CN105133492B - Concrete bridge deck with channels at bottom - Google Patents
Concrete bridge deck with channels at bottom Download PDFInfo
- Publication number
- CN105133492B CN105133492B CN201510618404.1A CN201510618404A CN105133492B CN 105133492 B CN105133492 B CN 105133492B CN 201510618404 A CN201510618404 A CN 201510618404A CN 105133492 B CN105133492 B CN 105133492B
- Authority
- CN
- China
- Prior art keywords
- concrete
- bridge deck
- conduit
- concrete bridge
- concrete slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a concrete bridge deck with channels at the bottom, and belongs to the technical field of bridge construction. The concrete bridge deck comprises a plurality of concrete bridge deck segments connected through cementing; a plurality of channels are arranged at the bottom of each concrete bridge deck segment. Concrete bridge deck segments are provided with a slurry openings communicating with the channels. Each slurry opening comprises a slurry inlet and a slurry outlet. The concrete bridge deck segment serving as the initial segment or the final segment of the concrete bridge deck is provided with a slurry inlet, and the rest segments of the concrete bridge deck are all provided with slurry outlets. The concrete bridge deck is simple in structure and convenient to transport and mount; the channels matched with steel beams are arranged at the bottom of the concrete bridge deck to form self-locking steel and concrete connecting pieces, so that the problems that a steel and concrete bonding surface is corroded, concrete cracks and the quality of post-poured concrete is hard to control can be effectively solved.
Description
Technical field
The present invention relates to a kind of concrete slab, belongs to technical field of bridge construction, more particularly to a kind of bottom is reserved
Reeded concrete slab.
Background technology
In bridge construction field, steel-concrete combined structure can effectively reduce own wt, improve span ability, range of application
And have a extensive future.Combination construction in steel-concrete combined structure generally follows closely preformed hole or piecemeal concrete slab seam using rear flow welding
Mode, will prefabricated bridge lift in advance to girder steel top, afterwards by rear pouring concrete realize steel reinforced concrete combine.For combination
For structural bridge, because girder steel and concrete slab can be manufactured respectively in factory, girder steel can realize in-site installation as platform
And template need not be built, possess prefabricated construction condition.But for common steel-concrete composite beam, can there is steel reinforced concrete knot
The problems such as conjunction face burn into concrete cracking, rear pouring concrete difficult quality are controlled, accordingly, it would be desirable to a kind of be conducive to steel reinforced concrete
The interconnection technique and the floorings suitable for the interconnection technique of the efficient assembling of combining structure.
A kind of prestressed concrete bridge panel is disclosed in Chinese utility patent specification CN203741713U, it includes
Concrete slab and for making concrete slab that the prestressing apparatus of precompression are longitudinally produced along it, prestressing apparatus include
Two anchoring walls for being respectively in concrete slab longitudinal direction two ends and the presstressed reinforcing steel being fixedly connected between two anchoring walls.
Although the practicality simple structure, solid and reliable and easy construction are quick, the practicality not can solve steel reinforced concrete faying face
The problems such as burn into concrete cracking, rear pouring concrete difficult quality are controlled, meanwhile, the concrete slab is adopted and is integrally formed,
Not readily transportable and installation.
The content of the invention
For the defect that above-mentioned prior art is present, the technical problem to be solved in the present invention is to provide a kind of bottom with groove
The concrete slab in road, it is not only simple in structure, transports, easy for installation, and can coordinate with girder steel and realize a kind of self-locking
Steel reinforced concrete connector, the problems such as control so as to solve steel reinforced concrete faying face burn into concrete cracking, rear pouring concrete difficult quality.
To solve above-mentioned technical problem, concrete slab of the such a bottom with conduit is present invention employs, its
Including polylith concrete bridge deck plate segment, by being glued connection between the concrete bridge deck plate segment;The concrete bridge deck
The bottom of plate segment is provided with multiple conduits;The slurry connected with the conduit is provided with the concrete bridge deck plate segment
Mouthful;The slurry mouth includes stock inlet and grout outlet;As concrete slab starting sections or the institute on last sections
State and stock inlet is provided with concrete bridge deck plate segment, on remaining sections of concrete slab grout outlet is provided with.
In a kind of preferred embodiment of the present invention, the reserved groove is key teeth connected in star.
In a kind of preferred embodiment of the present invention, the surface smear of the reserved groove has surface retarders and passes through
Giant is rinsed.
In a kind of preferred embodiment of the present invention, the indent that the surface of the reserved groove is provided with multiple closures is several
What shape.
In a kind of preferred embodiment of the present invention, the conduit is the reserved groove that surface is processed through roughening
In a kind of preferred embodiment of the present invention, between the concrete bridge deck plate segment multiple shear connectors are provided with
Tooth.
In a kind of preferred embodiment of the present invention, epoxide-resin glue is passed through between the concrete bridge deck plate segment
Connect.
The beneficial effects of the present invention is:Present configuration is simple, transport, easy for installation, by by polylith concrete bridge
Panel section is glued to form the people that concrete slab effectively reduces transport and consumed in installing using epoxy resin
Power material resources;It is connected by the way that a kind of self-locking steel reinforced concrete can be formed in one conduit coordinated with girder steel of concrete slab bottom setting
Part, different from traditional connectors, the type of attachment is reserved between groove and steel plate interface by high-strength grout and floorings
Bond, rub to meet the stress demand such as longitudinal shear resistance and vertical drawing, thus efficiently solve steel reinforced concrete faying face burn into
The problems such as concrete cracking, rear pouring concrete difficult quality are controlled;By arranging shear connector between concrete bridge deck plate segment
Tooth improves the stability and reliability of the present invention;Can facilitate this by arranging slurry mouth on concrete bridge deck plate segment
Bright installation.
Description of the drawings
Fig. 1 is a kind of concrete slab bay structural of concrete slab of the bottom of the embodiment of the present invention with conduit
Front view;
Fig. 2 is a kind of structural representation of concrete slab of the bottom of the embodiment of the present invention with conduit;
Fig. 3 is a kind of position view of concrete slab starching material mouth of the bottom of the embodiment of the present invention with conduit;
Fig. 4 is that a kind of concrete slab of the bottom of the embodiment of the present invention with conduit is arranged on formation on prefabricated girder steel
Assembled combined beam structure schematic diagram;
Fig. 5 is a kind of being made up of concrete slab for concrete slab of the bottom of the embodiment of the present invention with conduit
Self-locking steel reinforced concrete connector schematic diagram;
Fig. 6 is that a kind of self-locking steel reinforced concrete connector work of concrete slab of the bottom of the embodiment of the present invention with conduit is former
Reason schematic diagram;
In figure:1- concrete bridge deck plate segments;2- conduits;3- slurry mouths;4- shears key teeth;3a- stock inlets;3b- pulps
Mouthful.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not
For limiting the present invention.
From a kind of structural representation of concrete slab of the bottom with conduit of Fig. 1 and Fig. 2 present invention, the present invention
Including polylith concrete bridge deck plate segment 1, it is glued by epoxy resin between concrete bridge deck plate segment 1;Wherein, concrete bridge
The manufacture method of panel section 1 is mainly in factory using matching precasting process production, i.e., first pour starting in precast pedestal
Sections, after on the basis of fixing end mould, and initial sections is pushed into into matched position, adjust plan-position and absolute altitude as matching
Sections, by Pin next sections is poured.During cast, sections both sides to be poured set relatively-stationary side form (only lateral folding and do not move
It is dynamic), front end sets fixing end mould, and rear end is then the front end face of the previous sections (matching beam) for having poured, and to be formed between the two
Matching seam guaranteeing the splicing precision of adjacent segment.Its concrete step includes:(1) model sheetinstallat, including fixing end mould,
Removable bed die, side form etc., wherein bed die consider the shaping of the reserved groove of floorings lower edge;(2) reinforcing bar is in the case where processing factory is accurate
After material, transport on reinforcing bar colligation placenta, artificial colligation shaping, by straddle truck Integral lifting to prefabricated bed die;(3) install pre-
Stress pipeline, floorings stock inlet and grout outlet built-in pipe;(4) concreting is carried out using suspension bucket mode, after the initial set of surface
Carry out wharf's pavement quality;Using sprinkling constant temperature, the maintenance of moisturizing state;(5) mounting hanger, using gantry crane lifting to area is repaired, enters
The reserved groove roughening of row is processed;(6) it is identified, is finally hung to and stores up area and carry out subregion storage.
The bottom of concrete bridge deck plate segment 1 is provided with multiple conduits 2 for forming self-locking steel reinforced concrete connector, conduit 2
For the reserved groove that surface is processed through roughening, the method that wherein conduit interface roughnessization is processed is including brushing medicament, hydraulic giant
Rinse dabbing, sandblasting etc..The main way of two of which is:(1) surface retarders+giant is rinsed:In reserved groove-bottom
Surface retarders are applied on mould, when concrete strength reaches the 30% of design strength, reserved groove bed die is removed, in time with height
Blow wash cement mortar, makes surface expose stone, reaches dabbing effect.(2) reserve groove bed die and adopt special roughening template,
Including template and net, net is detachably secured to template surface, and net is identical with the surface size of template, grid
Geometry forms the indent geometry of closure on the surface at reserved conduit interface.It is provided with concrete bridge deck plate segment 1
The slurry mouth 3 connected with conduit 2, slurry mouth 3 includes stock inlet 3a and grout outlet 3b;As concrete slab starting sections or
Stock inlet 3a is provided with concrete bridge deck plate segment 1 on last sections, on remaining sections of concrete slab
Grout outlet 3b is provided with, as shown in Figure 3.In order to improve the stability and security of concrete slab of the present invention, concrete bridge
Multiple shearing key teeths 4 are provided between panel section 1.
From Fig. 4 and Fig. 5, the present invention in the bottom of concrete slab by arranging what surface was processed through roughening
Conduit, and it is (prefabricated to be installed on the girder steel with decorative pattern perforate floor and rubber seal strip being formed the grouting channel of a sealing
Floorings should completely be compressed rubber strip using own wt, to ensure the sealing of grouting channel), by noting to grouting channel
Enter special high-strength grout so as to realize a kind of efficient assembled steel reinforced concrete combination beam, the efficient assembled steel reinforced concrete combination beam is due to it
Concrete slab is fabricated by using the present invention, thus efficiently solves the steel reinforced concrete knot that concrete and steel beam surface contact are caused
The problems such as conjunction face burn into concrete cracking, simultaneously effective ensure that construction quality and improve live work efficiency.According to Fig. 6 institutes
The self-locking steel reinforced concrete connector operation principle schematic diagram shown understands that this connector includes the decorative pattern perforated rib above steel beam flange plate
Conduit, high-strength grout, rubber seal strip that plate, floorings lower section are processed through interface roughnessization, the high-strength encapsulating material 7 is a kind of
Early strong (1d>35MPa), good fluidity (divergence>550mm), compression strength height (28d>The dry-mixed material of cement base 80MPa).
Different from traditional connectors, the self-lock connecting piece is reserved viscous between groove and steel plate interface by high-strength grout and floorings
Tie, rub to meet the stress demand such as longitudinal shear resistance and vertical drawing.Under longitudinal shear τ effects, there is sliding s at steel reinforced concrete interface
The protuberance that is necessarily accompanied with simultaneously between different materials of trend separate u, and this separations u is limited by floorings laterally pre- answering
Direct stress σ produced by power, separation trend is bigger, and direct stress is also bigger.From for the mechanism of action, also efficiently quickly connect this
The form of connecing is referred to as self-lock connecting piece.
It should be appreciated that having carried out exemplary description to the present invention above in conjunction with accompanying drawing, it is clear that the present invention is specific
Realization is not subject to the restrictions described above, as long as employing the various improvement that method of the present invention design and technical scheme are carried out,
Or it is not improved by the present invention design and technical scheme directly apply to other occasions, in protection scope of the present invention
It is interior.
Claims (7)
1. a kind of concrete slab of bottom with conduit, including polylith concrete bridge deck plate segment (1), the concrete bridge
By being glued connection between panel section (1);It is characterized in that:The bottom of the concrete bridge deck plate segment (1) is provided with many
Individual conduit (2);The slurry mouth (3) connected with the conduit (2) is provided with the concrete bridge deck plate segment (1);The slurry
Material mouth (3) includes stock inlet (3a) and grout outlet (3b);As on concrete slab starting sections or last sections
Stock inlet (3a) is provided with the concrete bridge deck plate segment (1), is provided with out on remaining sections of concrete slab
Slurry mouth (3b).
2. a kind of bottom as claimed in claim 1 carries the concrete slab of conduit, it is characterised in that:The conduit (2)
For the reserved groove that surface is processed through roughening.
3. a kind of bottom as claimed in claim 2 carries the concrete slab of conduit, it is characterised in that:The reserved groove
For key teeth connected in star.
4. a kind of bottom as claimed in claim 2 carries the concrete slab of conduit, it is characterised in that:The reserved groove
Surface smear have surface retarders and by giant rinse.
5. a kind of bottom as claimed in claim 2 carries the concrete slab of conduit, it is characterised in that:The reserved groove
Surface be provided with the indent geometry of multiple closures.
6. a kind of bottom as claimed in claim 1 carries the concrete slab of conduit, it is characterised in that:The concrete bridge
Multiple shearings key teeth (4) are provided between panel section (1).
7. a kind of bottom as claimed in claim 1 carries the concrete slab of conduit, it is characterised in that:The concrete bridge
It is glued by epoxy resin between panel section (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618404.1A CN105133492B (en) | 2015-09-24 | 2015-09-24 | Concrete bridge deck with channels at bottom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618404.1A CN105133492B (en) | 2015-09-24 | 2015-09-24 | Concrete bridge deck with channels at bottom |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105133492A CN105133492A (en) | 2015-12-09 |
CN105133492B true CN105133492B (en) | 2017-05-10 |
Family
ID=54719042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510618404.1A Active CN105133492B (en) | 2015-09-24 | 2015-09-24 | Concrete bridge deck with channels at bottom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105133492B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120532A (en) * | 2016-07-26 | 2016-11-16 | 宁波金蛟龙重工钢构有限公司 | A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof |
CN108032427A (en) * | 2017-11-21 | 2018-05-15 | 重庆大业新型建材集团有限公司 | The preparation method of rectangle slot type superimposed sheet |
CN108316530A (en) * | 2018-01-11 | 2018-07-24 | 水利部交通运输部国家能源局南京水利科学研究院 | The assembled steel reinforced concrete composite floor and installation method connected using self-locking |
CN109736201A (en) * | 2019-01-18 | 2019-05-10 | 中铁第四勘察设计院集团有限公司 | Steel-is combined to mix bondbeam and bridge and construction method after wet seam built in one kind |
CN115094745A (en) * | 2022-06-24 | 2022-09-23 | 中冶建工集团有限公司 | Cast-in-situ integral steel-concrete composite beam |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5394667A (en) * | 1993-03-01 | 1995-03-07 | Nystrom; Ron | Flooring construction and method |
JP5346676B2 (en) * | 2009-05-08 | 2013-11-20 | 大成建設株式会社 | Floor slab unit, floor slab joining structure and floor slab construction method |
CN101831985B (en) * | 2010-06-04 | 2012-04-18 | 北京万科企业有限公司 | Precast concrete wallboard and preparation method thereof |
CN202482763U (en) * | 2011-12-06 | 2012-10-10 | 中铁工程设计咨询集团有限公司 | Connecting structure of bridge deck |
CN202913324U (en) * | 2012-10-25 | 2013-05-01 | 深圳市格林美高新技术股份有限公司 | Plank and extrusion die for manufacturing same |
CN104863382B (en) * | 2013-10-19 | 2017-03-08 | 叶长青 | Roof boarding reinforcement means |
CN205116011U (en) * | 2015-09-24 | 2016-03-30 | 中交第二航务工程局有限公司 | Bottom has novel concrete bridge panel of channel |
-
2015
- 2015-09-24 CN CN201510618404.1A patent/CN105133492B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105133492A (en) | 2015-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105133492B (en) | Concrete bridge deck with channels at bottom | |
CN105113425B (en) | A kind of construction method of efficiently assembled steel reinforced concrete combination beam | |
CN203546589U (en) | Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge | |
CN105317137B (en) | Precast wall body, wallboard and its construction method and prefabricated panel production method | |
CN207567656U (en) | A kind of precast bridge bridge floor using Bar Anchorage plate | |
CN108638324A (en) | A kind of construction method of prefabricated case beam | |
CN102116061A (en) | Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure | |
CN105350445A (en) | Novel efficient assembly-type reinforced concrete composite beam | |
CN107152104B (en) | Assembled cavity shear wall horizontal joint tooth socket rotating vane type connection structure | |
CN212613903U (en) | Brick-concrete structure old building body composite reinforcement structure | |
CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
CN208685933U (en) | A kind of post-cast strip template free of demolition | |
CN110805464A (en) | Subway station prefabricated rail top air duct and installation method thereof | |
CN205116011U (en) | Bottom has novel concrete bridge panel of channel | |
CN203961099U (en) | A kind of high strength hollow constructional column template brick and the constructional column of building thereof | |
CN205474843U (en) | Prefabricated T beam -ends head mould board | |
CN109629714A (en) | A kind of prefabricated partition wall of the staircase with installation base and its installation method | |
CN204850139U (en) | Prefabricated assembled concrete shear force wall that reinforcing bar dislocation was laid | |
CN110700873A (en) | Prefabricated rail top air duct for subway station and construction method thereof | |
CN216893134U (en) | Prefabricated assembled reinforced concrete beam structure through hybrid connection of bolts and sleeves | |
CN206667492U (en) | A kind of prefabricated composite wallboard and the laterally attached structure of precast stair | |
CN108316530A (en) | The assembled steel reinforced concrete composite floor and installation method connected using self-locking | |
CN105696453A (en) | Steel-concrete composite beam | |
CN105908631B (en) | A kind of built-in type steel reinforced concrete joint portion mud jacking filling device and construction method | |
CN210151577U (en) | Assembled track beam concrete post-cast groove mouth and template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |