CN206705563U - A kind of novel pile formula crane - Google Patents
A kind of novel pile formula crane Download PDFInfo
- Publication number
- CN206705563U CN206705563U CN201720442469.XU CN201720442469U CN206705563U CN 206705563 U CN206705563 U CN 206705563U CN 201720442469 U CN201720442469 U CN 201720442469U CN 206705563 U CN206705563 U CN 206705563U
- Authority
- CN
- China
- Prior art keywords
- arm
- suspension hook
- control room
- pile formula
- novel pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of novel pile formula crane, including vertical columns, the control room and arm being arranged on the vertical columns, arm is articulated with the control room upper end, also include connection arm and the hydraulic stem of control room bottom, arm can where vertical columns and arm plane internal rotation, coiling apparatus is provided with above arm, the first suspension hook and the second suspension hook are provided with below arm, drag-line connects power-equipment, coiling apparatus, first suspension hook and the second suspension hook, first suspension hook and the second suspension hook include symmetrically arranged two hooks, it can solve the problem that crane in lift cargo is run-off the straight or even the problem of break off relations.
Description
Technical field
It the utility model is related to crane technical field, and in particular to a kind of novel pile formula crane.
Background technology
Existing crane typically using translating trolleys are set on arm, sets jack up unit, raising under translating trolleys
Suspension hook to be installed on device and carrys out handling weight, common suspension hook is all unilateral suspension hook, i.e., the suspension hook of only one hook, and only one
Group jack up unit, this causes in the very big goods of handling weight, such as easy run-off the straight and center of gravity be not during large-scale counter etc.
Steady situation, the major accident that goods unhook is dropped even occurs when serious.
Utility model content
The purpose of this utility model is to be directed to deficiency of the prior art, and provides a kind of novel pile formula crane, its
It can solve the problem that crane in lift cargo is run-off the straight or even the problem of break off relations.
The purpose of this utility model is achieved through the following technical solutions:
A kind of novel pile formula crane is provided, including vertical columns, the control room and arm that are arranged on the vertical columns,
Arm is articulated with the control room upper end, in addition to connection arm and the hydraulic stem of control room bottom, and arm can be fixed vertical
Plane internal rotation where post and arm, arm top are provided with coiling apparatus, the first suspension hook and the second suspension hook are provided with below arm, draw
Rope connection power-equipment, coiling apparatus, the first suspension hook and the second suspension hook, the first suspension hook and the second suspension hook include symmetrically arranged
Two hooks.
Wherein, the first suspension hook is arranged at the boom tip, and second suspension hook is arranged in the middle part of the arm.
Wherein, hydraulic stem has two.
Wherein, the junction of control room and the vertical columns is provided with ring-shaped platform.
Wherein, staircase is provided between control room and the arm.
The beneficial effects of the utility model:
A kind of novel pile formula crane of the present utility model, its first suspension hook and second for including being arranged at below arm are hung
Hook, the first suspension hook and the second suspension hook include symmetrically arranged two hooks, and during lift cargo, power power equipment pulls drag-line,
Drag-line drives the first suspension hook and the second suspension hook by coiling apparatus, so as to sling weight;Due to the first suspension hook and the second suspension hook
Include two hooks, enable to the weight stress sling more balanced, will not produce unilateral suspension hook makes weight is inclined to ask
Topic, while employ two groups of suspension hooks and carry out handling weight, the stress equalization for being lifted goods is further ensured, so as to solve weight
The problem of run-off the straight is even broken off relations during thing handling.
Brief description of the drawings
Using accompanying drawing, the utility model is described in further detail, but the embodiment in accompanying drawing is not formed to of the present utility model
Any restrictions, on the premise of not paying creative work, can also be according to following attached for one of ordinary skill in the art
Figure obtains other accompanying drawings.
Fig. 1 is a kind of overall structural representation of novel pile formula crane of the present utility model.
Fig. 2 is a kind of structural representation of the arm of novel pile formula crane of the present utility model.
Fig. 3 is a kind of structural representation of the coiling apparatus of novel pile formula crane of the present utility model.
Fig. 4 is a kind of structural representation of the suspension hook of novel pile formula crane of the present utility model.
Reference in Fig. 1 to Fig. 4:
Vertical columns 1;
Control room 2;
Arm 3, the first suspension hook 31, the second suspension hook 32, hook 33,
Hydraulic stem 4;
Coiling apparatus 5;
Ring-shaped platform 6;
Staircase 7.
Embodiment
The utility model is further described with the following Examples.
A kind of adjustable gantry crane of the present utility model, as shown in Figures 1 to 4, including vertical columns 1, setting
In control room 2 and arm 3 on the vertical columns 1, arm 3 is articulated with the upper end of control room 2, and arm 3 can be fixed vertical
Post 1 and the place plane internal rotation of arm 3, in addition to connection arm 3 and the hydraulic stem 4 of the bottom of control room 2, the top of arm 3 are provided with
Coiling apparatus 5, the lower section of arm 3 are provided with the first suspension hook 31 and the second suspension hook 32, drag-line connection power-equipment, coiling apparatus 5, first
The suspension hook 32 of suspension hook 31 and second, the first suspension hook 31 and the second suspension hook 32 include symmetrically arranged two hooks 33, lift cargo
When, determine power equipment and pull drag-line, drag-line drives the first suspension hook 31 and the second suspension hook 32 by coiling apparatus 5, so as to sling weight;
Two hooks 33 are included due to the first suspension hook 31 and the second suspension hook 32, enable to the weight stress sling more balanced,
The problem of tilting weight of unilateral suspension hook will not be produced, while employs two groups of suspension hooks and carrys out handling weight, is further ensured
The stress equalization of goods is lifted, so as to solve the problems, such as that run-off the straight is even broken off relations during weight handling.
Wherein, the first suspension hook 31 is arranged at the end of arm 3, and second suspension hook 32 is arranged at the middle part of arm 3,
The position of the first suspension hook 31 and the second suspension hook 32 is so set to improve security so that arm 3 is more uniformly stressed.
Wherein, hydraulic stem 4 has two, and hydraulic stem 4 is used to promote arm 3 can be in vertical columns 1 and arm 3 in arm 3
Place plane internal rotation, the thrust of two hydraulic stems 4 is stronger, ensures arm 3 in vertical columns 1 and the place plane inward turning of arm 3
The security turned.
Wherein, the junction of control room 2 and the vertical columns 1 is provided with ring-shaped platform 6, control room 2 and the arm 3 it
Between be provided with staircase 7, staircase 7 can carry out the work such as repairing in order to which staff is gone to above arm 3 from control room 2.
Finally it should be noted that above example is only illustrating the technical solution of the utility model, rather than to this reality
With the limitation of novel protected scope, although being explained with reference to preferred embodiment to the utility model, this area it is general
It is logical it will be appreciated by the skilled person that can be modified to the technical solution of the utility model or equivalent substitution, without departing from this
The spirit and scope of utility model technical scheme.
Claims (5)
- A kind of 1. novel pile formula crane, it is characterised in that:Including vertical columns, the control room being arranged on the vertical columns and Arm, arm are articulated with the control room upper end, in addition to connection arm and the hydraulic stem of control room bottom, and arm can be solid Plane internal rotation where determining column and arm, is provided with coiling apparatus above the arm, provided with the first suspension hook and the below arm Two suspension hooks, drag-line connection power-equipment, coiling apparatus, the first suspension hook and the second suspension hook, first suspension hook and described second are hung Hook includes symmetrically arranged two hooks.
- A kind of 2. novel pile formula crane according to claim 1, it is characterised in that:First suspension hook is arranged at described Boom tip, second suspension hook are arranged in the middle part of the arm.
- A kind of 3. novel pile formula crane according to claim 1, it is characterised in that:The hydraulic stem has two.
- A kind of 4. novel pile formula crane according to claim 1, it is characterised in that:The control room is stood with the fixation The junction of post is provided with ring-shaped platform.
- A kind of 5. novel pile formula crane according to claim 1, it is characterised in that:The control room and the arm it Between be provided with staircase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442469.XU CN206705563U (en) | 2017-04-25 | 2017-04-25 | A kind of novel pile formula crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720442469.XU CN206705563U (en) | 2017-04-25 | 2017-04-25 | A kind of novel pile formula crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206705563U true CN206705563U (en) | 2017-12-05 |
Family
ID=60457233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720442469.XU Active CN206705563U (en) | 2017-04-25 | 2017-04-25 | A kind of novel pile formula crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206705563U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110980548A (en) * | 2019-12-27 | 2020-04-10 | 江苏政田重工股份有限公司 | Maintenance channel for crane |
-
2017
- 2017-04-25 CN CN201720442469.XU patent/CN206705563U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110980548A (en) * | 2019-12-27 | 2020-04-10 | 江苏政田重工股份有限公司 | Maintenance channel for crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109231023B (en) | Method for installing jib system of portal crane | |
CN206705563U (en) | A kind of novel pile formula crane | |
CN204281061U (en) | A kind of can the combined sling of automatic releasing hook | |
CN105947910B (en) | The hoisting of FPSO crane superstructures | |
CN206665952U (en) | A kind of novel hanging tool | |
CN206088728U (en) | Novel large -scale gallows of taking a trial run | |
CN208776230U (en) | A kind of large-tonnage mast hoist | |
CN206680062U (en) | A kind of prefabricated part hanging instrument | |
CN209583430U (en) | A kind of loop wheel machine | |
CN207276047U (en) | Steel roof truss boom hoisting | |
CN203411229U (en) | Lifting appliance with switchable states | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN105398944B (en) | Steel structure component bikini lifts by crane erecting device | |
CN204778496U (en) | Platform sling structure of tower crane | |
CN210480628U (en) | Rotatory hoist of two-way self-balancing | |
CN204355947U (en) | Large-scale without eye plate lifting beam device | |
CN206580444U (en) | A kind of urban construction building prefabricated components hanging apparatus | |
CN103058083B (en) | Bolt sphere truss gig | |
CN206203745U (en) | Mobile rubbish hangs | |
CN206188205U (en) | Hoist device is used in prefabricated piping lane upset | |
CN207243272U (en) | Hoisting limiter weight, hoisting limiter and crane | |
CN207209830U (en) | For the hoisting tooling at Bridge Beam bottom and pier stud small space | |
CN206088769U (en) | Portal slewing crane's four rope hoists | |
CN204297905U (en) | A kind of lifting device of precast concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |