CN108442595A - Precast concrete entirety ground floor and installation method for kitchen and toilet - Google Patents
Precast concrete entirety ground floor and installation method for kitchen and toilet Download PDFInfo
- Publication number
- CN108442595A CN108442595A CN201810289240.6A CN201810289240A CN108442595A CN 108442595 A CN108442595 A CN 108442595A CN 201810289240 A CN201810289240 A CN 201810289240A CN 108442595 A CN108442595 A CN 108442595A
- Authority
- CN
- China
- Prior art keywords
- kitchen
- wall
- toilet
- bottom plate
- precast concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
- E04H1/1266—Cubicles for dressing; Toilets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses a kind of precast concrete entirety ground floors for kitchen and toilet, including kitchen and toilet bottom plate, surrounding, which is equipped with, on kitchen and toilet bottom plate leads wall, it leads wall and kitchen and toilet bottom plate is integrated, wall is led to be directly installed in structural beams or partly lead wall in structural beams or be not installed in structural beams, it leads the outer middle side part of wall and is equipped with groove, groove is trapezoidal, it leads wall lateral surface root and inside inclined-plane slope foot is set, it leads the reserved annular anchoring stirrup in wall periphery and longitudinal reinforcement, the middle side part for leading wall is equipped with door opening.The technology of the present invention is simple and reasonable, it is easy to operate, be easy to grasp, speed of application is fast, the common quality defect that common cast-in-place structural floor leaks frequent occurrence at kitchen and toilet position is thoroughly prevented, solve the problems, such as that prefabrication cannot use precast concrete prefabricated member, remarkable in economical benefits in position between there is boiled water room in the interior such as kitchen and toilet.
Description
Technical field
It is specifically a kind of for the precast concrete entirety ground floor of kitchen and toilet and installation the present invention relates to building field
Method.
Background technology
With the continuous improvement that country requires building energy conservation emission reduction, building industry state-of-the-art technology has obtained political affairs at different levels
It wideling popularize and continuing to develop in mansion.Precast concrete assembled architecture technology is to realize that architecture production is industrialized most effective
Approach realizes architecture production mode and turns from traditional extensive produced on-site to the basic of intensive batch production flow line production
Become, the main member of building is prefabricated using the batch of batch production, as precast construction wall, structural column, structural beams, floor, stair,
Balcony slab, air-conditioning plate etc..
However, for the indoor floor having between boiled water room such as kitchen and toilet, due to existing common concrete
Prefabricated board piece position existing for Tulou plate technique cannot fundamentally solve waterproof problem, still cast-in-place mixed using tradition at present
Solidifying earth process construction, this just constrains the prefabricated rate of building element and cannot improve, and labour's input amount is still very big, and speed of application is still
It is old slow.If the ground floor having boiled water room to the kitchen of building, toilet etc. realizes integral prefabricated assembly construction, will be to drop
The industrialization technology level that low labour's input, quickening speed of application, raising are built is extremely important.
The present invention is based under above-mentioned background condition, and the interiors such as kitchen and toilet for prefabrication have
Position between boiled water room, a kind of precast concrete entirety ground floor technology of research and development.
Invention content
To solve the above-mentioned problems, the present invention provides a kind of precast concrete entirety ground floor and peace for kitchen and toilet
Dress method.
The technical scheme is that:For the precast concrete entirety ground floor of kitchen and toilet, including kitchen and toilet bottom plate,
It is surrounded by kitchen and toilet bottom plate and leads wall, led wall and kitchen and toilet bottom plate is integrated, lead the plan-position of wall and the structural beams of lower part
Position is overlapped or part lead wall plan-position it is Chong Die with the structural beams position of lower part or lead the knot of the plan-position of wall and lower part
Structure beam position is underlapped, leads wall lateral surface root and inside inclined-plane slope foot is arranged, it is pre- that one jiao of kitchen and toilet bottom plate is equipped with exhaust duct
The wall of leading of box out mouth, exhaust duct reserved opening position survives ground higher than kitchen and toilet bottom plate and is no less than 50mm, exhaust duct hole to be provided
Mouth side is equipped with floor drain, and pre-buried electric pipeline and pre-buried vertical drainage pipe are equipped in kitchen and toilet bottom plate, and the every side for leading wall is equipped with not
Less than 1 lifting point built-in fitting, the middle side part for leading wall are equipped with door opening, and kitchen and toilet plate outer side is equipped with attached superimposed sheet, attached
It includes superimposed sheet anchor bar, superimposed sheet cableway to belong to superimposed sheet.
