CN108442370A - The broken pile connector processing method of prestressed concrete pipe pile - Google Patents

The broken pile connector processing method of prestressed concrete pipe pile Download PDF

Info

Publication number
CN108442370A
CN108442370A CN201710083253.3A CN201710083253A CN108442370A CN 108442370 A CN108442370 A CN 108442370A CN 201710083253 A CN201710083253 A CN 201710083253A CN 108442370 A CN108442370 A CN 108442370A
Authority
CN
China
Prior art keywords
pile
concrete
broken
broken pile
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710083253.3A
Other languages
Chinese (zh)
Inventor
肖宇峰
马桂兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710083253.3A priority Critical patent/CN108442370A/en
Publication of CN108442370A publication Critical patent/CN108442370A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

A kind of broken pile connector processing method of prestressed concrete pipe pile is suitable for φ 500mm below broken pile of the fracture position within 2m below earth excavation face, it is characterised in that include the following steps:A, unwrapping wire positions, and b, smooth location, c, excavator are in place, d, excavation, and e, pile pile fill core, f, cast-in-situ steel reinforced concrete short column(6)Bundle muscle, formwork, pour concrete, g, maintenance, h, backfilling of earthwork compacting, i, casting concrete bed course(3).The broken pile connector processing method of the prestressed concrete pipe pile of the present invention has the operating mode that pile driving construction is hammered suitable for foundation pit pile foundation engineering by factors are affected and the generate broken pile such as soil property is poor, different soil conditions can be directed to, operation is carried out using reasonable construction method, method is simple, advantage easy for construction.

Description

The broken pile connector processing method of prestressed concrete pipe pile
Technical field
The present invention relates to a kind of broken pile connector processing methods of pile pile in basic engineering construction, specifically, being a kind of pre- The broken pile connector processing method of prestressed concrete pile pile.
Background technology
In recent years, with the expansion of the development of production and capital construction scale, foundation engineering is more and more, pile for prestressed pipe Fast, short time limit, the geology that design Application Range is wide, bearing capacity of single pile is high, larger to supporting course fluctuations with its speed of application Condition is adaptable, and transporting and hoisting is convenient, pile extension is quick, cost is relatively cheap, is not limited by construction machinery at pile length The advantage of aspect, the application in pile foundation engineering are also more extensive.But it during pile for prestressed pipe pile foundation construction, is also easy Survey the soil property for failing to verify with encountering(Boulder and barrier is more, hard soil layer)Soil layer in situation and place(Muck soil) It is poor, cause pile crown to be battered down or because of the depression of stake machine to squeeze off pile for prestressed pipe, tube pile construction is caused to lose.Simultaneously because of design The remedial measures such as staking and cause expense increase significantly, the duration be significantly affected, cause economic benefit of engineering to glide.
Therefore there is upper for the processing mode of the remedial measures such as broken pile design staking of known prestressed concrete pipe pile State various inconvenient and problems.
Invention content
The purpose of the present invention is to propose a kind of φ to fracture position shallow-layer within 2m below earth excavation face 500mm broken piles below, using the broken pile connector processing method of the prestressed concrete pipe pile of Reinforced Concrete Short Column pile extension.
To achieve the above object, technical solution of the invention is:
A kind of broken pile connector processing method of prestressed concrete pipe pile, be suitable for fracture position below earth excavation face 2m with Interior φ 500mm broken piles below, it is characterised in that include the following steps:
A, unwrapping wire positions
According to construction drawing and pile driving record, the specific location of broken pile is accurately positioned, and spreads lime line and marks;
B, smooth location
Mud, boulder barrier in broken pile peripheral extent are purged, and it is smooth to carry out construction site, avoids excavator in place The further damage to other in broken pile or foundation pit is caused afterwards;
C, excavator is in place
Select 0.6m3Small-sized excavator excavate, excavator track route avoids stake position region, can not avoid strictly according to the facts, then as possible Necessary protection is carried out to the stake position within the scope of excavator track route, the shoveling slope that excavator is seated in broken pile as possible influences model Other than enclosing;
D, it excavates
From broken pile position, peripheral position slowly excavates after excavator is in place, directly must not down excavate, be avoided to disconnected at the top of broken pile Stake and all skirt piles position damage, and floor manager is carried out with technical staff;It is excavated at broken pile to stop after lower 600mm It excavates down, is specifically determined according to soil property situation and excavate the slope gradient, the gradient 1:0.5-1:19, operating surface >=300mm;
E, pile pile fills core, includes the following steps:
(1)Prestressed concrete pipe pile is cut to form smooth port using pipe pile cutter at broken pile;
(2)Make steel reinforcement cage:8 root long degree >=1400mm, the 1st reinforcing bars of diameter 20mm and circular steel plate welding are taken, with the 1st reinforcing bar Make anchoring main reinforcement, the circular steel plate supporting plate of one end and the 5mm thickness of diameter < prestressed concrete pipe pile diameters makees vertical welding, Several 1st reinforcing bar encrypted areas are using spacing 100mm arrangements;Make stirrup, spacing 100mm with the 2nd reinforcing bars of diameter 8mm;
(3)Steel reinforcement cage will be made to be inserted into broken pile pipe
Steel reinforcement cage will be made with circular steel plate to make in bottom end insertion broken pile pipe, insertion depth is not less than 1400mm, close to the 1st reinforcing bar Expose the bending to outside pipe of prestressed concrete pipe pile circumference port;It is short that the 1st reinforcing bar positioned at middle section stretches into armored concrete In column, the diameter that reinforcing bar length is not less than the 50 × the 1st reinforcing bar is stretched into;
(4)The placing concrete in steel reinforcement cage
First remove broken pile tube top end and pile pipe inner wall laitance, with C40 slightly expanded concretes in steel reinforcement cage placing concrete, reach It is poured in steel reinforcement cage in broken pile tube top end full;
F, the bundle muscle of cast-in-situ steel reinforced concrete short column, formwork, pour concrete, include the following steps:
(1)Below the outside of broken pile pipe joint area 100mm thickness concrete cushions are poured around pile pile(9);
(2)In exterior circumference of broken pile pipe etc. point 4 the 3rd reinforcing bars of arrangement, one end of the 3rd reinforcing bar is made to be located at cap design of pile bottom absolute altitude At the above 100mm, the other end is located on the outside of steel reinforcement cage at concrete cushion, and the circular stirrups of the 3rd reinforcing bar use Φ 8mmHPB300 Reinforcing bar, spacing 100mm;
(3)Casting concrete template is set in the cuboid framework that 4 the 3rd reinforcing bars and its circular stirrups are formed, forms cast-in-place steel Reinforced concrete short column frame, cast-in-situ steel reinforced concrete short column main reinforcement use 8 HRB400 reinforcing bars, stirrup to use HPB300 steel Muscle, spacing are 8@100 of Φ;Cast-in-situ steel reinforced concrete short column main reinforcement and its stirrup are anchored at the reinforced concrete on top by code requirement In native cushion cap, anchor bar length is not less than the diameter of 50 × anchor bar, then uses C35 concretings, compacting, press polish Concrete surface;
G, it conserves
The conventional moisturizing that is carried out 14 days or more to the concrete that has poured, insulated curing, must not collide during maintenance or return in advance Earth fill;
H, backfilling of earthwork is tamped
The earthwork of backfill need to meet design and related specification requirement, and compaction in layers is smooth, backfill the compactness of the earthwork and must accord with Close design and code requirement;
I, casting concrete bed course
100mm thickness concrete cushions are poured according to design and code requirement, the pouring reinforcement concrete cushion cap on concrete cushion, Complete the broken pile connector processing of prestressed concrete pipe pile.
The present invention prestressed concrete pipe pile broken pile connector processing method can also using technical measures below come It further realizes.
Method above-mentioned, wherein the broken pile peripheral extent, which is radius, is equal to >=the region of 3m.
Method above-mentioned, wherein the 1st reinforcing bar is HRB400 reinforcing bars.
Method above-mentioned, wherein a height of 2800mm of the cast-in-situ steel reinforced concrete short column, cross section is length of side 600- The square of 700mm.
After adopting the above technical scheme, the broken pile connector processing method of the prestressed concrete pipe pile of the present invention is with following Advantage:
1, work of the pile driving construction by factors are affected and the generate broken pile such as soil property is poor is hammered suitable for foundation pit pile foundation engineering Condition;
2, different soil conditions can be directed to and operation is carried out using reasonable construction method, method is simple, easy for construction;
3, different soil conditions can be directed to and operation is carried out using reasonable construction method, method is simple, easy for construction.
Description of the drawings
Fig. 1 is that the broken pile connector of the embodiment of the present invention handles structural schematic diagram;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the B-B sectional views in Fig. 1.
In figure:1 steel plate 5mm steel plates and reinforcing bar full weld, 2 prestressed concrete pipe piles, 3 concrete cushions, 4 cap design of pile Bottom absolute altitude, 5 reinforced concrete pile caps, 6 cast-in-situ steel reinforced concrete short columns, 7 the 1st reinforcing bars, 8 the 2nd reinforcing bars, 9C15 concrete cushions, 10 the 3rd reinforcing bars.
Specific implementation mode
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The new east plot Wang Dong housing for survivor project is located at Bengbu Yuhui District, west to Youyi Community, south to East Sea main road, north to Changxing Road.Single building 13, wherein 12 residential buildings, 1 kindergarten;186446.66 ㎡ of overall floorage.Ground overall floorage 146654.36 ㎡, basement 39792.3 ㎡ constructions.Using 3 Driven Piles machines while prefabricated reinforced concrete pile pile of constructing: PHC-500-AB-100 type stakes.In prefabricated tubular pile work progress, when stake machine is constructed near A axis, 26 lines, is changed because of part and fill out depth Not enough and place mucky silt layer carries force difference, causes Driven Piles machine depression.Although taking treatment measures in time, the earthwork A axis is found after excavation, at 26 lines(Number of constructing 104#)Prefabricated tubular pile is still broken.Fracture position is in earth excavation face Following 2m.104# are thin-walled prefabricated tubular pile, and ultimate vertical bearing capacity standard value is 1280KN.
The broken pile connector processing method of the prestressed concrete pipe pile of the present invention is used for the broken pile treatment of the project, construction Flow is:Unwrapping wire positioning → smooth location → excavator is in place → it excavates(With lower 600mm at digging to broken pile)→ pile pile filling core → Short column pricks muscle, formwork, pours concrete → maintenance → and be backfilling and compacted → pour cushion cap concrete bed course → reinforced concrete pile cap and construct.
Structural schematic diagram is handled referring now to the broken pile connector that Fig. 1-Fig. 3, Fig. 1 are the embodiment of the present invention, Fig. 2 is in Fig. 1 A-A sectional views, Fig. 3 is the B-B sectional views in Fig. 1.
The broken pile connector processing method of the prestressed concrete pipe pile of the present invention, includes the following steps:
A, unwrapping wire positions
According to construction drawing and pile driving record, the specific location of broken pile is accurately positioned, is used in combination lime to spread line and marks.
B, smooth location
To broken pile periphery(Radius R=3m)The barriers such as mud, boulder are purged in range, and it is smooth to carry out construction site, keeps away Exempt to cause further to damage other stakes in broken pile or foundation pit after excavator is in place.
C, excavator is in place
Select 0.6m3Small-sized excavator excavate, excavator track route avoids stake position region, can not avoid strictly according to the facts, then as possible Necessary protection is carried out to the stake position within the scope of excavator track route, the shoveling slope that excavator is seated in broken pile as possible influences model Other than enclosing.
D, it excavates
From broken pile position, peripheral position slowly excavates after excavator is in place, directly must not down excavate, be avoided to disconnected at the top of broken pile Stake and all skirt piles position damage, and floor manager is carried out with technical staff;It is excavated at broken pile to stop after lower 600mm It excavates down, it is 1 to excavate the slope gradient:0.5-1:19(It is specifically determined according to soil property situation), operating surface >=300mm.
E, pile pile fills core, includes the following steps:
(1)The cutting of prestressed concrete pipe pile 2 is formed by smooth port using pipe pile cutter at broken pile.
(2)Make steel reinforcement cage:8 root long degree are taken to be equal to 1400mm, the 1st reinforcing bars of diameter 20mm and circular steel plate welding, with 1st reinforcing bar makees anchoring main reinforcement, and the circular steel plate supporting plate of one end and the 5mm thickness of 2 diameter of diameter < prestressed concrete pipe piles is made Vertical welding, several 1st reinforcing bar encrypted areas are using spacing 100mm arrangements;Make stirrup with the 2nd reinforcing bars of diameter 8mm, spacing 100mm。
(3)Steel reinforcement cage will be made to be inserted into broken pile pipe
Steel reinforcement cage will be made with circular steel plate to make in bottom end insertion broken pile pipe, insertion depth is not less than 1400mm, close to the 1st reinforcing bar Expose 2 circumference port bending to outside pipe of prestressed concrete pipe pile;It is short that the 1st reinforcing bar positioned at middle section stretches into armored concrete In column, the diameter that reinforcing bar length is not less than the 50 × the 1st reinforcing bar is stretched into.
(4)The placing concrete in steel reinforcement cage
First remove broken pile tube top end and pile pipe inner wall laitance, with C40 slightly expanded concretes in steel reinforcement cage placing concrete, reach It is poured in steel reinforcement cage in broken pile tube top end full.
F, the bundle muscle of cast-in-situ steel reinforced concrete short column 6, formwork, pour concrete, include the following steps:
(1)Below the outside of broken pile pipe joint area 100mm thickness concrete cushion 9 is poured around pile pile.
(2)In exterior circumference of broken pile pipe etc. point 4 the 3rd reinforcing bars 10 of arrangement, one end of the 3rd reinforcing bar is made to be located at cap design of pile At 4 or more 100mm of bottom absolute altitude, the other end is located on the outside of steel reinforcement cage at concrete cushion 9, and the circular stirrups of the 3rd reinforcing bar use Φ 8mmHPB300 reinforcing bars, spacing 100mm.
(3)Casting concrete template is set in the cuboid framework that 4 the 3rd reinforcing bars 10 and its circular stirrups are formed, is formed 6 frame of cast-in-situ steel reinforced concrete short column, cast-in-situ steel reinforced concrete short column main reinforcement use 8 HRB400 reinforcing bars, stirrup to use HPB300 reinforcing bars, spacing are 8@100 of Φ;Cast-in-situ steel reinforced concrete short column main reinforcement and its stirrup are anchored at top by code requirement In reinforced concrete pile cap, anchor bar length be not less than 50 × anchor bar diameter, then use C35 concretings, Compacting, press polish concrete surface.
G, it conserves
The conventional moisturizing that the concrete that has poured is carried out 14 days or more(Temperature)Maintenance, must not collide during maintenance or return in advance It fills out.
H, it is backfilling and compacted
The earthwork of backfill need to meet design and related specification requirement, and compaction in layers is smooth, backfill the compactness of the earthwork and must accord with Close design and code requirement.
I, cushion cap concrete bed course is poured
Pile framing concrete bed course is poured according to design and code requirement.
Engineering can be checked after the broken pile connector processing method construction of the prestressed concrete pipe pile of the present invention. Specific practice is as follows:
According to frame column compression calculation formula:N≤0.9×φ×(Fc × A+fy ' × As '),
In formula:N=single pile design bearing capacity, it is 1280KN to draft disconnected vertical bearing capacity limit;
A=piling sectional area, unit mm2
Fc=14.3N/mm2, it is piling concrete axial compressive strength design value, using C30 concrete;
fy’=300N/ mm2, it is piling longitudinal reinforcement compression strength design value, using three-level reinforcing bar;
The area of section of As '=piling whole longitudinal reinforcement, unit mm2
The coefficient of stability of φ=piling can be chosen according to the l0/b in the coefficient of stability table of armored concrete axis compression member.This Locate the section that short column is 600mm × 600mm, column length 2m, φ=1.0 of tabling look-up to obtain.As’=2513N/mm2;
1280000≤0.9×1×(14.3 × 360000+300 × As '),
It calculates:1280000N<5311710N.
Therefore the concrete compressive strength of reinforced column 600mm × 600mm has met requirement for bearing capacity.
Reinforcing bar uses the arrangement of reinforcement of detailing requiments, is matched according to Reinforcement minimum in Code for design of concrete structures Muscle rate table checks in, this short column minimum steel ratio is 0.6%.
Using 8 III grade of 20 reinforcing bars of φ, 0.006 × 600 × 600=2160 mm2 of the mm2 of As '=2513 > meet the requirements.
There is the present invention substantive distinguishing features and significant technological progress, the broken pile of prestressed concrete pipe pile of the invention to connect Head processing method, during carrying out the processing construction of Reinforced Concrete Short Column pile extension, by project supervision and owner to positioning, opening Dig, fill core, prick muscle and pour the critical processes such as concrete have carried out demonstration, observation is checked and accepted etc..Pass through the inspection in pile extension processing procedure And display is checked and accepted in observation, which meets design and code requirement, and work progress meets site construction management and mark It requires to chemical industry, respectively the approval for the side of being taken part in building, favorable comment.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a kind of broken pile connector processing method of prestressed concrete pipe pile is suitable for fracture position 2m below earth excavation face Within φ 500mm broken piles below, it is characterised in that include the following steps:
A, unwrapping wire positions
According to construction drawing and pile driving record, the specific location of broken pile is accurately positioned, and spreads lime line and marks;
B, smooth location
Mud, boulder barrier in broken pile peripheral extent are purged, and it is smooth to carry out construction site, avoids excavator in place The further damage to other in broken pile or foundation pit is caused afterwards;
C, excavator is in place
Select 0.6m3Small-sized excavator excavate, excavator track route is avoided stake position region, can not be avoided strictly according to the facts as possible, then right Stake position within the scope of excavator track route carries out necessary protection, and excavator is seated in the shoveling slope coverage of broken pile as possible In addition;
D, it excavates
From broken pile position, peripheral position slowly excavates after excavator is in place, directly must not down excavate, be avoided to disconnected at the top of broken pile Stake and all skirt piles position damage, and floor manager is carried out with technical staff;It is excavated at broken pile to stop after lower 600mm It excavates down, is specifically determined according to soil property situation and excavate the slope gradient, the gradient 1:0.5-1:19, operating surface >=300mm;
E, pile pile fills core, includes the following steps:
(1)Use pipe pile cutter by prestressed concrete pipe pile at broken pile(2)Cutting forms smooth port;
(2)Make steel reinforcement cage:8 root long degree >=1400mm, the 1st reinforcing bars of diameter 20mm and circular steel plate welding are taken, with the 1st reinforcing bar Make anchoring main reinforcement, one end and diameter < prestressed concrete pipe piles(2)The circular steel plate supporting plate of the 5mm thickness of diameter makees vertical welding It connects, several 1st reinforcing bar encrypted areas are using spacing 100mm arrangements;Make stirrup, spacing 100mm with the 2nd reinforcing bars of diameter 8mm;
(3)Steel reinforcement cage will be made to be inserted into broken pile pipe
Steel reinforcement cage will be made with circular steel plate to make in bottom end insertion broken pile pipe, insertion depth is not less than 1400mm, close to the 1st reinforcing bar Expose prestressed concrete pipe pile(2)The bending to outside pipe of circumference port;The 1st reinforcing bar positioned at middle section stretches into armored concrete In short column, the diameter that reinforcing bar length is not less than the 50 × the 1st reinforcing bar is stretched into;
(4)The placing concrete in steel reinforcement cage
First remove broken pile tube top end and pile pipe inner wall laitance, with C40 slightly expanded concretes in steel reinforcement cage placing concrete, reach It is poured in steel reinforcement cage in broken pile tube top end full;
F, cast-in-situ steel reinforced concrete short column(6)Bundle muscle, formwork, pour concrete, include the following steps:
(1)Below the outside of broken pile pipe joint area 100mm thickness concrete cushions are poured around pile pile(9);
(2)In exterior circumference of broken pile pipe etc. point 4 the 3rd reinforcing bars of arrangement(10), one end of the 3rd reinforcing bar is made to be located at cap design of pile bottom Absolute altitude(4)At the above 100mm, the other end is located at concrete cushion on the outside of steel reinforcement cage(9)The circular stirrups at place, the 3rd reinforcing bar use Φ 8mmHPB300 reinforcing bars, spacing 100mm;
(3)In 4 the 3rd reinforcing bars(10)And its casting concrete template is arranged in the cuboid framework that circular stirrups are formed, and is formed existing Pour Reinforced Concrete Short Column(6)Frame, cast-in-situ steel reinforced concrete short column main reinforcement use 8 HRB400 reinforcing bars, stirrup to use HPB300 reinforcing bars, spacing are 8@100 of Φ;Cast-in-situ steel reinforced concrete short column main reinforcement and its stirrup are anchored at top by code requirement In reinforced concrete pile cap, anchor bar length be not less than 50 × anchor bar diameter, then use C35 concretings, Compacting, press polish concrete surface;
G, it conserves
The conventional moisturizing that is carried out 14 days or more to the concrete that has poured, insulated curing, must not collide during maintenance or return in advance Earth fill;
H, backfilling of earthwork is tamped
The earthwork of backfill need to meet design and related specification requirement, and compaction in layers is smooth, backfill the compactness of the earthwork and must accord with Close design and code requirement;
I, casting concrete bed course(3)
100mm thickness concrete cushions are poured according to design and code requirement(3), pouring reinforcement concrete is held on concrete cushion Platform(5), complete the broken pile connector processing of prestressed concrete pipe pile.
2. the broken pile connector processing method of prestressed concrete pipe pile as described in claim 1, which is characterized in that the broken pile Peripheral extent is that radius is equal to the >=region of 3m.
3. the broken pile connector processing method of prestressed concrete pipe pile as described in claim 1, which is characterized in that the described 1st Reinforcing bar is HRB400 reinforcing bars.
4. the broken pile connector processing method of prestressed concrete pipe pile as described in claim 1, which is characterized in that described cast-in-place Reinforced Concrete Short Column(6)A height of 2800mm, cross section be length of side 600-700mm square.
CN201710083253.3A 2017-02-16 2017-02-16 The broken pile connector processing method of prestressed concrete pipe pile Pending CN108442370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710083253.3A CN108442370A (en) 2017-02-16 2017-02-16 The broken pile connector processing method of prestressed concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710083253.3A CN108442370A (en) 2017-02-16 2017-02-16 The broken pile connector processing method of prestressed concrete pipe pile

Publications (1)

Publication Number Publication Date
CN108442370A true CN108442370A (en) 2018-08-24

Family

ID=63190488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710083253.3A Pending CN108442370A (en) 2017-02-16 2017-02-16 The broken pile connector processing method of prestressed concrete pipe pile

Country Status (1)

Country Link
CN (1) CN108442370A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518681A (en) * 2018-11-22 2019-03-26 五冶集团上海有限公司 Precast concrete square pile connector processing method
CN110016928A (en) * 2019-04-23 2019-07-16 上海太江建设工程有限公司 Secondary pile connection construction method and its floor structure
CN111877329A (en) * 2020-07-03 2020-11-03 广州市第一市政工程有限公司 Pile-in-pile broken pile and pile-splicing construction method
CN114293600A (en) * 2021-12-22 2022-04-08 珠海华发人居生活研究院有限公司 Method for processing broken pile defect of precast pile in weak soil area
CN114657977A (en) * 2022-02-24 2022-06-24 中建一局集团第二建筑有限公司 Prestressed concrete tubular pile tip crack reinforcing and strengthening device
CN114808928A (en) * 2022-06-10 2022-07-29 中国建筑第七工程局有限公司 Connecting joint of assembled pile plate structure and construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351218A (en) * 2016-08-31 2017-01-25 南京工业大学 Broken pile remedying method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351218A (en) * 2016-08-31 2017-01-25 南京工业大学 Broken pile remedying method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518681A (en) * 2018-11-22 2019-03-26 五冶集团上海有限公司 Precast concrete square pile connector processing method
CN110016928A (en) * 2019-04-23 2019-07-16 上海太江建设工程有限公司 Secondary pile connection construction method and its floor structure
CN111877329A (en) * 2020-07-03 2020-11-03 广州市第一市政工程有限公司 Pile-in-pile broken pile and pile-splicing construction method
CN114293600A (en) * 2021-12-22 2022-04-08 珠海华发人居生活研究院有限公司 Method for processing broken pile defect of precast pile in weak soil area
CN114657977A (en) * 2022-02-24 2022-06-24 中建一局集团第二建筑有限公司 Prestressed concrete tubular pile tip crack reinforcing and strengthening device
CN114657977B (en) * 2022-02-24 2023-10-20 中建一局集团第二建筑有限公司 Prestressed concrete pipe pile end crack reinforcing device
CN114808928A (en) * 2022-06-10 2022-07-29 中国建筑第七工程局有限公司 Connecting joint of assembled pile plate structure and construction method
CN114808928B (en) * 2022-06-10 2024-03-22 中国建筑第七工程局有限公司 Assembled pile plate structure connecting node and construction method

Similar Documents

Publication Publication Date Title
CN108442370A (en) The broken pile connector processing method of prestressed concrete pipe pile
CN106958256A (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
CN103321246B (en) Underground diaphragm wall based foundation pit construction method
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN108894214A (en) A kind of solution cavity geological environment bored concrete pile and its bore forming method
CN110486019B (en) Underground excavation construction method for additionally arranging underground communication channels between new buildings and old buildings
CN109778869A (en) Foundation ditch construction method
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN107100164A (en) A kind of long auger guncreting pile construction method
CN109518681A (en) Precast concrete square pile connector processing method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN104480945B (en) A kind of foundation ditch reversed construction method
JP2000352296A (en) Method o constructing passage just under underground structure
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN104499489A (en) Foundation pit construction method
CN216765941U (en) Tunnel decompression load shedding structure under bias voltage state

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824

RJ01 Rejection of invention patent application after publication