CN206655217U - Precast concrete drainage pile - Google Patents

Precast concrete drainage pile Download PDF

Info

Publication number
CN206655217U
CN206655217U CN201720072724.6U CN201720072724U CN206655217U CN 206655217 U CN206655217 U CN 206655217U CN 201720072724 U CN201720072724 U CN 201720072724U CN 206655217 U CN206655217 U CN 206655217U
Authority
CN
China
Prior art keywords
concrete
pile
core
precast concrete
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720072724.6U
Other languages
Chinese (zh)
Inventor
陈杨
彭军
卢强
马少杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201720072724.6U priority Critical patent/CN206655217U/en
Application granted granted Critical
Publication of CN206655217U publication Critical patent/CN206655217U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Present patent application belongs to the special sheet pile wall of foundation engineering,Stake or other structures component technology field,Specifically disclose precast concrete drainage pile,Including prefabricated permeable concrete pipe,Overflow launder is provided with the top of prefabricated permeable concrete pipe,The bottom of overflow launder is communicated with vertical drainage channel,Drainage channel is in communication with the outside,Concrete jacket cylinder is cased with outside prefabricated permeable concrete pipe,Concrete sleeve bottom is inclined-plane,Precast concrete pile core is installed inside prefabricated permeable concrete pipe,Core point of the precast concrete pile core bottom integrally formed with cone,The diameter of core ogival is more than the internal diameter of prefabricated permeable concrete pipe,Installing plate is connected with by butterfly hinge on core point,The art of this patent is compared with prior art,In insertion,Concrete sleeve can loosen soil,Therefore whole precast concrete drainage pile directly can smoothly insert ground end,Other aids are not needed be inserted into simultaneously during,It is easy to operate.

Description

Precast concrete drainage pile
Technical field
The utility model belongs to the special sheet pile wall of foundation engineering, stake or other structures component technology field.
Background technology
Drainage pile is the concrete drainage pile for having some strength, because it has the compression strength of general concrete, while again With water penetration, draining, anti-liquefaction, consolidated earth mass can be played a part of.Existing concrete draining pile driving construction mainly has two kinds of sides Method:
One kind is cast-in-place method, and first with immersed tunnelling method, certain depth fills sand under earth's surface, and after extracting immersed tube, strike-on sinks again in the original location Pipe pours into non-fine concrete to desired depth, the in situ concrete pile absorption of technology prestressed concrete pipe pile, vibrator sunk pile The advantages of with the technology such as vibration dip mould thin cutoff wall, large-diameter thin-wall tubular pile is formed by the immersed tube bored concrete of clad steel, The relatively low economic technology benefit of cost with bearing capacity of single pile height, oneself is in the coastal area such as Jiangsu, Zhejiang weak soil at present Substantial amounts of engineer applied has been obtained in foundation treatment engineering.
However, during practice of construction, because in situ concrete pile belongs to soil compaction class pile-type, adjacent studs immersed tube set and The movement of stake machine can have a negative impact to not yet pre-hardening concrete pile body, even if in piling order, device pile penetration etc. Arrangement and method for construction optimization is carried out, stake top region pile body off normal, or broken pile, pile body concrete disintegration, weak interlayer etc. still occurs Disease, have a strong impact on the pile quality and load-carrying properties of present walling pile;And cast-in-situ concrete thin-wall stake week weak soil is easily by overlying lotus The reasons such as load, WATER LEVEL CHANGES cause consolidation settlement, so as to produce larger negative friction, reduce the bearing capacity of stake and increase work After settle.
In order to improve the load-carrying properties of drainage pile and pile quality, more and more people select another concrete drainage pile Construction method, i.e., make concrete drainage pile using prefabrication, and so-called prefabrication refers to the aggregate (gravelstone for selecting appropriate grading Son) and cement, the permeable pile tube that appropriate reinforcing bar is prefabricated into certain length is equipped with, is sent into after prefabricated pile with immersed tube in soil, its Surrounding fills net sand, then extracts immersed tube.
But the concrete drainage pile being made using prefabrication is applying man-hour requirement immersed tube, is also needed after installing Immersed tube is extracted, process is more in whole work progress so that whole operation process is very cumbersome, reduces installation coagulation The efficiency of native drainage pile.
Utility model content
The purpose of this utility model is to provide a kind of precast concrete drainage pile, can letter when installing concrete drainage pile Change operating procedure, improve installation effectiveness.
In order to achieve the above object, base case of the present utility model provides a kind of precast concrete drainage pile, including pre- Permeable concrete pipe processed, the prefabricated permeable concrete pipe is interior provided with the precast concrete pile core coordinated with it, described prefabricated Water coagulation soil tube top portion is provided with overflow launder, and the bottom of overflow launder is communicated with drainage channel, and drainage channel extends upward through prefabricated permeable Pipe of concrete;The precast concrete pile core bottom is provided with the core point of cone, and core point is placed in outside prefabricated permeable concrete pipe Portion.
The principle of this base case is:During installation, design according to demand first the diameter of prefabricated permeable concrete pipe with And length, then precast concrete pile core is installed in the prefabricated permeable concrete pipe after the completion of design, installation is combined Precast concrete drainage pile be inserted directly into ground in the way of core point is towards ground, stable installation is realized, in ground Water is directly entered prefabricated permeable concrete pipe and flowed out from drainage channel, while the water at top also can flow into draining from overflow launder and lead to Road.
The beneficial effect of this base case is:By precast concrete pile core and prefabricated permeable concrete pipe knot in this programme It is combined, while sets core point to be inserted directly into ground in precast concrete pile core bottom, can is directly overall when mounted Installed, it is not necessary to borrow immersed tube, when mounted can disposable installation, the step of simplifying installation operation, improve Installation effectiveness.
Scheme two:Scheme is preferred based on this, and the core point is structure as a whole with precast concrete pile core.
The core point that precast concrete pile core bottom is integrally formed cone can improve the sharp intensity of core, avoid core point from making It is broken off during, while the core point formed using integrally formed mode also can be firmer.
Scheme three:This is preferred for scheme two, and the diameter of the core pointed tip port is more than prefabricated permeable concrete pipe Internal diameter..
When precast concrete drainage pile inserts underground, core point insertion underground can be by upward resistance, core point the widest part Diameter be more than prefabricated permeable concrete pipe internal diameter, it is possible to prevente effectively from core point be squeezed into during insertion it is prefabricated permeable Cause core point can not normal work inside pipe of concrete.
Scheme four:This is preferred for scheme three, and the core point surface is hinged with installing plate.
Because precast concrete drainage pile is during ground end is inserted, installing plate will be turned upwards by the resistance of soil It is dynamic so that installing plate with core is pointed forms an angle, installing plate can block drainage channel bottom, prefabricated so as to avoid Soil enters drainage channel to concrete drainage pile during insertion, ensures that whole drainage channel keeps clear, and improves draining effect Fruit
Scheme five:This is preferred for scheme four, and concrete jacket cylinder, concrete are cased with outside the prefabricated permeable concrete pipe Sleeve bottom is inclined-plane.
In insertion, concrete sleeve can loosen soil, therefore whole precast concrete drainage pile can be directly smooth Insertion ground end.
Scheme six:This is preferred for scheme five, and the drainage channel is vertical drainage channel.
Vertical drainage channel can be such that the water of underground is flowed out rapidly directed along drainage channel, lead to compared to inclined draining Road, current are shorter in the time that drainage channel flows, the rate of outflow faster, so as to improve the draining of precast concrete drainage pile Effect and the reliability of work.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment precast concrete drainage pile.
Embodiment
The utility model is described in further detail below by embodiment:
Reference in Figure of description includes:Precast concrete pile core 1, prefabricated permeable concrete pipe 2, drainage channel 3rd, concrete sleeve 4, overflow launder 5, core point 6, installing plate 7.
Embodiment
Substantially as shown in Figure 1:Precast concrete drainage pile, including prefabricated permeable concrete pipe 2, prefabricated pervious concrete The top of pipe 2 is provided with overflow launder 5, and the bottom of overflow launder 5 is communicated with vertical drainage channel 3, and drainage channel 3 is in communication with the outside, in advance Concrete jacket cylinder 4 is cased with outside permeable concrete pipe 2 processed, the bottom of concrete sleeve 4 is inclined-plane.
Precast concrete pile core 1 is installed inside prefabricated permeable concrete pipe 2, the bottom of precast concrete pile core 1 one into Type has the core point 6 of cone, and the diameter at the top of core point 6 is more than the internal diameter of prefabricated permeable concrete pipe 2, passes through butterfly on core point 6 Hinge is connected with installing plate 7.
During installation, the diameter and length of prefabricated permeable concrete pipe 2 are designed according to demand first, then completed in design Installation precast concrete pile core 1 in prefabricated permeable concrete pipe 2 afterwards, the precast concrete drainage pile that installation is combined is straight Patch into ground, because precast concrete pile core 1 is integrally formed with the core point 6 of cone, and outside prefabricated permeable concrete pipe 2 Concrete sleeve 4 is cased with, the bottom of concrete sleeve 4 is inclined-plane, and in insertion, concrete sleeve 4 can loosen soil, therefore whole Individual precast concrete drainage pile directly can smoothly insert ground end.
Because precast concrete drainage pile is during ground end is inserted, installing plate 7 will be upward by the resistance of soil Rotate, so that installing plate 7 forms an angle with sharp 6 shapes of core, installing plate 7 can block the bottom of drainage channel 3, so as to keep away Exempting from precast concrete drainage pile, soil enters drainage channel 3 during insertion, ensures that whole drainage channel 3 keeps clear, when After the whole precast concrete drainage pile insertion enough depth of ground end, the soil plane of the lower section of installing plate 7 is opened, now can be to pre- Banketed around concrete drainage pile processed, substantial amounts of soil is sprinkling upon on installing plate 7 during banketing, and can be depressed installing plate 7, be made The keep level of installing plate 7, finally whole precast concrete drainage pile is compressed using soil, the water in ground is directly entered prefabricated Permeable concrete pipe 2 flows out from drainage channel 3, while the water at top also can flow into drainage channel 3 from overflow launder 5.
Above-described is only embodiment of the present utility model, and the general knowledge such as known concrete structure and characteristic is herein in scheme Do not describe excessively.It should be pointed out that for those skilled in the art, the premise of the utility model structure is not being departed from Under, several modifications and improvements can also be made, these should also be considered as the scope of protection of the utility model, and these are all without influence The effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim It is defined, the record such as embodiment in specification can be used for the content for explaining claim.

Claims (3)

1. precast concrete drainage pile, including prefabricated permeable concrete pipe, interior be provided with of the prefabricated permeable concrete pipe is matched somebody with somebody with it The precast concrete pile core of conjunction, it is characterised in that be provided with overflow launder, the bottom of overflow launder at the top of the prefabricated permeable concrete pipe Drainage channel is communicated with, drainage channel extends upward through prefabricated permeable concrete pipe;The precast concrete pile core bottom is provided with circle The core point of taper, and core point is placed in outside prefabricated permeable concrete pipe, core point is structure as a whole with precast concrete pile core, core point The diameter of top port is more than the internal diameter of prefabricated permeable concrete pipe, and core point surface is hinged with installing plate.
2. precast concrete drainage pile according to claim 1, it is characterised in that:Outside the prefabricated permeable concrete pipe Concrete sleeve is cased with, concrete sleeve bottom is inclined-plane.
3. precast concrete drainage pile according to claim 2, it is characterised in that:The drainage channel is vertical draining Passage.
CN201720072724.6U 2017-01-20 2017-01-20 Precast concrete drainage pile Expired - Fee Related CN206655217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720072724.6U CN206655217U (en) 2017-01-20 2017-01-20 Precast concrete drainage pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720072724.6U CN206655217U (en) 2017-01-20 2017-01-20 Precast concrete drainage pile

Publications (1)

Publication Number Publication Date
CN206655217U true CN206655217U (en) 2017-11-21

Family

ID=60314905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720072724.6U Expired - Fee Related CN206655217U (en) 2017-01-20 2017-01-20 Precast concrete drainage pile

Country Status (1)

Country Link
CN (1) CN206655217U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339027A (en) * 2018-11-30 2019-02-15 重庆大学 A kind of high frequency drainage pile for liquefaction of sand
CN110258542A (en) * 2019-06-15 2019-09-20 武汉中力岩土工程有限公司 A kind of soft soil foundation reinforcing method based on the concrete-cored stake of cement concrete

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339027A (en) * 2018-11-30 2019-02-15 重庆大学 A kind of high frequency drainage pile for liquefaction of sand
CN109339027B (en) * 2018-11-30 2020-11-10 重庆大学 A high frequency drainage stake for sandy soil liquefaction
CN110258542A (en) * 2019-06-15 2019-09-20 武汉中力岩土工程有限公司 A kind of soft soil foundation reinforcing method based on the concrete-cored stake of cement concrete

Similar Documents

Publication Publication Date Title
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN1986975A (en) Full sleeve large diameter vibration soil taking and filling pile construction method
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN101736738A (en) Pressure resistance and pull-out resistance grouted gravel pile
CN110485437A (en) Roadbed side slope entirety green safeguard structure and its construction method
CN206655217U (en) Precast concrete drainage pile
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN108643169A (en) One kind can slip casting prefabricated pile and its piling construction and grouting method
CN103061332B (en) Integrally-arranged and externally-wrapped double-layered water discharging body and middle concrete combined pile and construction method
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN100513702C (en) Construction method of guarantying pile length of driven cast-in-place pile constructed in pebble layer and sand layer
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN106638646A (en) Secondary bottom sealing structure of open caisson and construction method
CN204000859U (en) The mutual foundation drainage pile for prestressed pipe of a kind of soft or hard interlayer
CN110055845A (en) A kind of construction method that highway bridge and culvert two sides are soft soil roadbed
CN102182178A (en) Solid and hollow integrated pile, pile forming device and pile forming method
CN201762705U (en) Prefabricated extruding and expanding pile
CN205875146U (en) Broken pile's reinforced structure
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN208136910U (en) A kind of built pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121

Termination date: 20190120

CF01 Termination of patent right due to non-payment of annual fee