Further, it leads wall and uses armored concrete, the concrete for leading wall, kitchen and toilet bottom plate and attached superimposed sheet uses one
Secondary property continuous placing molding, in addition to door opening position is reserved, other positions are continuously arranged along the periphery of whole ground bottom plate,
The position not indwelling construction joint of prefabricated monolithic concrete ground floor component.
Further, the wall height of leading at door opening position survives ground higher than kitchen and toilet bottom plate and is no less than 20mm, removes door opening
Outside oral area position, the wall height for leading wall survives ground higher than kitchen and toilet bottom plate and is no less than 300mm, and the position and thickness for leading wall should be with
Upper part filling partition wall be consistent or be not less than 50mm, or according to filling partition wall thickness 1/2-1/3 guide wall in advance when lead wall
Outer middle side part is equipped with groove, and groove is trapezoidal or rectangle, when leading that middle side part is equipped with groove outside wall described in lead wall periphery reserved
Annular anchoring stirrup and longitudinal reinforcement.
Further, it kitchen and toilet plate upper surface and leads side within the walls and is equipped with waterproof layer and protective layer, waterproof layer and protective layer
It constructs at the scene or in shop.
The installation method of precast concrete entirety ground floor for kitchen and toilet, includes the following steps:
a)The prefabrication in kitchen and toilet monolithic concrete structurally waterproof ground floor;
1)Using prefabricated die station, the mould installation of kitchen and toilet entirety floor side is carried out successively;
2)Wall is led to whole kitchen and toilet bottom plate, surrounding and attached superimposed sheet position carries out the peace of reinforcing bar binding and lifting point built-in fitting
Dress is fixed;
3)Pre-buried to the installation of electromechanical supporting pipelines, surrounding is led the template installation of wall and reserved opening and is fixed;
4)Concrete is poured and is conserved, then form removal, which is transported to, stacks place, constructs to ground waterproof layer and protective layer;
b)The lifting of kitchen and toilet precast concrete entirety ground floor member;
1)Before lifting, carry out an acceptance inspection qualification to the reinforcing bar of installation position, template, it is whole to kitchen and toilet precast concrete
Body ground floor component carries out minute inspection, and whether each spot size meets whether design requirement, concrete structural surface touch
Undermine cracking, it is pre-buried and reserved whether omit and accurate;
2)It when lifting, is fixed using special hanger and rope, hoisting machinery install in place;Check member planar position
After meeting design and code requirement with absolute altitude, unloads suspender, completes kitchen and toilet precast concrete entirety ground floor member
Lifting;
c)Precast concrete entirety ground member is connect with perimeter body structure reinforcing bars and concreting;
1)After the floor member lifting of precast concrete entirety ground is in place, in time with the progress reinforcing bar binding of perimeter body structure and in advance
Bury electromechanical pipeline connection;
2)Check and accept verification, be determined for compliance with design requirement and it is accurate after, be attached the concrete pouring construction at position;
3)Concrete is conserved, after the strength of mould stripping for reaching code requirement, form removal.
The invention has the beneficial effects that:It is directly prefabricated in the factory and finishes, improve prefabrication and assembly construction rate, trapezoidal or rectangular recess
Increase contact surface, increases bonding strength, when factory makes precast concrete entirety ground floor, internal pre-buried electrical pipe
Line, drainpipe, floor drain etc. have all fixed good position, need not construct at the scene, accelerate speed of application, skill of the present invention
Art is simple and reasonable, it is easy to operate, be easy to grasp, speed of application is fast, has thoroughly prevented common cast-in-place structural floor in kitchen
The common quality defect in room and toilet position easy to leak, solve prefabrication has boiled water room in the interiors such as kitchen and toilet
Between ground bottom plate cannot use precast concrete prefabricated member problem, remarkable in economical benefits.
Description of the drawings
Fig. 1 be the present invention kitchen and toilet lead wall plan-position it is Chong Die with the structural beams position of lower part when component vertical view
Structural schematic diagram;
Fig. 2 be the present invention kitchen and toilet lead wall plan-position it is Chong Die with the structural beams position of lower part when component main view graph structure
Schematic diagram;
Fig. 3 be the present invention kitchen and toilet lead wall plan-position it is Chong Die with the structural beams position of lower part when component left view graph structure
Schematic diagram;
Fig. 4 be the present invention kitchen and toilet lead wall plan-position it is Chong Die with the structural beams position of lower part when component section graph structure
Schematic diagram;
Fig. 5 be the present invention kitchen and toilet only partly lead wall plan-position it is Chong Die with the structural beams position of lower part when component vertical view
Figure structure schematic representation;
Fig. 6 be the present invention kitchen and toilet only partly lead wall plan-position it is Chong Die with the structural beams position of lower part when component main view
Figure structure schematic representation;
Fig. 7 be the present invention kitchen and toilet only partly lead wall plan-position it is Chong Die with the structural beams position of lower part when component left view
Figure structure schematic representation;
Fig. 8 be the present invention kitchen and toilet only partly lead wall plan-position it is Chong Die with the structural beams position of lower part when component section
Figure structure schematic representation;
Fig. 9 be the present invention kitchen and toilet lead wall plan-position and lower part structural beams position it is underlapped when component vertical view
Structural schematic diagram;
Figure 10 be the present invention kitchen and toilet lead wall plan-position and lower part structural beams position it is underlapped when component main view
Figure structure schematic representation;
Figure 11 be the present invention kitchen and toilet lead wall plan-position and lower part structural beams position it is underlapped when component left view
Figure structure schematic representation;
Figure 12 be the present invention kitchen and toilet lead wall plan-position and lower part structural beams position it is underlapped when component section
Figure structure schematic representation;
Wherein 1, kitchen and toilet bottom plate, 2, lead wall, 3, exhaust duct reserved opening, 4, door opening, 5, lifting point built-in fitting, 6, pre-buried electricity
Gas pipeline, 7, pre-buried vertical drainage pipe, 8, floor drain, 9, reserved annular anchoring stirrup and longitudinal reinforcement, 10, attached superimposed sheet;11、
Superimposed sheet anchor bar;12, superimposed sheet cableway, 13, waterproof layer, 14, groove.
Specific implementation mode
The present invention is further described below in conjunction with the accompanying drawings.
For the precast concrete entirety ground floor of kitchen and toilet, including kitchen and toilet bottom plate 1, surrounding on kitchen and toilet bottom plate 1
Equipped with wall 2 is led, lead wall 2 and kitchen and toilet bottom plate 1 be integrated, lead wall 2 plan-position is Chong Die with the structural beams position of lower part or portion
The plan-position for point leading wall 2 is Chong Die with the structural beams position of lower part or lead the plan-position of wall 2 and the structural beams position of lower part is equal
It is underlapped, it leads 2 lateral surface root of wall and inside inclined-plane slope foot is set, 1 one jiaos of kitchen and toilet bottom plate is equipped with exhaust duct reserved opening 3,
2 height of wall of leading at 3 position of exhaust duct reserved opening survives ground higher than kitchen and toilet bottom plate 1 and is no less than 50mm, exhaust duct hole to be provided
3 sides of mouth are equipped with floor drain 8, are equipped with pre-buried electric pipeline 6 and pre-buried vertical drainage pipe 7 in kitchen and toilet bottom plate 1, lead every side of wall 2
Equipped with no less than 1 lifting point built-in fitting 5, the middle side part for leading wall 2 is equipped with door opening 4, and 1 outside of kitchen and toilet bottom plate is equipped with attached
Superimposed sheet 10, attached superimposed sheet 10 include superimposed sheet anchor bar 11, superimposed sheet cableway 12.
It leads wall 2 and uses armored concrete, the concrete use for leading wall 2, kitchen and toilet bottom plate 1 and attached superimposed sheet disposably connects
Continuous pouring molding, in addition to 4 position of door opening is reserved, other positions are continuously arranged along the periphery of whole ground bottom plate, prefabricated
The position not indwelling construction joint of monolithic concrete ground floor component.
2 height of wall of leading at 4 position of door opening survives ground higher than kitchen and toilet bottom plate 1 and is no less than 20mm, removes 4 position of door opening
Outside, the wall height for leading wall 2 survives ground higher than kitchen and toilet bottom plate 1 and is no less than 300mm, leads position and the thickness Ying Yuqi of wall 2
Top filling partition wall is consistent or not less than 50mm and no more than 100mm, or prefabricated according to the 1/3-1/2 of filling partition wall thickness
2 outer middle side part of wall is led when leading wall 2 and is equipped with groove 14, and groove 14 is trapezoidal or rectangle, and groove 14 is equipped with when leading 2 outer middle side part of wall
Shi Suoshu leads the reserved annular anchoring stirrup in 2 periphery of wall and longitudinal reinforcement 9.
It 1 upper surface of kitchen and toilet bottom plate and leads the inside of wall 2 and is equipped with waterproof layer 13 and protective layer, waterproof layer 13 and protective layer are existing
It constructs or in shop in field.
The installation method of precast concrete entirety ground floor for kitchen and toilet, includes the following steps:
a)The prefabrication in kitchen and toilet monolithic concrete structurally waterproof ground floor;
1)Using prefabricated die station, the mould installation of kitchen and toilet entirety floor side is carried out successively;
2)Wall 2 is led to whole kitchen and toilet bottom plate 1, surrounding and 10 position of attached superimposed sheet carries out reinforcing bar binding and lifting point built-in fitting
Installation fix;
3)Pre-buried to the installation of electromechanical supporting pipelines, surrounding is led the template installation of wall 2 and reserved opening and is fixed;
4)Concrete is poured and is conserved, then form removal, which is transported to, stacks place, constructs to ground waterproof layer and protective layer;
b)The lifting of kitchen and toilet precast concrete entirety ground floor member;
1)Before lifting, carry out an acceptance inspection qualification to the reinforcing bar of installation position, template, it is whole to kitchen and toilet precast concrete
Body ground floor component carries out minute inspection, and each spot size meets design requirement, concrete structural surface without clashing and breaking and cracking,
Pre-buried and reserved exhaustive is simultaneously accurate;
2)It when lifting, is fixed using special hanger and rope, hoisting machinery install in place;Check member planar position
After meeting design and code requirement with absolute altitude, unloads suspender, completes kitchen and toilet precast concrete entirety ground floor member
Lifting.
c)Precast concrete entirety ground member is connect with perimeter body structure reinforcing bars and concreting;
1)After the floor member lifting of precast concrete entirety ground is in place, in time with the progress reinforcing bar binding of perimeter body structure and in advance
Bury electromechanical pipeline connection;
2)Check and accept verification, be determined for compliance with design requirement and it is accurate after, be attached the concrete pouring construction at position;
3)Concrete is conserved, after the strength of mould stripping for reaching code requirement, form removal.
According to the position for leading wall and installation position structural beams of kitchen and toilet precast concrete entirety ground floor member
Relationship has following 3 kinds of embodiments respectively.
Kitchen and toilet lead wall plan-position it is Chong Die with the structural beams position of lower part on when, element structure figure institute picture 1-4
Show:
After kitchen and toilet precast concrete entirety ground floor member is transported to construction site, lifted just using lifting equipment
Position.At this point, the plan-position for leading wall of kitchen and toilet ground surrounding is Chong Die with the structural beams position of lower part;Component negative is set up per side
It is not less than 10mm in precast concrete beam(Or the side template inside of cast-in-place structural beam is stretched into not less than 10mm);For pressing
Wall is guided in advance according to the 1/2-1/3 of filling partition wall thickness, and the filling wall thickness on wall top is led according to kitchen and toilet, carries out leading wall outside portion
The reinforcing bar binding and template installation of position;Finally, to kitchen and toilet precast concrete entirety ground floor member and peripheral structure
Connecting portion carry out concreting, complete the installation of kitchen and toilet precast concrete entirety ground floor member.
Kitchen and toilet only partly lead wall plan-position it is Chong Die with the structural beams position of lower part on when, element structure figure as scheme
Shown in 5-8:
After kitchen and toilet precast concrete entirety ground floor member is transported to construction site, lifted just using lifting equipment
Position.At this point, the plan-position that kitchen and toilet ground surrounding only partly leads wall is Chong Die with the structural beams position of lower part;For partly leading
When the plan-position of wall and the not be overlapped structural beams position of lower part, close on the attached superimposed sheet edge for leading wall ride upon it is prefabricated
It is not less than 10mm on concrete structured beam(Or the side template inside of cast-in-place structural beam is stretched into not less than 10mm);It leads component part
When the plan-position of wall is Chong Die with the structural beams position of lower part, the bottom edge for leading wall lower part rides upon precast concrete
Beam is not less than 10mm(Or the side template inside of cast-in-place structural beam is stretched into not less than 10mm);For according to filling partition wall thickness
Wall is guided in advance, the filling wall thickness on wall top is led according to kitchen and toilet, carries out the reinforcing bar binding for leading wall outside left and mould
Plate is installed;Finally, concreting is carried out to the connecting portion of component and peripheral structure, completes kitchen and toilet precast concrete
The installation of whole ground floor member.
Kitchen and toilet lead wall plan-position and lower part structural beams position it is underlapped when, element structure figure such as Fig. 9-12
It is shown:
After kitchen and toilet precast concrete entirety ground floor member is transported to construction site, lifted just using lifting equipment
Position.At this point, the plan-position for leading wall of kitchen and toilet ground surrounding and the structural beams position of lower part are underlapped, close on this and lead wall
Attached superimposed sheet edge ride upon on precast concrete beam be not less than 10mm(Or stretch into the side template of cast-in-place structural beam
Inside is not less than 10mm);Finally, concreting is carried out to the connecting portion of component and peripheral structure, it is prefabricated completes kitchen and toilet
The installation of concrete structure entirety ground floor member.
Claims (5)
1. for the precast concrete entirety ground floor of kitchen and toilet, including kitchen and toilet bottom plate, it is characterised in that:The kitchen and toilet
It is surrounded by bottom plate and leads wall, it is described to lead wall and kitchen and toilet bottom plate is integrated, the structure of the plan-position and lower part for leading wall
Beam position is overlapped or part lead wall plan-position it is Chong Die with the structural beams position of lower part or lead the plan-position of wall and lower part
Structural beams position is underlapped, and inside inclined-plane slope foot is arranged in the wall lateral surface root of leading, and one jiao of the kitchen and toilet bottom plate is set
There is exhaust duct reserved opening, the wall height of leading below the exhaust duct reserved opening survives ground higher than kitchen and toilet bottom plate and is no less than
50mm, exhaust duct reserved opening side are equipped with floor drain, and the kitchen and toilet bottom plate is interior equipped with pre-buried electric pipeline and pre-buried perpendicular
To drainpipe, the every side for leading wall is equipped with no less than 1 lifting point built-in fitting, and the middle side part for leading wall is equipped with door opening
Mouthful, the kitchen and toilet plate outer side is equipped with attached superimposed sheet, and the attached superimposed sheet includes superimposed sheet anchor bar, overlapping grillage
Vertical reinforcing bar.
2. the precast concrete entirety ground floor according to claim 1 for kitchen and toilet, it is characterised in that:It is described to lead
Wall use armored concrete, the concrete for leading wall, kitchen and toilet bottom plate and attached superimposed sheet using disposable continuous placing at
Type, in addition to door opening position is reserved, other positions are continuously arranged along the periphery of whole ground bottom plate, in prefabricated monolithic concrete
The position not indwelling construction joint of ground floor component.
3. the precast concrete entirety ground floor according to claim 1 for kitchen and toilet, it is characterised in that:The door
The wall height of leading of hole part survives ground higher than kitchen and toilet bottom plate and is no less than 20mm, in addition to door opening position, leads the wall of wall
Height survives ground higher than kitchen and toilet bottom plate and is no less than 300mm, and the position for leading wall and thickness should fill partition wall with upper part
It is led described in when being consistent or be not less than 50mm and be not more than 100mm, or wall is guided in advance according to the 1/3-1/2 of filling partition wall thickness
The outer middle side part of wall is equipped with groove, and the groove is trapezoidal or rectangle, when it is described lead that middle side part is equipped with groove outside wall when described in lead
The reserved annular anchoring stirrup in wall periphery and longitudinal reinforcement.
4. the precast concrete entirety ground floor according to claim 1 for kitchen and toilet, it is characterised in that:The kitchen
Defend a plate upper surface and lead side within the walls and be equipped with waterproof layer and protective layer, the waterproof layer and protective layer construct at the scene or
Shop.
5. the installation method of the precast concrete entirety ground floor for kitchen and toilet, it is characterised in that:Include the following steps:
a)The prefabrication in kitchen and toilet monolithic concrete structurally waterproof ground floor;
1)Using prefabricated die station, the mould installation of kitchen and toilet entirety floor side is carried out successively;
2)Wall is led to whole kitchen and toilet bottom plate, surrounding and attached superimposed sheet position carries out the peace of reinforcing bar binding and lifting point built-in fitting
Dress is fixed;
3)Pre-buried to the installation of electromechanical supporting pipelines, surrounding is led the template installation of wall and reserved opening and is fixed;
4)Concrete is poured and is conserved, then form removal, which is transported to, stacks place, constructs to ground waterproof layer and protective layer;
b)The lifting of kitchen and toilet precast concrete entirety ground floor member;
1)Before lifting, carry out an acceptance inspection qualification to the reinforcing bar of installation position, template, it is whole to kitchen and toilet precast concrete
Body ground floor component carries out minute inspection, and each spot size meets design requirement, concrete structural surface without clashing and breaking and cracking,
Pre-buried and reserved exhaustive is simultaneously accurate;
2)It when lifting, is fixed using special hanger and rope, hoisting machinery install in place;Check member planar position
After meeting design and code requirement with absolute altitude, unloads suspender, completes kitchen and toilet precast concrete entirety ground floor member
Lifting;
c)Precast concrete entirety ground member is connect with perimeter body structure reinforcing bars and concreting;
1)After the floor member lifting of precast concrete entirety ground is in place, in time with the progress reinforcing bar binding of perimeter body structure and in advance
Bury electromechanical pipeline connection;
2)Check and accept verification, be determined for compliance with design requirement and it is accurate after, be attached the concrete pouring construction at position;
3)Concrete is conserved, after the strength of mould stripping for reaching code requirement, form removal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810289240.6A CN108442595A (en) | 2018-04-03 | 2018-04-03 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810289240.6A CN108442595A (en) | 2018-04-03 | 2018-04-03 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108442595A true CN108442595A (en) | 2018-08-24 |
Family
ID=63198086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810289240.6A Withdrawn CN108442595A (en) | 2018-04-03 | 2018-04-03 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108442595A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025016A (en) * | 2018-09-21 | 2018-12-18 | 中国二十二冶集团有限公司 | Plate and its construction method integrally drop in concrete |
CN109750831A (en) * | 2019-01-30 | 2019-05-14 | 山西三建集团有限公司 | The template system and mold method that kitchen toilet water-stopping platform and floor drop plate pour simultaneously |
CN112411798A (en) * | 2020-12-02 | 2021-02-26 | 贵州建工集团第六建筑工程有限责任公司 | Synchronous construction method for prefabricated guide wall and main structure of toilet |
CN114108917A (en) * | 2021-12-09 | 2022-03-01 | 中铁建设集团有限公司 | Height-adjustable assembly type composite floor slab construction method |
CN114525926A (en) * | 2022-02-24 | 2022-05-24 | 中国五冶集团有限公司 | Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU8468391A (en) * | 1990-09-27 | 1992-04-02 | Caulley, Allan | A building system using transportable service modules in slab on ground construction |
KR20080086329A (en) * | 2007-03-21 | 2008-09-25 | 이존경 | Floor waterproofing structure of prefabricated bathroom and method of executing the same |
CN102777033A (en) * | 2011-03-17 | 2012-11-14 | 有利华建筑预制件有限公司 | Method for mounting prefabricated kitchen |
CN105421818A (en) * | 2015-12-08 | 2016-03-23 | 徐州中煤百甲重钢科技股份有限公司 | Embedded steel structure assembling residence |
CN206189908U (en) * | 2016-09-29 | 2017-05-24 | 中民筑友科技投资有限公司 | Bathroom room |
CN107795017A (en) * | 2017-10-25 | 2018-03-13 | 长沙远大住宅工业集团股份有限公司 | A kind of attachment structure and its construction method of caisson and partition wall |
CN208280410U (en) * | 2018-04-03 | 2018-12-25 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor for kitchen and toilet |
-
2018
- 2018-04-03 CN CN201810289240.6A patent/CN108442595A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU8468391A (en) * | 1990-09-27 | 1992-04-02 | Caulley, Allan | A building system using transportable service modules in slab on ground construction |
KR20080086329A (en) * | 2007-03-21 | 2008-09-25 | 이존경 | Floor waterproofing structure of prefabricated bathroom and method of executing the same |
CN102777033A (en) * | 2011-03-17 | 2012-11-14 | 有利华建筑预制件有限公司 | Method for mounting prefabricated kitchen |
CN105421818A (en) * | 2015-12-08 | 2016-03-23 | 徐州中煤百甲重钢科技股份有限公司 | Embedded steel structure assembling residence |
CN206189908U (en) * | 2016-09-29 | 2017-05-24 | 中民筑友科技投资有限公司 | Bathroom room |
CN107795017A (en) * | 2017-10-25 | 2018-03-13 | 长沙远大住宅工业集团股份有限公司 | A kind of attachment structure and its construction method of caisson and partition wall |
CN208280410U (en) * | 2018-04-03 | 2018-12-25 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor for kitchen and toilet |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109025016A (en) * | 2018-09-21 | 2018-12-18 | 中国二十二冶集团有限公司 | Plate and its construction method integrally drop in concrete |
CN109750831A (en) * | 2019-01-30 | 2019-05-14 | 山西三建集团有限公司 | The template system and mold method that kitchen toilet water-stopping platform and floor drop plate pour simultaneously |
CN112411798A (en) * | 2020-12-02 | 2021-02-26 | 贵州建工集团第六建筑工程有限责任公司 | Synchronous construction method for prefabricated guide wall and main structure of toilet |
CN114108917A (en) * | 2021-12-09 | 2022-03-01 | 中铁建设集团有限公司 | Height-adjustable assembly type composite floor slab construction method |
CN114525926A (en) * | 2022-02-24 | 2022-05-24 | 中国五冶集团有限公司 | Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442595A (en) | Precast concrete entirety ground floor and installation method for kitchen and toilet | |
CN207228684U (en) | Integrated precast toilet | |
GB2362659A (en) | Self-contained bathroom unit construction method | |
WO2007134519A1 (en) | A concrete load-bearing wall with compound heat-insulating layer | |
CN108301466B (en) | Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof | |
CN106894445A (en) | One kind assembling superposed type pipe gallery and its method of construction | |
CN206667459U (en) | A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall | |
CN109707091A (en) | A kind of assembled stealth beam laminated floor slab for the pipeline separation installed from up to down | |
CN110625732A (en) | Method for manufacturing laminated plate | |
CN208280410U (en) | Precast concrete entirety ground floor for kitchen and toilet | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN110778154A (en) | Integral prefabricated toilet | |
CN207959747U (en) | A kind of precast prestressed concrete cranked slab stairs | |
CN207063610U (en) | A kind of transformer station by prefabricated components splicing builds | |
CN109779322A (en) | A kind of co-layer draining hard-cover integral vacuum toilet of inner wall provided pipe line groove hole | |
CN109797988A (en) | A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole | |
CN206916767U (en) | A kind of prefabricated assembled elevator basis | |
KR20170000255A (en) | Construction method for bathroom and Bathroom using the same | |
CN202882098U (en) | In-pit floor drain automatic drainage structure capable of preventing toilet from leaking | |
CN211313514U (en) | Integral prefabricated toilet | |
CN210798043U (en) | Prefabricated partition wall | |
CN211850319U (en) | Laminated plate | |
CN208088439U (en) | Integral prefabricated caisson of toilet and caisson of toilet construction | |
CN109779310A (en) | A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole | |
CN205688636U (en) | Prefabricated assembled have floorboard component between boiled water room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180824 |
|
WW01 | Invention patent application withdrawn after publication |