CN108221967A - A kind of built pile and preparation method thereof - Google Patents
A kind of built pile and preparation method thereof Download PDFInfo
- Publication number
- CN108221967A CN108221967A CN201810109399.5A CN201810109399A CN108221967A CN 108221967 A CN108221967 A CN 108221967A CN 201810109399 A CN201810109399 A CN 201810109399A CN 108221967 A CN108221967 A CN 108221967A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- built pile
- concrete
- steel
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000002360 preparation method Methods 0.000 title claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 71
- 239000010959 steel Substances 0.000 claims abstract description 71
- 239000004567 concrete Substances 0.000 claims abstract description 50
- 210000003205 muscle Anatomy 0.000 claims abstract description 20
- 230000002787 reinforcement Effects 0.000 claims abstract description 10
- 239000003351 stiffener Substances 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 claims description 2
- 230000015271 coagulation Effects 0.000 claims 1
- 238000005345 coagulation Methods 0.000 claims 1
- 230000006835 compression Effects 0.000 abstract description 7
- 238000007906 compression Methods 0.000 abstract description 7
- 239000008280 blood Substances 0.000 abstract description 2
- 210000004369 blood Anatomy 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 7
- 239000011150 reinforced concrete Substances 0.000 description 5
- 238000005056 compaction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000008602 contraction Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 210000004709 eyebrow Anatomy 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A kind of built pile and preparation method thereof, built pile include concrete cover, steel pipe and armored concrete obturator, and the concrete cover is poured on the outside of steel pipe, and armored concrete obturator is filled in steel pipe;Ribbed stiffener is equipped on the outside of the steel pipe, the convex block for protruding from steel pipe inner surface is equipped on the inside of steel pipe;The armored concrete obturator is formed by steel reinforcement cage and concreting, and steel reinforcement cage main body is made of tie hoop, and vertical muscle is welded on tie hoop.Due to built pile using steel pipe and steel reinforcement cage as skeleton, using concrete as flesh and blood so that built pile has preferable compression strength and tensile strength, when pressure wave reflection is into tensile wave, crack can occurs to avoid rivet nut.
Description
Technical field
This application involves technical field of civil engineering, and in particular to a kind of built pile and preparation method thereof.
Background technology
Traditional precast reinforced concrete pile can bear larger compression, but resist the energy force difference of tensile stress, work as pressure wave
Tensile wave is reflected into, when the tensile stress of generation is more than the tensile strength of concrete, generally annulus can occur on pile body top.
And the usual volume of traditional precast reinforced concrete pile is larger, is easy to cause the stake beaten after soil compaction effect makes and is difficult to squeeze into or makes ground
Face is swelled, and stake is caused to be floated, and influences the bearing capacity of stake, and soil compaction effect during construction of pile groups can also be to neighbouring building and municipal administration
Facility causes harmful effect.And traditional precast reinforced concrete pile operational procedure complexity, it is long in time limit.
And traditional piling bar is because of the reasons such as welding, hammer number is excessive or during first segment stake out of plumb, pile body is easily opened
It splits.
Invention content
The application provides a kind of built pile and preparation method thereof, enhances the tensile strength and compression strength of pile body.
According in a first aspect, a kind of built pile is provided in a kind of embodiment, including concrete cover, steel pipe and steel
Reinforced concrete obturator, the concrete cover are poured on the outside of steel pipe, and armored concrete obturator is filled in steel pipe;Institute
It states and ribbed stiffener is equipped on the outside of steel pipe, the convex block for protruding from steel pipe inner surface is equipped on the inside of steel pipe;The armored concrete filling
Body is formed by steel reinforcement cage and concreting, and steel reinforcement cage main body is made of tie hoop, and vertical muscle is welded on tie hoop.
Preferably, it is welded with hoop of putting more energy between the tie hoop of different level.
Preferably, it puts more energy into muscle every setpoint distance welding one on vertical muscle, muscle of putting more energy into is perpendicular to steel pipe axis.
Preferably, tie hoop upper end density of spiraling is spiraled density more than lower end.
Preferably, the tie hoop upper end is welded with short vertical muscle.
Preferably, the section of built pile is abnormally-structured.
Preferably, the concrete cover and armored concrete obturator using construction refuse regenerated concreting and
Into.
Preferably, thickness of concrete cover thinnest part 4-5cm, thickness 5-8cm, steel pipe pipe thickness 6-14mm.
According to second aspect, a kind of preparation method of built pile is provided in a kind of embodiment, including:It is welded on tie hoop
Vertical muscle is connect, is then positioned over tie hoop in steel pipe with one heart;The casting concrete into steel pipe forms steel core;Immersed tube is squeezed into
Ground predetermined depth, then steel core is positioned in immersed tube with one heart, the casting concrete between immersed tube and steel core, casting concrete
When, vibration sinking tube simultaneously slowly extracts immersed tube.
Preferably, it pours the concrete in steel duct and outside and uses construction refuse regenerated concrete.
Built pile according to above-described embodiment and preparation method thereof, due to built pile using steel pipe and steel reinforcement cage as bone
Frame, using concrete as flesh and blood, steel pipe has effect of contraction to concrete so that built pile has preferable compression strength and resists
Tensile strength when pressure wave reflection is into tensile wave, crack can occur to avoid rivet nut.Simultaneously as using this structure, group
The volume for closing stake is less than traditional precast reinforced concrete pile, and soil compaction effect is small, is not in the situation that stake is difficult to squeeze into ground.
Description of the drawings
Fig. 1 is one embodiment of the invention three-dimensional structure diagram.
Fig. 2 is one embodiment of the invention transverse cross-sectional view.
Fig. 3 is one embodiment of the invention concrete cover sectional view.
Fig. 4 is one embodiment of the invention partial longitudinal sectional view.
Specific embodiment
The present invention is described in further detail below by specific embodiment combination attached drawing.Wherein different embodiments
Middle similar component employs associated similar element numbers.In the following embodiments, many datail descriptions be in order to
The application is better understood.However, those skilled in the art can be without lifting an eyebrow recognize, which part feature
It is dispensed or can be substituted by other elements, material, method in varied situations.In some cases, this Shen
Please it is relevant some operation there is no in the description show or describe, this is the core in order to avoid the application by mistake
More descriptions are flooded, and to those skilled in the art, these relevant operations, which are described in detail, not to be necessary, they
The general technology knowledge of description and this field in specification can completely understand relevant operation.
It is herein component institute serialization number itself, such as " first ", " second " etc., is only used for distinguishing described object,
Without any sequence or art-recognized meanings.And " connection ", " connection " described in the application, unless otherwise instructed, include directly and
It is indirectly connected with(Connection).
- 4 are please referred to Fig.1,
Built pile, including concrete cover 1, steel pipe 2 and armored concrete obturator 3, concrete cover 1 pour in
2 outside of steel pipe, armored concrete obturator 3 are filled in steel pipe 2;2 outside of steel pipe is equipped with ribbed stiffener 21, and 2 inside of steel pipe is equipped with
The convex block 22 of steel pipe inner surface is protruded from, ribbed stiffener 21 sets up one section for every 90 ° around pipe direction, and the spacing of vertical direction is
50cm, it is 30cm that convex block 22, which protrudes vertical direction spacing,.
Ribbed stiffener 21 and convex block 22 can effectively enhance concrete cover 1, steel pipe 2,3 three of armored concrete obturator
Between cohesion, significantly improve the ultimate bearing capacity of structure, steel pipe prevented to be detached from concrete section, and improve steel pipe
To the effect of contraction of concrete, the compression strength and tensile strength of built pile with holding structure stabilized soil pavement, can be enhanced.Its
In steel pipe 2 itself also give the constraint in concrete horizontal direction so that structure stretching resistance enhances, and bearing capacity of single pile is higher.
Armored concrete obturator 3 is formed by steel reinforcement cage 31 with concreting, and 31 main body of steel reinforcement cage is by tie hoop 310
It forms, vertical muscle 311 is welded on tie hoop.Filling is by the armored concrete that forms based on tie hoop in steel pipe, together
Sample enhances the compression strength and tensile strength of pile body, and pile body is made to have preferable bearing capacity.
In addition, the present invention because having used concrete cover, can protect nail body steel pipe not corroded, it is resistance to increase structure
Long property extends the built pile service life.
Hoop 312 of putting more energy into, the overall construction intensity of reinforcing steel bar cage 31 are welded between the tie hoop of different level.
Muscle 313 of putting more energy into together is welded every 2 meters on vertical muscle 311, muscle 313 of putting more energy into is perpendicular to 2 axis of steel pipe.
Since pile body is when receiving tensile stress, cracking part is concentrated mainly on the upper part of pile body, therefore, in spiral hoop
Weld short vertical muscle 314 in muscle upper end;Tie hoop is spiraled the structure of density using upper end density of spiraling more than lower end, is further enhanced
The structural strength of pile body upper part enhances the compression strength and tensile strength of pile body.
The section of built pile acts on the raising of frictional force in side-pile using abnormally-structured, by cross section abnormity effect, has
Effect improves combination pile vertical carrying capacity and horizontal bearing capacity.
As the preferred embodiment of the present invention, concrete cover and armored concrete obturator use strength grade
The construction refuse regenerated concreting of C30 forms, and has that environmentally protective, energy saving, light-high-strength and durability be good, cost
Advantage.
With reference to figure 3, thickness of concrete cover thinnest part d1:4-5cm, thickness d2:5-8cm, steel pipe pipe thickness 6-
14mm。
A kind of preparation method of built pile, includes the following steps.
Be prefabricated in the factory steel core:Vertical muscle is welded on tie hoop, is then lifted on tie hoop in steel pipe with one heart;To
Casting concrete in steel pipe, until steel duct treats pulp surface close to opening after filling, maintenance after maintenance completely, is removed to hardening
Mold is removed, obtains steel core.
Cast in situs:Prefabricated blind rivet is lifted to construction site, first smooth location simultaneously pacifies vibrating type machine for placing pipesor piles
Dress is in place, and immersed tube squeezed into projected depth, and nail tip immersed tube is closed during immersed tube, then lifts steel core and sinks in immersed tube and make it and heavy
The vertical concentric fixed placement of pipe.Construction refuse regenerated concrete is poured into a mould by the feed inlet on the upside of immersed tube into immersed tube cavity to fill out
Material, Vibration on Start-up tube drawing, side filler, side vibration sinking tube simultaneously slowly extract immersed tube until immersed tube extracts ground.Treat that this kind half is prefabricated
After the half cast-in-place construction refuse regenerated concrete of odd-shaped cross section-steel pipe combination forming pile 24 hours, excavate and follow closely in foundation surface
Surrounding soil, pours into a mould cushion cap 4 later.It is finally completed a kind of half prefabricated half cast-in-place construction refuse regenerated concrete-steel of odd-shaped cross section
Pipe built pile.
Built pile is prepared using the above method, due to the steel core that can be prefabricated in the factory, there is short time limit, efficient, construction
The advantages of simple and convenient.
Use above specific case is illustrated the present invention, is merely used to help understand the present invention, not limiting
The system present invention.For those skilled in the art, thought according to the present invention can also be made several simple
It deduces, deform or replaces.
Claims (10)
1. a kind of built pile, which is characterized in that described mixed including concrete cover, steel pipe and armored concrete obturator
Solidifying protective soil layer is poured on the outside of steel pipe, and armored concrete obturator is filled in steel pipe;
Ribbed stiffener is equipped on the outside of the steel pipe, the convex block for protruding from steel pipe inner surface is equipped on the inside of steel pipe;
The armored concrete obturator is formed by steel reinforcement cage and concreting, and steel reinforcement cage main body is made of tie hoop, spiral shell
Vertical muscle is welded on rotation stirrup.
2. built pile as described in claim 1, which is characterized in that hoop of putting more energy into is welded between the tie hoop of different level.
3. built pile as described in claim 1, which is characterized in that put more energy into muscle, add every setpoint distance welding one on vertical muscle
Strength muscle is perpendicular to steel pipe axis.
4. built pile as described in claim 1, which is characterized in that tie hoop upper end spiral density spiral more than lower end it is close
Degree.
5. built pile as described in claim 1, which is characterized in that the tie hoop upper end is welded with short vertical muscle.
6. built pile as described in claim 1, which is characterized in that the section of built pile is abnormally-structured.
7. built pile as described in claim 1, which is characterized in that the concrete cover and armored concrete obturator are adopted
It is formed with construction refuse regenerated concreting.
8. built pile as described in claim 1, which is characterized in that thickness of concrete cover thinnest part 4-5cm, thickness 5-
8cm, steel pipe pipe thickness 6-14mm.
9. a kind of preparation method of built pile, which is characterized in that including:
Vertical muscle is welded on tie hoop, is then positioned over tie hoop in steel pipe with one heart;
The casting concrete into steel pipe forms steel core;
Immersed tube is squeezed into ground predetermined depth, then steel core is positioned in immersed tube with one heart, coagulation is poured between immersed tube and steel core
Soil, during casting concrete, vibration sinking tube simultaneously slowly extracts immersed tube.
10. the preparation method of built pile as claimed in claim 9, which is characterized in that pour in the mixed of steel duct and outside
Solidifying soil uses construction refuse regenerated concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810109399.5A CN108221967A (en) | 2018-02-05 | 2018-02-05 | A kind of built pile and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810109399.5A CN108221967A (en) | 2018-02-05 | 2018-02-05 | A kind of built pile and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108221967A true CN108221967A (en) | 2018-06-29 |
Family
ID=62669697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810109399.5A Pending CN108221967A (en) | 2018-02-05 | 2018-02-05 | A kind of built pile and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108221967A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877329A (en) * | 2020-07-03 | 2020-11-03 | 广州市第一市政工程有限公司 | Pile-in-pile broken pile and pile-splicing construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11152745A (en) * | 1997-11-19 | 1999-06-08 | Taisei Corp | Structure of pile to be formed in site |
CN1896383A (en) * | 2005-07-14 | 2007-01-17 | 胡柏英 | Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction |
CN201027308Y (en) * | 2007-05-09 | 2008-02-27 | 刘汉龙 | Cast-in-situ X shaped pile mould sinking device |
CN203795722U (en) * | 2014-04-24 | 2014-08-27 | 安徽城建检测科技有限公司 | Hollow steel pipe concrete pile |
CN204510247U (en) * | 2015-03-05 | 2015-07-29 | 中建材(北京)环保工程发展有限公司 | Garbage loading embeading factory piling strtucture |
CN106869015A (en) * | 2017-02-21 | 2017-06-20 | 南昌大学 | A kind of FRP pipes cast-in-place with half half prefabricated regeneration concrete prestressing force overlapping bridge pier and preparation method |
CN208136910U (en) * | 2018-02-05 | 2018-11-23 | 南昌大学 | A kind of built pile |
-
2018
- 2018-02-05 CN CN201810109399.5A patent/CN108221967A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11152745A (en) * | 1997-11-19 | 1999-06-08 | Taisei Corp | Structure of pile to be formed in site |
CN1896383A (en) * | 2005-07-14 | 2007-01-17 | 胡柏英 | Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction |
CN201027308Y (en) * | 2007-05-09 | 2008-02-27 | 刘汉龙 | Cast-in-situ X shaped pile mould sinking device |
CN203795722U (en) * | 2014-04-24 | 2014-08-27 | 安徽城建检测科技有限公司 | Hollow steel pipe concrete pile |
CN204510247U (en) * | 2015-03-05 | 2015-07-29 | 中建材(北京)环保工程发展有限公司 | Garbage loading embeading factory piling strtucture |
CN106869015A (en) * | 2017-02-21 | 2017-06-20 | 南昌大学 | A kind of FRP pipes cast-in-place with half half prefabricated regeneration concrete prestressing force overlapping bridge pier and preparation method |
CN208136910U (en) * | 2018-02-05 | 2018-11-23 | 南昌大学 | A kind of built pile |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877329A (en) * | 2020-07-03 | 2020-11-03 | 广州市第一市政工程有限公司 | Pile-in-pile broken pile and pile-splicing construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111424644B (en) | Carrier pile construction process | |
CN105155551B (en) | Pressure compensation type foundation pit supporting structure and construction method | |
CN100497842C (en) | Bottom impacting type steel pipe concrete pole and construction method thereof | |
CN101705683B (en) | Use method of flapper pile tip of sinking pipe cast-in-place pile | |
CN101736738B (en) | Production method of pressure resistance and pull-out resistance grouted gravel pile | |
CN107268807A (en) | A kind of Prefabricated concrete-filled steel tube superposed column | |
CN109505297A (en) | A kind of resistance to compression resistance to plucking variable diameters steel reinforcement cage club-footed pile | |
CN104594372A (en) | Fan pile pier foundation and construction method thereof | |
CN109024721B (en) | Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation | |
CN106836179A (en) | Vertical strengthening ribs enhanced bellows grouting pile and construction method | |
CN107100192A (en) | A kind of foundation ring of wind generating set local stiffening device and reinforcement means | |
CN108755453A (en) | A kind of water punching is damaged the composite reinforcement structure and its reinforcement means of bridge pier | |
CN105239607B (en) | Diaphram wall and concrete structure bottom plate whole anti-uplift structure and its construction method | |
KR101341260B1 (en) | Method of reinforcing existing concrete footing structure using micropile | |
CN208668252U (en) | Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame | |
CN208136910U (en) | A kind of built pile | |
CN108221967A (en) | A kind of built pile and preparation method thereof | |
CN102493472A (en) | Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge | |
CN201581398U (en) | Valve pile toe of filling pile of immersed tube | |
CN218061703U (en) | Concrete strip foundation reinforced by additional concrete sleeve | |
CN207512620U (en) | Pile foundation of bridge pier ruggedized construction | |
CN206655217U (en) | Precast concrete drainage pile | |
CN210031776U (en) | Prefabricated RPC tubular pile structure of flute formula type | |
CN211340742U (en) | Anti-settlement foundation | |
CN112921962A (en) | Pile foundation reinforcing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |