CN114525926A - Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof - Google Patents

Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof Download PDF

Info

Publication number
CN114525926A
CN114525926A CN202210175498.XA CN202210175498A CN114525926A CN 114525926 A CN114525926 A CN 114525926A CN 202210175498 A CN202210175498 A CN 202210175498A CN 114525926 A CN114525926 A CN 114525926A
Authority
CN
China
Prior art keywords
kitchen
water stop
toilet
template
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210175498.XA
Other languages
Chinese (zh)
Inventor
谢锦鸿
陈昌俊
何刚
刘永岗
包攀峰
贾东坡
杨松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202210175498.XA priority Critical patent/CN114525926A/en
Publication of CN114525926A publication Critical patent/CN114525926A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

The invention discloses a construction structure for integrally forming water stop and structure in a kitchen and toilet and a construction method thereof. This construction structures is prefabricated superimposed sheet in including, and the avris of prefabricated superimposed sheet is equipped with the major structure roof beam reinforcing bar in between, is equipped with the waterstop template on the major structure roof beam reinforcing bar, and the waterstop template encloses to keep off and forms the waterstop position, and the last reservation of waterstop template has kitchen bathroom door opening, and waterstop position and kitchen bathroom door opening all are located the top of major structure roof beam reinforcing bar. The construction method comprises the following steps: when the concrete of the floor slab with the main structure is poured, the concrete of the water stop belt between a kitchen and a toilet is poured together with the concrete of the floor slab and is sufficiently vibrated, so that the concrete of the water stop belt is compact and is integrated with the floor slab with the main structure. The invention has the beneficial effects that: the water stop belt of the kitchen and toilet and the main structure are cast in situ at the same time, so that the concrete integral molding of the water stop belt of the kitchen and toilet and the main structure is realized; the secondary construction process of the water stop belt in the kitchen and toilet is reduced, and the labor cost and the concrete loss rate of the secondary construction of the concrete structure are reduced.

Description

Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof
Technical Field
The invention belongs to high-rise building construction, and particularly relates to a construction structure for integrally forming kitchen and bathroom water stop and a construction method thereof.
Background
The common problem of the construction quality of high-rise residential buildings is particularly the problem of water seepage, which is always a chronic problem in the maintenance of construction units and the handing over of owners, wherein water seepage and damp-reversing of walls of kitchens and toilets are the most troublesome problems for residents, and serious consequences and loss are caused by the fact that the residents complain a lot of events. At present, the construction of the water stop of the kitchen and toilet usually comprises the steps of template matching, template installation and concrete pouring of the water stop after the construction of a main body structure is finished, and by adopting the traditional method, the construction quality of the water stop of the kitchen and toilet is poor, the quality problems of leakage at the root part of the water stop and the like are influenced and certain negative influence is brought to the image of a construction unit due to the factors of poor treatment of the base layer of the water stop, low work responsibility of constructors, poor management of managers and the like.
Disclosure of Invention
The invention aims to: the invention provides a construction structure for integrally forming water stop and structure of a kitchen and toilet and a construction method thereof, and solves the problem of leakage of the water stop of the existing kitchen and toilet.
The purpose of the invention is realized by the following technical scheme:
the utility model provides a kitchen bathroom stagnant water and structure integrated into one piece's construction structures, prefabricated superimposed sheet in including, the avris of prefabricated superimposed sheet is equipped with the major structure roof beam reinforcing bar in the room, is equipped with the waterstop template on the major structure roof beam reinforcing bar, and the waterstop template encloses to keep off and forms the waterstop position, and the waterstop template is reserved to have kitchen bathroom door opening, and waterstop position and kitchen bathroom door opening all are located the top of major structure roof beam reinforcing bar.
Furthermore, the prefabricated composite slab structure comprises an outer prefabricated composite slab, a main structure beam position is formed between the inner prefabricated composite slab and the outer prefabricated composite slab, and main structure beam steel bars are arranged in the main structure beam position.
Furthermore, all be equipped with the floor reinforcing bar on prefabricated superimposed sheet in and between the outer prefabricated superimposed sheet in between.
Furthermore, the waterstop template is bound on the main structure beam steel bar.
Furthermore, the water stop template is enclosed into a complete head-tail end structure, and a kitchen and bathroom door opening is formed between the head end and the tail end.
Furthermore, the side of the inter-inner prefabricated composite slab is provided with a shear wall position, a shear wall vertical reinforcing steel bar is arranged in the shear wall position, and the shear wall position is reserved on the water stop belt template.
Furthermore, the side of the prefabricated composite slab in the room is provided with a frame column position, the frame column position is internally provided with a frame column vertical reinforcing steel bar, and the water stop belt template is reserved with the frame column position.
Furthermore, the water stop template is an aluminum alloy template.
The construction method of the kitchen and bathroom water stop and structure integral forming construction structure comprises the following steps:
s1, designing and manufacturing a water stop template of a kitchen and toilet according to the distribution condition of water stops of the kitchen and toilet, the width of the water stop and the height of the water stop and the elevation of an adjacent main structural member, and customizing and processing the template in a template manufacturer;
s2, after the laminated floor slab of the main structure is installed, according to a building construction plane layout drawing, measuring and paying off of water stop belts between kitchens and bathrooms are carried out on the laminated floor slab, and water stop belt positioning ink lines are popped up on the laminated floor slab;
s3, before the template is installed, a release agent is coated uniformly;
s4, after the main structure beam steel bars are bound, installing a water stop template on the main structure beam steel bars;
s5, comparing the building construction plane layout drawing, checking whether the installation of the water stop template is in compliance and accurate, checking whether the water stop template is loosened, and timely adjusting and reinforcing if the water stop template is loosened and deviated;
s6, when concrete of the floor slab with the main structure is poured, water stop concrete of a kitchen and toilet is poured together with the floor slab concrete and sufficiently vibrated, so that the water stop concrete is compact and is integrated with the floor slab with the main structure;
s7, installing a specially-assigned person for guard when the concrete of the water stop of the kitchen and toilet is poured, and timely adjusting and reinforcing if deviation and demolding phenomena occur in the pouring process so as to ensure the construction quality and the forming quality of the water stop of the kitchen and toilet;
and S8, after pouring of concrete of the water stop belt in the kitchen and toilet is completed and the form removal condition is met, removing the form.
Further, when the installation is performed in the step S4, the installation is performed according to the wall structure of the kitchen and toilet specifically according to the following three conditions:
1) when the wall bodies of the kitchen and toilet are all of the masonry equal-filling structure
Directly installing a kitchen and toilet water stop template on the floor according to the kitchen and toilet water stop positioning line;
2) in the kitchen and toilet wall, when part of the wall is a shear wall
Reserving a shear wall position according to a water stop positioning line in a kitchen and toilet to facilitate the construction of the next layer of shear wall, completely installing water stop templates in the area of the water stop in the kitchen and toilet outside the shear wall, and connecting the root of the shear wall and the water stop in the kitchen and toilet into a whole when the next layer of shear wall is constructed;
3) in the wall body of the kitchen and toilet, when part of the wall body is adjacent to the frame column
Reserving the frame column position according to the water stop positioning line of the kitchen and toilet, so as to facilitate the construction of the next layer of frame column; and (3) completely installing water stop templates in the areas of the water stop zones of the kitchens and the bathrooms, except the frame columns, and connecting the root parts of the frame columns and the water stop zones of the kitchens and the bathrooms into a whole when the frame columns of the next floor are constructed.
The invention realizes the following functions: the invention combines the structural characteristics of the water stop of the kitchen and toilet and the construction characteristics of the main structure, combines the construction of the water stop of the kitchen and toilet with the construction of the main structure, simultaneously constructs the water stop of the kitchen and toilet along with the main structure, carries out template installation and concrete pouring along with the main structure, and integrally forms and constructs the water stop of the kitchen and toilet and the structure, thereby reducing the construction joint between the root of the water stop of the kitchen and toilet and the main structure, avoiding the leakage risk of the root of the water stop, radically solving the leakage problem of the root of the water stop of the kitchen and toilet, simultaneously reducing the secondary construction process of the water stop of the kitchen and toilet, reducing the labor cost and the concrete loss rate of the secondary construction of the concrete structure, improving the construction efficiency, reducing the labor intensity, having high concrete construction quality, closely connecting the structure, having good anti-leakage effect, and improving the residential living quality and the satisfaction degree of owners.
The invention has the beneficial effects that:
1. the water stop belt and the main structure of the kitchen and toilet are cast in situ at the same time, and the water stop belt and the concrete of the main structure of the kitchen and toilet are integrally formed.
2. The secondary construction process of the water stop belt in the kitchen and toilet is reduced, and the labor cost and the concrete loss rate of the secondary construction of the concrete structure are reduced.
3. The masonry construction can be timely carried out according to the site progress, construction can be carried out after the masonry construction enters the site, kitchen and toilet water stop belt construction does not need to be carried out independently, and influence of kitchen and toilet water stop belt construction factors does not need to be considered.
4. No construction joint exists between the root of the water stop of the kitchen and toilet and the main structure, so that the leakage risk of the root of the water stop is avoided, and the leakage problem of the root of the water stop of the kitchen and toilet is solved.
5. The water stop belt of the kitchen and toilet is poured with the main structure at the same time, the concrete is tightly combined, the construction quality of the concrete is ensured, the cost is reduced, the construction period is shortened, and the comprehensive economy is good.
6. The water stop belt in the kitchen and toilet is designed and manufactured by adopting an aluminum alloy template, the template can be repeatedly used in a turnover manner, the turnover use frequency is high, the template installation effect is good, the reserved size of a door opening is accurate, and the concrete forming quality is high.
The main scheme and the further selection schemes can be freely combined to form a plurality of schemes which are all adopted and claimed by the invention; in the invention, the selection (each non-conflict selection) and other selections can be freely combined. The skilled person in the art can understand that there are many combinations, which are all the technical solutions to be protected by the present invention, according to the prior art and the common general knowledge after understanding the scheme of the present invention, and the technical solutions are not exhaustive herein.
Drawings
Fig. 1 is a schematic structural view of a waterstop template of the present invention.
Fig. 2 is a schematic structural view of embodiment 1 of the present invention.
Fig. 3 is a schematic structural diagram of embodiment 2 of the present invention.
Fig. 4 is a schematic structural diagram of embodiment 3 of the present invention.
In the figure: 1-interior prefabricated laminated slab, 2-exterior prefabricated laminated slab, 3-floor slab steel bar, 4-main structure beam steel bar, 5-waterstop template, 6-kitchen and bathroom door opening, 7-shear wall vertical steel bar, 8-shear wall position, 9-frame column vertical steel bar and 10-frame column position.
Detailed Description
The following non-limiting examples serve to illustrate the invention.
Example 1:
referring to fig. 1 and 2, a construction structure for water stop and integral structure forming in kitchens and bathrooms comprises internal prefabricated laminated slabs 1, external prefabricated laminated slabs 2, floor slab steel bars 3, main structure beam steel bars 4, water stop templates 5 and kitchens and bathrooms door openings 6.
The avris of interior prefabricated superimposed sheet 1 is equipped with major structure roof beam reinforcing bar 4 in the room, forms the major structure roof beam position between interior prefabricated superimposed sheet 1 and the outer prefabricated superimposed sheet 2 in the room, and major structure roof beam reinforcing bar 4 is established in the major structure roof beam position. All be equipped with floor reinforcing bar 3 on prefabricated superimposed sheet 1 and the outer prefabricated superimposed sheet 2 in the room in for the construction of pouring of later stage floor.
Be equipped with on the major structure beam reinforcement 4 along the waterstop template 5 that its profile was arranged, waterstop template 5 divides into a plurality of pieces, interconnect between the waterstop template 5 of a plurality of pieces encloses the fender and forms banding enclosure space, as the waterstop position, the waterstop position is just located the top of major structure beam reinforcement 4.
The waterstop template 5 is bound on the main structure beam steel bars 4, the waterstop template 5 is fixedly installed on the whole structure, the waterstop template 5 is utilized to enclose the baffle, the floor and the waterstop are integrally poured, and construction quality is guaranteed.
The water stop template 5 is an aluminum alloy template, has stable and reliable quality and can be used for multiple transitions. The water stop templates 5 form a complete head-tail end structure, and a kitchen and bathroom door opening 6 is formed between the head end and the tail end. A kitchen and bathroom door opening 6 positioned above the main structure beam steel bars 4 is reserved on the water stop template 5, so that the kitchen and bathroom door opening can be constructed and processed subsequently.
A construction method of the construction structure integrally formed by the kitchen and toilet water stop and the structure comprises the following steps:
s1, according to distribution conditions of water stops in kitchens and bathrooms, the width of the water stops and the height of the water stops, water stop templates 5 in kitchens and bathrooms are designed and manufactured by combining the water stops with the elevations of adjacent main structural members, and the water stop templates 5 are customized and processed in template manufacturers and are shown in attached drawings 1.
And S2, after the composite floor slab (comprising the inter-inner prefabricated composite slab 1 and the inter-outer prefabricated composite slab 2) of the main structure is installed, according to a building construction plane layout, measuring and paying off of the water stop of the kitchen and toilet are carried out on the composite floor slab, and a water stop positioning ink line is popped up on the composite floor slab.
And S3, before the water stop template 5 is installed, coating a release agent, and uniformly coating.
S4, after the main structure beam reinforcing steel bars 4 are bound, installing a water stop template 5 on the main structure beam reinforcing steel bars 4; when the water stop template is installed, when the wall bodies of the kitchens and bathrooms are all of masonry and other filling structures, the water stop template 5 of the kitchens and bathrooms is directly installed on the floor slab according to the water stop positioning line of the kitchens and bathrooms.
S5, contrasting the building construction plane layout drawing, checking whether the installation of the water stop template 5 is in compliance and accurate, checking whether the water stop template 5 is loosened, and timely adjusting and reinforcing if the water stop template 5 is loosened and deviated.
S6, when concrete of the floor slab with the main structure is poured, water stop concrete in a kitchen and toilet is poured together with the floor slab concrete and sufficiently vibrated, so that the water stop concrete is compact and is integrated with the floor slab with the main structure.
S7, installing a specially-assigned person for guard when the concrete of the water stop of the kitchen and toilet is poured, and timely adjusting and reinforcing if deviation and demolding phenomena occur in the pouring process so as to ensure the construction quality and the forming quality of the water stop of the kitchen and toilet.
And S8, after pouring of concrete of the water stop belt in the kitchen and toilet is completed and the form removal condition is met, removing the form.
Example 2:
referring to fig. 1 and 3, in the construction structure for water stop and integral structure forming in kitchens and bathrooms, a shear wall position 8 is arranged on the side of a prefabricated laminated slab 1 in each kitchen and bathroom, shear wall vertical steel bars 7 are arranged in the shear wall positions 8, a shear wall position 8 is reserved on a water stop template 5, and the shear wall construction and the water stop construction are separated by the reserved shear wall position 8. The other structure is the same as that of embodiment 1.
When S4 is installed, when part of the wall body in the kitchen and toilet is a shear wall, a shear wall position 8 is reserved according to a kitchen and toilet water stop positioning line to facilitate the construction of the next layer of shear wall, a water stop template 5 is completely installed in the area of the kitchen and toilet water stop zone outside the shear wall, and when the next layer of shear wall is constructed, the root of the shear wall is connected with the kitchen and toilet water stop into a whole. The other methods were the same as in example 1.
Example 3:
referring to fig. 1 and 4, in the construction structure for integrally forming water stopping and structures in kitchens and bathrooms, frame column positions 10 are arranged on the sides of prefabricated composite slabs 1 in the kitchens and bathrooms, frame column vertical steel bars 9 are arranged in the frame column positions 10, frame column positions 10 are reserved on water stopping belt templates 5, and the frame column construction and the water stopping belt construction are separated by the reserved frame column positions 10. The other structure is the same as that of embodiment 1.
When S4 is installed, when part of the wall body in the kitchen and toilet wall body is a frame column, reserving a frame column position 10 according to a water stop positioning line of the kitchen and toilet, and facilitating the construction of the next layer of frame column; and (3) completely installing a water stop template 5 in the kitchen and toilet water stop zone area outside the frame column, and connecting the root of the frame column with the kitchen and toilet water stop into a whole when constructing the frame column of the next floor. The other methods were the same as in example 1.
The foregoing basic embodiments of the invention and their various further alternatives can be freely combined to form multiple embodiments, all of which are contemplated and claimed herein. In the scheme of the invention, each selection example can be combined with any other basic example and selection example at will.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The utility model provides a kitchen bathroom stagnant water and structure integrated into one piece's construction structures, prefabricated superimposed sheet (1) in including, its characterized in that: the avris of prefabricated superimposed sheet (1) in between be equipped with major structure beam reinforcement (4), be equipped with waterstop template (5) on major structure beam reinforcement (4), waterstop template (5) enclose to keep off and form the waterstop position, it has kitchen bathroom door opening (6) to reserve on waterstop template (5), waterstop position and kitchen bathroom door opening (6) all are located the top of major structure beam reinforcement (4).
2. The kitchen and toilet water stop and structure integrally formed construction structure as claimed in claim 1, wherein: still including outer prefabricated superimposed sheet (2) in the room, form the major structure roof beam position in between prefabricated superimposed sheet (1) and the outer prefabricated superimposed sheet (2) in the room, major structure roof beam reinforcing bar (4) are established in the major structure roof beam position.
3. The kitchen and toilet water stop and structure integrally formed construction structure as claimed in claim 2, wherein: the prefabricated composite slab comprises an inter-inner prefabricated composite slab (1) and an inter-outer prefabricated composite slab (2), and floor slab reinforcing steel bars (3) are arranged on the inter-inner prefabricated composite slab and the inter-outer prefabricated composite slab.
4. The kitchen and toilet water stop and structure integrally formed construction structure as claimed in claim 1, wherein: and the water stop template (5) is bound on the main structure beam steel bar (4).
5. The kitchen and toilet water stop and structure integral forming construction structure as claimed in any one of claims 1 to 4, wherein: the water stop template (5) is surrounded into a complete head-tail end structure, and a kitchen and bathroom door opening (6) is formed between the head end and the tail end.
6. The kitchen and toilet water stop and structure integral forming construction structure as claimed in any one of claims 1 to 4, wherein: the avris of prefabricated superimposed sheet (1) in between be equipped with shear force wall position (8), be equipped with shear force wall vertical reinforcement (7) in shear force wall position (8), reserve on waterstop template (5) and have shear force wall position (8).
7. The kitchen and toilet water stop and structure integral forming construction structure as claimed in any one of claims 1 to 4, wherein: the avris of prefabricated superimposed sheet (1) in between be equipped with frame post position (10), be equipped with frame post vertical reinforcement (9) in frame post position (10), reserve on waterstop template (5) has frame post position (10).
8. The kitchen and toilet water stop and structure integrally formed construction structure as claimed in claim 1 or 4, wherein: the waterstop template (5) is an aluminum alloy template.
9. A construction method of a kitchen and toilet water stopping and structure integral forming construction structure as claimed in any one of claims 1 to 8, characterized by comprising the steps of:
s1, designing and manufacturing a water stop template (5) of the kitchen and toilet according to the distribution condition of the water stops in the kitchen and toilet, the width of the water stops and the height of the water stops and the elevation of an adjacent main structural member, and customizing and processing the template in a template manufacturer;
s2, after the laminated floor slab of the main structure is installed, according to a building construction plane layout drawing, measuring and paying off of water stop belts between kitchens and bathrooms are carried out on the laminated floor slab, and water stop belt positioning ink lines are popped up on the laminated floor slab;
s3, before the template is installed, a release agent is coated uniformly;
s4, after the main structure beam reinforcing steel bars (4) are bound, installing a water stop template (5) on the main structure beam reinforcing steel bars (4);
s5, checking and checking whether the water stop template (5) is installed in a compliant and accurate manner by contrasting a building construction plane layout drawing, checking whether the water stop template (5) is loosened, and timely adjusting and reinforcing if the water stop template (5) is loosened and deviated;
s6, when concrete of the floor slab with the main structure is poured, water stop concrete of a kitchen and toilet is poured together with the floor slab concrete and sufficiently vibrated, so that the water stop concrete is compact and is integrated with the floor slab with the main structure;
s7, installing a specially-assigned person for guard when the concrete of the water stop of the kitchen and toilet is poured, and timely adjusting and reinforcing if deviation and demolding phenomena occur in the pouring process so as to ensure the construction quality and the forming quality of the water stop of the kitchen and toilet;
and S8, after pouring of concrete of the water stop belt in the kitchen and toilet is completed and the form removal condition is met, removing the form.
10. The construction method according to claim 9, wherein: when the step S4 is used for installation, the installation is carried out according to the wall structure of a kitchen and toilet according to the following three specific conditions:
1) when the wall bodies of the kitchens and bathrooms are all of filling structures:
directly installing a kitchen and toilet water stop template (5) on the floor according to the kitchen and toilet water stop positioning line;
2) in the kitchen and toilet wall, when part of the wall is a shear wall:
reserving a shear wall position (8) according to a kitchen and toilet waterstop positioning line to facilitate construction of the next layer of shear wall, completely installing a waterstop template (5) in the kitchen and toilet waterstop area outside the shear wall, and connecting the root of the shear wall and the kitchen and toilet waterstop into a whole when constructing the next layer of shear wall;
3) in the kitchen bathroom wall body, when some wall bodies face the frame post:
reserving a frame column position (10) according to a water stop positioning line of a kitchen and toilet, so that the construction of the next layer of frame column is facilitated; and water stop belt templates (5) are all installed in the areas of the water stop belts of the kitchens and the bathrooms, except the frame columns, and the root parts of the frame columns are connected with the water stop belts of the kitchens and the bathrooms into a whole when the frame columns of the next floor are constructed.
CN202210175498.XA 2022-02-24 2022-02-24 Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof Pending CN114525926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210175498.XA CN114525926A (en) 2022-02-24 2022-02-24 Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210175498.XA CN114525926A (en) 2022-02-24 2022-02-24 Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof

Publications (1)

Publication Number Publication Date
CN114525926A true CN114525926A (en) 2022-05-24

Family

ID=81624967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210175498.XA Pending CN114525926A (en) 2022-02-24 2022-02-24 Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof

Country Status (1)

Country Link
CN (1) CN114525926A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248865U (en) * 2011-08-29 2012-05-30 浙江城建建设集团有限公司 Flanged concrete one-time formed support mold device for kitchens and restrooms and construction method
CN108442595A (en) * 2018-04-03 2018-08-24 江苏南通三建集团股份有限公司 Precast concrete entirety ground floor and installation method for kitchen and toilet
CN109025268A (en) * 2018-08-17 2018-12-18 重庆中科建设(集团)有限公司 Kitchen and toilet concrete flanging construction method
CN112609846A (en) * 2021-01-15 2021-04-06 山东海龙建筑科技有限公司 Assembled reverse ridge of toilet and manufacturing and mounting method thereof
CN217326438U (en) * 2022-02-24 2022-08-30 中国五冶集团有限公司 Kitchen bathroom stagnant water and structure integrated into one piece's construction structures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248865U (en) * 2011-08-29 2012-05-30 浙江城建建设集团有限公司 Flanged concrete one-time formed support mold device for kitchens and restrooms and construction method
CN108442595A (en) * 2018-04-03 2018-08-24 江苏南通三建集团股份有限公司 Precast concrete entirety ground floor and installation method for kitchen and toilet
CN109025268A (en) * 2018-08-17 2018-12-18 重庆中科建设(集团)有限公司 Kitchen and toilet concrete flanging construction method
CN112609846A (en) * 2021-01-15 2021-04-06 山东海龙建筑科技有限公司 Assembled reverse ridge of toilet and manufacturing and mounting method thereof
CN217326438U (en) * 2022-02-24 2022-08-30 中国五冶集团有限公司 Kitchen bathroom stagnant water and structure integrated into one piece's construction structures

Similar Documents

Publication Publication Date Title
EP3670774B1 (en) Prefabricated bathroom and methods for constructing and installing the same
CN100396860C (en) Concrete building combined with heat insulating framework and its construction method
JP2002004610A (en) Prefabricated bathroom
CN105696744B (en) Steam-pressing aero-concrete integral wall and its production technology
CN217326438U (en) Kitchen bathroom stagnant water and structure integrated into one piece's construction structures
CN102230338A (en) Prefabricated toilet and construction method and installation method thereof
CN109667376A (en) Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam
CN102230339A (en) Prefabricated kitchen and construction and installation method thereof
CN209703805U (en) A kind of novel superposed superstructure suitable for steel construction H profile steel beam
CN114525926A (en) Construction structure for integrally forming water stop and structure of kitchen and bathroom and construction method thereof
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN110644814A (en) Integrated bathroom and assembling method thereof
CN102777032B (en) Installation method of prefabricated toilet
CN109779322A (en) A kind of co-layer draining hard-cover integral vacuum toilet of inner wall provided pipe line groove hole
CN114809512A (en) Oversized prefabricated bare concrete hanging plate and manufacturing and mounting process
CN210975857U (en) Caisson connection structure
CN112144675A (en) Precast concrete reversed ridge with overhanging reinforcing steel bars and construction method
CN113373977A (en) Basement exterior wall and construction method thereof
CN102777033B (en) Method for mounting prefabricated kitchen
CN111119377A (en) Prefabricated hollow superposed shear wall with vertical steel bars not protruding out of ribs and formed holes of shaped pipeline
JP2004293078A (en) Reinforcing construction method using fiber-mixed mortar
CN216142467U (en) Assembled integral prefabricated toilet
CN218028971U (en) Integrated slope finding mold for construction of sinking toilet structural slab
CN109779310A (en) A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole
CN209799361U (en) Construction mold device for flanging of toilet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination