CN207276047U - Steel roof truss boom hoisting - Google Patents
Steel roof truss boom hoisting Download PDFInfo
- Publication number
- CN207276047U CN207276047U CN201721238692.9U CN201721238692U CN207276047U CN 207276047 U CN207276047 U CN 207276047U CN 201721238692 U CN201721238692 U CN 201721238692U CN 207276047 U CN207276047 U CN 207276047U
- Authority
- CN
- China
- Prior art keywords
- roof truss
- steel roof
- hoisting
- utility
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of steel roof truss boom hoisting, including substrate, hoisting board and roof truss connecting plate, the hoisting board is vertically connected with the upper surface of the substrate, the roof truss connecting plate is vertically connected with the lower surface of the substrate, and the hoisting board is vertically arranged with the roof truss connecting plate, formed with lifting hole(eyelet) on the hoisting board, formed with through hole on the roof truss connecting plate.The problem of center of gravity inclination is oblique will not occur when slinging as the prior art for the utility model, thus easy to control verticality, so that the connection of world control steel roof truss and column.As it can be seen that the utility model in construction, using simple and fast, securely and reliably, will not hinder mother metal and unhook and precision height etc., safety, quality and lifting efficiency when advantageously ensuring that steel roof truss construction.
Description
Technical field
Building field is the utility model is related to, more particularly to a kind of steel roof truss boom hoisting.
Background technology
In the prior art, the lifting parts used more in steel roof truss work progress are lifted to play a tongs, as shown in Figure 1, in reality
Wide span steel roof frame dead weight is concentrated and acted on suspension centre more than 6T, gravity in the construction of border.Wind up however, playing tongs 10 and being stuck in roof truss
9 angle steel side, is on the one hand easy to make roof truss to wind up mother metal deformed damaged, on the other hand easily to break off relations during lifting, exists
Security risk.In addition, priority control verticality in steel roof truss lifting, when being lifted using a tongs, steel roof truss center of gravity in slinging
Lateral deviation tilts, and is difficult control when being connected with column.
Utility model content
The purpose of this utility model is to provide a kind of steel roof truss boom hoisting, and playing tongs in the prior art with solution is stuck in room
The angle steel side that frame winds up, easily makes roof truss wind up mother metal deformed damaged and the problem of easily breaking off relations when lifting.
In order to solve the above technical problems, the utility model provides a kind of steel roof truss boom hoisting, including substrate, hoisting board
With roof truss connecting plate, the hoisting board is vertically connected with the upper surface of the substrate, the roof truss connecting plate and the substrate
Lower surface vertically connect, and the hoisting board is vertically arranged with the roof truss connecting plate, on the hoisting board formed with
Lifting hole(eyelet), formed with through hole on the roof truss connecting plate.
Preferably, the transition position of the hoisting board and the substrate is additionally provided with stiffener plate.
Preferably, the steel roof truss boom hoisting further includes the hoist cable being detachably connected with the lifting hole(eyelet).
Preferably, the hoist cable is detachably connected by hanging ring and the lifting hole(eyelet).
Preferably, the steel roof truss boom hoisting further includes the bolt being installed in the through hole.
The problem of center of gravity inclination is oblique will not occur when slinging as the prior art for utility model the utility model, thus
Easy to control verticality, so that the connection of world control steel roof truss and column.As it can be seen that the utility model construction when, using simple
Fast, it is safe and reliable, mother metal and unhook and precision height etc. will not be hindered, safety, quality and hung when advantageously ensuring that steel roof truss construction
Fill efficiency.
In addition to objects, features and advantages described above, the utility model also has other purposes, feature and excellent
Point.The utility model will be described in further detail below.
Brief description of the drawings
The Figure of description for forming the part of the utility model is used to provide a further understanding of the present invention, this
The schematic description and description of utility model is used to explain the utility model, does not form the improper limit to the utility model
It is fixed.In the accompanying drawings:
Fig. 1 is the lifting schematic diagram of steel roof truss structure of the prior art.
Fig. 2 is the front view of the steel roof truss boom hoisting in the utility model.
Fig. 3 is the side view of Fig. 2.
Fig. 4 is the top view of Fig. 2.
Fig. 5 is the lifting diagram of the steel roof truss in the utility model.
Fig. 6 is scheme of installation of the steel roof truss boom hoisting in lifting.
Reference numeral in figure:
1st, substrate;2nd, hoisting board;3rd, roof truss connecting plate;4th, lifting hole(eyelet);5th, hoist cable;6th, bolt;8th, through hole;9th, wind up;10th, rise
Tongs;11st, stiffener plate;12nd, steel roof truss;14th, hanging ring;15th, steel roof truss boom hoisting.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the utility model can
To be mutually combined.The utility model is described in detail with reference to embodiment.
In order to make those skilled in the art more fully understand the utility model, the utility model will be implemented below
Technical solution in example is clearly and completely described, it is clear that described embodiment is only the utility model part
Embodiment, instead of all the embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not doing
Go out all other embodiments obtained under the premise of creative work, should all belong to the scope of the utility model protection.
The utility model provides a kind of steel roof truss boom hoisting, including substrate 1, hoisting board 2 and roof truss connecting plate 3, institute
The upper surface that hoisting board 2 is stated with the substrate 1 is vertically connected, and the roof truss connecting plate 3 is vertical with the lower surface of the substrate 1
Ground connects, and the hoisting board 2 is vertically arranged with the roof truss connecting plate 3, described formed with lifting hole(eyelet) 4 on the hoisting board 2
Formed with through hole 8 on roof truss connecting plate 3.The utility model can use Q235-B structural sections, by the steel plate welding of different thicknesss of slab
Into.
Fig. 5 and Fig. 6 are refer to, in use, the roof truss connecting plate 3 of the steel roof truss boom hoisting in the utility model is inserted into
Into the angle steel gap for winding up 9 of steel roof truss 12, then it is connected with steel roof truss 12 with bolt 6, then can be by hanging
Rope 5 is lifted by crane.
By adopting the above-described technical solution, center of gravity will not to occur as the prior art when slinging inclined for the utility model
The problem of inclination, thus easy to control verticality, so that the connection of convenient control steel roof truss and column.As it can be seen that the utility model exists
During construction, using simple and fast, securely and reliably, mother metal and unhook and precision height etc. will not be hindered, advantageously ensure that steel roof truss is constructed
Shi Anquan, quality and lifting efficiency.
Preferably, the transition position of the hoisting board 2 and the substrate 1 is additionally provided with stiffener plate 11.
Preferably, the steel roof truss boom hoisting further includes the hoist cable 5 being detachably connected with the lifting hole(eyelet) 4.
Preferably, the hoist cable 5 is detachably connected by hanging ring and the lifting hole(eyelet) 4.
Preferably, the steel roof truss boom hoisting further includes the bolt 6 being installed in the through hole 8.
The utility model improves safety in steel roof truss lifting construction, quality and lifting efficiency, it passes through the knot of steel roof truss
Structure feature, seeks solution method in lifting construction key job points, and the selection of lifting device is to influence Hoisting Security and stability
Direct factor, lifting steel roof truss safety, quality and work efficiency can be improved by changing the construction method of lifting device and lifting.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the present invention, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on, should be included within the scope of protection of this utility model.
Claims (5)
1. a kind of steel roof truss boom hoisting, it is characterised in that described including substrate (1), hoisting board (2) and roof truss connecting plate (3)
Hoisting board (2) is vertically connected with the upper surface of the substrate (1), the roof truss connecting plate (3) and the following table of the substrate (1)
Face vertically connects, and the hoisting board (2) is vertically arranged with the roof truss connecting plate (3), is formed on the hoisting board (2)
There is a lifting hole(eyelet) (4), formed with through hole (8) on the roof truss connecting plate (3).
2. steel roof truss boom hoisting according to claim 1, it is characterised in that the hoisting board (2) and the substrate (1)
Transition position be additionally provided with stiffener plate (11).
3. steel roof truss boom hoisting according to claim 1, it is characterised in that the steel roof truss boom hoisting further include with
The hoist cable (5) that the lifting hole(eyelet) (4) is detachably connected.
4. steel roof truss boom hoisting according to claim 3, it is characterised in that the hoist cable (5) by hanging ring with it is described
Lifting hole(eyelet) (4) is detachably connected.
5. steel roof truss boom hoisting according to claim 1, it is characterised in that the steel roof truss boom hoisting further includes peace
The bolt (6) being attached in the through hole (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721238692.9U CN207276047U (en) | 2017-09-26 | 2017-09-26 | Steel roof truss boom hoisting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721238692.9U CN207276047U (en) | 2017-09-26 | 2017-09-26 | Steel roof truss boom hoisting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207276047U true CN207276047U (en) | 2018-04-27 |
Family
ID=61982946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721238692.9U Expired - Fee Related CN207276047U (en) | 2017-09-26 | 2017-09-26 | Steel roof truss boom hoisting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207276047U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107640700A (en) * | 2017-09-26 | 2018-01-30 | 中铁城建集团第三工程有限公司 | The hoisting method of steel roof truss boom hoisting and steel roof truss |
CN108706438A (en) * | 2018-08-14 | 2018-10-26 | 中交二公局第二工程有限公司 | A kind of large size I-shape construction construction suspender |
-
2017
- 2017-09-26 CN CN201721238692.9U patent/CN207276047U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107640700A (en) * | 2017-09-26 | 2018-01-30 | 中铁城建集团第三工程有限公司 | The hoisting method of steel roof truss boom hoisting and steel roof truss |
CN108706438A (en) * | 2018-08-14 | 2018-10-26 | 中交二公局第二工程有限公司 | A kind of large size I-shape construction construction suspender |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588B (en) | Lifting platform for protecting safety of high-level construction | |
CN207276047U (en) | Steel roof truss boom hoisting | |
CN207348480U (en) | High-order structural glass erecting device | |
CN201952153U (en) | Portable detachable hoisting equipment | |
CN103663144A (en) | Special turnover device used for steel members | |
CN209872109U (en) | A jib frock for dismouting portal | |
CN207511723U (en) | A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type | |
CN208071235U (en) | A kind of bearing and lifting system of steel truss frame integral hoisting | |
CN203716062U (en) | Integral type pier body decorating hanging basket | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN206219113U (en) | One kind lifting chassis | |
CN107640700A (en) | The hoisting method of steel roof truss boom hoisting and steel roof truss | |
CN204357138U (en) | Simple steel structure hoisting frame | |
CN201762053U (en) | Simple automatic hoisting rod | |
CN201907631U (en) | Rudder blade hoisting device | |
CN212024531U (en) | Self-balancing carrying pole beam for hoisting steel reinforcement cage | |
CN206705563U (en) | A kind of novel pile formula crane | |
CN204873441U (en) | Novel big plate -girder of boiler hoist and mount lug | |
CN207243272U (en) | Hoisting limiter weight, hoisting limiter and crane | |
CN103058083B (en) | Bolt sphere truss gig | |
CN208684250U (en) | One kind being based on the quick detachable boom hoisting of major structure of construction | |
CN206569910U (en) | The vertical hanging apparatus of slender member | |
CN106320525B (en) | Light shaft ceiling large span round steel tubular truss rotation-sliding construction method | |
CN207328748U (en) | A kind of quick auxiliary device for realizing transverse bulkhead lifting positioning and construction safety | |
CN206205463U (en) | Super large steel truss vestibule high-altitude integral hoisting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180427 Termination date: 20200926 |