CN108396856A - A kind of floor layered structure of integrated house - Google Patents

A kind of floor layered structure of integrated house Download PDF

Info

Publication number
CN108396856A
CN108396856A CN201810199968.XA CN201810199968A CN108396856A CN 108396856 A CN108396856 A CN 108396856A CN 201810199968 A CN201810199968 A CN 201810199968A CN 108396856 A CN108396856 A CN 108396856A
Authority
CN
China
Prior art keywords
rod body
floor
layered structure
integrated house
common joists
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810199968.XA
Other languages
Chinese (zh)
Other versions
CN108396856B (en
Inventor
阮卜琴
肖招银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Topsun Logistic Control Co Ltd
Original Assignee
Zhejiang Topsun Logistic Control Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Topsun Logistic Control Co Ltd filed Critical Zhejiang Topsun Logistic Control Co Ltd
Priority to CN201810199968.XA priority Critical patent/CN108396856B/en
Publication of CN108396856A publication Critical patent/CN108396856A/en
Application granted granted Critical
Publication of CN108396856B publication Critical patent/CN108396856B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/26Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention provides a kind of floor layered structures of integrated house, belong to integrated building technical field.The technical issues of layered structure construction process that it solves existing integrated house is complicated, and common joists laying is more troublesome.This floor layered structure includes being set on wall and horizontally disposed concrete laminate, concrete laminate is equipped with several common joists for being used for laying floor, it is installed with built-in fitting in concrete laminate, built-in fitting has the connecting-rod body being exposed on the upside of concrete laminate, connecting-rod body has more, more connecting-rod bodies are spaced setting and are mutually parallel successively, plugged and fixed has connector on connecting-rod body, the both ends of every common joists are connected to respectively by connector on two adjacent connecting-rod bodies and the equal plugged and fixed in both ends of common joists is on corresponding connector.The present invention has many advantages, such as that construction efficiency is high, structural stability is strong.

Description

A kind of floor layered structure of integrated house
Technical field
The invention belongs to integrated building technical fields, are related to a kind of floor layered structure of integrated house.
Background technology
Integrated house mainly by the wall that is prefabricated in the factory, roofing etc., is processed according to design requirement using steel construction as generation The load-carrying members of table can be assembled into rapidly a kind of building pattern in set house.For integrated house compares common building, master The advantage wanted be that construction it is more quick, therefore, how under the premise of ensureing building structure intensity lifting construction efficiency, It is particularly important for integrated house.
As Chinese patent literature discloses a kind of structural framing system being used to support building and assembles its method (Shen Please number:201510520656.0), which includes multiple stays and base beam, and the base beam can To be horizontally supported between multiple stays.Pairs of concrete slab component be arranged on base beam and with base beam Vertically, each concrete slab component is all provided with hole or channel.The system is in practical building course, and there are deficiencies below: 1, the cabling for outpouring channel for carrying out cable, water pipe etc. is directly poured in concrete slab component.When pouring, need using every Plate prevents the channel in precast concrete board member from being filled by cement mortar.Such structure cast trouble, is unfavorable for construction effect The promotion of rate, and the risk that channel is blocked is still remained, channel is done over again again after being blocked, and construction speed is again Delayed;2, concrete slab component only relies on the base beam at its both ends and is supported, therefore middle part lacks support, in order to protect Demonstrate,prove concrete slab component strength, it is also necessary to the step of concrete last layer is filled and led up is carried out, with by promoting concrete slab component Thickness ensures its structural strength;And concrete slab component is filled and led up by concrete last layer, and keel are re-layed after filling and leading up, in this way The step of more concrete are filled and led up, not only waste of time, but also waste material.And beat keel and also need to destroy ground, make room The structure in room changes, and safety coefficient reduces.After having beaten keel, ground can be made to increase, can also reduce the use space in house. In addition, in laying floor keel, the length of the common joists of use is all very long in house at present, trouble is carried, needs to use and hang The mode of dress is lifted to room, and the splicing of common joists is then carried out further according to the size in room, unavoidably also needs to root Keel are cut into different sizes according to actual conditions.Therefore, traditional common joists laying is all more troublesome.
Invention content
The purpose of the present invention is there is the above problem in view of the prior art, it is proposed that it is a kind of how the effect of lifting construction Rate.
Object of the invention can be realized by the following technical scheme:A kind of floor layered structure of integrated house integrates House includes wall, and This floor layered structure includes being set on wall and horizontally disposed concrete laminate, concrete laminate It is equipped with several common joists for being used for laying floor, which is characterized in that be installed with built-in fitting in the concrete laminate, institute Stating built-in fitting, there is the connecting-rod body being exposed on the upside of concrete laminate, the connecting-rod body to have more, more connecting-rod bodies Interval is arranged and is mutually parallel successively, and plugged and fixed has connector, the both ends difference of every common joists on the connecting-rod body It is connected to by connector on two adjacent connecting-rod bodies and the equal plugged and fixed in both ends of common joists is in corresponding connector On.
In the layered structure of This floor, since the both ends of every common joists are both connected to two adjacent connecting-rod bodies On, such design makes common joists length shorter, not only facilitates carrying, but also space requirement is low, keel light weight, installation Convenience is improved, can significantly lifting construction efficiency.More connecting-rod bodies are mutually parallel so that common joists can Be manufactured into identical length, laying when any common joists that can arbitrarily take installed, installation is very convenient, Significantly improve the efficiency of construction.In addition, the built-in fitting in the application is poured in advance in concrete laminate casting process On concrete laminate, the connecting-rod body of built-in fitting is exposed on the upside of concrete laminate, after being saved in building course The process that layer is filled and led up is poured, concrete is not only saved, but also saves the efficiency that process also improves construction later.And exposed connection The body of rod just can be used for installation floor keel, directly beat the mode of keel on cement flooring compared to traditional construction mode, this The common joists of application are connected by connector and connecting-rod body, and are adopted between connector and connecting-rod body, common joists It is attached with the mode of plugged and fixed so that connector, common joists installation are simple and quick, are capable of the efficiency of lifting construction.
In the floor layered structure of above-mentioned integrated house, the concrete laminate is rectangular, the connecting-rod body Length direction it is parallel with the length direction of concrete laminate, more connecting-rod bodies along concrete laminate width direction successively between It is extended respectively at two short side edges of concrete laminate every the both ends of arrangement, the connecting-rod body.
In the floor layered structure of above-mentioned integrated house, also one on each connector on two connecting-rod bodies of outermost One correspondence is connected with splicing keel, and the splicing keel are mutually perpendicular to connecting-rod body, and one end plugged and fixed for splicing keel exists On corresponding connector, the splicing keel other end rides against the edge of concrete laminate upper surface.Since concrete laminate does not have The process that last layer is filled and led up, therefore there is a distance at the edge of two connecting-rod bodies of outermost and concrete laminate.Therefore, Setting splicing keel, can guarantee that concrete laminate is evenly distributed in the upper surface full keel, facilitate the laying of later stage timber floor.Splice keel It is plugged and fixed on connector, therefore it is also more convenient to splice keel installation.
In the floor layered structure of above-mentioned integrated house, the bottom of the splicing keel other end has lug boss, spells Building sequence bone rides against the edge of concrete laminate upper surface by the lug boss.The kerve wall and connector of inserting groove on connector Bottom surface a distance away, and the other end for splicing keel has lug boss, in this way can guarantee the levelness of splicing keel, Facilitate the laying for carrying out floor.And splicing keel are in vacant state, are on the one hand avoided that keel make moist, and are promoted and use the longevity Life.In addition the effect of sound insulation and noise reduction can also be played.
In the floor layered structure of above-mentioned integrated house, on each concrete laminate per adjacent two connecting-rod bodies it Between distance it is all equal, the common joists are mutually perpendicular to the connecting-rod body.Such design is so that every common joists Any common joists that can arbitrarily take when identical length can be manufactured into, and be laid with are installed, and are pacified It fills very convenient, significantly improves the efficiency of construction.
In the floor layered structure of above-mentioned integrated house, along connecting-rod body length between every adjacent two connecting-rod bodies Direction is equipped at intervals with more common joists, and each common joists are along the length side of connecting-rod body on concrete laminate upper surface To several rows are arranged in, each common joists are on same straight line in often arranging.Such design is not only so that common joists length Shorter, installation convenience is high, can significantly lifting construction efficiency.And common joists proper alignment after installing, it is convenient The laying of later stage timber floor.
In the floor layered structure of above-mentioned integrated house, several horizontally disposed branch are also associated on the wall Beam is supportted, the bottom of the concrete laminate is overlapped in the supporting beam that more are mutually parallel, is fixed in the supporting beam several Root walks spool.Fix spool in supporting beam, cabling pipe is used to carry out the cabling of cable, water pipe etc., therefore, this concrete laminate Inside is without punching or is embedded pipeline into walking line, but can pour and build up solid construction, structure in the case of condition of equivalent thickness Intensity higher.
In the floor layered structure of above-mentioned integrated house, it is spaced apart along its length equipped with several in the supporting beam Mounting hole, the mounting hole in each supporting beam line up the concentric setting of each mounting hole of several rows and same row in the horizontal direction, It is described walk spool be threaded through in each mounting hole of same row.In supporting beam production process, it can be processed in supporting beam Mounting hole.When integrated house is built, after supporting beam installs, will walk spool and penetrate mounting hole just realizes away the peace of spool Dress, there is no need to install away spool by welding, pouring into a mould or relying on the modes such as fixing piece again so that quick construction is convenient.
In the floor layered structure of above-mentioned integrated house, the connector includes in block-like ontology, the ontology On offer the perforative location hole in both ends in the horizontal direction, connecting-rod body is passed through in the location hole and is located in location hole, It is located on the ontology on the downside of location hole and is further opened with guiding groove, the upper end of the guiding groove is connected to location hole, and lower end has Opening, the connecting-rod body can be inserted into the location hole by guiding groove, and the both sides on the ontology positioned at location hole are also divided The inserting groove for being attached with common joists end is not offered.When being installed, the opening of trench bottom will guided just To connecting-rod body, connector is firmly pressed down on, connecting-rod body is made to be caught in location hole by guiding groove, realizes consolidating for connector It is fixed.Such mounting means is attached without welding without by connectors such as bolt, rivets, and construction is more convenient.
In the floor layered structure of above-mentioned integrated house, the upper end of the inserting groove is opening, which has Kerve wall and two upright side walls being oppositely arranged, are respectively provided with clamping protrusion in two upright side walls, shape between two clamping protrusions At resigning breach, clamping groove, the end of the common joists are opened up in two upright side walls of the common joists end respectively It can be inserted into from the opening of inserting groove upper end in inserting groove and two clamping protrusions can be respectively clamped into two clamping grooves. It, only need to be by the end of common joists since the upper end of inserting groove is opening when the connection of progress common joists and connector It is directed at inserting groove, then will press down on common joists, the clamping protrusion on connector is made to be caught in the clamping groove of common joists It is interior, until the bottom of common joists is resisted against on the kerve wall of inserting groove, the installation of common joists just can be completed, it is clear that this Shen Please the installation of common joists is attached without by connectors such as bolt, rivets, construction is more convenient.
In the floor layered structure of above-mentioned integrated house, it is mixed that polylith is provided in each supporting beam at the top of each room Solidifying soil layer plate, polylith concrete laminate splice successively in the direction of the width.At the top of each room using polylith concrete laminate into Row binds, therefore reduces per the area of block concrete laminate, required lifting space reduction, therefore can facilitate lifting and coagulation The installation of soil layer plate, the efficiency of lifting construction.
Compared with prior art, the floor layered structure of this integrated house has the following advantages:
1, this concrete laminate eliminates the process that last layer is filled and led up so that connecting-rod body can be exposed to concrete laminate Top and between the upper surface of concrete laminate a distance away, such connecting-rod body just can be used for installation floor Keel so that common joists are easy for installation, can significantly lifting construction efficiency.
2, fix spool in supporting beam, cabling pipe is used to carry out the cabling of cable, water pipe etc., therefore, this concrete layer Intralamellar part is without punching or is embedded pipeline into walking line, and construction is more convenient.
3, common joists are connected on connecting-rod body by the application using connector, will not be destroyed in laying floor keel Concrete laminate, thus while saving the process that last layer is filled and led up, concrete thickness reduces, but still disclosure satisfy that laydown Demand.And concrete layer board bottom portion is supported by more supporting beams, therefore can guarantee concrete layer harden structure Stability.
Description of the drawings
Fig. 1 is the structural schematic diagram one of this integrated house embodiment one.
Fig. 2 is the structural schematic diagram two of this integrated house embodiment one.
Fig. 3 is the dimensional structure diagram of This floor layered structure embodiment one.
Fig. 4 is the enlarged drawing at A in Fig. 3.
Fig. 5 is the enlarged drawing at B in Fig. 3.
Fig. 6 is the connection diagram between common joists and connector in embodiment one.
Fig. 7 is the structural schematic diagram in concrete layer board bottom portion in embodiment one.
Fig. 8 is the dimensional structure diagram of built-in fitting in embodiment one.
Fig. 9 is the connection diagram between common joists and connector in embodiment two.
In figure, 1, wall;2, supporting beam;3, concrete laminate;4, built-in fitting;41, connecting-rod body;41a, spliced eye;5、 Common joists;51, clamping groove;5a, counterbore;6, splice keel;61, lug boss;7, spool is walked;8, mounting hole;9, ontology; 91, location hole;92, guiding groove;93, inserting groove;931, kerve wall;932, upright side walls;933, clamping protrusion;934, it steps down and lacks Mouthful;9a, inserting column;9b, pillar;10, column;11, floor.
Specific implementation mode
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described, However, the present invention is not limited to these examples.
Embodiment one
The floor layered structure of this integrated house is located inside integrated house, for realizing point of floor above and below integrated house Layer.Referring to Fig. 1 and Fig. 2, in order to more clearly indicate the structure of integrated house, roof and part room partition wall are eliminated in Fig. 1, Floor 11 has been equipped with above concrete laminate 3.Wall 1 and its floor of surrounding are eliminated in Fig. 2 on the basis of Fig. 1 11.Integrated house includes wall 1, and several columns being vertically arranged 10 are cast in wall 1.It is all had at the top of each room The both ends of the more supporting beams 2 being mutually parallel, every supporting beam 2 are respectively connected on the column 10 in wall 1.
As shown in Figure 3 and Figure 4, This floor layered structure includes concrete laminate 3, each supporting beam 2 at the top of each room On be provided with three block concrete laminates 3.It, can be according to the size in room and wanting for building structure intensity in practical manufacturing process It asks, increases or decreases the quantity of concrete laminate 3.As being arranged one piece or two pieces or four in each supporting beam 2 at the top of each room Block concrete laminate 3.Rectangular per block concrete laminate 3, polylith concrete laminate 3 splices successively in the direction of the width. It is bound using polylith concrete laminate 3 at the top of each room, therefore reduced per the area of block concrete laminate 3, it is required Space reduction is lifted, therefore the installation of lifting and concrete laminate 3 can be facilitated, the efficiency of lifting construction.Concrete laminate 3 is The bottom of solid construction, concrete laminate 3 is overlapped in the more supporting beams being mutually parallel 2, if being embedded in concrete laminate 3 The built-in fitting 4 that dry root is mutually parallel.As shown in figure 8, the top of built-in fitting 4 has connecting-rod body 41, the length of connecting-rod body 41 Direction is parallel with the length direction of concrete laminate 3, and more connecting-rod bodies 41 are spaced successively along the width direction of concrete laminate 3 Arrangement, the both ends of connecting-rod body 41 extend respectively at two short side edges of concrete laminate 3.It is every on each concrete laminate 3 The distance between adjacent two connecting-rod bodies 41 are all equal, and the lower part frame body of built-in fitting 4 is embedded in concrete laminate 3, pre-buried The top frame body of part 4 is exposed to the upside of concrete laminate 3 and connecting-rod body 41 be higher by one section of the upper surface of concrete laminate 3 away from From being additionally provided with several common joists 5 for laying floor on the upper surface of concrete laminate 3, common joists 5 are batten system At cross section is rectangular.In practical building course, plugged and fixed has connector, every common joists 5 on connecting-rod body 41 Both ends be connected on adjacent two connecting-rod bodies 41 by connector respectively and the equal plugged and fixed in both ends of common joists 5 is right On the connector answered.Common joists 5 are mutually perpendicular to connecting-rod body 41, along connecting-rod body between every adjacent two connecting-rod bodies 41 41 length directions are equipped at intervals with more common joists 5, and each common joists 5 are along connecting-rod body 41 on 3 upper surface of concrete laminate Length direction be arranged in several rows, often arrange in each common joists 5 be on same straight line, the both ends of board keel pass through company respectively Fitting is connected on two adjacent connecting-rod bodies 41.
As shown in Figure 4 and Figure 5, also connecting one to one on each connector on two connecting-rod bodies 41 of outermost has splicing Keel 6, splicing keel 6 are mutually perpendicular to connecting-rod body 41, splice one end plugged and fixed of keel 6 on corresponding connector, The bottom for splicing 6 other end of keel has lug boss 61, and lug boss 61 rides against the edge of 3 upper surface of concrete laminate.Splicing dragon One end of bone 6 have with 5 mutually isostructural end of common joists, can with connector formed plugged and fixed.Inserting groove on connector A distance away, such design is so that common joists 5 are in hanging shape for 93 kerve wall 931 and the bottom surface of connector On the one hand state is avoided that keel make moist, promote service life.It can also playing the effect of sound insulation and noise reduction.And splice keel 6 The other end have lug boss 61, can guarantee in this way splicing keel 6 levelness, facilitate carry out floor 11 laying.
As shown in fig. 6, connector includes being in block-like ontology 9, it is perforative fixed to offer both ends in the horizontal direction on ontology 9 Position hole 91, connecting-rod body 41 are passed through in the location hole 91 and are located in location hole 91, and 91 downside of location hole is located on ontology 9 It is further opened with guiding groove 92, the upper end of guiding groove 92 is connected to location hole 91, and lower end has opening, and connecting-rod body 41 can be by drawing Guide groove 92 be inserted into location hole 91 in, on ontology 9 positioned at location hole 91 both sides also offer respectively for 5 end of common joists The inserting groove 93 being attached.The upper end of inserting groove 93 is opening, which is oppositely arranged with kerve wall 931 and two Upright side walls 932, clamping protrusion 933 is respectively provided in two upright side walls 932, is formed to step down between two clamping protrusions 933 and lacks Mouthfuls 934, clamping groove 51 is opened up respectively in two upright side walls 932 of board keel end, and the end of board keel can be from inserting groove 93 The opening of upper end is inserted into inserting groove 93 and two clamping protrusions 933 can be respectively clamped into two clamping grooves 51.Pacified When dress, by the opening face connecting-rod body 41 of 92 bottom of guiding groove, connector is firmly pressed down on, makes connecting-rod body 41 by drawing Guide groove 92 is caught in location hole 91, realizes the fixation of connector.Then by the end alignment inserting groove 93 of common joists 5, so Common joists 5 will be pressed down on afterwards, and the protrusion of the clamping on connector 933 is made to be caught in the clamping groove 51 of common joists 5, until The bottom of common joists 5 is resisted against on the kerve wall 931 of inserting groove 93, just can complete the installation of common joists 5.Obviously, this Shen Please the installation of common joists 5 is attached without by connectors such as bolt, rivets, construction is more convenient.
As shown in fig. 7, being fixed with several roots being mutually parallel in supporting beam 2 walks spool 7, every is walked spool 7 by coagulation One end of soil layer plate 3 extends to the other end.In practical manufacturing process, it is spaced apart along its length equipped with several in supporting beam 2 Mounting hole 8, each mounting hole 8 that the mounting hole 8 in each supporting beam 2 lines up several rows and same row in the horizontal direction concentric are set It sets, walks spool 7 and be threaded through in each mounting hole 8 of same row.It fixes in the supporting beam 2 of the floor layered structure of this integrated house Spool 7 walks cabling of the spool 7 for carrying out cable, water pipe etc., and therefore, 3 inside of this concrete laminate is without punching or is embedded pipe Road can pour into walking line and build up solid construction, structural strength higher in the case of condition of equivalent thickness.It is given birth in supporting beam 2 During production, mounting hole 8 can be processed in supporting beam 2.When integrated house is built, after supporting beam 2 installs, will walk Spool 7, which penetrates mounting hole 8, just realizes away the installation of spool 7, and there is no need to again by welding, cast or by fixing piece etc. Mode installs away spool 7 so that quick construction is convenient.
This concrete laminate 3 eliminates the process that last layer is filled and led up so that connecting-rod body 41 can be exposed to concrete layer The top of plate 3 and between the upper surface of concrete laminate 3 a distance away, such connecting-rod body 41 just can be used for pacifying Installed floor keel 5, and every common joists 5 are both connected between adjacent two connecting-rod bodies 41, such design is so that floor 5 length of keel is shorter, not only facilitates carrying, but also space requirement is low, keel light weight, and installation convenience is also improved, energy The significantly efficiency of lifting construction.This concrete laminate 3 eliminates the process that last layer is filled and led up, although 3 thickness of concrete laminate It reduces, but 3 bottom of concrete laminate is supported by more supporting beams 2, therefore still can guarantee its stable structure Property.And the mode of keel is directly beaten on cement flooring compared to traditional construction mode, the common joists 5 of the application pass through connection Part is connected with connecting-rod body 41, and process is more simple, and will not destroy concrete laminate 3, thus while concrete thickness drops It is low, but still disclosure satisfy that the demand of laydown.
Embodiment two
The present embodiment and the structure of embodiment one are essentially identical, and different places are between common joists and connector Connection structure is different.As shown in figure 9, connector includes being in block-like ontology 9, spliced eye 41a, institute are offered on connecting-rod body 41 Stating has inserting column 9a on ontology 9, inserting column 9a, which can enter, makes connector be fixed on connecting-rod body 41 in spliced eye 41a.And ground The end of board keel 5 offers counterbore 5a, has the pillar 9b that can be plugged in counterbore 5a on ontology 9, passes through pillar pillar 9b It is inserted into counterbore 5a and realizes the connection of common joists 5 and connector.
Specific embodiment described herein is only an example for the spirit of the invention.Technology belonging to the present invention is led The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.
Although 1, wall is used more herein;2, supporting beam;3, concrete laminate;4, built-in fitting;41, connecting rod Body;5, common joists;51, clamping groove;6, splice keel;61, lug boss;7, spool is walked;8, mounting hole;9, ontology;91, fixed Position hole;92, guiding groove;93, inserting groove;931, kerve wall;932, upright side walls;933, clamping protrusion;934, resigning breach; 10, column;11, the terms such as floor, but it does not preclude the possibility of using other terms.The use of these items is only for more Easily describe and explain the essence of the present invention;Being construed as any one of the additional limitations all is and spirit of that invention phase It violates.

Claims (10)

1. a kind of floor layered structure of integrated house, integrated house includes wall (1), and This floor layered structure includes being set to On wall (1) and horizontally disposed concrete laminate (3), concrete laminate (3) are equipped with several ground for being used for laying floor Board keel (5), which is characterized in that built-in fitting (4) is installed in the concrete laminate (3), the built-in fitting (4) has exposed Connecting-rod body (41) on the upside of concrete laminate (3), the connecting-rod body (41) have more, more connecting-rod bodies (41) according to Minor tick is arranged and is mutually parallel, and plugged and fixed has connector, the both ends of every common joists (5) on the connecting-rod body (41) It is connected to respectively by connector on two adjacent connecting-rod bodies (41) and the equal plugged and fixed in both ends of common joists (5) is right On the connector answered.
2. the floor layered structure of integrated house according to claim 1, which is characterized in that the concrete laminate (3) Rectangular, the length direction of the connecting-rod body (41) is parallel with the length direction of concrete laminate (3), more connecting-rod bodies (41) width direction along concrete laminate (3) is sequentially arranged at intervals, and the both ends of the connecting-rod body (41) extend respectively to mix At two short side edges of solidifying soil layer plate (3).
3. the floor layered structure of integrated house according to claim 2, which is characterized in that two connecting-rod bodies of outermost (41) also connecting one to one on each connector on has splicing keel (6), the splicing keel (6) and connecting-rod body (41) phase Mutually vertical, for one end plugged and fixed of splicing keel (6) on corresponding connector, splicing keel (6) other end rides against coagulation The edge of soil layer plate (3) upper surface.
4. the floor layered structure of integrated house according to claim 3, which is characterized in that the splicing keel (6) are another The bottom tool lug boss (61) of one end, splicing keel (6) ride against concrete laminate (3) upper surface by the lug boss (61) Edge.
5. the floor layered structure of integrated house according to claim 1 or 2 or 3 or 4, which is characterized in that each coagulation It is all equal the distance between per adjacent two connecting-rod bodies (41) on soil layer plate (3), the common joists (5) and the connecting rod Body (41) is mutually perpendicular to.
6. the floor layered structure of integrated house according to claim 5, which is characterized in that per adjacent two connecting-rod bodies (41) more common joists (5), concrete laminate (3) upper table are equipped at intervals with along connecting-rod body (41) length direction between Each common joists (5) are arranged in several rows along the length direction of connecting-rod body (41) on face, and each common joists (5) are in often arranging On same straight line.
7. the floor layered structure of integrated house according to claim 1 or 2 or 3 or 4, which is characterized in that the wall (1) several horizontally disposed supporting beams (2) are also associated on, the bottom of the concrete laminate (3) is overlapped on more mutually It is fixed with several in parallel supporting beam (2), on the supporting beam (2) and walks spool (7).
8. the floor layered structure of integrated house according to claim 7, which is characterized in that supporting beam (2) upper edge Length direction, which is spaced apart, is equipped with several mounting holes (8), and the mounting hole (8) on each supporting beam (2) is lined up several in the horizontal direction Each mounting hole (8) concentric setting of row and same row, it is described walk spool (7) be threaded through in each mounting hole (8) of same row.
9. the floor layered structure of integrated house according to claim 1 or 2 or 3 or 4, which is characterized in that the connection Part include be in block-like ontology (9), offer the perforative location hole in both ends (91) in the horizontal direction on the ontology (9), it is described Connecting-rod body (41) is passed through in the location hole (91) and is located in location hole (91), and location hole is located on the ontology (9) (91) downside is further opened with guiding groove (92), and the upper end of the guiding groove (92) is connected to location hole (91), and lower end has opening, The connecting-rod body (41) can be inserted by guiding groove (92) in the location hole (91), and location hole is located on the ontology (9) (91) both sides also offer the inserting groove (93) for being attached with common joists (5) end respectively.
10. the floor layered structure of integrated house according to claim 9, which is characterized in that the inserting groove (93) Upper end is opening, which has kerve wall (931) and two upright side walls (932) being oppositely arranged, two vertical sides It is raised (933) that it is respectively provided with clamping on wall (932), resigning breach (934), the floor are formed between two clampings raised (933) Open up clamping groove (51) in two upright side walls (932) of keel (5) end respectively, the ends of the common joists (5) can be from The opening of inserting groove (93) upper end is inserted into inserting groove (93) and two clampings raised (933) can be respectively clamped into two clampings In groove (51).
CN201810199968.XA 2018-03-12 2018-03-12 A kind of floor layered structure of integrated house Active CN108396856B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810199968.XA CN108396856B (en) 2018-03-12 2018-03-12 A kind of floor layered structure of integrated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810199968.XA CN108396856B (en) 2018-03-12 2018-03-12 A kind of floor layered structure of integrated house

Publications (2)

Publication Number Publication Date
CN108396856A true CN108396856A (en) 2018-08-14
CN108396856B CN108396856B (en) 2019-09-03

Family

ID=63092222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810199968.XA Active CN108396856B (en) 2018-03-12 2018-03-12 A kind of floor layered structure of integrated house

Country Status (1)

Country Link
CN (1) CN108396856B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997046771A1 (en) * 1996-06-06 1997-12-11 Albert Solano Method of floor construction with a grid system
CN204137651U (en) * 2014-09-23 2015-02-04 浙江双友物流器械股份有限公司 A kind of decker of compartment
CN204919930U (en) * 2015-09-16 2015-12-30 常熟古建园林建设集团有限公司 Steel construction archaize building's floor structure
CN105544733A (en) * 2013-12-13 2016-05-04 赫鹏城科工程咨询公司 Structural frame system for supporting buildings and assemble method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997046771A1 (en) * 1996-06-06 1997-12-11 Albert Solano Method of floor construction with a grid system
CN105544733A (en) * 2013-12-13 2016-05-04 赫鹏城科工程咨询公司 Structural frame system for supporting buildings and assemble method thereof
CN204137651U (en) * 2014-09-23 2015-02-04 浙江双友物流器械股份有限公司 A kind of decker of compartment
CN204919930U (en) * 2015-09-16 2015-12-30 常熟古建园林建设集团有限公司 Steel construction archaize building's floor structure

Also Published As

Publication number Publication date
CN108396856B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN106049707B (en) Prefabricated wall, prefabricated building construction and method of construction
AU2009225124B2 (en) Prefabricated self-supporting construction element
CN103306402B (en) Non-superimposition beam type fabricated frame-shear wall connection structure and construction method thereof
CN105178433B (en) Precast concrete shear wall structure and its construction method
CN1981102A (en) Insulated concrete form system with variable length wall ties.
CN105544798B (en) Assembled hollow slab shear wall structure and construction method thereof
US20190136507A1 (en) Method for constructing a concrete floor in a multistorey building
CN112177168A (en) Connecting structure of prefabricated building
KR101850948B1 (en) Eco-mold module and construction method of wooden building using the same
CN108396856B (en) A kind of floor layered structure of integrated house
CN109629732B (en) Cast-in-place concrete hidden beam floor with separated pipelines and construction method
RU2441965C1 (en) Multi-stored building of the frame-wall structural system from prefabricated and monolithic reinforced concrete
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system
CN211037527U (en) Take vertical connected node structure of floor is assembled to full assembled of hidden beam
CN204491947U (en) A kind of laminated floor slab
CN114457949A (en) Laminated slab bottom plate with concave and convex plate ends and without ribs and mounting structure
CN210342219U (en) Building with prefabricated bathroom
CN210369500U (en) Steel bar truss floor bearing plate with separated pipelines
CN208201892U (en) A kind of white-out tubular pole and soil nail wall composite supporting construction
CN105926820A (en) Construction method for prefabricated beam steel bearing plate resistance net piece combination floor
CN213927041U (en) Concrete precast slab
CN113958136B (en) Construction method of large-span reinforced concrete cantilever leisure platform
CN217897007U (en) Prefabricated steel lintel and door lintel structure
CN203961066U (en) A kind of foam ceramsite concrete partition board structure
CN102418418A (en) Short-slab-span prefabricated beam floor formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A floor layered structure of integrated house

Effective date of registration: 20211229

Granted publication date: 20190903

Pledgee: Bank of China Limited Yuhuan sub branch

Pledgor: ZHEJIANG TOPSUN LOGISTIC CONTROL Co.,Ltd.

Registration number: Y2021330002723

PE01 Entry into force of the registration of the contract for pledge of patent right