CN108516454A - A kind of hanging apparatus of prefabricated components - Google Patents
A kind of hanging apparatus of prefabricated components Download PDFInfo
- Publication number
- CN108516454A CN108516454A CN201810360725.XA CN201810360725A CN108516454A CN 108516454 A CN108516454 A CN 108516454A CN 201810360725 A CN201810360725 A CN 201810360725A CN 108516454 A CN108516454 A CN 108516454A
- Authority
- CN
- China
- Prior art keywords
- prefabricated components
- shackle
- steel wire
- wire rope
- hanging apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention proposes a kind of hanging apparatus of prefabricated components, including:First built-in fitting and the second built-in fitting, are connected to prefabricated components;First vertical hanger and the second vertical hanger are connected by bolt with described two built-in fittings;First platform sling and the second platform sling, are connected to described two vertical hangers;First steel wire rope and the second steel wire rope, the first roller, the second roller are bypassed respectively, it is connected with described two platform slings by the first shackle, the second shackle, described two rollers are connected by third shackle, the 4th shackle with fringed iris herb respectively, and third steel wire rope, the 4th steel wire rope are connected around third shackle, the 4th shackle with the suspension hook of lifting equipment.The hanging apparatus of prefabricated components proposed by the present invention is exempted and needs to change suspender during hoisting and hanging prefabricated components or change the processes such as the position of suspender, provides that a kind of lifting is efficient and dangerous small Prefabricated element slings.
Description
Technical field
The invention belongs to foundation basic construction technical fields, and more particularly to a kind of hanging apparatus of prefabricated components, are used for
Hoisting large-size prefabricated components in construction, specifically, being a kind of a set of lifting that the component by multiple and different functions forms dress
It sets, the device can be accurately connected securely and with prefabricated components by means of built-in fitting, pass through vertical hanger, steel wire rope, iron
The co-operation such as shoulder pole can conveniently, reliably and securely lifting build be big, quality is big, complex-shaped prefabricated components.
Background technology
Now, Building Trade in China rapidly develops, and prefabricated assembled construction is widely popularized in the realm of building construction, constructs
In the hoisting and hanging demand of large-scale component is also increasingly increased.Currently, when China's lifting prefabricated components, adopt single machine lifting or double more
Machine lifts by crane, and after being bound to prefabricated components, carries out vertical lifting, later, may need to change suspender or change the position of suspender, so
Prefabricated components are installed in place using construction methods such as rotary process, coastdown, delivering methods afterwards.Existing hoisting and hanging device is most
Compare it is heavy, using also tending to be influenced by live ambient conditions and the component sole mass that need to lift by crane and shape, whole
It may need to be replaced as frequently as suspender during a.Therefore, existing hanging apparatus use is not convenient enough, and process is more, hangs
It is inefficient to pretend industry, and existing risk factor is more, is restricted in large-scale component lifting application aspect.
Invention content
The present invention proposes a kind of hanging apparatus of prefabricated components, exempts hoisting and hanging prefabricated components and needs to change suspender in the process
Or change the processes such as position of suspender, provide that a kind of lifting is efficient and dangerous small Prefabricated element slings.
In order to achieve the above object, the present invention proposes a kind of hanging apparatus of prefabricated components, including:
First built-in fitting and the second built-in fitting, are connected to prefabricated components;
First vertical hanger and the second vertical hanger are connected by bolt with described two built-in fittings;
First platform sling and the second platform sling, are connected to described two vertical hangers;
First steel wire rope and the second steel wire rope bypass the first roller, the second roller, are unloaded by the first shackle, second respectively
Button is connected with described two platform slings, and described two rollers are connected by third shackle, the 4th shackle with fringed iris herb respectively, third steel
Cord, the 4th steel wire rope are connected around third shackle, the 4th shackle with the suspension hook of lifting equipment.
Further, first platform sling and the second platform sling by two groups of pins, round nut, gasket structure be connected to it is described
Two vertical hangers, the platform sling can be freely rotated with vertical hanger around round nut.
Further, during prefabricated components lift by crane, first steel wire rope and the second steel wire rope are respectively with described two
A roller fits closely, and can do opposite sliding.
Further, it during prefabricated components lift by crane, is lifted by crane, prefabricated components are sling and is installed to mesh using rotary process
Cursor position.
Further, which further includes horizontal embedded part, is connected to prefabricated components, and the horizontal embedded part is connected to level and hangs
Tool.
The hanging apparatus of prefabricated components proposed by the present invention in the construction process need not be with changing suspender, also need not be more
The position relationship for changing suspender and prefabricated components, eliminate replace suspender and replace during spreader position complicated process for bringing and
Insecurity improves work efficiency.
Description of the drawings
Fig. 1 and Fig. 2 show the structural representation of the hanging apparatus different directions of the prefabricated components of present pre-ferred embodiments
Figure.
Fig. 3 show the built-in fitting and vertical hanger attachment structure schematic diagram of present pre-ferred embodiments.
Specific implementation mode
The specific implementation mode of the present invention is provided below in conjunction with attached drawing, but the present invention is not limited to the following embodiments and the accompanying drawings.Root
According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing be all made of it is very simple
The form of change and use non-accurate ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
The present invention provides a kind of device for hoisting and hanging that applicability is wide, easy to operate, and lifting is efficient and dangerous
Property is small.
~Fig. 3 is please referred to Fig.1, the hanging apparatus that Fig. 1 and Fig. 2 show the prefabricated components of present pre-ferred embodiments is different
The structural schematic diagram in direction.Fig. 3 show the built-in fitting and vertical hanger attachment structure schematic diagram of present pre-ferred embodiments.
The present invention proposes a kind of hanging apparatus of prefabricated components, including:First built-in fitting 110 and the second built-in fitting 120, even
It is connected to prefabricated components 10;First vertical hanger 210 and the second vertical hanger 220, pass through bolt 300 and described two built-in fittings
110,120 are connected;First platform sling 410 and the second platform sling 420, are connected to described two vertical hangers 210,220;First steel wire rope
510 and second steel wire rope 520, the first roller 610, the second roller 620 are bypassed respectively, pass through the first shackle 710, the second shackle
720 are connected with described two platform slings 410,420, and described two rollers 610,620 pass through third shackle 810, the 4th shackle respectively
820 are connected with fringed iris herb 800, and third steel wire rope 910, the 4th steel wire rope 920 are around third shackle 810, the 4th shackle 820 and rise
The suspension hook 20 of heavy equipment is connected.
, need to be first secured by built-in fitting and the reinforcement welding in prefabricated components when making prefabricated components, it is prefabricated with after-pouring
The concrete of component needs the position for strictly controlling built-in fitting in concreting process.
According to present pre-ferred embodiments, first platform sling, 410 and second platform sling 420 passes through two groups of pins, round nut, pads
The structure of piece is connected to described two vertical hangers 210,220, and the platform sling can freely turn with vertical hanger around round nut
It is dynamic.
During prefabricated components lift by crane, first steel wire rope, 510 and second steel wire rope 520 respectively with described two rollers
Wheel 610,620 fits closely, and can do opposite sliding.
Further, it during prefabricated components lift by crane, is lifted by crane, prefabricated components are sling and is installed to mesh using rotary process
Cursor position.During this period, without suspender is needed to change, the position of suspender need not be also adjusted, securely and reliably.Device processing is simple, applies
Work is at low cost, detachably recycles, and maximum function is exactly that can improve the lifting efficiency of prefabricated components.
According to present pre-ferred embodiments, which further includes horizontal embedded part 130, is connected to prefabricated components 10, the water
Flat embedded part 130 is connected to horizontal sling 230.
In the suspension hook uphill process of lifting equipment, the power transmission of suspension hook elder generation is to third steel wire rope 910, the 4th steel wire rope 920, and
Three steel wire ropes 910,920 power transmission of the 4th steel wire rope are to third shackle 810, the 4th shackle 820, third shackle 810, the 4th shackle
820 power transmissions give the first steel wire rope 510 to fringed iris herb 800,800 power transmission of fringed iris herb to roller 610,620, roller 610,620 power transmissions
With the second steel wire rope 520, the first shackle 710, the second shackle 720 are given in the first steel wire rope 510 and 520 power transmission of the second steel wire rope, the
The first platform sling 410 and the second platform sling 420, the first platform sling 410 and the second platform sling 420 are given in one shackle 710,720 power transmission of the second shackle
Power transmission gives 110 and of the first built-in fitting to vertical hanger 210,220, vertical hanger 210,220 by pin, round nut, gasket power transmission
Second built-in fitting 120, the first built-in fitting 110 and 120 power transmission of the second built-in fitting are to prefabricated components 10, to overcome gravity to complete
It hangs.
During lifting, dead angle will not be formed when each connecting portion is all rotatable in the device, is particularly suitable for prefabricated
Wall, prefabricated post, the lifting of prefabricated board and installation exercise.
In conclusion the hanging apparatus of prefabricated components proposed by the present invention, in the construction process, need not with changing suspender,
Also the position relationship that suspender and prefabricated components need not be replaced eliminates and replaces suspender and replace what spreader position was brought in the process
Complicated process and insecurity, improve work efficiency.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention
Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause
This, the scope of protection of the present invention is defined by those of the claims.
Claims (5)
1. a kind of hanging apparatus of prefabricated components, which is characterized in that including:
First built-in fitting and the second built-in fitting, are connected to prefabricated components;
First vertical hanger and the second vertical hanger are connected by bolt with described two built-in fittings;
First platform sling and the second platform sling, are connected to described two vertical hangers;
First steel wire rope and the second steel wire rope, respectively bypass the first roller, the second roller, by the first shackle, the second shackle with
Described two platform slings are connected, and described two rollers are connected by third shackle, the 4th shackle with fringed iris herb respectively, third steel wire
Rope, the 4th steel wire rope are connected around third shackle, the 4th shackle with the suspension hook of lifting equipment.
2. the hanging apparatus of prefabricated components according to claim 1, which is characterized in that first platform sling and the second platform sling
It is connected to described two vertical hangers by the structure of two groups of pins, round nut, gasket, the platform sling and vertical hanger can be around
Round nut is freely rotated.
3. the hanging apparatus of prefabricated components according to claim 1, which is characterized in that during prefabricated components lift by crane,
First steel wire rope and the second steel wire rope are fitted closely with described two rollers respectively, and can do opposite sliding.
4. the hanging apparatus of prefabricated components according to claim 1, which is characterized in that during prefabricated components lift by crane,
It is lifted by crane, prefabricated components are sling and is installed to target location using rotary process.
5. the hanging apparatus of prefabricated components according to claim 1, which is characterized in that the device further includes horizontal embedded part,
Prefabricated components are connected to, the horizontal embedded part is connected to horizontal sling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810360725.XA CN108516454A (en) | 2018-04-20 | 2018-04-20 | A kind of hanging apparatus of prefabricated components |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810360725.XA CN108516454A (en) | 2018-04-20 | 2018-04-20 | A kind of hanging apparatus of prefabricated components |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108516454A true CN108516454A (en) | 2018-09-11 |
Family
ID=63428911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810360725.XA Pending CN108516454A (en) | 2018-04-20 | 2018-04-20 | A kind of hanging apparatus of prefabricated components |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108516454A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109733996A (en) * | 2019-02-19 | 2019-05-10 | 苏州嘉昶住宅工业有限公司 | The hoisting method of suspender and prefabricated components with rollover prefabricated components function |
CN109911765A (en) * | 2019-04-09 | 2019-06-21 | 中铁十八局集团第二工程有限公司 | The vertical lifting horizontal alignment hanging method of main chord |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000327259A (en) * | 1999-05-19 | 2000-11-28 | Ishikawajima Harima Heavy Ind Co Ltd | Heating tube panel block hoisting method for exhaust heat recovery boiler |
CN101434366A (en) * | 2008-12-12 | 2009-05-20 | 宁夏电力建设工程公司 | Hoisting tool and hoisting method for column component |
CN201501729U (en) * | 2009-09-27 | 2010-06-09 | 中国石化集团第十建设公司 | Air turning device of equipment |
CN205675990U (en) * | 2016-06-15 | 2016-11-09 | 北京城建建设工程有限公司 | A kind of building prefabricated components hanging apparatus |
CN206521203U (en) * | 2017-03-07 | 2017-09-26 | 中建科技(北京)有限公司 | Special hanger for lifting by crane prefabricated components |
CN208279171U (en) * | 2018-04-20 | 2018-12-25 | 上海市机械施工集团有限公司 | A kind of device for prefabricated components hoisting and hanging |
-
2018
- 2018-04-20 CN CN201810360725.XA patent/CN108516454A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000327259A (en) * | 1999-05-19 | 2000-11-28 | Ishikawajima Harima Heavy Ind Co Ltd | Heating tube panel block hoisting method for exhaust heat recovery boiler |
CN101434366A (en) * | 2008-12-12 | 2009-05-20 | 宁夏电力建设工程公司 | Hoisting tool and hoisting method for column component |
CN201501729U (en) * | 2009-09-27 | 2010-06-09 | 中国石化集团第十建设公司 | Air turning device of equipment |
CN205675990U (en) * | 2016-06-15 | 2016-11-09 | 北京城建建设工程有限公司 | A kind of building prefabricated components hanging apparatus |
CN206521203U (en) * | 2017-03-07 | 2017-09-26 | 中建科技(北京)有限公司 | Special hanger for lifting by crane prefabricated components |
CN208279171U (en) * | 2018-04-20 | 2018-12-25 | 上海市机械施工集团有限公司 | A kind of device for prefabricated components hoisting and hanging |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109733996A (en) * | 2019-02-19 | 2019-05-10 | 苏州嘉昶住宅工业有限公司 | The hoisting method of suspender and prefabricated components with rollover prefabricated components function |
CN109911765A (en) * | 2019-04-09 | 2019-06-21 | 中铁十八局集团第二工程有限公司 | The vertical lifting horizontal alignment hanging method of main chord |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205045698U (en) | Reinforcement cage hoisting utensil | |
CN104925672A (en) | Full-hydraulic self-climbing suspended double-sided tower crane | |
CN108516454A (en) | A kind of hanging apparatus of prefabricated components | |
CN204057659U (en) | The prefabricated superimposed panel lifting appliance of super large | |
CN204738543U (en) | Reinforcement cage hoisting hoist | |
CN208279171U (en) | A kind of device for prefabricated components hoisting and hanging | |
CN107628554A (en) | multi-arm tower crane | |
CN205932922U (en) | Reinforcement cage hoisting pulley gear | |
CN105110205B (en) | A kind of reverse method for dismounting of derrick crane | |
CN207390887U (en) | A kind of hanging apparatus | |
CN207243306U (en) | Tower crane two sides jacks stock | |
CN206447498U (en) | Large Tube truss Steel Structure purlin lifting gin pole | |
CN204778496U (en) | Platform sling structure of tower crane | |
CN208054770U (en) | A kind of adjustable hoisting balance beam device of light-duty center of gravity | |
CN208898385U (en) | A kind of concrete prefabricated element hanging device | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus | |
CN113636444A (en) | Hoisting method and tool capable of adjusting different weights | |
CN206580444U (en) | A kind of urban construction building prefabricated components hanging apparatus | |
CN207932896U (en) | Ring beam and ring rail integral hoisting tool | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN206336917U (en) | A kind of integrated wall lifting device | |
CN206705563U (en) | A kind of novel pile formula crane | |
CN206457788U (en) | A kind of water conservancy lock for being easy to cleaning stands device for hoisting | |
CN205772948U (en) | Super High Core Walls Structure soil dead man | |
CN205151577U (en) | Fix small -size hoisting machine on steel support of groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |