CN210151577U - A post-casting slot and formwork for prefabricated track beam concrete - Google Patents

A post-casting slot and formwork for prefabricated track beam concrete Download PDF

Info

Publication number
CN210151577U
CN210151577U CN201920500723.6U CN201920500723U CN210151577U CN 210151577 U CN210151577 U CN 210151577U CN 201920500723 U CN201920500723 U CN 201920500723U CN 210151577 U CN210151577 U CN 210151577U
Authority
CN
China
Prior art keywords
formwork
template
cast
precast concrete
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920500723.6U
Other languages
Chinese (zh)
Inventor
周帅
方聪
李水生
谭立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201920500723.6U priority Critical patent/CN210151577U/en
Application granted granted Critical
Publication of CN210151577U publication Critical patent/CN210151577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

一种装配式轨道梁砼后浇槽口及模板A post-casting slot and formwork for prefabricated track beam concrete

技术领域technical field

本实用新型涉及轨道交通领域,特别涉及一种装配式轨道梁砼后浇槽口、模板及施工方法。The utility model relates to the field of rail transit, in particular to a post-casting slot, a template and a construction method of an assembled rail beam concrete.

背景技术Background technique

近些年,随着我国经济的持续高速发展,节能环保意识成为社会主流,我国的预制装配式建筑结构逐渐得到社会的认可。预制装配式组合结构作为适应建筑工业化进程的一种新型结构形式,因其构件加工制作快、施工环保、经济效益好等优势,成为工程师们越来越青睐的一种结构形式,未来具有无可比拟的优势和巨大的发展前景。In recent years, with the sustained and rapid development of my country's economy, the awareness of energy conservation and environmental protection has become the mainstream of society, and my country's prefabricated building structures have gradually been recognized by the society. As a new type of structure that adapts to the process of building industrialization, the prefabricated composite structure has become a structural form more and more favored by engineers due to its advantages of fast component processing, environmental protection, and good economic benefits. Comparable advantages and huge development prospects.

预制混凝土板与钢箱之间的连接可靠性是钢-预制混凝土组合梁的主要问题,其连接的实现都是在其预制混凝土板上预留的后浇槽口内实现,槽口内布置有剪力钉群,剪力钉群焊接在钢箱上,主要实现形式是在预制混凝土板过程中通过模板布置预留槽口,槽口对应钢箱位置布置剪力钉群,槽口内后浇混凝土以实现钢混组合,因此,槽口的设置与预留成为预制混凝土板制作期间的主要工作,对于后期实现钢混的组合具有至关重要的作用。The reliability of the connection between the precast concrete slab and the steel box is the main problem of the steel-precast concrete composite beam. The connection is realized in the post-cast slot reserved in the precast concrete slab, and the shear force is arranged in the slot. The nail group, the shear nail group is welded on the steel box. The main realization form is to arrange reserved slots through the template during the precast concrete slab process. The steel-concrete combination, therefore, the setting and reservation of the notch becomes the main work during the production of the precast concrete slab, which plays a vital role in the later realization of the steel-concrete combination.

但是,在预留槽口内浇筑混凝土连接预制混凝土板和钢箱存在以下问题,新旧混凝土(预制混凝土板的混凝土和后浇槽口内用于连接的混凝土)界面在外部荷载以及混凝土收缩徐变、温差作用下容易出现裂缝,对预制混凝土板和钢箱的稳固连接造成影响,导致运营存在安全隐患。However, pouring concrete in the reserved slot to connect the precast concrete slab and the steel box has the following problems. Under the action, cracks are prone to occur, which affects the stable connection of the precast concrete slab and the steel box, resulting in potential safety hazards in operation.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术中所存在的预制混凝土板与钢箱之间通过剪力钉群和后浇混凝土的连接,新旧混凝土界面在外部荷载以及混凝土收缩徐变、温差作用下容易出现裂缝,对预制混凝土板和钢箱的稳固连接造成影响,导致运营存在安全隐患的上述不足,提供一种装配式轨道梁砼后浇槽口、模板及施工方法。The purpose of the utility model is to overcome the existing connection between the precast concrete slab and the steel box through the shear nail group and the post-cast concrete. Cracks occur, which will affect the stable connection of the precast concrete slab and the steel box, and lead to the above-mentioned shortcomings of potential safety hazards in operation. Provided are a post-casting slot, formwork and construction method for prefabricated track beam concrete.

为了实现上述实用新型目的,本实用新型提供了以下技术方案:In order to realize the above-mentioned purpose of the utility model, the utility model provides the following technical solutions:

一种装配式轨道梁砼后浇槽口,包括至少一个竖向贯穿预制混凝土板的槽口本体,所述预制混凝土板用于与钢箱装配,所有所述槽口本体对应的所述钢箱顶面设有剪力钉群,每个所述槽口本体内设有钢筋网,所述钢筋网位于所述剪力钉群上方,所述钢筋网嵌入所述预制混凝土板。An assembled track beam concrete post pouring slot, comprising at least one slot body vertically penetrating a precast concrete slab, the prefabricated concrete slab is used for assembling with a steel box, and all the steel boxes corresponding to the slot body The top surface is provided with a group of shearing nails, and each of the notch body is provided with a reinforcing mesh, the reinforcing mesh is located above the shearing nail group, and the reinforcing mesh is embedded in the prefabricated concrete slab.

采用本实用新型所述的一种装配式轨道梁砼后浇槽口,所述槽口本体内设有所述钢筋网,当所述槽口本体浇筑后,即便新旧混凝土界面在外部荷载以及混凝土收缩徐变、温差作用下容易出现裂缝,但后浇砼能够稳固连接所述钢筋网和所述剪力钉群,从而将所述预制混凝土板和所述钢箱稳固连接,同时通过所述钢筋网提高了新旧混凝土之间的结合力,大大减小了裂缝的出现,避免安全隐患,该后浇槽口结构简单,实施方便,效果良好。Using the post-casting slot of the prefabricated track beam concrete of the present invention, the steel mesh is provided in the slot body. Cracks are easy to appear under the action of shrinkage, creep and temperature difference, but post-cast concrete can firmly connect the steel mesh and the shear nail group, so as to firmly connect the precast concrete slab and the steel box, and at the same time pass the steel reinforcement The net improves the bonding force between the old and new concrete, greatly reduces the occurrence of cracks, and avoids potential safety hazards.

优选地,所述预制混凝土板内设有钢筋骨架,所述钢筋网连接于所述钢筋骨架。Preferably, the prefabricated concrete slab is provided with a steel frame, and the steel mesh is connected to the steel frame.

优选地,所述钢筋网焊接于所述钢筋骨架。Preferably, the steel mesh is welded to the steel frame.

优选地,沿所述预制混凝土板长度方向设有至少两排所述槽口本体,相邻两排的所述槽口本体交错设置。Preferably, at least two rows of the slot bodies are provided along the length direction of the precast concrete slab, and the slot bodies of two adjacent rows are arranged in a staggered manner.

优选地,所述预制混凝土板和所述钢箱装配后,每个所述槽口本体内用于设置现浇混凝土结构。Preferably, after the prefabricated concrete slab and the steel box are assembled, each slot body is used for setting a cast-in-place concrete structure.

优选地,所述槽口本体竖直设置。Preferably, the slot body is arranged vertically.

优选地,所述槽口本体的水平截面为矩形或者圆形。Preferably, the horizontal section of the slot body is rectangular or circular.

由于上述装配式轨道梁砼后浇槽口的所述槽口本体内设置有所述钢筋网,因此,传统的所述槽口本体成型模板已不能适用,因而本实用新型还提供了一种装配式轨道梁砼后浇槽口的模板,包括上模板和下模板,所述上模板和所述下模板可拆合模,所述上模板和所述下模板用于设于如以上所述槽口本体的四周,所述上模板底边设有若干个半槽孔,所述下模板顶边设有若干个对应的所述半槽孔,合模后的所述半槽孔形成槽孔,所述钢筋网上的钢筋通过所述槽孔进入待浇筑的所述预制混凝土板区域内,所述上模板底边和所述下模板顶边沿长度方向轴线可转动抵接。Since the steel mesh is provided in the slot body of the post pouring slot of the above-mentioned assembled track beam concrete, the traditional slot body forming template is no longer applicable, so the utility model also provides an assembly The formwork for the post pouring slot of the rail beam concrete, including the upper formwork and the lower formwork, the upper formwork and the lower formwork can be disassembled and closed, and the upper formwork and the lower formwork are used for setting in the groove as described above. Around the mouth body, the bottom edge of the upper template is provided with a number of half-slot holes, the top side of the lower template is provided with a number of corresponding half-slot holes, and the half-slot holes after the mold is closed form a slot hole, The reinforcing bars on the reinforcing mesh enter the area of the precast concrete slab to be poured through the slot holes, and the bottom edge of the upper formwork and the top edge of the lower formwork are rotatably abutted along the longitudinal axis.

采用本实用新型所述的一种装配式轨道梁砼后浇槽口的模板,通过可拆合模的所述上模板和所述下模板界线之间设置所述半槽孔,形成所述钢筋网的所述钢筋能够穿过的所述槽孔,满足上述装配式轨道梁砼后浇槽口成型需求,同时,在所述预制混凝土板浇筑成型后,由于附着力和混凝土粘结等因素的影响,所述上模板难以直接从所述下模板上拔出拆模,通过所述上模板底边和所述下模板顶边可转动抵接,拆模时所述上模板先相对所述下模板顶边往复掰转,便于脱模,该后浇槽口的模板结构简单,使用方便,效果良好,可重复利用。By adopting the formwork for the post-casting slot of the prefabricated track beam concrete according to the present invention, the half-slot hole is arranged between the upper formwork and the lower formwork boundary line of the detachable mold to form the steel bar. The slot holes through which the steel bars of the mesh can pass meet the above-mentioned requirements for post-casting slot forming of the prefabricated track beam concrete. At the same time, after the precast concrete slab is cast and formed, due to factors such as adhesion and concrete bonding, Influence, it is difficult to directly pull out the upper formwork from the lower formwork to remove the formwork. The bottom edge of the upper formwork and the top edge of the lower formwork are rotatably abutted, and the upper formwork first faces the lower formwork when removing the formwork. The top edge of the formwork is reciprocated and rotated, which is convenient for demoulding. The formwork of the post pouring slot has a simple structure, is easy to use, has good effect and can be reused.

优选地,所述上模板底边沿长度方向的纵截面为U形凸缘,对应的所述下模板顶边沿长度方向的纵截面为U形凹槽,所述U形凸缘适配所述U形凹槽。Preferably, the longitudinal section of the bottom edge of the upper template along the length direction is a U-shaped flange, the corresponding longitudinal section of the top edge of the lower template along the length direction is a U-shaped groove, and the U-shaped flange is adapted to the U-shaped flange. shaped groove.

采用这种结构,所述上模板底边的所述U形凸缘和所述下模板顶边的所述U形凹槽能够实现承插以及相对转动,便于合模时的稳定以及拆模时方便转动脱模。With this structure, the U-shaped flange on the bottom edge of the upper template and the U-shaped groove on the top edge of the lower template can realize socket insertion and relative rotation, which is convenient for stability during mold clamping and mold removal. Easy to turn and demould.

优选地,所述上模板底边沿长度方向的纵截面为U形凹槽,对应的所述下模板顶边沿长度方向的纵截面为U形凸缘,所述U形凸缘适配所述U形凹槽。Preferably, the longitudinal section of the bottom edge of the upper template along the length direction is a U-shaped groove, and the corresponding longitudinal section of the top edge of the lower template along the length direction is a U-shaped flange, and the U-shaped flange is adapted to the U-shaped flange. shaped groove.

采用这种结构,所述上模板底边的所述U形凸缘和所述下模板顶边的所述U形凹槽能够实现承插以及相对转动,便于合模时的稳定以及拆模时方便转动脱模。With this structure, the U-shaped flange on the bottom edge of the upper template and the U-shaped groove on the top edge of the lower template can realize socket insertion and relative rotation, which is convenient for stability during mold clamping and mold removal. Easy to turn and demould.

优选地,所述上模板朝向待浇筑的所述预制混凝土板区域的一侧和所述下模板朝向待浇筑的所述预制混凝土板区域的一侧均设有若干个凸起。Preferably, a side of the upper formwork facing the precast concrete slab area to be poured and a side of the lower formwork facing the precast concrete slab area to be poured are provided with several protrusions.

采用这种结构,能够在成型的所述预制混凝土板侧壁上形成与所述凸起适配的凹孔,后续所述槽口本体现浇后,后浇砼会填补所述凹孔,从而相互啮合,并增大所述预制混凝土板和所述后浇砼之间的接触面积,提高了所述预制混凝土板与所述后浇砼之间的咬合度,保证了新旧混凝土之间的稳定结合。By adopting this structure, concave holes adapted to the protrusions can be formed on the side walls of the formed precast concrete slabs, and after the notch itself is poured, the post-cast concrete will fill the concave holes, thereby They mesh with each other and increase the contact area between the precast concrete slab and the post-cast concrete, improve the occlusion between the precast concrete slab and the post-cast concrete, and ensure the stability between the old and new concrete. combine.

优选地,所述上模板和所述下模板为钢模板或者木模板。Preferably, the upper formwork and the lower formwork are steel formwork or wood formwork.

本实用新型还提供了一种装配式轨道梁砼后浇槽口的施工方法,应用如以上所述的后浇槽口的模板,该施工方法包括以下步骤:The utility model also provides a construction method for the post-cast notch of the prefabricated track beam concrete, using the template for the post-cast notch as described above, and the construction method comprises the following steps:

A、设置所述预制混凝土板的浇筑模板,在其内设置成型所述槽口本体的所述上模板和所述下模板;A. The pouring formwork of the precast concrete slab is set, and the upper formwork and the lower formwork for forming the notch body are set therein;

B、在所述上模板的所述半槽孔和所述下模板的所述半槽孔形成的所述槽孔内穿插所述钢筋形成所述钢筋网;B. Inserting the reinforcing bars in the slots formed by the half-slot holes of the upper template and the half-slot holes of the lower template to form the steel mesh;

C、浇筑所述预制混凝土板区域混凝土并养护成型;C, pouring described precast concrete slab area concrete and curing molding;

D、从所述预制混凝土板上部拆除所述上模板;D. Remove the upper formwork from the upper part of the precast concrete slab;

E、吊升或者顶升所述预制混凝土板,从所述预制混凝土板下部拆除所述下模板,完成所述预制混凝土板的预制以及所述槽口本体的预留。E. Lifting or jacking up the prefabricated concrete slab, removing the lower formwork from the lower part of the prefabricated concrete slab, and completing the prefabrication of the prefabricated concrete slab and the reservation of the slot body.

