CN111877329A - Pile-in-pile broken pile and pile-splicing construction method - Google Patents

Pile-in-pile broken pile and pile-splicing construction method Download PDF

Info

Publication number
CN111877329A
CN111877329A CN202010636701.XA CN202010636701A CN111877329A CN 111877329 A CN111877329 A CN 111877329A CN 202010636701 A CN202010636701 A CN 202010636701A CN 111877329 A CN111877329 A CN 111877329A
Authority
CN
China
Prior art keywords
pile
concrete
steel pipe
steel
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010636701.XA
Other languages
Chinese (zh)
Inventor
曾祥茂
李志生
林楚涛
方宏彬
王鹏
叶剑铭
张昭洪
方旭
黄维阳
罗家俊
吴汉银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou First Municipal Engineering Co ltd
Original Assignee
Guangzhou First Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou First Municipal Engineering Co ltd filed Critical Guangzhou First Municipal Engineering Co ltd
Priority to CN202010636701.XA priority Critical patent/CN111877329A/en
Publication of CN111877329A publication Critical patent/CN111877329A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/64Repairing piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a pile-in-pile broken pile and pile-connected construction method, which comprises the following construction processes: the method comprises the following steps of leveling a field, measuring and lofting, rotary drilling and core pulling, ribbed steel pipe manufacturing, welding, steel reinforcement cage manufacturing, mounting, hoisting ribbed steel pipes, base concrete treatment, concrete pouring on the inner sides of the steel pipes, mortar pouring on the outer sides of the steel pipes and concrete curing. The method does not need to consider the influence of the surrounding geological environment, and utilizes the existing pile body and the core-pulling hole reserved in the core-pulling detection process to the maximum extent.

Description

Pile-in-pile broken pile and pile-splicing construction method
Technical Field
The invention relates to the technical field of drilling and pouring construction, in particular to a pile-in-pile construction method for pile breaking and pile splicing.
Background
As a mature building form, the cast-in-situ bored pile has the advantages of simple construction process, mature technology, easy quality detection and the like, and is widely applied to construction of various bridge pile foundations.
However, in the daily construction of bored piles, sometimes, due to the process problems, the problems of the pouring operation or the influence of external force, it often happens that slurry or gravel enters the cement concrete to separate the poured concrete into an upper section and a lower section, which causes the deterioration of the concrete or the damage of the cross section area to cause the pile breaking accident, so that the pile foundation cannot meet the design stress requirement.
The existing technological method closest to the scheme of the invention mainly has three realization processes:
(1) if the broken pile position is below 10m from the ground surface and the concrete is finally set, the impact drill with the diameter slightly smaller than the inner diameter of the reinforcement cage can be used for performing impact drilling on the original pile position to the position 1m below the bottom opening of the reinforcement cage, then a proper amount of explosive is put into the hole, and the reinforcement cage is integrally lifted out or lifted out one by one after being loosened. And then carrying out secondary hole expansion to the designed diameter, and pouring concrete again after hole cleaning.
(2) If the pile breaking position is within 5m from the ground surface and the geological conditions are good, excavating to the pile breaking position, removing the slurry or the concrete doped with the slurry, exposing the good concrete and chiseling, removing the slurry on the reinforcing steel bars, and then erecting and pouring the concrete. And backfilling and tamping in time after the mold is removed.
(3) If the pile breaking position is within 5m and 10m of the ground surface, or if the geological condition is poor within 5m of the ground surface, concrete pipes or steel pipes with the diameter slightly larger than the pile diameter are connected in a joint mode until the pile breaking position sinks to a position 0.5m below the pile breaking position, the slurry and the concrete mixed with the slurry are removed, a good concrete surface is exposed and roughened, the slurry on the reinforcing steel bars is removed, and then the concrete is poured by taking the concrete pipes or the steel pipes as templates.
The existing technological method closest to the scheme of the invention comprises the following pile splicing construction technological processes: and (3) using an impact drill with the diameter slightly smaller than the inner diameter of the steel reinforcement cage to perform impact drilling at the original pile position to a position 1m below a bottom opening of the steel reinforcement cage, then putting a proper amount of explosive into the hole, and integrally hoisting or hoisting one steel reinforcement cage after the steel reinforcement cage is loosened. And then carrying out secondary hole expansion to the designed diameter, and pouring concrete again after hole cleaning.
The prior technical scheme has the following defects and reasons:
firstly, the process needs to use explosives, and the danger coefficient is higher in the material entering and construction processes. And the scheme must be approved by a public security department, and the procedure is complicated. After the pile is broken by the process, the original pile body must be completely broken and cannot be recycled. And in the secondary pouring process, the surrounding rock stratum is in a broken state, which is not beneficial to the quality control of the pile body.
Secondly, the technology has strict requirements on the periphery of the pile foundation, and if an urban rail tunnel exists near the constructed foundation pile, the technology can possibly damage the urban rail tunnel.
Disclosure of Invention
The invention aims to solve the technical problem of overcoming the defects of the prior art and provides a construction method for pile breaking and pile splicing in a pile.
In order to solve the technical problems, the technical scheme provided by the invention is as follows: a pile-in-pile-breaking and pile-splicing construction method comprises the following construction processes: leveling the site → lofting for measurement → loosing core by rotary drilling → manufacturing ribbed steel tube, welding → manufacturing and installing steel reinforcement cage → hoisting ribbed steel tube → treating base concrete → injecting concrete inside the steel tube → injecting cement mortar outside the steel tube → maintaining concrete.
A pile-in-pile-breaking and pile-splicing construction method comprises the following operation steps:
s1, leveling the field: and intensively cleaning the abandoned soil on the construction site, leveling the site, and preparing for measuring and lofting and pile splicing.
S2, measurement lofting: and (4) lofting the central position of the pile position by a measuring team according to the parameters of the design drawing, rechecking by a field technician, reporting and supervising an engineer for inspection, performing written return operation on the team, drawing a cross line according to the central point of the pile position to lead out the fender pile, and protecting the fender pile.
S3, rotary drilling and core pulling: the diameter of the original foundation pile is 1800mm, and the inner diameter of the reinforcement cage is 1620 mm. After a core bit (with the diameter of 1200mm) is installed on the rotary excavating machine, the rotary excavating machine is moved until the core bit is concentric with the foundation pile, and operation is started. The foundation pile is crushed by the rotation of a barrel type core drill bit with a valve at the bottom, and is directly loaded into the drill bit, then the drill bit is lifted out of the pipe by a drilling machine lifting device and a telescopic drill rod to unload soil, and the steps are repeated in a circulating way, and soil is continuously taken out and unloaded until the drilling reaches 1500mm below the cracks of the foundation pile.
S4, manufacturing and installing ribbed steel pipes: the steel pipe is made of Q235c steel, and has an outer diameter of 1100mm, a wall thickness of 16mm and a length of 12820 mm. In order to ensure the vertical bearing capacity of the steel pipe, increase the initial deflection and joint defects of the steel pipe, increase the bond stress between the steel pipe and the concrete and improve the integrity of the concrete-filled steel pipe, HRB 400-grade steel bar hoops with the diameter of 16mm are uniformly arranged on the inner wall and the outer wall of the steel pipe at intervals of 300mm, and the steel bar hoops are welded on the steel pipe by adopting single-side welding. The stirrup joint adopts double-sided welding, and the length of the joint is not less than 80 mm. The steel pipe can be made in sections, the steel pipe is welded and lengthened, and the length of each section is determined according to actual conditions. The perimeter tolerance of the steel pipe joints is required to be 40mm, the flatness tolerance of the pipe ends is required to be 10mm, the plane inclination tolerance of the pipe ends is required to be 10mm, the tolerance of the adjacent pipe diameters is 5mm, and the tolerance of the edge of the adjacent pipe joints is required to be 3mm when the pipe joints are spliced in an opposite mode.
S5, manufacturing and welding a reinforcement cage: in order to ensure the connection between the pile extension part and the bearing platform at the upper part of the foundation pile, a steel reinforcement cage is welded at the upper part of the steel pipe and extends into the bearing platform. Manufacturing a steel reinforcement cage: HRB 400-grade steel bars with the diameter of 32mm and the length of 3700mm are adopted as the main bars of the steel reinforcement cage and are uniformly distributed on the circumference with the diameter of 1100 mm. And the stirrups are added around the main reinforcement of the steel reinforcement cage, and one stirrup is added every 100mm, and the stirrups gradually encircle to 2200mm from top to bottom. The stirrups adopt HPB 300-grade steel bars with the diameter of 10mm, and are firmly bound with the crossed points of the stressed main bars. The whole length of the stress main reinforcement stirrup setting part is 2200mm, and the rest 1500mm is fixed on the inner wall of the steel pipe by adopting single-side welding.
S6, hoisting the ribbed steel pipe: after the ribbed steel pipe is manufactured, the ribbed steel pipe is hoisted into the core-pulling hole by adopting a crawler crane, the insertion depth exceeds 1500mm downwards of the crack, the ribbed steel pipe is hoisted into the hole and should be centered and slowly placed, the hole wall is prevented from being collided, and the ribbed steel pipe should be immediately parked when being placed down, so that the reason is checked.
S7, treating the base concrete: and cleaning small concrete blocks and sand grains on the concrete surface of the foundation pile by adopting a negative pressure vacuum pump, and smearing a layer of mortar with the same grade before concrete construction in order to ensure the pile body quality and better connect cast-in-place concrete and the original concrete.
S8, pouring concrete on the inner side of the steel pipe: and (3) pouring concrete which is larger than the original foundation pile concrete (C35) by a grade (C40) in the ribbed steel pipe by adopting a conduit method. And (3) carrying out layered continuous pouring on the concrete, wherein the pouring thickness of each layer is 500mm, and the concrete pouring is finished at one time. The steel pipe is vibrated by adopting the inserted vibrator, the inserted vibrator is required to be embedded into the lower layer to a certain depth (50-100 mm) when the upper layer is poured, the vibration is dense, and the vibrating rod cannot directly vibrate the steel pipe. The elevation of the surface of the poured concrete is more than 800mm higher than the elevation of the designed bearing platform bottom.
S9, grouting cement mortar on the outer side of the steel pipe: selecting a welded steel pipe with the diameter of phi 32mm as a grouting pipe, wherein the grouting pipe reaches the bottom of the gap. M40 cement mortar (the original foundation pile concrete is marked as C35) is filled in a gap between the steel pipe and the concrete pile body at high pressure by adopting a high-pressure slurry pump, the steel pipe is vibrated at the same time until the liquid level of the slurry (the designed elevation of the pile surface) is not lower and overflows, the injection speed is slow during construction, and the grouting amount is ensured to be not less than the volume of the gap between the steel pipe and the concrete pile body. Solidifying and maintaining for a period of time to form a pile-in-pile to complete pile extension for the broken pile.
S10, concrete curing: after the concrete is poured, in order to ensure that the poured concrete reaches the strength required by the design within the specified age and prevent the concrete from shrinking, the concrete is covered, moisturized and cured within 12 hours. The watering times of the pile-connecting concrete can keep the concrete in a wet state; the curing water of the concrete is the same as the mixing water, and the concrete is watered every 2 hours. And the geotextile is used for wrapping around the pile, so that the concrete is sufficiently maintained under the condition of no water loss, and the geotextile is kept wet all the time.
The invention has the following advantages: the method has the characteristics that 1, the distance between the pile body crack and the pile top is within 15m in the early stage of application.
2. And (4) core pulling of the rotary drill, moving the rotary drill to the state that the core drill is concentric with the foundation pile after the core drill is installed on the rotary drill, and starting operation. The foundation pile is crushed by the rotation of a barrel type core drill bit with a valve at the bottom, and is directly loaded into the drill bit, then the drill bit is lifted out of the pipe by a drilling machine lifting device and a telescopic drill rod to unload soil, and the steps are repeated in a circulating way, and soil is continuously taken out and unloaded until the drilling reaches 1500mm below the cracks of the foundation pile.
3. And manufacturing and installing the ribbed steel pipe. The steel pipe is made of Q235c steel, and has an outer diameter of 1100mm, a wall thickness of 16mm and a length of 12820 mm. In order to ensure the vertical bearing capacity of the steel pipe, increase the initial deflection and joint defects of the steel pipe, increase the bond stress between the steel pipe and the concrete and improve the integrity of the concrete-filled steel pipe, HRB 400-grade steel bar hoops with the diameter of 16mm are uniformly arranged on the inner wall and the outer wall of the steel pipe at intervals of 300mm, and the steel bar hoops are welded on the steel pipe by adopting single-side welding. The stirrup joint adopts double-sided welding, and the length of the joint is not less than 80 mm.
4. And grouting cement mortar on the outer side of the steel pipe. Selecting a welded steel pipe with the diameter of phi 32mm as a grouting pipe, wherein the grouting pipe reaches the bottom of the gap. M40 cement mortar (the original foundation pile concrete is marked as C35) is filled in a gap between the steel pipe and the concrete pile body at high pressure by adopting a high-pressure slurry pump, the steel pipe is vibrated at the same time until the liquid level of the slurry (the designed elevation of the pile surface) is not lower and overflows, the injection speed is slow during construction, and the grouting amount is ensured to be not less than the volume of the gap between the steel pipe and the concrete pile body.
The method does not need to consider the influence of the surrounding geological environment, and utilizes the existing pile body and the core-pulling hole reserved in the core-pulling detection process to the maximum extent.
Drawings
FIG. 1 is a process flow diagram of the present invention.
Fig. 2 is a cross-sectional view of an embodiment of the present invention.
FIG. 3 is a flow chart of a prior art process closest to the solution of the present invention.
Detailed Description
The present invention will be described in further detail with reference to examples.
A construction method suitable for pile-in-pile breaking and pile splicing is exemplified by bridge engineering (Heijingbridge) which is a first-stage municipal infrastructure project in a violin zone of a central business zone of a Zhuhai Cross door. The engineering bridge pile foundation adopts a D1800 cast-in-place pile as a bridge foundation.
The single pile construction comprises the following raw materials in parts by weight:
Figure BDA0002569323910000041
before formal construction begins, a core drill bit (the diameter is 1200mm) is installed on the rotary excavating machine, then the rotary excavating machine is moved until the core drill bit is concentric with the foundation pile, and operation is started until the core drill bit drills until the cracks of the foundation pile fall down by 1500 mm. The steel pipe is made of Q235c steel, and has an outer diameter of 1100mm, a wall thickness of 16mm and a length of 12820 mm. HRB 400-grade steel bar hoops with the diameter of 16mm are uniformly arranged on the inner wall and the outer wall of the steel pipe at intervals of 300mm, and the steel bar hoops are welded on the steel pipe by adopting single-side welding.
In order to ensure the connection between the pile extension part and the bearing platform at the upper part of the foundation pile, a steel reinforcement cage is welded at the upper part of the steel pipe and extends into the bearing platform. Manufacturing a steel reinforcement cage: HRB 400-grade steel bars with the diameter of 32mm and the length of 3700mm are adopted as the main bars of the steel reinforcement cage and are uniformly distributed on the circumference with the diameter of 1100 mm. And the stirrups are added around the main reinforcement of the steel reinforcement cage, and one stirrup is added every 100mm, and the stirrups gradually encircle to 2200mm from top to bottom. The stirrups adopt HPB 300-grade steel bars with the diameter of 10mm, and are firmly bound with the crossed points of the stressed main bars. The whole length of the stress main reinforcement stirrup setting part is 2200mm, and the rest 1500mm is fixed on the inner wall of the steel pipe by adopting single-side welding.
And after the ribbed steel pipe is manufactured, hoisting the ribbed steel pipe into the core-pulling hole by adopting a crawler crane. And cleaning small concrete blocks and sand grains on the concrete surface of the foundation pile by adopting a negative pressure vacuum pump, and smearing a layer of mortar with the same grade before concrete construction in order to ensure the pile body quality and better connect cast-in-place concrete and the original concrete.
And (3) pouring concrete which is larger than the original foundation pile concrete (C35) by a grade (C40) in the ribbed steel pipe by adopting a conduit method. And (3) carrying out layered continuous pouring on the concrete, wherein the pouring thickness of each layer is 500mm, and the concrete pouring is finished at one time. The steel pipe is vibrated by adopting the inserted vibrator, the inserted vibrator is required to be embedded into the lower layer to a certain depth (50-100 mm) when the upper layer is poured, the vibration is dense, and the vibrating rod cannot directly vibrate the steel pipe. The elevation of the surface of the poured concrete is more than 800mm higher than the elevation of the designed bearing platform bottom.
Selecting a welded steel pipe with the diameter of phi 32mm as a grouting pipe, wherein the grouting pipe reaches the bottom of the gap. M40 cement mortar (the original foundation pile concrete is marked as C35) is filled in a gap between the steel pipe and the concrete pile body at high pressure by adopting a high-pressure slurry pump, the steel pipe is vibrated at the same time until the liquid level of the slurry (the designed elevation of the pile surface) is not lower and overflows, the injection speed is slow during construction, and the grouting amount is ensured to be not less than the volume of the gap between the steel pipe and the concrete pile body. Solidifying and maintaining for a period of time to form a pile-in-pile to complete pile extension for the broken pile. And finally, maintaining the foundation pile concrete in a heat preservation and moisture preservation manner.
Although the invention has been described in detail hereinabove with respect to a general description and specific embodiments thereof, it will be apparent to those skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (4)

1. A pile-in-pile-breaking and pile-splicing construction method is characterized by comprising the following operation steps:
s1, leveling the field: intensively cleaning the abandoned soil of the construction site, leveling the site, and preparing for measuring lofting and pile splicing;
s2, measurement lofting: the measuring team and team loft out the center position of the pile position according to the parameters of the design drawing, after rechecking by a field technician, the report and supervision engineer checks the position, hands over the team and works in writing, draws a cross line according to the center point of the pile position to lead out the fender pile and protects the fender pile;
s3, rotary drilling and core pulling: after the core drill bit is installed on the rotary excavator, the rotary excavator is moved until the core drill bit is concentric with the foundation pile, operation is started, the foundation pile is crushed through the rotation of the barrel core drill bit with a valve at the bottom and is directly installed in the drill bit, then the drill bit is lifted out of the pipe by the drilling machine lifting device and the telescopic drill rod to unload soil, and the operation is repeated in a circulating mode until the crack of the foundation pile is drilled to be 1500mm below the foundation pile;
s4, manufacturing and installing ribbed steel pipes: the steel pipe is made of Q235c steel, the outer diameter is 1100mm, the wall thickness is 16mm, the length is 12820mm, HRB 400-grade steel hoops with the diameter of 16mm are uniformly arranged on the inner wall and the outer wall of the steel pipe at intervals of 300mm, the steel hoops are welded on the steel pipe by adopting single-side welding, the stirrup joints are welded on two sides, the joint length is not less than 80mm, the allowable deviation of the circumference of a pipe joint of the steel pipe is required to be 40mm, the allowable deviation of the flatness of the pipe end is 10mm, the allowable deviation of the plane inclination of the pipe end is 10mm, the allowable deviation of adjacent pipe diameters is 5mm, and when the pipe joints;
s5, manufacturing and welding a reinforcement cage: in order to ensure the connection between the pile extension part and a bearing platform at the upper part of a foundation pile, a reinforcement cage is welded at the upper part of a steel pipe and extends into the bearing platform, stirrups are added around main reinforcements of the reinforcement cage, one reinforcement is added every 100mm and gradually surrounds to a position of 2200mm from top to bottom, the stirrups adopt HPB 300-grade reinforcements with the diameter of 10mm and are firmly bound with the cross points of stressed main reinforcements, the total length of the stressed main reinforcements is 2200mm, and the rest 1500mm are fixed on the inner wall of the steel pipe by single-side welding;
s6, hoisting the ribbed steel pipe: after the ribbed steel pipe is manufactured, hoisting the ribbed steel pipe into the core-pulling hole by adopting a crawler crane, wherein the insertion depth exceeds that of the crack and is 1500mm downwards, the ribbed steel pipe is hoisted into the hole to be centered and slowly placed to prevent the ribbed steel pipe from colliding with the hole wall, and the ribbed steel pipe is immediately parked when placed down, so that the reason is checked;
s7, treating the base concrete: cleaning small concrete blocks and sand grains on the concrete surface of the foundation pile by using a negative pressure vacuum pump, and smearing a layer of mortar with the same grade before concrete construction to ensure the quality of a pile body and better connect cast-in-place concrete and original concrete;
s8, pouring concrete on the inner side of the steel pipe: c40 concrete which is one label larger than the original foundation pile concrete C35 is poured into the ribbed steel tube by adopting a guide tube method, the concrete is poured continuously in a layered mode, the pouring thickness of each layer is 500mm, the concrete pouring is finished once, an inserted vibrator is adopted for vibrating, the inserted vibrator is required to be deep into the lower layer for 50mm-100mm when the upper layer is poured, the vibration is dense, a vibrating rod cannot directly vibrate the steel tube, and the surface elevation of the poured concrete is required to be more than 800mm higher than the bottom elevation of a designed bearing platform;
s9, grouting cement mortar on the outer side of the steel pipe: selecting a welded steel pipe with the diameter of phi 32mm as a grouting pipe, filling M40 cement mortar into a gap between the steel pipe and a concrete pile body at high pressure by using a high-pressure slurry pump when the grouting pipe reaches the bottom of the gap, vibrating the steel pipe at the same time until the slurry liquid level or the designed elevation of the pile surface is not lower and overflows, and ensuring that the grouting amount is not less than the volume of the gap between the steel pipe and the concrete pile body during construction, and solidifying and maintaining for a period of time to form a pile-in-pile to complete pile extension for a broken pile;
s10, concrete curing: after the concrete is poured, in order to ensure that the poured concrete reaches the strength required by the design within the specified age and prevent the concrete from shrinking, the concrete is covered, moisturized and maintained within 12 hours, and the concrete water-pouring times of the pile connecting are required to keep the concrete in a wet state; the water for curing the concrete is the same as the water for mixing, the water is watered every 2 hours, the earthwork cloth is used for wrapping around the pile, the concrete is sufficiently cured under the condition of no water loss, and the inside of the earthwork cloth is kept wet all the time.
2. A pile-in-pile break-and-pile construction method according to claim 1, characterized in that: and in the step S3, the size of the core bit installed by the rotary excavating machine is 1200mm in diameter.
3. A pile-in-pile break-and-pile construction method according to claim 1, characterized in that: in the step S4, the steel pipe can be manufactured in sections, the steel pipe is welded and lengthened, and the length of each section is determined according to the actual situation.
4. A pile-in-pile break-and-pile construction method according to claim 1, characterized in that: and manufacturing the reinforcement cage in the step S5: HRB 400-grade steel bars with the diameter of 32mm and the length of 3700mm are adopted as the main bars of the steel reinforcement cage and are uniformly distributed on the circumference with the diameter of 1100 mm.
CN202010636701.XA 2020-07-03 2020-07-03 Pile-in-pile broken pile and pile-splicing construction method Pending CN111877329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010636701.XA CN111877329A (en) 2020-07-03 2020-07-03 Pile-in-pile broken pile and pile-splicing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010636701.XA CN111877329A (en) 2020-07-03 2020-07-03 Pile-in-pile broken pile and pile-splicing construction method

Publications (1)

Publication Number Publication Date
CN111877329A true CN111877329A (en) 2020-11-03

Family

ID=73149942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010636701.XA Pending CN111877329A (en) 2020-07-03 2020-07-03 Pile-in-pile broken pile and pile-splicing construction method

Country Status (1)

Country Link
CN (1) CN111877329A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523202A (en) * 2020-11-23 2021-03-19 中冶交通建设集团有限公司 Broken pile treatment construction method for cast-in-situ bored pile
CN113293759A (en) * 2021-06-30 2021-08-24 西南交通大学 Implanted steel pipe concrete reinforcing method for concrete filling pile broken pile
CN114059575A (en) * 2021-11-23 2022-02-18 浙江恒宸建设集团有限公司 Bearing platform and pile foundation connecting structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19518066C1 (en) * 1995-05-17 1996-08-01 Bilfinger Berger Bau Method of reconstructing borehole pile with at least one gap in concrete
CN103437351A (en) * 2013-09-18 2013-12-11 浙江省岩土基础公司 Treatment method of deviation and fracture remediation of pile body of filling pile
CN105369983A (en) * 2015-09-29 2016-03-02 南京林业大学 Rib constraint thin-walled steel pipe concrete structure
CN108221967A (en) * 2018-02-05 2018-06-29 南昌大学 A kind of built pile and preparation method thereof
CN108442370A (en) * 2017-02-16 2018-08-24 五冶集团上海有限公司 The broken pile connector processing method of prestressed concrete pipe pile
CN108560538A (en) * 2018-04-24 2018-09-21 中国水利水电第十四工程局有限公司 A kind of Novel pile foundation broken pile treatment method
CN110397059A (en) * 2018-04-25 2019-11-01 上海城地建设股份有限公司 A kind of compound tree root pile constructing process of preexisting hole stiffness

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19518066C1 (en) * 1995-05-17 1996-08-01 Bilfinger Berger Bau Method of reconstructing borehole pile with at least one gap in concrete
CN103437351A (en) * 2013-09-18 2013-12-11 浙江省岩土基础公司 Treatment method of deviation and fracture remediation of pile body of filling pile
CN105369983A (en) * 2015-09-29 2016-03-02 南京林业大学 Rib constraint thin-walled steel pipe concrete structure
CN108442370A (en) * 2017-02-16 2018-08-24 五冶集团上海有限公司 The broken pile connector processing method of prestressed concrete pipe pile
CN108221967A (en) * 2018-02-05 2018-06-29 南昌大学 A kind of built pile and preparation method thereof
CN108560538A (en) * 2018-04-24 2018-09-21 中国水利水电第十四工程局有限公司 A kind of Novel pile foundation broken pile treatment method
CN110397059A (en) * 2018-04-25 2019-11-01 上海城地建设股份有限公司 A kind of compound tree root pile constructing process of preexisting hole stiffness

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
卿三惠等: "《土木工程施工工艺 桥梁工程》", 31 October 2013, 中国铁道出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523202A (en) * 2020-11-23 2021-03-19 中冶交通建设集团有限公司 Broken pile treatment construction method for cast-in-situ bored pile
CN113293759A (en) * 2021-06-30 2021-08-24 西南交通大学 Implanted steel pipe concrete reinforcing method for concrete filling pile broken pile
CN114059575A (en) * 2021-11-23 2022-02-18 浙江恒宸建设集团有限公司 Bearing platform and pile foundation connecting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN108894214B (en) Karst cave geological environment cast-in-place pile and pile-forming construction method thereof
CN111877329A (en) Pile-in-pile broken pile and pile-splicing construction method
CN106284313A (en) Long spire based on circulating mud retaining wall is squeezed into rock filling pile construction method
CN110387879B (en) Concrete cast-in-place pile construction method for hydraulically vibrating and hammering immersed tube
CN111576431A (en) Excavation method for foundation pit of four-layer subway station
CN111173038B (en) Construction process of vertical shaft
CN112144559A (en) Well construction method in high water-rich loess sandy gravel stratum transformer tube well
CN112609690A (en) Construction method of rotary drilling cast-in-place pile in sea-filling geological complex area
CN113914327A (en) Construction method for foundation pit enclosure and earth excavation
CN110080779B (en) Tunnel bottom karst cave treatment construction method
CN110777775A (en) Foundation pit structure and construction method thereof
RU2375521C1 (en) Method of erecting piled foundation designed for high loads
CN113685190B (en) Reinforcing system for shield to penetrate shallow soft clay and construction method
CN114541408B (en) Front upper part wind-containing well structure of underground station end well and underpass construction method thereof
CN110924401A (en) Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
CN115595979A (en) Construction method for treating karst cave by bridge pile foundation under geological condition of strong development of karst
CN114411761A (en) Advanced pre-support system for planned subway tunnel during construction of newly-built building and pre-support construction method
CN115030731A (en) Pilot tunnel construction method in cross tunnel engineering
CN114961336A (en) Protective demolition construction method for basement pile foundation next to existing subway line
CN113668602A (en) Pipe gallery construction method for overpassing subway channel
CN210975801U (en) Existing building pile foundation steel sleeve pile reinforced structure
CN113463655A (en) Pile construction method in complex environment ultra-deep foundation pit support
CN112575794A (en) Deep silt geological foundation pit support structure and construction method thereof
CN214423369U (en) Deep silt geology foundation ditch retaining structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201103

RJ01 Rejection of invention patent application after publication