CN206680062U - A kind of prefabricated part hanging instrument - Google Patents

A kind of prefabricated part hanging instrument Download PDF

Info

Publication number
CN206680062U
CN206680062U CN201720172091.6U CN201720172091U CN206680062U CN 206680062 U CN206680062 U CN 206680062U CN 201720172091 U CN201720172091 U CN 201720172091U CN 206680062 U CN206680062 U CN 206680062U
Authority
CN
China
Prior art keywords
lifting
hoisting beam
pulley
pulling force
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720172091.6U
Other languages
Chinese (zh)
Inventor
翟新铭
许宗国
张利新
马建国
齐青林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG SEVEN STAR CONSTRUCTION & TECHNOLOGY Co Ltd
Original Assignee
XINJIANG SEVEN STAR CONSTRUCTION & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG SEVEN STAR CONSTRUCTION & TECHNOLOGY Co Ltd filed Critical XINJIANG SEVEN STAR CONSTRUCTION & TECHNOLOGY Co Ltd
Priority to CN201720172091.6U priority Critical patent/CN206680062U/en
Application granted granted Critical
Publication of CN206680062U publication Critical patent/CN206680062U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of prefabricated part hanging instrument of the utility model, from top to bottom include lifting pulley, suspension hook, tower crane successively and lift main rope, pulling force rope, hoisting beam, lifting pulley, suspending hook;The suspension hook is arranged on below the lifting pulley;The main rope of tower crane lifting is connected on the suspension hook;The main rope of tower crane lifting is connected with one end of the pulling force rope;The hoisting beam is rectangle, and the pulling force rope length is identical, at least four, is connected to the corner of the hoisting beam, is fixed for the hoisting beam to be hung;Multiple lifting pulleys are provided with the hoisting beam;Suspending hook is provided with the lifting pulley;The multiple lifting pulley is connected and fixed to the lower section of the hoisting beam by a ring steel loading cord.

Description

A kind of prefabricated part hanging instrument
Technical field
A kind of lifting device is the utility model is related to, more particularly to a kind of lifting device of prefabricated components.
Background technology
The selection of prefabricated components various instruments according to the characteristics of its own and in hoisting process, final prefabricated components are installed Speed and quality have very direct association.Existing lifting device includes tower crane and lifts main rope, steel wire rope, hoisting beam, its During use can because when steel wire rope length is inconsistent or shoulder pole girder hoisting point position selection inaccuracy causes to sling prefabricated components, Component not horizontal vertical, installation is caused compared with burden.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of prefabricated components simple in construction, easy to use Lifting device.
A kind of prefabricated part hanging instrument of the utility model, from top to bottom include lifting pulley, suspension hook, tower crane lifting successively Main rope, pulling force rope, hoisting beam, lifting pulley, suspending hook;
The suspension hook is arranged on below the lifting pulley;
The main rope of tower crane lifting is connected on the suspension hook;
The main rope of tower crane lifting is connected with one end of the pulling force rope;
The hoisting beam is rectangle, and the pulling force rope length is identical, at least four, is connected to the hoisting beam Corner, for by the hoisting beam hang fix;
Multiple lifting pulleys are provided with the hoisting beam;
Suspending hook is provided with the lifting pulley;
The multiple lifting pulley is connected and fixed to the lower section of the hoisting beam by a ring steel loading cord.
Preferably, totally 4, the pulley of lifting, two long sides of the hoisting beam are separately installed with two.
Preferably, totally 6, the pulley of lifting, two long sides of the hoisting beam are separately installed with three.
A kind of prefabricated part hanging instrument also includes lifting pulling force rope, and connection lifting in described lifting pulling force rope one end is hung Hook, the goods of lifting needed for other end connection.
The pulling force rope is diameter 18.5mm steel wire ropes, and the main rope of tower crane lifting is diameter 26mm steel wire ropes.
The utility model is sling by the suspension hook with pulley after to workpiece original point, installed on hoisting beam, crane gear During prefabricated components, by member dead weight, pulley suspension hook can be automatically moved to the position corresponding with component suspension centre, ensure on suspension centre Lower position is vertical.Meanwhile pulley suspension hook is fixed on the steel wire rope of hoisting beam, when component lifts by crane, pass through a ring on hoisting beam Itself regulation of steel loading cord, can eliminate the inconsistent situation of the steel wire rope length being connected with component.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the structural representation of embodiment two.
Embodiment
Embodiment one:
As shown in figure 1, a kind of prefabricated part hanging instrument of the present embodiment, from top to bottom includes lifting pulley 1, suspension hook successively 2nd, tower crane lifts main rope, pulling force rope 3, hoisting beam 4, lifting pulley 5, suspending hook 6;
The suspension hook 2 is arranged on the lower section of lifting pulley 1;
The main rope of tower crane lifting is connected on the suspension hook 2;
The main rope of tower crane lifting is connected with one end of the pulling force rope 3;
The hoisting beam 4 is rectangle, and the length of pulling force rope 3 is identical, at least four, is connected to the lifting The corner of beam 4, for the hoisting beam 4 to be hung into fixation;
Multiple lifting pulleys 5 are provided with the hoisting beam 4;
Suspending hook 6 is provided with the lifting pulley 5;
The multiple lifting pulley 5 is connected and fixed to the lower section of the hoisting beam by a ring steel loading cord.
Totally 4, the pulley 5 of lifting, two long sides of the hoisting beam 4 are separately installed with two.
Embodiment two:
As shown in Fig. 2 being with the difference of embodiment one, totally 6, the pulley of lifting, two of the hoisting beam 4 are long While it is separately installed with three.
A kind of prefabricated part hanging instrument also includes lifting pulling force rope 7, and described lifting pulling force rope 7 one end connects the lifting Hook 6, the goods of lifting needed for other end connection.
The pulling force rope 3 is diameter 18.5mm steel wire ropes, and the main rope of tower crane lifting is diameter 26mm steel wire ropes.
The utility model is sling by the suspension hook with pulley after to workpiece original point, installed on hoisting beam, crane gear During prefabricated components, by member dead weight, pulley suspension hook can be automatically moved to the position corresponding with component suspension centre, ensure on suspension centre Lower position is vertical.Meanwhile pulley suspension hook is fixed on the steel wire rope of hoisting beam, when component lifts by crane, pass through a ring on hoisting beam Itself regulation of steel loading cord, can eliminate the inconsistent situation of the steel wire rope length being connected with component.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical scheme of utility model is made, the protection of the utility model claims book determination all should be fallen into In the range of.

Claims (5)

1. a kind of prefabricated part hanging instrument, it is characterised in that from top to bottom include lifting pulley, suspension hook, tower crane lifting successively Main rope, pulling force rope, hoisting beam, lifting pulley, suspending hook;
The suspension hook is arranged on below the lifting pulley;
The main rope of tower crane lifting is connected on the suspension hook;
The main rope of tower crane lifting is connected with one end of the pulling force rope;
The hoisting beam is rectangle, and the pulling force rope length is identical, at least four, is connected to the four of the hoisting beam Angle, fixed for the hoisting beam to be hung;
Multiple lifting pulleys are provided with the hoisting beam;
Suspending hook is provided with the lifting pulley;
The multiple lifting pulley is connected and fixed to the lower section of the hoisting beam by a ring steel loading cord.
A kind of 2. prefabricated part hanging instrument according to claim 1, it is characterised in that
Totally 4, the pulley of lifting, two long sides of the hoisting beam are separately installed with two.
A kind of 3. prefabricated part hanging instrument according to claim 1, it is characterised in that
Totally 6, the pulley of lifting, two long sides of the hoisting beam are separately installed with three.
A kind of 4. prefabricated part hanging instrument according to Claims 2 or 3, it is characterised in that
Also include lifting pulling force rope, described lifting pulling force rope one end connects the suspending hook, lifting needed for other end connection Goods.
A kind of 5. prefabricated part hanging instrument according to claim 4, it is characterised in that
The pulling force rope is diameter 18.5mm steel wire ropes, and the main rope of tower crane lifting is diameter 26mm steel wire ropes.
CN201720172091.6U 2017-02-24 2017-02-24 A kind of prefabricated part hanging instrument Expired - Fee Related CN206680062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720172091.6U CN206680062U (en) 2017-02-24 2017-02-24 A kind of prefabricated part hanging instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720172091.6U CN206680062U (en) 2017-02-24 2017-02-24 A kind of prefabricated part hanging instrument

Publications (1)

Publication Number Publication Date
CN206680062U true CN206680062U (en) 2017-11-28

Family

ID=60391887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720172091.6U Expired - Fee Related CN206680062U (en) 2017-02-24 2017-02-24 A kind of prefabricated part hanging instrument

Country Status (1)

Country Link
CN (1) CN206680062U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108313891A (en) * 2018-05-12 2018-07-24 德清县荣昌冷轧带钢有限公司 A kind of cold-strip steel lifting machine
CN108821090A (en) * 2018-07-10 2018-11-16 江苏金贸科技发展有限公司 A kind of superimposed sheet autobalance boom hoisting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108313891A (en) * 2018-05-12 2018-07-24 德清县荣昌冷轧带钢有限公司 A kind of cold-strip steel lifting machine
CN108821090A (en) * 2018-07-10 2018-11-16 江苏金贸科技发展有限公司 A kind of superimposed sheet autobalance boom hoisting

Similar Documents

Publication Publication Date Title
CN205397854U (en) Gasifier hoist and mount hoisting device
CN206680062U (en) A kind of prefabricated part hanging instrument
CN109252733B (en) Attached self-climbing holding pole lifting system
CN208532009U (en) The hanging apparatus of heavy thin-wall long and thin class equipment
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN206665952U (en) A kind of novel hanging tool
CN204752012U (en) Wall -hanging miniature hoist
CN208182486U (en) Construction lifting mechanical device
CN201619948U (en) Dedicated lifting appliance for lifting concrete column with prepared holes
CN201762053U (en) Simple automatic derrick
CN105398944B (en) Steel structure component bikini lifts by crane erecting device
CN205397929U (en) Equipment is lifted by crane to wane formula for building
CN206705563U (en) A kind of novel pile formula crane
CN206088769U (en) Portal slewing crane's four rope hoists
CN206203745U (en) Mobile rubbish hangs
CN209038856U (en) A kind of overhead traveling crane steel plate special suspender
CN203624932U (en) Portable indoor material lifter
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN207192589U (en) A kind of dual-purpose gantry lifting tool
CN205346622U (en) Steel constructs component bikini and lifts by crane installation device
CN205294671U (en) Device of falling roof beam
CN105438958B (en) Rotating lifting steel-fastening structure component boom hoisting
CN203865885U (en) Movable arm tower-type crane
CN205687389U (en) A kind of slipping tail suspension rod for the lifting of tower kind equipment
CN105398936B (en) Cassette beam column boom hoisting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20180224