CN105113425B CN201510618402.2A CN201510618402A CN105113425B CN 105113425 B CN105113425 B CN 105113425B CN 201510618402 A CN201510618402 A CN 201510618402A CN 105113425 B CN105113425 B CN 105113425B
Authority
CN
China
Prior art keywords
steel
concrete
bridge deck
channel
composite beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510618402.2A
Other languages
Chinese (zh)
Other versions
CN105113425A (en
Inventor
张永涛
游新鹏
王敏
郑和晖
黄跃
巫兴发
陈少林
彭成明
黄灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510618402.2A priority Critical patent/CN105113425B/en
Publication of CN105113425A publication Critical patent/CN105113425A/en
Application granted granted Critical
Publication of CN105113425B publication Critical patent/CN105113425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种高效装配式钢混组合梁的施工方法,属于桥梁施工技术领域,其以顶端连接有橡胶封条和肋板的钢梁为拼装平台,将底端设置有槽道的预制混凝土桥面板搭放在橡胶封条上,向钢梁、橡胶封条、预制混凝土桥面板围成的灌浆通道内注入高强灌浆料形成钢混组合梁;钢梁的上翼缘板上固接有沿着钢梁纵向延伸的肋板。本发明有效地避免了加工钢混连接件和现场浇筑接缝混凝土带来的钢混组合梁结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题,在保证施工质量的同时提高现场工效,且更环保,具有良好的经济效益。

The invention discloses a construction method of an efficient assembled steel-concrete composite beam, which belongs to the technical field of bridge construction. It uses a steel beam connected with a rubber seal and a rib plate at the top as an assembly platform, and prefabricated concrete with a channel at the bottom The bridge deck is placed on the rubber seal, and high-strength grouting material is injected into the grouting channel surrounded by the steel girder, rubber seal, and precast concrete bridge deck to form a steel-concrete composite beam; A rib extending longitudinally of a beam. The invention effectively avoids the problems of steel-concrete composite beam joint surface corrosion, concrete cracking, and difficulty in controlling the quality of post-cast concrete caused by processing steel-concrete connectors and pouring joint concrete on site, and improves site work efficiency while ensuring construction quality. It is more environmentally friendly and has good economic benefits.

Description

一种高效装配式钢混组合梁的施工方法A construction method for high-efficiency assembled steel-concrete composite beams

技术领域technical field

本发明涉及一种钢混组合梁的施工方法,属于桥梁施工技术领域,尤其涉及一种无需现场混凝土浇筑的高效装配式钢混组合梁施工方法。The invention relates to a construction method of a steel-concrete composite beam, which belongs to the technical field of bridge construction, and in particular relates to a construction method of an efficient assembled steel-concrete composite beam without on-site concrete pouring.

背景技术Background technique

在桥梁建设领域,钢混组合结构可以有效降低自身重量,提高跨越能力,应用范围和前景广阔。In the field of bridge construction, the steel-concrete composite structure can effectively reduce its own weight, improve the spanning capacity, and has a wide range of applications and prospects.

在钢与混凝土组合结构中,通常采用连接件把两者结合在一起图如图1、图2和图3中所示的三种连接件:焊钉连接件、开孔板连接件和型钢连接机件,其中焊钉连接件应用最为广泛。钢混组合结构中的组合施工通常采用后浇焊钉预留孔或分块混凝土板间接缝的方式(如图4和图5所示),即将预制桥面板事先吊装至钢梁上方,后通过后浇混凝土实现钢混结合。实践表明,上述两种组合方式会带来结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题,更为关键的是将增加现浇工序,延长现场施工周期。当前,装配化施工已成为桥梁建设领域的重要发展方向之一。对于组合结构桥梁来说,由于钢梁及混凝土板可以分别在工厂制造,钢梁可作为平台实现现场安装而无需搭建模板,具备装配化施工条件。为此,急需开发一种有利于钢混组合结构高效装配化的连接技术。In the composite structure of steel and concrete, connectors are usually used to combine the two together. There are three kinds of connectors shown in Figure 1, Figure 2 and Figure 3: welding stud connectors, perforated plate connectors and steel connections Machine parts, among which welding stud connectors are the most widely used. The combined construction in the steel-concrete composite structure usually adopts the method of post-cast welding stud reserved holes or joints between block concrete slabs (as shown in Figure 4 and Figure 5), that is, the prefabricated bridge deck is hoisted above the steel beam in advance, and then passed through Post-cast concrete realizes steel-concrete combination. Practice has shown that the above two combination methods will cause problems such as joint surface corrosion, concrete cracking, and difficulty in controlling the quality of post-cast concrete. More importantly, it will increase the cast-in-place process and prolong the on-site construction period. At present, assembly construction has become one of the important development directions in the field of bridge construction. For composite structure bridges, since the steel girders and concrete slabs can be manufactured separately in factories, the steel girders can be used as a platform to realize on-site installation without building formwork, which meets the prefabricated construction conditions. Therefore, it is urgent to develop a connection technology that is conducive to the efficient assembly of steel-concrete composite structures.

在中国实用新型专利说明书CN203129439U中公开了一种钢-混凝土组合梁,它包括,包括钢梁、混凝土梁、开孔钢板和带肋贯穿钢筋;其特征在于:开孔钢板焊接在钢梁翼缘的表面;钢梁的腹板上开有与开孔钢板对应的圆孔;带肋贯穿钢筋从开孔钢板以及钢梁腹板上的圆孔中心穿过;混凝土梁浇筑在钢梁的外围,包裹所述开孔钢板、带肋贯穿钢筋。该实用新型虽然改善了钢-混凝土组合梁中剪力键的荷载分布状态、钢-混凝土组合梁的应力分布状态,并且能够提高钢-混凝土组合梁的安全系数,且施工方便、施工效率高,无需复杂的施工设备。但是该钢-混凝土组合梁仍然是通过浇焊钉预留孔配合后浇混凝土浇筑实现钢混结合,所以该实用新型存在钢混结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题;同时该实用新型的钢-混凝土组合梁是采用一体成形,因此该钢混组合梁不便于运输和安装。A steel-concrete composite beam is disclosed in Chinese utility model patent specification CN203129439U, which includes steel beams, concrete beams, perforated steel plates and ribbed through steel bars; it is characterized in that the perforated steel plates are welded on the surface of the steel beam flange The web of the steel beam has a round hole corresponding to the holed steel plate; the ribbed steel bar passes through the holed steel plate and the center of the round hole on the web of the steel beam; the concrete beam is poured on the periphery of the steel beam, wrapping the The perforated steel plate and the ribbed through steel bar. Although the utility model improves the load distribution state of the shear key in the steel-concrete composite beam and the stress distribution state of the steel-concrete composite beam, and can improve the safety factor of the steel-concrete composite beam, it is convenient for construction and high in construction efficiency. No complex construction equipment is required. However, the steel-concrete composite beam still realizes steel-concrete combination through the reserved holes of welding nails and post-cast concrete pouring, so this utility model has problems such as corrosion of steel-concrete joint surface, cracking of concrete, and difficulty in controlling the quality of post-cast concrete; at the same time The steel-concrete composite beam of the utility model is integrally formed, so the steel-concrete composite beam is not convenient for transportation and installation.

在中国发明专利说明书CN101831869A中公开了一种组合梁与混凝土支撑横梁连接结构,它包括钢梁、混凝土支承横梁,其中,钢梁在中支点处间断,与混凝土支承横梁连接;在钢梁端部设置端板,在端板上设置有开孔板或焊钉连接钢梁与混凝土支承横梁,以此传递梁体剪力与弯矩;混凝土支承横梁内布置有构造钢筋,同主受力钢筋一起形成钢筋笼;混凝土桥墩上设置支座支承于混凝土支承横梁底部。虽然使用该发明的连接结构可以使得混凝土收缩、徐变与温差引起的负弯矩区桥面板拉应力减小,同时具有传力简洁、明确,负弯矩区无需施加预应力,省去了盖梁,现场无需钢结构焊接,桥墩的布设位置可调整性好等优点,但是该发明仍然存在钢混结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题;并且利用该发明装配组合梁桥时步骤繁多,首先需要架设完成钢梁,布置好模板和混凝土支承横梁与桥面板的钢筋,先浇筑跨中混凝土再浇筑支点附近和结合部的混凝土,安装永久支座、拆模、落架即可形成钢与混凝土连续组合梁桥结构;该套工序耗费工时长,施工强度大。In the Chinese invention patent specification CN101831869A, a connection structure between a composite beam and a concrete support beam is disclosed. The end plate is provided with a perforated plate or welding nails to connect the steel beam and the concrete support beam, so as to transmit the shear force and bending moment of the beam body; the structural steel bar is arranged in the concrete support beam, and together with the main stress steel bar to form a steel bar Cage; the concrete pier is provided with a bearing supported on the bottom of the concrete supporting beam. Although the connection structure of the invention can reduce the tensile stress of the bridge deck in the negative moment area caused by concrete shrinkage, creep and temperature difference, it also has the advantages of simple and clear force transmission, no need to apply prestress in the negative moment area, and saves the cover. beam, no steel structure welding is required on site, and the layout position of the bridge pier is well adjustable. However, this invention still has problems such as corrosion of the steel-concrete joint surface, concrete cracking, and difficulty in controlling the quality of the post-cast concrete; and the invention is used to assemble composite girder bridges. There are many steps in this process. Firstly, it is necessary to erect the steel girders, arrange the formwork and concrete support beams and the steel bars of the bridge deck, pour the mid-span concrete first, then pour the concrete near the fulcrum and the joint, install the permanent support, remove the formwork, and drop the frame. Forming a steel and concrete continuous composite beam bridge structure; this set of procedures takes a long time and has a high construction intensity.

在中国发明专利说明书CN101435249A中公开了一种新型钢-混凝土组合梁,其包括腹板、连接于腹板底部的下翼缘板和浇筑于腹板顶部的混凝土面板;腹板外浇筑包裹有轻骨料混凝土防护层。该发明虽然提高了组合梁抗火性能、刚度及整体稳定性,但是该发明的钢-混凝土组合梁制作方法繁琐,并且仍然存在混凝土和钢梁表面接触造成的钢混结合面腐蚀、混凝土开裂等问题。In the Chinese invention patent specification CN101435249A, a new type of steel-concrete composite beam is disclosed, which includes a web, a lower flange plate connected to the bottom of the web, and a concrete panel poured on the top of the web; Aggregate concrete protective layer. Although the invention improves the fire resistance, stiffness and overall stability of the composite beam, the manufacturing method of the steel-concrete composite beam of the invention is cumbersome, and there are still problems such as corrosion of the steel-concrete joint surface and cracking of the concrete caused by the contact between the surface of the concrete and the steel beam.

发明内容Contents of the invention

针对上述现有技术存在的缺陷,本发明要解决的技术问题是提供一种高效装配式钢混组合梁及其制造施工方法,它能够有效地解决混凝土和钢梁表面接触造成的钢混结合面腐蚀、混凝土开裂等问题,同时在保证施工质量的前提下能够有效地提高工效,且更加环保。In view of the above-mentioned defects in the prior art, the technical problem to be solved by the present invention is to provide a high-efficiency assembled steel-concrete composite beam and its manufacturing and construction method, which can effectively solve the problem of the steel-concrete joint surface caused by the contact between the concrete and the steel beam surface. Corrosion, concrete cracking and other problems, while ensuring the construction quality can effectively improve work efficiency, and more environmentally friendly.

为解决上述技术问题,本发明采用了这样一种高效装配式钢混组合梁的施工方法,其以顶端连接有橡胶封条和肋板的钢梁为拼装平台,将底端设置有槽道的预制混凝土桥面板搭放在橡胶封条上,向钢梁、橡胶封条、预制混凝土桥面板围成的灌浆通道内注入高强灌浆料形成钢混组合梁;所述钢梁的上翼缘板上固接有沿着钢梁纵向延伸的肋板。In order to solve the above technical problems, the present invention adopts such a construction method of high-efficiency assembled steel-concrete composite beams, which uses the steel beams connected with rubber seals and ribs at the top as the assembly platform, and the prefabricated steel beams with channels at the bottom The concrete bridge deck is placed on the rubber seal, and high-strength grouting material is injected into the grouting channel surrounded by the steel beam, rubber seal, and prefabricated concrete bridge deck to form a steel-concrete composite beam; the upper flange of the steel beam is fixed with A rib extending longitudinally along a steel beam.

在本发明公开了的一种优选实施方案中,所述预制混凝土桥面板包括多块预制混凝土桥面板节段;所述预制混凝土桥面板节段之间通过环氧树脂胶接连接。In a preferred embodiment disclosed in the present invention, the prefabricated concrete bridge deck includes a plurality of precast concrete bridge deck segments; the precast concrete bridge deck segments are connected by epoxy resin bonding.

在本发明公开了的一种优选实施方案中,所述预制混凝土桥面板节段之间设置有多个剪力键齿。In a preferred embodiment disclosed in the present invention, a plurality of shear splines are arranged between the prefabricated concrete bridge deck segments.

在本发明公开了的一种优选实施方案中,所述预制混凝土桥面板节段的槽道上方设置有与槽道连通的灌浆口。In a preferred embodiment disclosed in the present invention, a grouting port communicating with the channel is provided above the channel of the prefabricated concrete bridge deck segment.

在本发明公开了的一种优选实施方案中,所述肋板上有可提高肋板表面粗糙度的花纹和多个通孔。In a preferred embodiment disclosed in the present invention, the rib plate has patterns and a plurality of through holes that can improve the surface roughness of the rib plate.

在本发明公开了的一种优选实施方案中,所述槽道的表面均通过粗糙化处理。In a preferred embodiment disclosed in the present invention, the surfaces of the channels are all roughened.

在本发明公开了的一种优选实施方案中,所述槽道的表面粗糙化处理的方法包括:(1)在所述槽道底模上涂表面缓凝剂,当混凝土强度达到设计强度的30%时,拆除预留凹槽处底模;(2)用高压水冲洗水泥浆,使表面露出石子,达到凿毛效果。In a preferred embodiment disclosed by the present invention, the method for roughening the surface of the channel includes: (1) coating the surface retarder on the bottom form of the channel, when the concrete strength reaches the design strength 30%, remove the bottom mold at the reserved groove; (2) wash the cement slurry with high-pressure water to expose the stones on the surface to achieve the chisel effect.

在本发明公开了的一种优选实施方案中,所述槽道的表面粗糙化处理时的采用专用粗糙化模板;所述粗糙化模板包括模板和网状物;所述网状物可拆卸固定在所述模板表面;所述网状物与所述模板的表面大小相同;所述网状物的几何形状在所述槽道界面的表面形成闭合的内凹几何形状。In a preferred embodiment disclosed by the present invention, a special roughening template is used for surface roughening of the channel; the roughening template includes a template and a mesh; the mesh can be detachably fixed On the surface of the template; the size of the mesh is the same as that of the surface of the template; the geometry of the mesh forms a closed concave geometry on the surface of the channel interface.

在本发明公开了的一种优选实施方案中,其具体施工步骤包括:(1)在工场内完成钢梁的制造,并在钢梁的上翼缘板上固接花纹开孔肋板,同时在钢梁的上翼缘板的两侧边缘沿钢梁纵向粘贴可压缩的橡胶封条;(2)在预制场内浇筑底端带有槽道的预制混凝土桥面板节段,首先浇筑起始节段,并以此节段作为匹配节段,浇筑下一节面板节段;(3)对每个预制混凝土桥面板节段底端的槽道进行粗糙化加工;(4)在施工现场利用起吊设备安装组合梁中的钢梁部分,以钢梁作为拼装平台,在预制混凝土桥面板节段安装前,将横向预应力钢束及锚具安装到位,然后依次安装预制混凝土桥面板节段,各预制混凝土桥面板节段之间通过环氧树脂胶连接形成预制混凝土桥面板;(5)各预制混凝土桥面板节段铺设连接完成后,预制混凝土桥面板、槽道、橡胶封条和预制钢梁四者围成一密封的灌浆通道;(6)通过预制混凝土桥面板上的灌浆口向灌浆通道内压注高强灌浆料,持续到各灌浆口连续流出圆柱状浆液后用橡胶塞封堵排浆孔;(7)利用横向预应力钢束及锚具张拉桥面板内横向预应力。In a preferred embodiment disclosed by the present invention, the specific construction steps include: (1) completing the manufacture of the steel girder in the workshop, and affixing the patterned perforated ribs on the upper flange of the steel girder, while Paste compressible rubber seals on both sides of the upper flange plate of the steel beam along the longitudinal direction of the steel beam; and use this segment as a matching segment to pour the next panel segment; (3) roughen the channel at the bottom of each precast concrete bridge deck segment; (4) use lifting equipment at the construction site Install the steel girder part of the composite girder, use the steel girder as the assembly platform, install the transverse prestressed steel beams and anchors in place before installing the precast concrete bridge deck sections, and then install the precast concrete bridge deck sections in sequence, each precast concrete bridge deck section The concrete bridge deck sections are connected by epoxy resin glue to form a precast concrete bridge deck; (5) After the laying and connection of each precast concrete bridge deck section is completed, the precast concrete bridge deck, channel, rubber seal and prefabricated steel girder Enclose a sealed grouting channel; (6) inject high-strength grouting material into the grouting channel through the grouting port on the prefabricated concrete bridge deck, and then use rubber plugs to block the grouting hole after each grouting port continuously flows out of cylindrical grout; (7) Use transverse prestressed steel tendons and anchors to tension the transverse prestress in the bridge deck.

在本发明公开了的一种优选实施方案中,所述预制混凝土桥面板的起始节段或最后一个节段上设置有进浆口;所述混凝土桥面板的其余节段上均设置有出浆口。In a preferred embodiment disclosed in the present invention, the initial segment or the last segment of the prefabricated concrete bridge deck is provided with a grout inlet; pulp mouth.

本发明的有益效果是:本发明通过在预制混凝土桥面板、橡胶封条和预制钢梁围成的灌浆通道内注入高强灌浆料实现了钢混组合梁的快速装配施工,该预制混凝土桥面板提前在工厂内预制完成,所以在桥梁施工过程中无需混凝土现浇工序,从而有效地解决了钢混组合梁结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题;本发明有效地提高了钢混组合梁的装配施工效率,同时降低了施工耗时、减低了施工强度、避免了加工钢混连接件和现场浇筑接缝混凝土带来的一系列问题,在保证施工质量的同时提高现场工效,且更环保,具有良好的经济效益。The beneficial effects of the present invention are: the present invention realizes the rapid assembly and construction of steel-concrete composite beams by injecting high-strength grouting material into the grouting channel surrounded by prefabricated concrete bridge decks, rubber seals and prefabricated steel girders. Prefabrication is completed in the factory, so there is no need for concrete pouring process in the bridge construction process, thus effectively solving the problems of steel-concrete composite beam joint surface corrosion, concrete cracking, and difficulty in controlling the quality of post-cast concrete; the invention effectively improves the steel-concrete composite beam. The assembly and construction efficiency of composite beams reduces construction time and construction strength, avoids a series of problems caused by processing steel-concrete connectors and pouring joint concrete on site, improves site work efficiency while ensuring construction quality, and It is more environmentally friendly and has good economic benefits.

附图说明Description of drawings

图1是现有技术中钢混组合梁采用的焊钉连接件结构示意图;Fig. 1 is the structural representation of the welding stud connector adopted in the steel-concrete composite beam in the prior art;

图2是现有技术中钢混组合梁采用的开孔板连接件结构示意图;Fig. 2 is a structural schematic diagram of a perforated plate connector used in a steel-concrete composite beam in the prior art;

图3是现有技术中钢混组合梁采用的型钢连接件结构示意图;Fig. 3 is a structural schematic diagram of a steel connector used in a steel-concrete composite beam in the prior art;

图4是现有技术中采用后浇焊钉预留孔方式实现钢混组合梁的装配的示意图;Fig. 4 is a schematic diagram of the assembly of steel-concrete composite beams realized by using post-cast welding nails to reserve holes in the prior art;

图5是现有技术中采用分块混凝土板间接缝方式实现钢混组合梁的装配的示意图;Fig. 5 is a schematic diagram of the assembly of steel-concrete composite beams realized in the prior art by means of joints between block concrete slabs;

图6是本发明实施例一种高效装配式钢混组合梁的施工方法的结构示意图;Fig. 6 is a schematic structural view of a construction method of an efficient assembled steel-concrete composite beam according to an embodiment of the present invention;

图7是本发明实施例一种高效装配式钢混组合梁的施工方法中采用的自锁连接件的结构示意图;Fig. 7 is a schematic structural diagram of a self-locking connector used in a construction method of a high-efficiency assembled steel-concrete composite beam according to an embodiment of the present invention;

图8是本发明实施例一种高效装配式钢混组合梁的施工方法中采用工字型钢梁实施例的结构示意图;Fig. 8 is a structural schematic diagram of an embodiment of an I-shaped steel beam used in a construction method of a high-efficiency assembled steel-concrete composite beam according to an embodiment of the present invention;

图9是本发明实施例一种高效装配式钢混组合梁的施工方法中采用槽型钢梁实施例的结构示意图;Fig. 9 is a structural schematic diagram of an embodiment of a channel-shaped steel beam used in a construction method of a high-efficiency assembled steel-concrete composite beam according to an embodiment of the present invention;

图10是本发明实施例一种高效装配式钢混组合梁的施工方法的灌浆通道结构示意图;Fig. 10 is a schematic diagram of the grouting channel structure of a construction method of a high-efficiency assembled steel-concrete composite beam according to an embodiment of the present invention;

图11是本发明实施例一种高效装配式钢混组合梁的施工方法中设置在预制桥面板之间剪力键齿的结构示意图;Fig. 11 is a schematic diagram of the structure of the shear key set between the prefabricated bridge decks in the construction method of a high-efficiency assembled steel-concrete composite beam according to the embodiment of the present invention;

图12是本发明实施例一种高效装配式钢混组合梁的施工方法的灌浆口位置示意图;Fig. 12 is a schematic diagram of the position of the grouting opening of a construction method of a high-efficiency assembled steel-concrete composite beam according to an embodiment of the present invention;

图13是本发明实施例一种高效装配式钢混组合梁的施工方法中由高强灌胶料构成的自锁连接件工作原理示意图;Fig. 13 is a schematic diagram of the working principle of a self-locking connector made of high-strength potting material in a construction method of an efficient assembled steel-concrete composite beam according to an embodiment of the present invention;

图中:1-预制混凝土桥面板,2-钢梁,3-肋板,4-槽道,5-橡胶封条,6-灌浆通道,7-高强灌胶料,8-剪力键齿,9-灌浆口,1a-预制混凝土桥面板节段,2a-上翼缘板。In the figure: 1-prefabricated concrete bridge deck, 2-steel girder, 3-rib, 4-channel, 5-rubber seal, 6-grouting channel, 7-high-strength grouting material, 8-shear key, 9 - grouting opening, 1a - precast concrete bridge deck segment, 2a - upper flange plate.

具体实施方式detailed description

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

由图6和图7所示的一种高效装配式钢混组合梁的施工方法的结构示意图可知,本发明的高效装配式钢混组合梁包括预制混凝土桥面板1和钢梁2;预制混凝土桥面板1安装于钢梁2上方;钢梁2的上翼缘板2a上固接有沿着钢梁纵向延伸的肋板3;预制混凝土桥面板1的底部设置有沿着钢梁纵向延伸的槽道4,该槽道4为长方体状,并且内壁均通过粗糙化处理,其中槽道4界面粗糙化处理的方法包括涂刷药剂、水枪冲洗凿毛、喷砂等。几种比较常用的做法是:(1)表面缓凝剂+高压水枪冲洗:在预留凹槽底模上涂表面缓凝剂,当混凝土强度达到设计强度的30%时,拆除预留凹槽处底模,及时用高压水冲洗水泥浆,使表面露出石子,达到凿毛效果。(2)预留凹槽底模采用专用粗糙化模板,包括模板和网状物,网状物可拆卸固定在模板表面,网状物与模板的表面大小相同,网状物的几何形状在预留槽道界面的表面形成闭合的内凹几何形状;肋板3位于槽道4内,肋板3上设置有多个通孔,并且肋板3的表面上加工有可提高肋板表面粗糙度的花纹;上翼缘板2a的两侧边沿固接有沿着钢梁纵向延伸的橡胶封条5;预制混凝土桥面板1的底面搭接在所述橡胶封条5上,预制混凝土桥面板1通过自身重力对橡胶封条5实现压缩从而保证了其密封性,例如:某钢混组合箱梁采用邵氏硬度为60的高弹性、高密度、耐老化、防腐蚀的氯丁橡胶条。橡胶条在预制桥面板重量作用下由厚35mm压缩到20mm,压缩率达到42.8%。上翼缘板2a、橡胶封条5、预制混凝土桥面板1的底面和槽道4四者围成一倒T字形灌浆通道6(如图10所示);灌浆通道6内填充有高强灌胶料7,高强灌胶料7形成自锁连接件,该高强灌胶料7是一种早强(1d>35MPa)、流动性好(扩展度>550mm)、抗压强度高(28d>80MPa)的水泥基干混材料。As can be seen from the structural schematic diagram of a construction method of a high-efficiency assembled steel-concrete composite beam shown in Fig. 6 and Fig. 7, the high-efficiency assembled steel-concrete composite beam of the present invention includes a prefabricated concrete bridge deck 1 and a steel girder 2; The panel 1 is installed above the steel girder 2; the upper flange plate 2a of the steel girder 2 is fixed with a rib plate 3 extending longitudinally along the steel girder; the bottom of the precast concrete bridge deck 1 is provided with a groove extending longitudinally along the steel girder channel 4, the channel 4 is in the shape of a cuboid, and the inner walls are all roughened, and the methods for roughening the interface of the channel 4 include brushing chemicals, washing chisels with a water gun, and sandblasting. Several commonly used methods are: (1) surface retarder + high-pressure water gun flushing: apply surface retarder on the bottom mold of the reserved groove, and remove the reserved groove when the concrete strength reaches 30% of the design strength At the bottom mold, wash the cement slurry with high-pressure water in time to expose the stones on the surface and achieve the chisel effect. (2) The bottom mold with reserved grooves adopts a special roughened template, including a template and a mesh. The mesh is detachably fixed on the surface of the template. The size of the mesh is the same as the surface of the template. The surface of the groove interface forms a closed concave geometry; the rib 3 is located in the groove 4, and the rib 3 is provided with a plurality of through holes, and the surface of the rib 3 is processed to improve the surface roughness of the rib. pattern; the two sides of the upper flange plate 2a are fixed with rubber seals 5 extending longitudinally along the steel beam; the bottom surface of the precast concrete bridge deck 1 is lapped on the rubber seal 5, and the precast concrete bridge deck 1 passes through itself Gravity compresses the rubber seal 5 to ensure its tightness. For example, a steel-concrete composite box girder adopts a highly elastic, high-density, aging-resistant, and corrosion-resistant neoprene strip with a Shore hardness of 60. The rubber strip is compressed from 35mm thick to 20mm under the weight of the prefabricated bridge deck, and the compression rate reaches 42.8%. The upper flange plate 2a, the rubber seal 5, the bottom surface of the precast concrete bridge deck 1 and the channel 4 form an inverted T-shaped grouting channel 6 (as shown in Figure 10); the grouting channel 6 is filled with high-strength grouting material 7. The high-strength potting material 7 forms a self-locking joint. The high-strength potting material 7 is a kind of early strength (1d>35MPa), good fluidity (expansion>550mm), and high compressive strength (28d>80MPa). Cement based dry mix material.

在本发明中,预制混凝土桥面板1和钢梁2均可以在加工工厂内进行标准化预制,同时完成预制混凝土桥面板1底部槽道4的加工以及粗糙化处理,然后将预制完成的预制混凝土桥面板1和钢梁2运抵施工安装现场拼装。故预制混凝土桥面板1可以通过预制多块预制桥面板1a,然后在施工现场预制混凝土桥面板节段1a之间通过胶接连接即可形成预制混凝土桥面板1,为了提高预制混凝土桥面板节段1a胶接的稳定性,预制混凝土桥面板节段1a之间的胶接面上设置有多个剪力键齿8,如图11所示。安装时只需将肋板3插入桥面板槽道4,通过预制混凝土桥面板节段1a上的灌浆口9压注一种高强灌浆料7来实现钢混组合如图12所示,整个安装期无需混凝土现浇工序。在每块预制混凝土桥面板节段1a的槽道4上方均设置灌浆口,其中进浆口布置于起始节段或最后一个节段内,其余节段均布置出浆口。本发明中钢梁2的结构可采用工字型钢梁或者槽型钢梁,如图8和图9所示。In the present invention, both the prefabricated concrete bridge deck 1 and the steel girder 2 can be standardized and prefabricated in the processing factory, and the processing and roughening of the bottom channel 4 of the prefabricated concrete bridge deck 1 can be completed at the same time, and then the prefabricated concrete bridge can be prefabricated The panels 1 and steel beams 2 are delivered to the construction and installation site for assembly. Therefore, the precast concrete bridge deck 1 can be formed by prefabricating multiple precast bridge decks 1a, and then connecting the precast concrete bridge deck sections 1a at the construction site to form the precast concrete bridge deck 1. 1a The stability of the glued joint, a plurality of shear keys 8 are arranged on the glued joint surface between the precast concrete bridge deck segments 1a, as shown in FIG. 11 . During installation, it is only necessary to insert the rib plate 3 into the bridge deck channel 4, and inject a high-strength grouting material 7 through the grouting port 9 on the precast concrete bridge deck segment 1a to realize the steel-concrete combination, as shown in Figure 12. The entire installation period No concrete pouring process is required. A grouting port is provided above the channel 4 of each precast concrete bridge deck segment 1a, wherein the grouting port is arranged in the initial segment or the last segment, and the grouting port is arranged in the remaining segments. The structure of the steel beam 2 in the present invention can be an I-shaped steel beam or a channel-shaped steel beam, as shown in Fig. 8 and Fig. 9 .

通过向上翼缘板2a、橡胶封条5、预制混凝土桥面板1的底面和槽道4四者围成的一倒T字形密封的灌浆通道6内注入高强灌浆料7形成的一种自锁连接件是本发明用以解决钢混组合梁结合面腐蚀、混凝土开裂、后浇混凝土质量难以控制等问题关键,该自锁连接件的结构形式如图7所示。该自锁连接件的工作原理如下:与传统连接件不同,该自锁连接件是依靠高强灌浆料与桥面板预留凹槽及钢板界面间的粘结、摩擦来满足纵向抗剪及竖向拉拔等受力需求的。图13为自锁连接件抵抗纵向剪力的工作原理,在纵向剪力τ作用下,钢混界面有滑移s的趋势同时必然伴随着不同材料间的隆起分离u,而这种分离u又受制于桥面板内横向预应力所产生的正应力σ,分离趋势越大,正应力也越大。从作用机理来说,也将这种高效快速连接形式称之为自锁连接件。A self-locking connector formed by injecting high-strength grouting material 7 into an inverted T-shaped sealed grouting channel 6 surrounded by the upper flange plate 2a, the rubber seal 5, the bottom surface of the precast concrete bridge deck 1 and the channel 4 It is the key of the present invention to solve the problems of steel-concrete composite beam joint surface corrosion, concrete cracking, and difficulty in controlling the quality of post-cast concrete. The structural form of the self-locking connector is shown in Figure 7. The working principle of the self-locking connector is as follows: Different from the traditional connector, the self-locking connector relies on the bonding and friction between the high-strength grouting material and the reserved groove of the bridge deck and the steel plate interface to meet the longitudinal shear and vertical Pulling and other force requirements. Figure 13 shows the working principle of the self-locking connector against longitudinal shear force. Under the action of longitudinal shear force τ, the steel-concrete interface has a tendency to slip s and at the same time must be accompanied by a bulge separation u between different materials, and this separation u Constrained by the normal stress σ generated by the transverse prestress in the bridge deck, the greater the separation tendency, the greater the normal stress. From the mechanism of action, this high-efficiency quick connection form is also called a self-locking connector.

使用本发明的具体方式如下:The concrete mode of using the present invention is as follows:

(1)在工厂内制造完成钢梁部分,包括对钢梁上方肋板的花纹、开孔等加工内容;(1) Manufacture the steel beam part in the factory, including the processing content such as the pattern and opening of the rib plate above the steel beam;

(2)在预制场内浇筑混凝土桥面板。先浇筑起始节段,并以此节段作为匹配节段,浇筑下一桥面板节段;(2) Concrete bridge decks are poured in the precast yard. The initial segment is poured first, and this segment is used as a matching segment to pour the next bridge deck segment;

(3)节段桥面板预制完成,需对桥面板下方预留槽道界面进行粗糙化处理,处理手段包括涂刷药剂、水枪冲洗凿毛、喷砂等;(3) After the segmental bridge deck is prefabricated, it is necessary to roughen the interface of the channel reserved under the bridge deck. The treatment methods include brushing chemicals, washing chisels with water guns, sandblasting, etc.;

(4)在拼装现场,通过起吊设备安装组合梁中的钢梁部分;(4) At the assembly site, install the steel beam part in the composite beam by lifting equipment;

(5)以钢梁作为拼装平台,在桥面板安装前,将横向预应力钢束及锚具安装到位,待到混凝土桥面板安装完成以及桥位处灌浆完成后,可以利用千斤顶对横向预应力钢束进行张拉。依次安装小节段混凝土桥面板,节段间通过涂抹环氧树脂胶进行连接;桥面板安装之前,需事先在钢梁顶板顶面沿两侧边缘顺桥向通长粘贴可压缩的橡胶封条以形成钢混间的灌浆通道;预制桥面板利用自身重量应将橡胶条完全压缩,以保证灌浆通道的密封性;(5) Use the steel girder as the assembly platform. Before the bridge deck is installed, install the transverse prestressed steel beams and anchors in place. Steel strands are tensioned. Small segmental concrete bridge decks are installed in sequence, and the segments are connected by applying epoxy resin glue; before the bridge deck is installed, compressible rubber seals must be pasted on the top surface of the steel girder roof along the edges of both sides along the length of the bridge to form The grouting channel in the steel-concrete room; the prefabricated bridge deck should fully compress the rubber strip by its own weight to ensure the sealing of the grouting channel;

(6)在通道内压注专用高强灌浆料。压浆前先用压力清水冲洗将要压浆的孔道,再将灌浆料从进浆口的一端压入,从出浆口排出后封闭;其具体步骤包括:首先,在灌浆前,采用压入空气对灌浆通道进行清孔,并检验密封橡胶条是否能承受灌浆压力;然后,将灌浆料应按照产品使用说明拌制均匀,其流动度应符合产品使用要求;接着,在灌浆时,将灌浆料从进浆口注入,持续到各出浆口孔连续流出圆柱状浆液后用橡胶塞封堵排浆孔;完成灌浆后,应对组合梁加强保护,避免受到冲击、振动,且待灌浆料达到规定强度后方可进行后续施工,需要注意的是灌浆操作过程中,如果出现无法出浆的情况,应立即停止灌浆作业,查明原因及时排除故障。(6) Pressure inject special high-strength grouting material in the channel. Before grouting, first wash the hole to be grouted with pressure water, then press the grouting material from one end of the grouting port, and then close it after being discharged from the grouting port; the specific steps include: first, before grouting, press air Clean the grouting channel and check whether the sealing rubber strip can withstand the grouting pressure; then, the grouting material should be mixed evenly according to the product instructions, and its fluidity should meet the requirements of the product; then, when grouting, the grouting material Inject from the grout inlet until the cylindrical grout continuously flows out from each grout outlet hole, then seal the grout hole with a rubber plug; after the grouting is completed, the composite beam should be protected to avoid impact and vibration, and the grouting material should meet the specified requirements Subsequent construction can be carried out after the strength is reached. It should be noted that during the grouting operation, if the grout cannot be produced, the grouting operation should be stopped immediately, and the cause should be found out and the fault should be eliminated in time.

(7)张拉桥面板内横向预应力。(7) Transverse prestress in the deck of the tensioned bridge.

此外,通过采取将钢肋板表面加工成花纹状或直接开孔、桥面板预留凹槽设置为键齿型等构造措施,进一步改善高强灌浆料与钢混界面的粘结性能,更能满足受力要求。In addition, by taking structural measures such as processing the surface of the steel ribs into a pattern shape or directly opening holes, and setting the reserved grooves of the bridge deck as key teeth, the bonding performance between the high-strength grouting material and the steel-concrete interface is further improved, and it can better meet Stress requirements.

以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本领域的技术人员在本发明所揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present invention. All should be covered within the protection scope of the present invention.

Claims (9)

1.一种高效装配式钢混组合梁的施工方法,其特征在于:以顶端连接有橡胶封条(5)和肋板(3)的钢梁(2)为拼装平台,将底端设置有槽道(4)的预制混凝土桥面板(1)搭放在橡胶封条(5)上,向钢梁(2)、橡胶封条(5)、预制混凝土桥面板(1)围成的灌浆通道(6)内注入高强灌浆料(7)形成钢混组合梁;所述钢梁(2)的上翼缘板(2a)上固接有沿着钢梁纵向延伸的肋板(3);其具体施工步骤包括:1. A construction method for high-efficiency assembled steel-concrete composite beams, characterized in that: the steel beams (2) connected with rubber seals (5) and ribs (3) at the top are used as assembly platforms, and the bottom ends are provided with grooves The precast concrete bridge deck (1) of the road (4) is placed on the rubber seal (5), and the grouting channel (6) surrounded by the steel beam (2), the rubber seal (5), and the precast concrete bridge deck (1) Inject high-strength grouting material (7) to form a steel-concrete composite beam; the upper flange plate (2a) of the steel beam (2) is fixed with a rib plate (3) extending longitudinally along the steel beam; the specific construction steps include: (1)在工场内完成钢梁的制造,并在钢梁的上翼缘板上固接花纹开孔肋板,同时在钢梁的上翼缘板的两侧边缘沿钢梁纵向粘贴可压缩的橡胶封条;(1) Complete the manufacture of the steel girder in the workshop, and fix the patterned perforated ribs on the upper flange of the steel girder, and at the same time paste compressible ribs on both sides of the upper flange of the steel girder along the longitudinal direction of the steel girder rubber seals; (2)在预制场内浇筑底端带有槽道的预制混凝土桥面板节段,(2) Pouring precast concrete bridge deck segments with channels at the bottom in the precast yard, 首先浇筑起始节段,并以此节段作为匹配节段,浇筑下一节面板节段;First pour the initial segment, and use this segment as a matching segment to pour the next panel segment; (3)对每个预制混凝土桥面板节段底端的槽道进行粗糙化加工;(3) Roughening the channel at the bottom of each precast concrete deck segment; (4)在施工现场利用起吊设备安装组合梁中的钢梁部分,以钢梁作为拼装平台,在预制混凝土桥面板节段安装前,将横向预应力钢束及锚具安装到位,然后依次安装预制混凝土桥面板节段,各预制混凝土桥面板节段之间通过环氧树脂胶连接形成预制混凝土桥面板;(4) Use hoisting equipment to install the steel beam part of the composite beam at the construction site, and use the steel beam as the assembly platform. Before the precast concrete bridge deck section is installed, install the transverse prestressed steel beams and anchors in place, and then install them in sequence Prefabricated concrete bridge deck segments, each precast concrete bridge deck segment is connected by epoxy resin glue to form a precast concrete bridge deck; (5)各预制混凝土桥面板节段铺设连接完成后,预制混凝土桥面板、槽道、橡胶封条和预制钢梁四者围成一密封的灌浆通道;(5) After the laying and connection of each precast concrete bridge deck section is completed, the precast concrete bridge deck, channel, rubber seal and prefabricated steel girder form a sealed grouting channel; (6)通过预制混凝土桥面板上的灌浆口向灌浆通道内压注高强灌浆料,持续到各灌浆口连续流出圆柱状浆液后用橡胶塞封堵排浆孔;(6) Pressure-inject high-strength grouting material into the grouting channel through the grouting port on the prefabricated concrete bridge deck, and then use rubber plugs to block the grouting hole after each grouting port continuously flows out of cylindrical grout; (7)利用横向预应力钢束及锚具张拉桥面板内横向预应力。(7) Use transverse prestressed steel tendons and anchors to tension the transverse prestress in the bridge deck. 2.如权利要求1所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述预制混凝土桥面板(1)包括多块预制混凝土桥面板节段(1a);所述预制混凝土桥面板节段(1a)之间通过环氧树脂胶接连接。2. The construction method of a kind of efficient prefabricated steel-concrete composite beam as claimed in claim 1, is characterized in that: said prefabricated concrete bridge deck (1) comprises a plurality of prefabricated concrete bridge deck segments (1a); said The prefabricated concrete bridge deck segments (1a) are connected by epoxy resin bonding. 3.如权利要求2所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述预制混凝土桥面板节段(1a)之间设置有多个剪力键齿(8)。3. The construction method of a high-efficiency assembled steel-concrete composite beam as claimed in claim 2, characterized in that: a plurality of shear splines (8) are arranged between the precast concrete bridge deck segments (1a) . 4.如权利要求2所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述预制混凝土桥面板节段(1a)的槽道(4)上方设置有与槽道(4)连通的灌浆口(9)。4. the construction method of a kind of efficient prefabricated steel-concrete composite beam as claimed in claim 2, is characterized in that: the channel (4) top of described prefabricated concrete deck section (1a) is provided with channel ( 4) A connected grouting port (9). 5.如权利要求1所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述肋板(3)上有可提高肋板表面粗糙度的花纹和多个通孔。5. The construction method of a high-efficiency assembled steel-concrete composite beam according to claim 1, characterized in that: the ribs (3) have patterns and a plurality of through holes that can improve the surface roughness of the ribs. 6.如权利要求1所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述槽道(4)的表面均通过粗糙化处理。6. The construction method of a high-efficiency assembled steel-concrete composite beam according to claim 1, characterized in that: the surfaces of the channels (4) are all roughened. 7.如权利要求6所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述槽道(4)的表面粗糙化处理的方法包括:7. The construction method of a high-efficiency assembled steel-concrete composite beam as claimed in claim 6, characterized in that: the surface roughening treatment method of the channel (4) comprises: (1)在所述槽道(4)底模上涂表面缓凝剂,当混凝土强度达到设计强度的30%时,拆除预留凹槽处底模;(1) coat surface retarder on the bottom mold of the channel (4), and when the concrete strength reaches 30% of the design strength, remove the bottom mold at the reserved groove; (2)用高压水冲洗水泥浆,使表面露出石子,达到凿毛效果。(2) Rinse the cement slurry with high-pressure water to expose the stones on the surface to achieve the chisel effect. 8.如权利要求6所述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述槽道(4)的表面粗糙化处理时的采用专用粗糙化模板;所述粗糙化模板包括模板和网状物;所述网状物可拆卸固定在所述模板表面;所述网状物与所述模板的表面大小相同;所述网状物的几何形状在所述槽道(4)界面的表面形成闭合的内凹几何形状。8. The construction method of a kind of high-efficiency assembled steel-concrete composite beam as claimed in claim 6, is characterized in that: when the surface roughening treatment of described channel (4) adopts special-purpose roughening formwork; The template includes a template and a mesh; the mesh is detachably fixed on the surface of the template; the mesh is the same size as the surface of the template; the geometry of the mesh is in the groove ( 4) The surface of the interface forms a closed concave geometry. 9.如权利要求1述的一种高效装配式钢混组合梁的施工方法,其特征在于:所述预制混凝土桥面板的起始节段或最后一个节段上设置有进浆口;所述混凝土桥面板的其余节段上均设置有出浆口。9. The construction method of a high-efficiency assembled steel-concrete composite beam as claimed in claim 1, characterized in that: the initial segment or the last segment of the precast concrete bridge deck is provided with a grout inlet; The remaining segments of the concrete bridge deck are provided with grout outlets.
CN201510618402.2A 2015-09-24 2015-09-24 A kind of construction method of efficiently assembled steel reinforced concrete combination beam Active CN105113425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510618402.2A CN105113425B (en) 2015-09-24 2015-09-24 A kind of construction method of efficiently assembled steel reinforced concrete combination beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510618402.2A CN105113425B (en) 2015-09-24 2015-09-24 A kind of construction method of efficiently assembled steel reinforced concrete combination beam

Publications (2)

Publication Number Publication Date
CN105113425A CN105113425A (en) 2015-12-02
CN105113425B true CN105113425B (en) 2017-12-26

Family

ID=54661519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510618402.2A Active CN105113425B (en) 2015-09-24 2015-09-24 A kind of construction method of efficiently assembled steel reinforced concrete combination beam

Country Status (1)

Country Link
CN (1) CN105113425B (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908631B (en) * 2016-05-11 2017-12-19 中铁十四局集团第二工程有限公司 A kind of built-in type steel reinforced concrete joint portion mud jacking filling device and construction method
CN106120532A (en) * 2016-07-26 2016-11-16 宁波金蛟龙重工钢构有限公司 A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof
CN106149546A (en) * 2016-08-04 2016-11-23 浙江工业大学 Steel-Rubber Concrete Composite Bridge Beam-Slab
CN106284047A (en) * 2016-08-04 2017-01-04 浙江工业大学 Steel‑Concrete Composite Bridge Beams and Slabs
CN108071070A (en) * 2016-11-11 2018-05-25 重庆大学 It a kind of longitudinal direction can limited slip joint
CN106835930B (en) * 2017-04-10 2018-10-16 广州大学 A kind of bolt connecting type steel concrete combination beam
CN107620254B (en) * 2017-09-29 2023-10-31 中交公路长大桥建设国家工程研究中心有限公司 The mid-span area of the main span is a hybrid composite girder bridge made of steel and lightweight concrete.
CN107938493A (en) * 2017-12-28 2018-04-20 贵州大学 A kind of novel fabricated combination beam
CN108316530A (en) * 2018-01-11 2018-07-24 水利部交通运输部国家能源局南京水利科学研究院 The assembled steel reinforced concrete composite floor and installation method connected using self-locking
CN108385522B (en) * 2018-01-17 2019-12-03 中交第二航务工程局有限公司 Prefabricated and assembled UHPC composite beams and rapid construction method
CN108625284A (en) * 2018-06-08 2018-10-09 苏交科集团股份有限公司 Assembly type concrete beam plate and installation and maintenance method
CN109610310B (en) * 2018-12-12 2023-07-25 湖南大学 Steel-UHPC Composite Bridge Deck Structure Applicable to Cantilever State and Its Construction Method
CN109629419B (en) * 2019-01-18 2024-04-19 中铁第四勘察设计院集团有限公司 Post-bonded steel-concrete bonded beam and bridge with high-efficiency prestressing force application and construction method
CN109736201A (en) * 2019-01-18 2019-05-10 中铁第四勘察设计院集团有限公司 A kind of built-in wet joint post-bonded steel-concrete composite beam and bridge and construction method
CN110409280A (en) * 2019-07-24 2019-11-05 中交第一公路勘察设计研究院有限公司 Prefabricated quick installation composite beam
CN110468727B (en) * 2019-09-06 2024-05-28 中铁第四勘察设计院集团有限公司 Temporary prestress tensioning pedestal and lifting point integrated structure of segmental beam and construction method
CN110528702B (en) * 2019-09-10 2020-10-20 中铁隧道局集团有限公司 Construction method for bonding thin-layer epoxy structural adhesive of steel-concrete composite beam
CN110863418B (en) * 2019-12-12 2024-08-02 长安大学 Assembled external prestress steel truss combined beam structure and construction method thereof
CN111622113A (en) * 2020-05-08 2020-09-04 中铁九桥工程有限公司 Steel-concrete composite beam prefabricated bridge deck installation and combination interface seam treatment process
CN111778835A (en) * 2020-07-01 2020-10-16 上海市城市建设设计研究总院(集团)有限公司 Composite beam of steel, ordinary concrete and ultra-high performance concrete and construction method
CN111877640A (en) * 2020-09-09 2020-11-03 河南工业大学 Prefabricated steel-concrete composite beam connected by perforated steel plates and manufacturing method
CN112144383B (en) * 2020-10-23 2023-05-05 湖南工学院 Prefabricated steel-concrete composite beam and its installation and construction method
CN112695617B (en) * 2021-02-04 2024-11-29 重庆交通大学 Shear connection structure for assembled steel-concrete composite beam
CN117721699B (en) * 2023-09-13 2026-06-26 山西省交通科技研发有限公司 Steel-UHPC composite beams with hybrid connections using multiple PBL connectors and their design methods

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5394667A (en) * 1993-03-01 1995-03-07 Nystrom; Ron Flooring construction and method
CN203320417U (en) * 2013-04-07 2013-12-04 同济大学 Composite beam bridge deck structure with replaceable bridge deck slab
CN203284707U (en) * 2013-05-23 2013-11-13 苏州荣生大方路桥建设工程有限公司 Assembled-type three-dimensional city road system
CN103452320A (en) * 2013-09-05 2013-12-18 中铁上海工程局有限公司 Concrete dabbing construction method
CN203546589U (en) * 2013-10-24 2014-04-16 同济大学 Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
CN104195950A (en) * 2014-08-15 2014-12-10 中交第二航务工程局有限公司 Steel-concrete composite beam cable-stayed bridge glued joint connecting method

Also Published As

Publication number Publication date
CN105113425A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105113425A (en) Novel construction method for efficient fabricated steel-concrete composite beam
CN105350445A (en) Novel efficient assembly-type reinforced concrete composite beam
CN104831617B (en) Steel-Ultra High Performance Concrete Composite Beam Based on Ribbed Deck and Its Construction Method
CN108049498B (en) Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure
CN105862538B (en) The oblique bond-retarded prestressed concrete pavement structure of assembled
CN105484142B (en) A kind of pin-connected panel precast segment concrete hollow slab beam structure and preparation method thereof
CN105133492B (en) Concrete bridge deck with channels at bottom
CN206189455U (en) a corridor
CN110792164B (en) A kind of horizontal assembly device and assembly method of prefabricated shear wall
CN104652294A (en) New technology for reinforcing box girder through adhesion of UHPC (Ultra High Performance Concrete) and steel plate
CN108643031A (en) A kind of Precast Concrete Segmental Bridges bridge pier steel reinforced concrete jointing
CN106320162A (en) Prefabricated assembly cap beam structure with steel shear keys and construction method
CN115369910A (en) Post-tensioned prestressed assembled substation prefabricated independent foundation under prefabricated columns and its design method
CN109653350B (en) Mixed reinforcement embedded low-prestress dry beam column node and method
CN110468708A (en) A composite deck structure of steel-UHPC prefabricated panels and its construction method
CN209443571U (en) A kind of large span fabricated construction self-balancing tenon-prestressing combination connecting node
CN107700731A (en) A kind of precast assemble floor and construction method
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN103556564B (en) A kind of assembled slab bridge based on the connection of steel diaphragm plate and construction method thereof
CN206189590U (en) Full precast prestressed assembly structure
CN116005548A (en) Segmental prefabricated assembled steel concrete composite beam and construction method thereof
CN209227836U (en) Prefabricated concrete structure wall-column full steel key connection structure
CN211737147U (en) Prefabricated piecing and assembling connecting device for tunnel with super-large section
CN108411801A (en) One kind reinforcing the old hollow slab bridge construction of single hole and construction method by real abdomen Bars In Poured Concrete Slab
CN205116011U (en) Bottom has novel concrete bridge panel of channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination