CN109025016A - Plate and its construction method integrally drop in concrete - Google Patents
Plate and its construction method integrally drop in concrete Download PDFInfo
- Publication number
- CN109025016A CN109025016A CN201811105390.3A CN201811105390A CN109025016A CN 109025016 A CN109025016 A CN 109025016A CN 201811105390 A CN201811105390 A CN 201811105390A CN 109025016 A CN109025016 A CN 109025016A
- Authority
- CN
- China
- Prior art keywords
- anchor bar
- plate
- floor slab
- laminated floor
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
Abstract
The present invention provides a kind of concrete and integrally drops plate, it is prefabricated monolithic concrete plate, is surrounded by anchor bar, wherein three faces are anchor bar one, it is on one side anchor bar two, the anchor bar one is to be turned under the right angle torn open, and the side and floor where anchor bar one are affixed;The anchor bar two is the steel disk of straight stretching, and the side and another prefabricated laminated floor slab where anchor bar two are affixed, additionally provides the construction method that plate integrally drops in concrete: the prefabricated one whole hardened structure of drop;Monoblock type drop plate is lifted into installation site, and is placed into wall top edge;The laminated floor slab adjacent with drop plate is lifted into installation site, and snaps into the anchor bar one of monoblock type drop plate on wall, and anchor bar two is inserted into the girder rib of laminated floor slab;Concreting is carried out to laminated floor slab last layer, the present invention reduces situ wet operation, improves construction efficiency, raising toilet drop plate is impervious, and save the cost, spool is precisely reserved, and precision is improved.
Description
Technical field
The invention belongs to assembled architecture field of engineering technology, and in particular to plate and its construction method integrally drop in concrete.
Background technique
In traditional assembled architecture system, toilet and kitchen are mostly to drop plate, i.e. floor mark of the absolute altitude lower than same layer
Height, generallys use cast-in-place form, does not do the prefabricated of unification.But the construction of the drop plate of cast-in-place form at the scene is complicated, operation
It is difficult.
Summary of the invention
Present invention seek to address that the above problem, to provide the construction party that plate integrally drops in the simple concrete of work progress
Method.
The present invention to solve the above problems, the technical solution adopted is that:
Plate integrally drops in a kind of concrete, has reserved string holes pipe in plate face, it is prefabricated monolithic concrete plate, and four
Week is equipped with anchor bar, wherein three faces are anchor bar one, it is on one side anchor bar two, the anchor bar one is to be turned under to tear open
Right angle, the side and floor where anchor bar one be affixed;The anchor bar two is the steel disk of straight stretching, anchor bar two
The side at place and another prefabricated laminated floor slab are affixed.
The construction method of plate integrally drops in a kind of concrete:
1) the prefabricated one whole hardened structure of drop;
2) monoblock type drop plate is lifted into installation site, and is placed into wall top edge;
3) laminated floor slab adjacent with drop plate is lifted into installation site, and overlaps the anchor bar one of monoblock type drop plate
Onto wall, and anchor bar two is inserted into the girder rib of laminated floor slab;
4) plate to be dropped is finished with laminated floor slab fixation, concreting is carried out to laminated floor slab last layer, after reaching intensity
Demoulding.
The advantages of technical solution provided by the invention, is: 1, reducing situ wet operation, improve construction efficiency.2, monoblock type drops
It is impervious to improve toilet drop plate for plate vibration compacting.3, it reduces template to use, save the cost.4, spool is precisely reserved, and improves essence
Degree.
Detailed description of the invention
The structure chart of this concrete of Fig. 1 drop plate;
Fig. 2 is the angle of depression figure of this drop plate;
Fig. 3 is the left side perspective figure of present invention drop plate;
Board mounting structure figure drops in Fig. 4;
Fig. 5 is the side view based on Fig. 4;
Fig. 6 is drop plate and laminated floor slab node structure schematic diagram.
In figure: 1, anchor bar one;2, anchor bar two;3, concrete slab;4, wall;5, laminated floor slab;6, girder rib;
7, node.
Specific embodiment
With reference to the accompanying drawing to the detailed description of the invention:
As shown in Figs. 1-5, plate drops in a kind of concrete, has reserved string holes pipe in plate face, it is characterized in that: it is prefabricated
Monolithic concrete plate 3, is surrounded by anchor bar, wherein three faces are anchor bar 1, it is on one side anchor bar 22, it is described
Anchor bar 1 is to be turned under the right angle torn open, and the side and wall 4 where anchor bar 1 are affixed;The anchor bar 22 is
The reinforcing bar of straight stretching, the side and another prefabricated laminated floor slab 5 where anchor bar 22 are affixed.
It is precast construction that plate drops in this programme, ground will drop plate it is prefabricated after the completion of integral installation, can just constructing operation, save
Plenty of time.
The present invention also provides the construction methods for applying above-mentioned prefabricated drop plate:
1) the prefabricated one whole hardened structure of drop;
2) monoblock type drop plate is lifted into installation site, and is placed into 4 top edge of wall;
3) laminated floor slab 5 adjacent with drop plate is lifted into installation site, and takes the anchor bar 1 of monoblock type drop plate
It is connected on wall 4, and anchor bar 22 is inserted into the girder rib 6 of laminated floor slab 5;
4) plate to be dropped is finished with the fixation of laminated floor slab 5, is carried out concreting to 5 last layer of laminated floor slab, is reached intensity
Demoulding afterwards.
When final step carries out concreting to 5 last layer of laminated floor slab in above-mentioned flag method, drop plate and laminated floor slab 5
7 part of node pour referring to shown in Fig. 6.
The advantages of technical solution provided by the invention, is:
1, situ wet operation is reduced, construction efficiency is improved.
2, plate vibration compacting drops in monoblock type, and it is impervious to improve toilet drop plate.
3, it reduces template to use, save the cost.4, spool is precisely reserved, and improves precision.
Claims (2)
1. plate integrally drops in a kind of concrete, has reserved string holes pipe in plate face, it is characterized in that: it is prefabricated monolithic concrete
Plate is surrounded by anchor bar, wherein three faces are anchor bar one, it is on one side anchor bar two, the anchor bar one is
It is turned under the right angle torn open, the side and floor where anchor bar one are affixed;The anchor bar two is the steel disk of straight stretching, anchor
Gu the side and another prefabricated laminated floor slab where reinforcing bar two are affixed.
2. the construction method that plate integrally drops in a kind of concrete:
1) the prefabricated one whole hardened structure of drop;
2) monoblock type drop plate is lifted into installation site, and is placed into wall top edge;
3) laminated floor slab adjacent with drop plate is lifted into installation site, and the anchor bar one of monoblock type drop plate is made to snap into wall
On body, and anchor bar two is inserted into the girder rib of laminated floor slab;
4) plate to be dropped is finished with laminated floor slab fixation, is carried out concreting to laminated floor slab last layer, is reached demoulding after intensity
?.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811105390.3A CN109025016A (en) | 2018-09-21 | 2018-09-21 | Plate and its construction method integrally drop in concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811105390.3A CN109025016A (en) | 2018-09-21 | 2018-09-21 | Plate and its construction method integrally drop in concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025016A true CN109025016A (en) | 2018-12-18 |
Family
ID=64617305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811105390.3A Withdrawn CN109025016A (en) | 2018-09-21 | 2018-09-21 | Plate and its construction method integrally drop in concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025016A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806095A (en) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
CN202882180U (en) * | 2012-02-16 | 2013-04-17 | 黑龙江宇辉新型建筑材料有限公司 | Concrete laminated slab welding with steel bar and connecting with spiral bar within span |
CN104652830A (en) * | 2015-01-27 | 2015-05-27 | 安徽同济建设集团有限责任公司 | Construction method for building of prefabricated slab floor and prefabricated wall plate |
CN105525714A (en) * | 2016-02-02 | 2016-04-27 | 济南汇富住宅工业有限公司 | Prefabricated reinforced concrete laminated slab |
CN107152112A (en) * | 2017-07-04 | 2017-09-12 | 上海宝岳住宅工业有限公司 | A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region |
CN206693470U (en) * | 2017-05-19 | 2017-12-01 | 李聪 | A kind of cast-in-place secondary beam T-shaped floor |
CN108018972A (en) * | 2017-12-01 | 2018-05-11 | 沈阳建筑大学 | Full precast floor slab and laminated floor slab combining structure, making and assembly method |
CN108442595A (en) * | 2018-04-03 | 2018-08-24 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
CN208844772U (en) * | 2018-09-21 | 2019-05-10 | 中国二十二冶集团有限公司 | Plate integrally drops in concrete |
-
2018
- 2018-09-21 CN CN201811105390.3A patent/CN109025016A/en not_active Withdrawn
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806095A (en) * | 2010-03-15 | 2010-08-18 | 中山市快而居房屋预制件有限公司 | Full-fabricated assembly overall reinforced concrete house and building method thereof |
CN202882180U (en) * | 2012-02-16 | 2013-04-17 | 黑龙江宇辉新型建筑材料有限公司 | Concrete laminated slab welding with steel bar and connecting with spiral bar within span |
CN104652830A (en) * | 2015-01-27 | 2015-05-27 | 安徽同济建设集团有限责任公司 | Construction method for building of prefabricated slab floor and prefabricated wall plate |
CN105525714A (en) * | 2016-02-02 | 2016-04-27 | 济南汇富住宅工业有限公司 | Prefabricated reinforced concrete laminated slab |
CN206693470U (en) * | 2017-05-19 | 2017-12-01 | 李聪 | A kind of cast-in-place secondary beam T-shaped floor |
CN107152112A (en) * | 2017-07-04 | 2017-09-12 | 上海宝岳住宅工业有限公司 | A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region |
CN108018972A (en) * | 2017-12-01 | 2018-05-11 | 沈阳建筑大学 | Full precast floor slab and laminated floor slab combining structure, making and assembly method |
CN108442595A (en) * | 2018-04-03 | 2018-08-24 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
CN208844772U (en) * | 2018-09-21 | 2019-05-10 | 中国二十二冶集团有限公司 | Plate integrally drops in concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206267317U (en) | The connecting structure of SP prestressed cored slabs and H profile steel beam | |
CN201217898Y (en) | Concrete prefabricated stairs | |
CN108643428B (en) | But height-adjusting's assembled precast concrete coincide floor | |
CN201738443U (en) | Prefabricated concrete double-overlapping beam | |
CN210238552U (en) | Basin type superposed prefabricated bearing platform | |
CN108824676B (en) | Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof | |
CN110344530B (en) | Local laminated slab connecting joint and construction method thereof | |
CN210887523U (en) | Precast concrete assembled rainwater well | |
CN206298900U (en) | A kind of diaphram wall built-in type steel encloses purlin plug system | |
CN109723140A (en) | A kind of construction method between precast stair | |
CN109648696A (en) | Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN205894668U (en) | Superimposed sheet is pour and is used mould | |
CN208844772U (en) | Plate integrally drops in concrete | |
CN211115052U (en) | Shaft type underground stereo garage structure | |
CN102587502A (en) | Self-modeling and self-heat preservation building | |
CN109025016A (en) | Plate and its construction method integrally drop in concrete | |
CN207934054U (en) | A kind of prefabricated assembled raft foundation | |
CN105386447A (en) | Construction method for replacement support of post-cast strip in construction site | |
CN209703805U (en) | A kind of novel superposed superstructure suitable for steel construction H profile steel beam | |
CN210482584U (en) | Connecting joint of double-T plate and beam | |
CN211200460U (en) | Assembled integral underground space foundation member | |
CN210508475U (en) | History building unitized wall body with waterproof function | |
CN209975560U (en) | Prefabricated waterproof retaining wall plate structure | |
CN210151577U (en) | Assembled track beam concrete post-cast groove mouth and template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181218 |