采用本实用新型所述的一种装配式轨道梁砼后浇槽口的施工方法,能够利用所述上模板和所述下模板快速、方便地制作出上述装配式轨道梁砼后浇槽口,同时能够方便快捷的脱模,该施工方法步骤简单,操作方便效果良好。By adopting the construction method for the post-casting slot of the prefabricated rail beam concrete according to the present invention, the above-mentioned post-casting slot of the prefabricated rail beam concrete can be quickly and conveniently produced by using the upper formwork and the lower formwork. At the same time, it can be easily and quickly demolded, the construction method has simple steps, convenient operation and good effect.

综上所述,由于采用了上述技术方案,本实用新型的有益效果是:To sum up, due to the adoption of the above-mentioned technical solutions, the beneficial effects of the present utility model are:

1、运用本实用新型所述的一种装配式轨道梁砼后浇槽口,所述槽口本体内设有所述钢筋网,当所述槽口本体浇筑后,即便新旧混凝土界面在外部荷载以及混凝土收缩徐变、温差作用下容易出现裂缝,但后浇砼能够稳固连接所述钢筋网和所述剪力钉群,从而将所述预制混凝土板和所述钢箱稳固连接,同时通过所述钢筋网提高了新旧混凝土之间的结合力,大大减小了裂缝的出现,避免安全隐患,该后浇槽口结构简单,实施方便,效果良好;1. Using the post-pouring slot of a prefabricated track beam concrete described in the present utility model, the slot body is provided with the steel mesh. When the slot body is poured, even if the new and old concrete interface is under external load And the concrete shrinks and creeps, and cracks easily occur under the action of temperature difference, but the post-cast concrete can firmly connect the steel mesh and the shear nail group, so as to connect the precast concrete slab and the steel box firmly, and at the same time through all the The steel mesh improves the bonding force between the old and new concrete, greatly reduces the occurrence of cracks, and avoids potential safety hazards.

2、运用本实用新型所述的一种装配式轨道梁砼后浇槽口的模板,通过可拆合模的所述上模板和所述下模板界线之间设置所述半槽孔,形成所述钢筋网的所述钢筋能够穿过的所述槽孔,满足上述装配式轨道梁砼后浇槽口成型需求,同时,在所述预制混凝土板浇筑成型后,由于附着力和混凝土粘结等因素的影响,所述上模板难以直接从所述下模板上拔出拆模,通过所述上模板底边和所述下模板顶边可转动抵接,拆模时所述上模板先相对所述下模板顶边往复掰转,便于脱模,该后浇槽口的模板结构简单,使用方便,效果良好,可重复利用;2. Using the formwork of the post-grouting slot of the assembled track beam concrete described in the present invention, the half-slot hole is arranged between the upper formwork and the lower formwork boundary line of the detachable mold to form all the grooves. The slot holes through which the reinforcing bars of the reinforcing mesh can pass meet the requirements of the above-mentioned prefabricated rail beam concrete post-casting slot forming requirements. At the same time, after the precast concrete slab is cast and formed, due to adhesion and concrete bonding Influenced by factors, it is difficult to directly pull out the upper formwork from the lower formwork to remove the formwork. The bottom edge of the upper formwork and the top edge of the lower formwork are rotatably abutted. The top edge of the lower formwork is reciprocated and rotated, which is convenient for demoulding. The formwork of the post-casting slot has a simple structure, is easy to use, has a good effect, and can be reused;

3、运用本实用新型所述的一种装配式轨道梁砼后浇槽口的模板,所述上模板底边的所述U形凸缘和所述下模板顶边的所述U形凹槽能够实现承插以及相对转动,便于合模时的稳定以及拆模时方便转动脱模;3. Using the formwork for the back pouring slot of an assembled track beam concrete according to the present invention, the U-shaped flange on the bottom edge of the upper formwork and the U-shaped groove on the top edge of the lower formwork It can realize socket and relative rotation, which is convenient for stability during mold clamping and easy rotation and demoulding during mold removal;

4、运用本实用新型所述的一种装配式轨道梁砼后浇槽口的模板,所述上模板朝向待浇筑的所述预制混凝土板区域的一侧和所述下模板朝向待浇筑的所述预制混凝土板区域的一侧均设有若干个凸起,能够在成型的所述预制混凝土板侧壁上形成与所述凸起适配的凹孔,后续所述槽口本体现浇后,后浇砼会填补所述凹孔,从而相互啮合,并增大所述预制混凝土板和所述后浇砼之间的接触面积,提高了所述预制混凝土板与所述后浇砼之间的咬合度,保证了新旧混凝土之间的稳定结合;4. Using the formwork for the post pouring slot of the prefabricated track beam concrete according to the present invention, the upper formwork faces the side of the precast concrete slab area to be poured and the lower formwork faces the place to be poured. One side of the precast concrete slab area is provided with a plurality of protrusions, which can form concave holes adapted to the protrusions on the side wall of the formed precast concrete slab. The post-cast concrete will fill the concave holes, so as to mesh with each other, increase the contact area between the precast concrete slab and the post-cast concrete, and improve the contact area between the precast concrete slab and the post-cast concrete. The degree of occlusion ensures a stable combination between the old and new concrete;

5、运用本实用新型所述的一种装配式轨道梁砼后浇槽口的施工方法,能够利用所述上模板和所述下模板快速、方便地制作出上述装配式轨道梁砼后浇槽口,同时能够方便快捷的脱模,该施工方法步骤简单,操作方便效果良好。5. Using the construction method for the post-casting slot of the prefabricated rail beam concrete described in the present utility model, the above-mentioned prefabricated rail beam concrete post-grouting groove can be quickly and conveniently produced by using the upper formwork and the lower formwork At the same time, it can be easily and quickly demoulded. The construction method has simple steps, convenient operation and good effect.

附图说明Description of drawings

图1为本实用新型所述的一种装配式轨道梁砼后浇槽口的结构示意图;Fig. 1 is the structural representation of a kind of prefabricated track beam concrete back pouring slot described in the utility model;

图2为预制混凝土板与钢箱的连接示意图;Fig. 2 is the connection schematic diagram of precast concrete slab and steel box;

图3为图2的俯视图;Fig. 3 is the top view of Fig. 2;

图4为本实用新型所述的一种装配式轨道梁砼后浇槽口的模板的结构示意图;4 is a schematic structural diagram of a formwork for a post-grouting slot of an assembled track beam concrete according to the utility model;

图5为图4中上模板和下模板拆模的示意图;Fig. 5 is the schematic diagram of demolding of upper template and lower template in Fig. 4;

图6为图5的左视图。FIG. 6 is a left side view of FIG. 5 .

图中标记:1-预制混凝土板,11-槽口本体,12-钢筋网,2-钢箱,21-剪力钉群,3-现浇混凝土结构,4-上模板,41-U形凸缘,5-下模板,51-U形凹槽,6-半槽孔,7-凸起。Marking in the figure: 1- Precast concrete slab, 11- Notch body, 12- Steel mesh, 2- Steel box, 21- Shear nail group, 3- Cast-in-place concrete structure, 4- Upper formwork, 41- U-shaped convex Rim, 5-lower template, 51-U-shaped groove, 6-half-slotted hole, 7-protrusion.

具体实施方式Detailed ways

下面结合试验例及具体实施方式对本实用新型作进一步的详细描述。但不应将此理解为本实用新型上述主题的范围仅限于以下的实施例,凡基于本实用新型内容所实现的技术均属于本实用新型的范围。The present utility model will be further described in detail below in conjunction with the test examples and specific embodiments. But it should not be construed that the scope of the above-mentioned subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

实施例1Example 1

如图1-3所示,本实用新型所述的一种装配式轨道梁砼后浇槽口,包括至少一个竖直贯穿预制混凝土板1的槽口本体11,所述槽口本体11的水平截面为矩形,沿所述预制混凝土板1长度方向设有至少两排所述槽口本体11,相邻两排的所述槽口本体11交错设置。As shown in Figures 1-3, the post-casting slot of an assembled track beam concrete according to the present invention includes at least one slot body 11 vertically penetrating the precast concrete slab 1. The slot body 11 is horizontal The cross section is rectangular, and at least two rows of the slot bodies 11 are provided along the length direction of the precast concrete slab 1 , and the slot bodies 11 of two adjacent rows are arranged in a staggered manner.

所述预制混凝土板1用于与钢箱2装配,所有所述槽口本体11对应的所述钢箱2顶面设有剪力钉群21,每个所述槽口本体11内设有钢筋网12,所述钢筋网12位于所述剪力钉群21上方,所述预制混凝土板1内设有钢筋骨架,所述钢筋网12焊接于所述钢筋骨架,所述预制混凝土板1和所述钢箱2装配后,每个所述槽口本体11内用于设置现浇混凝土结构3,以连接所述预制混凝土板1和所述钢箱2。The prefabricated concrete slab 1 is used for assembling with the steel box 2, the top surface of the steel box 2 corresponding to all the slot bodies 11 is provided with shear nail groups 21, and each of the slot bodies 11 is provided with steel bars Mesh 12, the reinforcement mesh 12 is located above the shear nail group 21, the precast concrete slab 1 is provided with a reinforcement frame, the reinforcement mesh 12 is welded to the reinforcement frame, the precast concrete slab 1 and all After the steel box 2 is assembled, a cast-in-place concrete structure 3 is arranged in each of the slot bodies 11 to connect the precast concrete slab 1 and the steel box 2 .

运用本实用新型所述的一种装配式轨道梁砼后浇槽口,所述槽口本体11内设有所述钢筋网12,当所述槽口本体11浇筑后,即便新旧混凝土界面在外部荷载以及混凝土收缩徐变、温差作用下容易出现裂缝,但后浇砼能够稳固连接所述钢筋网12和所述剪力钉群21,从而将所述预制混凝土板1和所述钢箱2稳固连接,同时通过所述钢筋网12提高了新旧混凝土之间的结合力,大大减小了裂缝的出现,避免安全隐患,该后浇槽口结构简单,实施方便,效果良好。Using the post-casting slot of the prefabricated track beam concrete of the present invention, the slot body 11 is provided with the steel mesh 12. After the slot body 11 is poured, even if the new and old concrete interface is outside Cracks are prone to occur under the action of load, shrinkage and creep of concrete and temperature difference, but post-cast concrete can stably connect the steel mesh 12 and the shear nail group 21, so as to stabilize the precast concrete slab 1 and the steel box 2 At the same time, the bonding force between the old and new concrete is improved through the steel mesh 12, the occurrence of cracks is greatly reduced, and potential safety hazards are avoided.

实施例2Example 2

由于实施例1所述的装配式轨道梁砼后浇槽口的所述槽口本体11内设置有所述钢筋网12,因此,传统的所述槽口本体11成型模板已不能适用。Since the steel mesh 12 is provided in the slot body 11 of the post-cast slot of the prefabricated track beam concrete described in Embodiment 1, the conventional forming template for the slot body 11 is no longer applicable.

如图1-6所示,本实用新型提供了一种装配式轨道梁砼后浇槽口的模板,包括上模板4和下模板5,所述上模板4和所述下模板5为钢模板。As shown in Figures 1-6, the present utility model provides a formwork for an assembled track beam concrete back pouring slot, including an upper formwork 4 and a lower formwork 5, and the upper formwork 4 and the lower formwork 5 are steel formwork .

所述上模板4和所述下模板5可拆合模,所述上模板4和所述下模板5用于设于如实施例1中所述槽口本体11的四周,所述上模板4底边设有若干个半槽孔6,所述下模板5顶边设有若干个对应的所述半槽孔6,合模后的所述半槽孔6形成槽孔,所述钢筋网12上的钢筋通过所述槽孔进入待浇筑的所述预制混凝土板1区域内,所述上模板4底边沿长度方向的纵截面为U形凸缘41,对应的所述下模板5顶边沿长度方向的纵截面为U形凹槽51,所述U形凸缘41适配所述U形凹槽51,如图6所示,由于所述上模板4底边具有所述U形凸缘41这个承插段,因而图5中所述上模板4底边的所述半槽孔6较所述下模板5顶边的所述半槽孔6长,待所述上模板4和所述下模板5合模后,所述U形凸缘41承插如所述U形凹槽51中,所述上模板4底边的所述半槽孔6和所述下模板5顶边的所述半槽孔6形成如图4所示的所述槽孔。The upper die plate 4 and the lower die plate 5 can be disassembled and detached, and the upper die plate 4 and the lower die plate 5 are used to be arranged around the slot body 11 as described in Embodiment 1, and the upper die plate 4 The bottom side is provided with a number of half-slot holes 6, the top side of the lower formwork 5 is provided with a number of corresponding half-slot holes 6, the half-slot holes 6 after the mold is closed form a slot hole, and the steel mesh 12 The upper steel bar enters the area of the precast concrete slab 1 to be poured through the slot hole, the longitudinal section of the bottom edge of the upper formwork 4 along the length direction is a U-shaped flange 41, and the corresponding length of the top edge of the lower formwork 5 is The longitudinal section in the direction is a U-shaped groove 51, and the U-shaped flange 41 is adapted to the U-shaped groove 51. As shown in FIG. 6, since the bottom edge of the upper template 4 has the U-shaped flange 41 Because of this socket segment, the half-slot hole 6 on the bottom edge of the upper template 4 in FIG. 5 is longer than the half-slot hole 6 on the top side of the lower template 5. After the mold plate 5 is clamped, the U-shaped flange 41 is inserted into the U-shaped groove 51, the half-slot hole 6 on the bottom edge of the upper mold plate 4 and the top edge of the lower mold plate 5 The half slot hole 6 forms the slot hole as shown in FIG. 4 .

作为本实施例的一个优选方案,所述上模板4朝向待浇筑的所述预制混凝土板1区域的一侧和所述下模板5朝向待浇筑的所述预制混凝土板1区域的一侧均设有若干个凸起6,采用这种结构,能够在成型的所述预制混凝土板1侧壁上形成与所述凸起6适配的凹孔,后续所述槽口本体11现浇后,后浇砼会填补所述凹孔,从而相互啮合,并增大所述预制混凝土板1和所述后浇砼之间的接触面积,提高了所述预制混凝土板1与所述后浇砼之间的咬合度,保证了新旧混凝土之间的稳定结合。As a preferred solution of this embodiment, the side of the upper formwork 4 facing the area of the precast concrete slab 1 to be poured and the side of the lower formwork 5 facing the area of the precast concrete slab 1 to be poured are provided with There are several protrusions 6. With this structure, concave holes that are adapted to the protrusions 6 can be formed on the side walls of the precast concrete slab 1. After the slot body 11 is cast in place, the The poured concrete will fill the concave holes, so as to mesh with each other, increase the contact area between the precast concrete slab 1 and the post-cast concrete, and improve the gap between the precast concrete slab 1 and the post-cast concrete. The high occlusion ensures a stable bond between the old and new concrete.

运用本实用新型所述的一种装配式轨道梁砼后浇槽口的模板,通过可拆合模的所述上模板4和所述下模板5界线之间设置所述半槽孔6,形成所述钢筋网12的所述钢筋能够穿过的所述槽孔,满足上述装配式轨道梁砼后浇槽口成型需求,同时,在所述预制混凝土板1浇筑成型后,由于附着力和混凝土粘结等因素的影响,所述上模板4难以直接从所述下模板5上拔出拆模,通过所述上模板4底边的所述U形凸缘41和所述下模板5顶边的所述U形凹槽51能够实现承插以及相对转动,便于合模时的稳定以及拆模时方便转动脱模,拆模时所述上模板4先相对所述下模板5顶边往复掰转以便脱模,该后浇槽口的模板结构简单,使用方便,效果良好,可重复利用。Using the formwork for the post-grouting slot of the assembled track beam concrete described in the present invention, the half-slot hole 6 is arranged between the boundary line of the upper formwork 4 and the lower formwork 5 of the detachable mold to form a form. The slots through which the reinforcement bars of the reinforcement mesh 12 can pass meet the above-mentioned requirements for forming the post-casting slot of the prefabricated rail beam concrete. Due to the influence of factors such as bonding, it is difficult for the upper template 4 to be directly pulled out from the lower template 5 for demolding. The U-shaped groove 51 can realize socket insertion and relative rotation, which is convenient for stability during mold clamping and convenient rotation and demoulding during mold removal. It can be rotated for demoulding, and the template structure of the post pouring slot is simple in structure, convenient in use, good in effect, and can be reused.

实施例3Example 3

如图1-6所示,本实用新型所述的一种装配式轨道梁砼后浇槽口的施工方法,应用如实施例2所述的后浇槽口的模板,该施工方法包括以下步骤:As shown in Figures 1-6, the construction method of a post-cast notch of an assembled track beam concrete according to the present invention applies the template of the post-cast notch as described in Example 2, and the construction method includes the following steps :

A、设置所述预制混凝土板1的浇筑模板,在其内设置成型所述槽口本体11的所述上模板4和所述下模板5;A. The pouring formwork of the precast concrete slab 1 is set, and the upper formwork 4 and the lower formwork 5 for forming the notch body 11 are set therein;

B、在所述上模板4的所述半槽孔6和所述下模板5的所述半槽孔6形成的所述槽孔内穿插所述钢筋形成所述钢筋网12;B. Insert the reinforcing bars into the slots formed by the half-slot holes 6 of the upper template 4 and the half-slot holes 6 of the lower template 5 to form the steel mesh 12;

C、浇筑所述预制混凝土板1区域混凝土并养护成型;C, pouring described precast concrete slab 1 area concrete and curing molding;

D、从所述预制混凝土板1上部拆除所述上模板4;D. Remove the upper formwork 4 from the upper part of the precast concrete slab 1;

E、吊升或者顶升所述预制混凝土板1,从所述预制混凝土板1下部拆除所述下模板5,完成所述预制混凝土板1的预制以及所述槽口本体11的预留。E. Lifting or jacking up the prefabricated concrete slab 1 , removing the lower formwork 5 from the lower part of the prefabricated concrete slab 1 , and completing the prefabrication of the prefabricated concrete slab 1 and the reservation of the slot body 11 .

运用本实用新型所述的一种装配式轨道梁砼后浇槽口的施工方法,能够利用所述上模板4和所述下模板5快速、方便地制作出上述装配式轨道梁砼后浇槽口,同时能够方便快捷的脱模,该施工方法步骤简单,操作方便效果良好。By using the construction method of the post-casting slot of the prefabricated rail beam concrete described in the present utility model, the above-mentioned prefabricated rail beam concrete post-grouting groove can be quickly and conveniently produced by using the upper formwork 4 and the lower formwork 5 At the same time, it can be easily and quickly demoulded. The construction method has simple steps, convenient operation and good effect.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the present invention. within the scope of protection of the utility model.

Claims (10)

1. The assembled track beam concrete post-pouring trough opening is characterized by comprising at least one notch body (11) which vertically penetrates through a precast concrete plate (1), wherein the precast concrete plate (1) is used for being assembled with a steel box (2), the top surface of the steel box (2) corresponding to the notch body (11) is provided with a shear nail group (21), a reinforcing mesh (12) is arranged in each notch body (11), the reinforcing mesh (12) is positioned above the shear nail group (21), and the reinforcing mesh (12) is embedded into the precast concrete plate (1).
2. The fabricated track beam concrete post-cast trough according to claim 1, characterized in that a steel reinforcement cage is provided in the precast concrete plate (1), and the steel reinforcement mesh (12) is connected to the steel reinforcement cage.
3. The fabricated track beam concrete post-cast spout according to claim 2, wherein the mesh reinforcement (12) is welded to the steel reinforcement cage.
4. The fabricated track beam concrete post-cast trough according to claim 1, characterized in that at least two rows of the notch bodies (11) are arranged along the length direction of the precast concrete plate (1), and the notch bodies (11) of the adjacent two rows are arranged in a staggered manner.
5. The fabricated track beam concrete post-cast slot according to any one of claims 1 to 4, wherein each of the slot bodies (11) is used for arranging a cast-in-place concrete structure (3) therein after the precast concrete slab (1) and the steel box (2) are fabricated.
6. The template of the assembled track beam concrete post-cast groove opening comprises an upper template (4) and a lower template (5), and is characterized in that the upper template (4) and the lower template (5) can be disassembled and assembled, the upper template (4) and the lower template (5) are used for being arranged around the notch body (11) according to any one of claims 1-5, a plurality of half slotted holes (6) are formed in the bottom edge of the upper template (4), a plurality of corresponding half slotted holes (6) are formed in the top edge of the lower template (5), slotted holes are formed in the half slotted holes (6) after assembly, reinforcing steel bars on a reinforcing steel bar net (12) enter the area of the precast concrete slab (1) to be cast through the slotted holes, and the bottom edge of the upper template (4) and the top edge of the lower template (5) can be in rotatable abutting joint along the length direction axis.
7. The formwork according to claim 6, wherein the longitudinal section of the lower edge of the upper formwork (4) along the length direction is a U-shaped flange (41), and the longitudinal section of the corresponding upper edge of the lower formwork (5) along the length direction is a U-shaped groove (51), and the U-shaped flange (41) is matched with the U-shaped groove (51).
8. The template according to claim 6, characterized in that the longitudinal section of the bottom edge of the upper template (4) along the length direction is a U-shaped groove (51), and the longitudinal section of the corresponding top edge of the lower template (5) along the length direction is a U-shaped flange (41), and the U-shaped flange (41) is matched with the U-shaped groove (51).
9. Formwork according to claim 6, wherein the side of the upper formwork (4) facing the area of the precast concrete panel (1) to be cast and the side of the lower formwork (5) facing the area of the precast concrete panel (1) to be cast are provided with a plurality of protrusions (7).
10. Formwork according to any one of claims 6 to 9, wherein the upper formwork (4) and the lower formwork (5) are steel or wood formwork.
CN201920500723.6U 2019-04-12 2019-04-12 A post-casting slot and formwork for prefabricated track beam concrete Active CN210151577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920500723.6U CN210151577U (en) 2019-04-12 2019-04-12 A post-casting slot and formwork for prefabricated track beam concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920500723.6U CN210151577U (en) 2019-04-12 2019-04-12 A post-casting slot and formwork for prefabricated track beam concrete

Publications (1)

Publication Number Publication Date
CN210151577U true CN210151577U (en) 2020-03-17

Family

ID=69756913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920500723.6U Active CN210151577U (en) 2019-04-12 2019-04-12 A post-casting slot and formwork for prefabricated track beam concrete

Country Status (1)

Country Link
CN (1) CN210151577U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868751A (en) * 2019-04-12 2019-06-11 中国建筑第五工程局有限公司 Notch, template and construction method are poured after a kind of assembled track girder concrete
CN112695617A (en) * 2021-02-04 2021-04-23 重庆交通大学 Shear force connecting structure for assembled steel-concrete composite beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868751A (en) * 2019-04-12 2019-06-11 中国建筑第五工程局有限公司 Notch, template and construction method are poured after a kind of assembled track girder concrete
CN109868751B (en) * 2019-04-12 2024-06-14 中国建筑第五工程局有限公司 Assembled track beam concrete post-pouring notch, template and construction method
CN112695617A (en) * 2021-02-04 2021-04-23 重庆交通大学 Shear force connecting structure for assembled steel-concrete composite beam

Similar Documents

Publication Publication Date Title
CN109518858B (en) Assembled beam-slab connection structure and construction method thereof
CN203546589U (en) Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
CN106988483B (en) A prefabricated reinforced concrete U-shaped frame beam and its connecting steel frame
CN110509396B (en) Laminated slab, laminated slab production equipment and laminated slab production method
CN111719849B (en) One-step forming structure of main and secondary beams of PC composite beam and construction method thereof
CN209368677U (en) A kind of Cast-in-situ Beam transverse prestress tension slot groove punching block
CN111958815A (en) Separated prefabricated prestressed concrete slab stair and production process thereof
CN109868751B (en) Assembled track beam concrete post-pouring notch, template and construction method
CN107905426B (en) Construction method of bidirectional hollow composite floor slab
CN113738007A (en) Truss floor plate
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN108360362A (en) Assembled simple supported box beam end floor beam constructs
CN105780612B (en) A kind of prefabricated subway assembled track plate and its construction method
CN111335355A (en) Special-shaped block post-pouring type light retaining wall supporting structure and construction method thereof
CN212927032U (en) Primary and secondary beam one-step forming structure of PC superposed beam
CN110409708A (en) A permanent post-tensioned prestressed formwork for composite beams and its installation method
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN220166669U (en) Bridge precast reinforced concrete bridge face structure
CN214925420U (en) Concrete bridge deck slab prefabricated steel formwork side form structure and side form comprising same
CN111350348A (en) Positioning and reinforcing device for outer wall anti-seepage inverted beam template and construction method
CN116927383A (en) Linear flexible formwork shear wall member containing hidden columns and production method thereof
CN210552011U (en) Take precast stair mould of concrete maintenance function
CN217353124U (en) Prefabricated assembled reinforced concrete superimposed sheet structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant