CN208668252U - Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame - Google Patents

Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame Download PDF

Info

Publication number
CN208668252U
CN208668252U CN201820910529.0U CN201820910529U CN208668252U CN 208668252 U CN208668252 U CN 208668252U CN 201820910529 U CN201820910529 U CN 201820910529U CN 208668252 U CN208668252 U CN 208668252U
Authority
CN
China
Prior art keywords
pier stud
alligator
bridge
slot
socket joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820910529.0U
Other languages
Chinese (zh)
Inventor
何维利
王航
李江龙
李荣均
林轲
逯彦秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CAPITAL ROAD DEVELOPMENT GROUP Co Ltd
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
BEIJING CAPITAL ROAD DEVELOPMENT GROUP Co Ltd
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CAPITAL ROAD DEVELOPMENT GROUP Co Ltd, Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical BEIJING CAPITAL ROAD DEVELOPMENT GROUP Co Ltd
Priority to CN201820910529.0U priority Critical patent/CN208668252U/en
Application granted granted Critical
Publication of CN208668252U publication Critical patent/CN208668252U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud and bridge foundation, pier stud includes pier stud exposed junction and pier stud built-in end, the down-set reserved socket joint slot in bridge foundation top surface, the shape of socket joint slot and the shape of pier stud built-in end match so that pier stud built-in end can be embedded in socket joint slot, pier stud built-in end is enclosed along outer wall one is arranged annular pier stud keyway, socket joint slot is along the corresponding annular bridge base keyway of the circle setting of inner wall one, after pier stud built-in end is embedded in socket joint slot, there are slot bottom gaps between pier stud built-in end bottom surface and socket joint groove bottom, there are slot gaps between the outer wall of newel post's built-in end and the inner wall of socket joint slot;Annular alligator is condensed into pier stud keyway and bridge foundation keyway from the cast-in-place potting compound of top entry in slot gap.The technical issues of the utility model can solve the multiple alligator distribution of force unevenness of existing alligator bell and spigot frame, the compactness of grouting material is difficult to ensure, slip casting low efficiency.

Description

Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame
Technical field
The utility model belongs to packaged type bridges technical field, specially bridge prefabrication performance of concrete column confined and bridge foundation tooth Key bell and spigot frame.
Background technique
Bridge prefabrication pier stud with the connection of cushion cap or Extended chemotherapy mainly has steel strand wires to connect at present, grout sleeve reinforcing bar connects It connects, the bellows that is in the milk connection, cast-in-place wet joint connects and the forms such as bayonet joint.Wherein steel strand wires connection is chiefly used in pier stud point Prefabricated situation is saved, pier stud segment is concatenated by prestressing force;The connection of grout sleeve reinforcing bar is to connect foot stall steel using grout sleeve Muscle, connection sleeve is prefabricated inside performance of concrete column confined, is in the milk to form connection by sleeve;Bellows connection of being in the milk is in prefabricated pier Reserved steel bar on column reserves bellows reinforced hole on cushion cap, and reserved steel bar is inserted into reserved steel bar hole when construction and carries out hole Road grouting, forms connection, its essence is pier stud reinforcing bars to anchor in cushion cap;Cast-in-place wet joint be connected on the bridge of coastal waters using than More, in Precast Pier Columns lower end, reserved one section of Cast-in-Situ Segment and cushion cap casting are integrated and form connection;Bayonet joint is to hold Slot is reserved on platform, Precast Pier Columns are installed in slot, the gap concrete cast-in-situ between Precast Pier Columns and slot, the company of being formed It connects.
Wherein, the connection of grout sleeve reinforcing bar connects domestic at present only widely apply in low earthquake region, in height with grouting bellows The application in earthquake region need further to verify.Foreign countries have related data to show, in high intensity Zone it is not recommended that using grouting set Cylinder connection.No matter and grout sleeve or the bellows that is in the milk connection, when construction, are both needed to the full face reinforcing bar insertion of pier stud is reserved Duct, and be hole-specifically in the milk, difficulty of construction is larger.
In above-mentioned existing connection type, the application time of cast-in-place wet joint connection and bayonet joint is more long, still Both each have certain limitation: cast-in-place wet joint method is very high to the requirement of pier stud hanging device, and pier stud lower section is existing Pouring concrete amount is also bigger;Bayonet joint generally requires cushion cap socket depth not less than 2 times or so of pier stud diameter, in this way The thickness of cushion cap is required to increased.
Patent No. CN201510967124 it is entitled " bridge prefabrication pier column and cushion cap socket type connecting structure and its In the patent of assembling method ", a kind of socket type connecting structure is disclosed, the gap between pier stud and cushion cap slot is generally 2cm Or so, grouting material mud jacking is used in gap, the small alligator of the multiple depth directions of setting in gap.However, under the action of seismic force, Since multiple alligator distribution of force are uneven, easily cause uppermost small alligator to be initially formed destruction, shear gradually move down later, it is small Alligator is broken up one by one.On the other hand, since its gap is smaller, easily there is cavity after mud jacking or grouting, it cannot be guaranteed that slurry is full Full, i.e., the compactness of grouting material is relatively difficult to guarantee in gap, and compactness inspection is also more difficult.Due to the seam between pier stud and cushion cap slot Gap is small, can not the slip casting directly above gap, need to open up mud jacking channel on cushion cap, shadow will necessarily be caused to cushion cap intensity It rings, and mud jacking operating efficiency is low.
Summary of the invention
In order to overcome the above technical defects and insufficient, the utility model provides a kind of bridge prefabrication performance of concrete column confined and bridge It is difficult to solve the multiple alligator distribution of force unevenness of existing alligator bell and spigot frame, the compactness of grouting material for beam basis alligator bell and spigot frame The technical issues of with guarantee, slip casting low efficiency.
The utility model uses following technological means: bridge prefabrication performance of concrete column confined and bridge foundation alligator socket joint knot Structure, including prefabricated pier stud and bridge foundation, the pier stud includes pier stud exposed junction and pier stud built-in end, the bridge foundation top Reserved socket joint slot is set downwards, and the shape of the socket joint slot and the shape of the pier stud built-in end match so that the pier Column built-in end can be embedded in the socket joint slot, and the pier stud built-in end encloses the annular pier stud key of one indent of setting along outer wall one Slot, the socket joint slot enclose the annular bridge base keyway of one corresponding indent of setting, the pier stud built-in end along inner wall one After insertion socket joint slot, there are slot bottom gap, the pier stud built-in ends between pier stud built-in end bottom surface and socket joint groove bottom Outer wall and the socket joint slot inner wall between there are slot gap, the pier stud keyway is corresponding with bridge foundation keyway;Institute It states in slot gap and is condensed into ring from the potting compound in the cast-in-place potting compound of top entry, the pier stud keyway and bridge foundation keyway Shape alligator.
The pier stud is coaxial ladder column, and the thick section of the pier stud is pier stud built-in end, thin segment is exposed junction, the pier stud The vertical main reinforcement of one circle perforation pier stud built-in end of setting, the main reinforcement are at a distance from pier stud keyway indent side wall in side wall 2~4cm.
More prefabricated pier stud alligator distributing bars of setting are enclosed along side wall profile one in the pier stud built-in end;The bridge More prefabricated basic alligator distributing bars of setting are enclosed along socket joint groove sidewall profile one in basic.
Multiple shear reinforcements are set along one circle in the alligator, each shear reinforcement is located inside the alligator, For annular corresponding with the alligator cross sectional shape and bottom closing, top opening extend upward two parallel rebars from described Bridge foundation top surface is extended upwardly in slot gap.
The bridge foundation is cushion cap or Extended chemotherapy;The bridge foundation locally increase around socket joint slot to be formed it is convex Platform.
Mat formation in advance in the slot bottom gap slurry.
The top surface of the pier stud built-in end is higher than or flushes in the bridge foundation top surface.
The slot bottom gap is 4~10cm, and the alligator is with a thickness of 15~25cm.
Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud and bridge foundation, institute Stating pier stud includes pier stud exposed junction and pier stud built-in end, and the down-set reserved socket joint slot in bridge foundation top surface is described to hold The shape of the shape of slot and the pier stud built-in end matches so that the pier stud built-in end can be embedded in the socket joint slot, The pier stud built-in end encloses the annular pier stud keyway of one indent of setting along outer wall one, and the socket joint slot is along the circle of inner wall one setting one The annular bridge base keyway of a corresponding indent, after pier stud built-in end insertion socket joint slot, pier stud built-in end bottom There are slot bottom gaps between face and socket joint groove bottom, stay between the outer wall of the pier stud built-in end and the inner wall of the socket joint slot There is slot gap, the pier stud keyway is corresponding with bridge foundation keyway;From the cast-in-place perfusion of top entry in the slot gap Potting compound in object, the pier stud keyway and bridge foundation keyway is condensed into annular alligator;
The pier stud is coaxial ladder column, and the thick section of the pier stud is pier stud built-in end, thin segment is exposed junction, the pier stud The vertical main reinforcement of one circle perforation pier stud built-in end of setting, the main reinforcement are at a distance from pier stud keyway indent side wall in side wall 2~4cm;
More prefabricated pier stud alligator distributing bars of setting are enclosed along side wall profile one in the pier stud built-in end;The bridge More prefabricated basic alligator distributing bars of setting are enclosed along socket joint groove sidewall profile one in basic;
Multiple shear reinforcements are set along one circle in the alligator, each shear reinforcement is located inside the alligator, For annular corresponding with the alligator cross sectional shape and bottom closing, top opening extend upward two parallel rebars from described Bridge foundation top surface is extended upwardly in slot gap.
The construction method of bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame the following steps are included:
1) bridge foundation described in cast-in-site reserves socket joint slot in the bridge foundation;2) pier stud is measured in bridge Installation site in beam basis, and telltale mark is installed in the socket joint slot;3) mat formation a slurry in the socket joint trench bottom, The seat slurry is concordant with telltale mark;4) the prefabricated pier stud is lifted into socket joint slot, bottom is aligned with telltale mark After submerge in the seat slurry, fixed after adjusted using being fixed temporarily measure;5) shear reinforcement inside the alligator is installed: The shear reinforcement is put between pier stud keyway and bridge foundation keyway along slot gap in parallel, is rotated to be poured The alligator thickness direction is fixed temporarily in the slot gap reserved part shear reinforcement by electric welding or improving bud grafting;6) Potting compound in the slot gap and alligator is perfused and waits for its condensation molding.
The utility model has following positive beneficial effect:
1) the utility model be a kind of novel Precast Pier Columns and bridge bearing platform or Extended chemotherapy connection type, it can be achieved that Precast Pier Columns are reliably connected with basis, and easy construction, and construction efficiency is high, and there is very strong construction error to adjust energy Power;
2) the utility model proposes the connections of a kind of novel fabricated bridge prefabrication pier stud and bridge bearing platform or Extended chemotherapy Form, the connection can enhance the stress performance of Precast Pier Columns and basic junction, reduce difficulty of construction, accelerate packaged type bridges and apply Work progress;
3) the utility model increases the gap between the reserved slot of socket joint junction pier stud and basis, by gravity With good flow channel, it is ensured that potting compound is full of each corner in gap, can guarantee the compactness of gap casting;It is logical Cross formed a biggish alligator, and in alligator arrangement of reinforcement mode, be greatly improved in the case where not increasing height of foundation pre- Bonding strength between pier stud and cushion cap processed;The anchor connection between Precast Pier Columns and basis is strengthened, pier stud insertion is reduced The anchorage depth on basis;
4) the utility model pier stud built-in end sectional dimension expands, therefore reserving pier stud main reinforcement at tooth socket in pier stud can penetrate through Do not have to be truncated to bottom, ensure that the intensity of socket joint position pier stud.
Detailed description of the invention
Fig. 1 is Precast Pier Columns elevation;
Fig. 2 is bridge foundation elevational schematic view;
Precast Pier Columns and basis assembled schematic diagram when Fig. 3 is unreinforced;
Fig. 4 is slot gap and alligator detail schematic diagram.
Accompanying drawing number: 1- pier stud;2- pier stud built-in end;3- pier stud keyway;4- bridge foundation;5- socket joint slot;6- bridge base Plinth keyway;7- boss;8- alligator;9- slot gap;10- main reinforcement;11- pier stud alligator distributing bar;The basis 13- alligator construction Reinforcing bar;16- shear reinforcement;17- slot bottom gap, 18- slurries.
Specific embodiment
Specific embodiments of the utility model will be further explained with reference to the accompanying drawing.
Following embodiment is only examples for clearly illustrating the present invention to clearly illustrate, and the implementation not to the utility model The restriction of mode.For those of ordinary skill in the art, other can also be made not on the basis of the following description With the variation or variation of form, and these belong to obvious changes or variations that spirit of that invention is drawn still in this reality Among novel protection scope.
Referring to Figure 1~4, bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud 1 With bridge foundation 4, the pier stud 1 includes pier stud exposed junction and pier stud built-in end 2, and 4 top surface of bridge foundation is down-set pre- The shape of the socket joint slot 5 stayed, the shape of the socket joint slot 5 and the pier stud built-in end 2 matches so that the pier stud built-in end 2 It can be embedded in the socket joint slot 5, the pier stud built-in end 2 encloses the annular pier stud keyway 3 of one indent of setting along outer wall one, The socket joint slot 5 encloses the annular bridge base keyway 6 of one corresponding indent of setting, the pier stud built-in end 2 along inner wall one After being embedded in socket joint slot 5, between 2 bottom surface of pier stud built-in end and 5 bottom surface of socket joint slot there are slot bottom gap 17, the pier stud is embedding Enter between the outer wall at end 2 and the inner wall of the socket joint slot 5 there are slot gap 9, the pier stud keyway 3 and bridge foundation keyway 6 It is corresponding;From the cast-in-place potting compound of top entry, the pier stud keyway 3 and the filling in bridge foundation keyway 6 in the slot gap 9 Note object is condensed into annular alligator 8.
Referring to Fig. 1, the pier stud 1 is coaxial ladder column, and the thick section of the pier stud 1 is pier stud built-in end 2, thin segment is exposed End, the vertical main reinforcement 10 of the interior one circle perforation pier stud built-in end 2 of setting of 1 side wall of pier stud, the main reinforcement 10 and pier stud key The distance of 3 indent side wall of slot is 2~4cm.
More prefabricated pier stud alligator distributing bars 11 of setting are enclosed along side wall profile one in the pier stud built-in end 2;It is described More prefabricated basic alligator distributing bars 13 of setting are enclosed along 5 side wall profile one of socket joint slot in bridge foundation 4.
Referring to fig. 2, multiple shear reinforcements 16 are set along one circle in the alligator 8, each shear reinforcement 16 is located at Inside the alligator 8, for annular corresponding with 8 cross sectional shape of alligator and bottom closing, top opening extend upward two Root parallel rebar extends upwardly to 4 top surface of bridge foundation out of described slot gap 9.
The bridge foundation 4 is cushion cap or Extended chemotherapy;The bridge foundation 4 is locally increased to be formed around socket joint slot 5 Boss 7.
Referring to Fig. 3, Fig. 4, slurry 18 of mating formation in advance in the slot bottom gap 17.
The top surface of the pier stud built-in end 2 is higher than or flushes in 4 top surface of bridge foundation.
The slot bottom gap 17 is 4~10cm, and the alligator 8 is with a thickness of 15~25cm.
Referring to fig. 4, bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud 1 and bridge Beam basis 4, the pier stud 1 include pier stud exposed junction and pier stud built-in end 2, and 4 top surface of bridge foundation is down-set reserved The shape of socket joint slot 5, the shape of the socket joint slot 5 and the pier stud built-in end 2 matches so that the pier stud built-in end 2 can It is embedded in the socket joint slot 5, the pier stud built-in end 2 encloses the annular pier stud keyway 3 of one indent of setting along outer wall one, described to hold Slot 5 encloses the annular bridge base keyway 6 of one corresponding indent of setting along inner wall one, and the insertion of pier stud built-in end 2 is held After slot 5, there are slot bottom gap 17, the pier stud built-in ends 2 between 2 bottom surface of pier stud built-in end and 5 bottom surface of socket joint slot Outer wall and the socket joint slot 5 inner wall between there are slot gap 9, the pier stud keyway 3 is opposite with bridge foundation keyway 6 It answers;From the cast-in-place potting compound of top entry, the pier stud keyway 3 and the potting compound in bridge foundation keyway 6 in the slot gap 9 It is condensed into annular alligator 8;
The pier stud is coaxial ladder column, and the thick section of the pier stud is pier stud built-in end 2, thin segment is exposed junction, the pier The vertical main reinforcement 10 of one circle perforation pier stud built-in end 2 of setting, the main reinforcement 10 and 3 concave side of pier stud keyway in 1 side wall of column The distance of wall is 2~4cm;
More prefabricated pier stud alligator distributing bars 11 of setting are enclosed along side wall profile one in the pier stud built-in end 2;It is described More prefabricated basic alligator distributing bars 13 of setting are enclosed along 5 side wall profile one of socket joint slot in bridge foundation 4;
Multiple shear reinforcements 16 are set along one circle in the alligator 8, each shear reinforcement 16 is located at the alligator 8 Inside, for annular corresponding with 8 cross sectional shape of alligator and bottom closing, top opening extend upward two parallel rebars 4 top surface of bridge foundation is extended upwardly to out of described slot gap 9.
The construction method of bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame the following steps are included:
1) socket joint slot 5 is reserved in bridge foundation 4 described in cast-in-site in the bridge foundation 4;2) pier stud 1 is measured Installation site in bridge foundation 4, and telltale mark is installed in the socket joint slot 5;3) it is spread in 5 bottom of socket joint slot Seat slurry 18 is filled, the seat slurry 18 is concordant with telltale mark;4) the prefabricated pier stud 1 is lifted into socket joint slot 5, bottom It is submerged after being aligned with telltale mark in the seat slurry 18, adjusted use afterwards is fixed temporarily measure and fixes;5) tooth is installed Shear reinforcement 16 inside key 8: the shear reinforcement 16 is put into pier stud keyway 3 and bridge foundation along slot gap 9 in parallel It between keyway 6, is rotated to 8 thickness direction of the alligator to be poured, in the 9 reserved part shear reinforcement of slot gap 16 are fixed temporarily by electric welding or improving bud grafting;6) potting compound in the slot gap 9 and alligator 8 is perfused and waits for its condensation molding.
Prefabricated reinforced concrete pier stud and bridge bearing platform or Extended chemotherapy in the utility model use bayonet joint.? The reserved circle pier stud keyway 3 in 1 bottom of Precast Pier Columns, reserves socket joint slot 5 in cushion cap or Extended chemotherapy, in socket joint slot 5 and pier stud The reserved circle bridge foundation keyway in the corresponding position of keyway 3.1 bottom surface of pier stud and cushion cap or Extended chemotherapy reserve socket joint slot 5 it Between there are 5~15cm slot gap 9, pour self-compacting concrete in slot gap 9.In pier stud 1 and cushion cap after concrete coagulation Or shearing resistance alligator 8 is formed between Extended chemotherapy, which strengthens the anchoring between Precast Pier Columns 1 and cushion cap or Extended chemotherapy Connection reduces the anchorage depth that pier stud 1 is inserted into cushion cap or Extended chemotherapy.
1 bottom section dimension enlargement of Precast Pier Columns ensure that 1 main reinforcement 10 of pier stud in the net protection thickness of alligator slot range The requirement of the size of degree and pier stud bottom socket joint slot 5, while guaranteeing that 1 main reinforcement 10 of pier stud passes to 1 bottom of pier stud.
Shear reinforcement 16 is configured in alligator 8, improves the shearing strength of alligator 1, ensure that pier stud 1 anchors stress performance, Enhance pier stud anti-seismic performance.Self-compaction non-shrinking steel fiber concrete can be poured in alligator 8 according to different force requests, Ultra-high performance concrete or common non-shrinkage concrete can be poured.
1 bottom pier stud keyway 3 of Precast Pier Columns and cushion cap or Extended chemotherapy socket joint slot 5 configure corresponding shear reinforcement, full Sufficient force request.
Boss 7 is set at the top of cushion cap or Extended chemotherapy, the size of cushion cap or Extended chemotherapy alligator can be increased, increases pier stud 1 anchoring ability.
Slot bottom gap 17 is set as 4~10cm, guarantees that concreting is closely knit.
The middle part of 4 coupling part of the pier stud built-in end 2 and bridge foundation is arranged in alligator 8, and the height of alligator 8 is not according to Same 4 thickness of bridge foundation setting.
Pier stud alligator distributing bar 11 is set as a circle, including upper and lower two sections of 8 Internal periphery of alligator along 8 Internal periphery of alligator;Base Plinth alligator distributing bar 13 is set as a circle along 8 outer profile of alligator, two sections including 8 outer profile upper and lower part of alligator and 8 side of alligator One section of vertical bar outside wall.

Claims (9)

1. bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud (1) and bridge foundation (4), the pier stud (1) includes pier stud exposed junction and pier stud built-in end (2), and bridge foundation (4) top surface is down-set reserved Socket joint slot (5), the shape of the socket joint slot (5) and the shape of the pier stud built-in end (2) match so that the pier stud is embedding Entering end (2) can be embedded in the socket joint slot (5), which is characterized in that the pier stud built-in end (2) is along setting one, the circle of outer wall one The annular pier stud keyway (3) of indent, the socket joint slot (5) enclose the annular bridge base of one corresponding indent of setting along inner wall one Plinth keyway (6), the pier stud built-in end (2) insertion socket joint slot (5) afterwards, pier stud built-in end (2) bottom surface and socket joint slot (5) bottom There are slot bottom gap (17) between face, between the outer wall of the pier stud built-in end (2) and the inner wall of the socket joint slot (5) there are Slot gap (9), the pier stud keyway (3) are corresponding with bridge foundation keyway (6);Enter in the slot gap (9) from top The cast-in-place potting compound of mouth, the pier stud keyway (3) are condensed into annular alligator (8) with the potting compound in bridge foundation keyway (6).
2. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute Stating pier stud (1) is coaxial ladder column, and the thick section of the pier stud (1) is pier stud built-in end (2), thin segment is exposed junction, the pier stud (1) the vertical main reinforcement (10) for penetrating through pier stud built-in end (2), the main reinforcement (10) and pier stud keyway are enclosed in setting one in side wall (3) distance of indent side wall is 2~4cm.
3. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute It states in pier stud built-in end (2) and encloses more prefabricated pier stud alligator distributing bars (11) of setting along side wall profile one;The bridge base More prefabricated basic alligator distributing bars (13) of setting are enclosed along socket joint slot (5) side wall profile one in plinth (4).
4. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute It states in alligator (8) and multiple shear reinforcements (16) is set along one circle, each shear reinforcement (16) is located in the alligator (8) Portion, for annular corresponding with the alligator (8) cross sectional shape and bottom closing, top opening extend upward two parallel rebars Bridge foundation (4) top surface is extended upwardly in from the slot gap (9).
5. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute Stating bridge foundation (4) is cushion cap or Extended chemotherapy;Increase to form boss in the bridge foundation (4) part around socket joint slot (5) (7)。
6. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute State mat formation in advance in slot bottom gap (17) slurry (18).
7. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute The top surface for stating pier stud built-in end (2) is higher than or flushes in the bridge foundation (4) top surface.
8. bridge prefabrication performance of concrete column confined as described in claim 1 and bridge foundation alligator bell and spigot frame, which is characterized in that institute Stating slot bottom gap (17) is 4~10cm, and the alligator (8) is with a thickness of 15~25cm.
9. bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame, including prefabricated pier stud (1) and bridge foundation (4), the pier stud (1) includes pier stud exposed junction and pier stud built-in end (2), and bridge foundation (4) top surface is down-set reserved Socket joint slot (5), the shape of the socket joint slot (5) and the shape of the pier stud built-in end (2) match so that the pier stud is embedding Entering end (2) can be embedded in the socket joint slot (5), which is characterized in that the pier stud built-in end (2) is along setting one, the circle of outer wall one The annular pier stud keyway (3) of indent, the socket joint slot (5) enclose the annular bridge base of one corresponding indent of setting along inner wall one Plinth keyway (6), the pier stud built-in end (2) insertion socket joint slot (5) afterwards, pier stud built-in end (2) bottom surface and socket joint slot (5) bottom There are slot bottom gap (17) between face, between the outer wall of the pier stud built-in end (2) and the inner wall of the socket joint slot (5) there are Slot gap (9), the pier stud keyway (3) are corresponding with bridge foundation keyway (6);Enter in the slot gap (9) from top The cast-in-place potting compound of mouth, the pier stud keyway (3) are condensed into annular alligator (8) with the potting compound in bridge foundation keyway (6);
The pier stud is coaxial ladder column, and the thick section of the pier stud is pier stud built-in end (2), thin segment is exposed junction, the pier stud (1) the vertical main reinforcement (10) for penetrating through pier stud built-in end (2), the main reinforcement (10) and pier stud keyway are enclosed in setting one in side wall (3) distance of indent side wall is 2~4cm;
More prefabricated pier stud alligator distributing bars (11) of setting are enclosed along side wall profile one in the pier stud built-in end (2);It is described More prefabricated basic alligator distributing bars (13) of setting are enclosed along socket joint slot (5) side wall profile one in bridge foundation (4);
Multiple shear reinforcements (16) are set along one circle in the alligator (8), each shear reinforcement (16) is located at the tooth Key (8) is internal, and for annular corresponding with the alligator (8) cross sectional shape and bottom closing, top opening extend upward two Parallel rebar extends upwardly to bridge foundation (4) top surface out of described slot gap (9).
CN201820910529.0U 2018-06-12 2018-06-12 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame Withdrawn - After Issue CN208668252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820910529.0U CN208668252U (en) 2018-06-12 2018-06-12 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820910529.0U CN208668252U (en) 2018-06-12 2018-06-12 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame

Publications (1)

Publication Number Publication Date
CN208668252U true CN208668252U (en) 2019-03-29

Family

ID=65824841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820910529.0U Withdrawn - After Issue CN208668252U (en) 2018-06-12 2018-06-12 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame

Country Status (1)

Country Link
CN (1) CN208668252U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN112609562A (en) * 2020-11-18 2021-04-06 四川交投建设工程股份有限公司 Assembled bridge substructure and construction method thereof
CN114592423A (en) * 2022-04-01 2022-06-07 中国十九冶集团有限公司 Wet joint connection construction method of prefabricated pier stud and bearing platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN112609562A (en) * 2020-11-18 2021-04-06 四川交投建设工程股份有限公司 Assembled bridge substructure and construction method thereof
CN114592423A (en) * 2022-04-01 2022-06-07 中国十九冶集团有限公司 Wet joint connection construction method of prefabricated pier stud and bearing platform
CN114592423B (en) * 2022-04-01 2024-01-30 中国十九冶集团有限公司 Wet joint connection construction method for prefabricated pier column and bearing platform

Similar Documents

Publication Publication Date Title
CN108547216A (en) Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN108547217B (en) Prefabricated bridge precast concrete pier column and cover beam socket structure and construction method
CN208668252U (en) Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame
CN206376276U (en) A kind of prefabricated pipe gallery
CN109853364A (en) A kind of the precast segment assembly bridge pier connection structure and method of shearing resistance
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN110359363A (en) Prestressing force assembled Self-resetting bridge pier column node and method are cohered in a kind of part
CN105155724A (en) Construction method of structural column for simultaneous construction with frame-structured filled wall
CN107386127A (en) A kind of bridge pier assembly device
CN108179807A (en) A kind of prefabricated beam column crimping joint strengthening structure and its construction method
CN107355010A (en) A kind of precast concrete shear wall profile steel joint attachment structure
CN108374332A (en) A kind of bridge substructure and its construction method using ultra-tough fiber concrete
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN109457568A (en) A kind of beam prefabricated post-stressed assembly construction Craft of bilateral overlapping
CN207525877U (en) A kind of assembled caisson of toilet and its mounting structure
CN108797791A (en) A kind of assembly method of upper and lower self-heat conserving external wall and floor
CN109826192A (en) A kind of prefabricated PC fender post
CN205296209U (en) Prestressed anchorage cable assembled stake siding wall protective structure
CN109914589A (en) A kind of prestressed reinforced concrete prefabricated post vertical connection structure and its construction method
CN112900482A (en) Assembled internal-pulling anchor type gravity retaining wall and construction method thereof
CN108442236A (en) Assembled bridge pier and construction method, prefabricated assembled beam bridge
CN109594467A (en) Precast pier and cushion cap connection structure, construction method, precast pier, cushion cap
KR102268423B1 (en) Precaste Bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190329

Effective date of abandoning: 20230711

AV01 Patent right actively abandoned

Granted publication date: 20190329

Effective date of abandoning: 20230711

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned