stiffened column body slips the use structural representation of ball conduit string pipe concrete pouring structure.
Fig. 2 is the enlarged drawing of part A in Fig. 1.
Fig. 3 is that on the ground big scale of construction stiffened column body slips the structural representation of conduit threading snare hoop of ball conduit string pipe concrete pouring structure.
Fig. 4 is this utility model work progress figure.
In figure: pour flexible catheter 1, bar 8 fixed by conduit threading snare hoop 2, wire 3, concrete prefabricated ball 4, string pipe 5, threading circle 6, conduit cuff 7, the steel wire of slipping.
Detailed description of the invention
With embodiment, this utility model is elaborated below in conjunction with the accompanying drawings, but this utility model is not limited to specific embodiment.
Embodiment 1
nullOn the ground big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure,The concrete prefabricated material slipping ball 4 is identical with stiffened column body concrete,The concrete prefabricated a diameter of 60mm slipping ball 4,Pour flexible catheter 1 through standard connecting port segment processing,Every section engages in inverted cone,Every segment length is 2.4m,Pour the diameter of flexible catheter 1 identical with the concrete prefabricated diameter slipping ball 4,Pour flexible catheter 1 to concatenate by conduit threading snare hoop 2 is elongated with wire 3,The arrangement pitch of conduit threading snare hoop 2 is 1.2m,Conduit threading snare hoop 2 includes threading circle 6、Conduit cuff 7,Threading circle 6 is fixedly linked with conduit cuff 7,Fixing connection wire 3 in threading circle 6,Conduit cuff 7 is fixed connection and pours flexible catheter 1,1.1 times of a diameter of wire 3 diameter of threading circle 6,A diameter of pour flexible catheter 1 diameter 1.05 times of conduit cuff 7,The specification of wire 3 is 1.0mm,The bottom of wire 3 and concrete prefabricated termination, the junction sealing off and covering anchorage slipping ball 4 through hole,Be positioned at the wire 3 at stiffness cylinder upper port be fixedly connected at stiffness cylinder upper port arrange steel wire fix on bar 8,The top connecting port pouring flexible catheter 1 engages with concrete hopper,String pipe 5 is embedded at the stiffener pouring hole at stiffened column body flex point position in advance,String pipe 5 is the unidirectional horn mouth rigid casing of a length of 150mm,Big mouth is upper、Osculum is in lower placement,A diameter of pour flexible catheter 1 diameter 2.0 times of big mouth,A diameter of pour flexible catheter 1 diameter 1.2 times of osculum.
This pouring structure uses horn mouth sleeve pipe to be inverted work string pipe in advance, it is embedded on the stiffener pouring hole at special-shaped stiffness concrete column body flex point position, before concreting, by the prefabricated deadweight slipping ball of coagulation, flexible catheter will be poured along the inwall of cylinder and the string pipe rolling at flex point position at the bottom of Special-Shaped Column post by wire, flexible catheter top connecting port will be poured afterwards engage with hopper or pump line discharging opening, and start to pour;In casting process, lift time delay according to the flow speed control conduit of pipeline, to be confirmed pour after flexible catheter lower end discharging opening is buried in below concreting face, starting at the uniform velocity to lift, keeping buried degree of depth 150mm of conduit discharging opening, until having poured.
Embodiment 2
It is the most in the same manner as in Example 1 with annexation that ground big scale of construction stiffened column body described in the present embodiment slips ball conduit string pipe concrete pouring structure Each part, and different technical parameters is:
1, the concrete prefabricated a diameter of 70mm slipping ball 4;
2, pouring the every segment length of flexible catheter 1 is 2.7m;
3, the arrangement pitch of conduit threading snare hoop 2 is 1.6m;
4,1.18 times of a diameter of wire 3 diameter of threading circle 6;
5, a diameter of pour flexible catheter 1 diameter 1.1 times of conduit cuff 7;
6, the specification of wire 3 is 2.5mm;
7, string pipe 5 is a length of 225mm;
8, a diameter of pour flexible catheter 1 diameter 2.2 times of the big mouth of string pipe 5, a diameter of pour flexible catheter 1 diameter 1.4 times of osculum.
Embodiment 3
It is all the most identical with embodiment 1, embodiment 2 with annexation that ground big scale of construction stiffened column body described in the present embodiment slips ball conduit string pipe concrete pouring structure Each part, and different technical parameters is:
1, the concrete prefabricated a diameter of 80mm slipping ball 4;
2, pouring the every segment length of flexible catheter 1 is 3.0m;
3, the arrangement pitch of conduit threading snare hoop 2 is 2.0m;
4,1.25 times of a diameter of wire 3 diameter of threading circle 6;
5, a diameter of pour flexible catheter 1 diameter 1.15 times of conduit cuff 7;
6, the specification of wire 3 is 4.0mm;
7, string pipe 5 is a length of 300mm;
8, a diameter of pour flexible catheter 1 diameter 2.5 times of the big mouth of string pipe 5, a diameter of pour flexible catheter 1 diameter 1.5 times of osculum.
Above content is to combine the further description that this utility model is done by optimal technical scheme, it is impossible to assert utility model be embodied as be only limitted to these explanations.For this utility model person of an ordinary skill in the technical field, on the premise of without departing from design of the present utility model, it is also possible to make simple deduction and replacement, all should be considered as protection domain of the present utility model.

Claims (9)

1. on the ground big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure, it is characterized in that: pour flexible catheter (1) and concatenate by conduit threading snare hoop (2) is elongated with wire (3), the bottom of wire (3) is fixed with the concrete prefabricated through hole slipping ball (4) and is connected, the top connecting port pouring flexible catheter (1) engages with concrete hopper or pump line discharging opening, string pipe (5) is embedded at the stiffener pouring hole at stiffened column body flex point position in advance, and the osculum diameter of string pipe (5) is more than the concrete prefabricated diameter slipping ball (4).
Ground the most according to claim 1 big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure, it is characterized in that: described conduit threading snare hoop (2) includes threading circle (6), conduit cuff (7), threading circle (6) is fixedly linked with conduit cuff (7), in threading circle (6), fixing connection wire (3), fixes connection and pours flexible catheter (1) in conduit cuff (7).
Ground the most according to claim 2 big scale of construction stiffened column body slips ball conduit string pipe concrete pouring structure, it is characterized in that: 1.1-1.25 times of a diameter of wire (3) diameter of described threading circle (6), a diameter of pour flexible catheter (1) diameter 1.05-1.15 times of conduit cuff (7).
4. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterised in that: termination, the junction sealing off and covering anchorage of the bottom of described wire (3) and the concrete prefabricated through hole slipping ball (4).
5. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterized in that: the described concrete prefabricated material slipping ball (4) is identical with stiffened column body concrete, the concrete prefabricated a diameter of 60-80mm slipping ball (4).
6. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterized in that: described in pour flexible catheter (1) through standard connecting port segment processing, every section engages in inverted cone, every segment length is 2.4-3.0m, pours the diameter of flexible catheter (1) identical with the concrete prefabricated diameter slipping ball (4).
7. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterized in that: described string pipe (5) is the unidirectional horn mouth rigid casing of a length of 150-300mm, big mouth at upper, osculum in lower placement, a diameter of pour flexible catheter (1) diameter 2.0-2.5 times of big mouth, and no more than stiffened column headroom inner chamber, a diameter of pour flexible catheter (1) diameter 1.2-1.5 times of osculum.
8. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterized in that: the specification of described wire (3) is 1.0-4.0mm, be positioned at the wire (3) at stiffness cylinder upper port be fixedly connected at stiffness cylinder upper port arrange steel wire fix on bar (8).
9. slip ball conduit string pipe concrete pouring structure according to the arbitrary described ground big scale of construction stiffened column body of claims 1 to 3, it is characterised in that: the arrangement pitch of described conduit threading snare hoop (2) is 1.2-2.0m.
CN201620230276.3U 2016-03-24 2016-03-24 Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground Expired - Fee Related CN205577430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620230276.3U CN205577430U (en) 2016-03-24 2016-03-24 Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620230276.3U CN205577430U (en) 2016-03-24 2016-03-24 Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground

Publications (1)

Publication Number Publication Date
CN205577430U true CN205577430U (en) 2016-09-14

Family

ID=56866954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620230276.3U Expired - Fee Related CN205577430U (en) 2016-03-24 2016-03-24 Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground

Country Status (1)

Country Link
CN (1) CN205577430U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804403A (en) * 2016-03-24 2016-07-27 中国建筑第八工程局有限公司 Rolling ball type concrete pouring structure and method for overground large special-shaped stiff column
CN107217850A (en) * 2017-07-04 2017-09-29 广东省建筑工程机械施工有限公司 A kind of concrete placing installation
CN109989525A (en) * 2019-04-15 2019-07-09 中国建筑第八工程局有限公司 Y shape composite supporting structure and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804403A (en) * 2016-03-24 2016-07-27 中国建筑第八工程局有限公司 Rolling ball type concrete pouring structure and method for overground large special-shaped stiff column
CN107217850A (en) * 2017-07-04 2017-09-29 广东省建筑工程机械施工有限公司 A kind of concrete placing installation
CN109989525A (en) * 2019-04-15 2019-07-09 中国建筑第八工程局有限公司 Y shape composite supporting structure and its construction method
CN109989525B (en) * 2019-04-15 2024-01-23 中国建筑第八工程局有限公司 Y-shaped composite supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN206646642U (en) A kind of assembled architecture post and column connected node
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN105804403B (en) Big scale of construction special-shaped stiffness concrete column body slips ball concrete pouring structure and method on the ground
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN103758362B (en) After existing masonry building, increase the Shockproof reinforcing method of collar tie beam, constructional column and reinforcing pull rod
WO2017096644A1 (en) Expanded-foot tubular pile having unfolding blade and piling method thereof
CN107355010A (en) A kind of precast concrete shear wall profile steel joint attachment structure
CN209114465U (en) Foundation pit supporting construction
CN104314075A (en) Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile
CN104295001B (en) The construction technology of variable cross-section prestressing force cant beam
CN109295981A (en) Water proof stud structure, preparation method and the construction method that bored concrete pile is poured using it
CN203270584U (en) One-way intercepting grouting head for grouting
CN107975152A (en) The ductility connecting structure and construction method of first floor vertical member and basement roof
CN105507336A (en) Method for forming composite foundation by using dewatering well
CN105971196A (en) Method for constructing masonry structure embedded square concrete filled steel tube ring beam-constructional column
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN206928426U (en) A kind of prefabricated composite wallboard formula underground installation
CN102296593A (en) Cylindrical compound bored concrete pile of concrete gravels and construction process thereof
CN206554428U (en) A kind of precast stair connecting node
CN206174295U (en) Steel pipe concrete assembly type structure concreting device
CN204001418U (en) Variable cross-section prestressing force cant beam
CN207846677U (en) The ductility connecting structure of first floor vertical member and basement roof
CN209585028U (en) A kind of open caisson applies broken pile
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN206902765U (en) A kind of antiseepage sand device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914