CN105926820A CN201610290894.1A CN201610290894A CN105926820A CN 105926820 A CN105926820 A CN 105926820A CN 201610290894 A CN201610290894 A CN 201610290894A CN 105926820 A CN105926820 A CN 105926820A
Authority
CN
China
Prior art keywords
prefabricated
construction
steel board
secondary beam
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610290894.1A
Other languages
Chinese (zh)
Other versions
CN105926820B (en
Inventor
陈方丽
倪海平
王旭
李勇
魏伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Yuanxin Construction Engineering Co Ltd
Original Assignee
Taizhou Yuanxin Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Yuanxin Construction Engineering Co Ltd filed Critical Taizhou Yuanxin Construction Engineering Co Ltd
Priority to CN201610290894.1A priority Critical patent/CN105926820B/en
Publication of CN105926820A publication Critical patent/CN105926820A/en
Application granted granted Critical
Publication of CN105926820B publication Critical patent/CN105926820B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention provides a construction method for a prefabricated beam steel bearing plate resistance net piece combination floor and belongs to the technical field of architectural engineering. According to the construction method for the prefabricated beam steel bearing plate resistance net piece combination floor, the problem that the construction period of an existing factory building floor is too long is solved. The construction method for the prefabricated beam steel bearing plate resistance net piece combination floor comprises the following steps of a, concrete column pouring, b, prefabricated main beam installing, c, prefabricated secondary beam installing, d, steel bearing plate installing, e, rebar net piece installing, and f, floor pouring. Prefabricated main beams, prefabricated secondary beams, steel bearing plates and rebar net pieces are all prefabricated members, all prefabricated in a production place at first and then transported to a construction site to be installed; no supporting plate is needed to conduct supporting in the installation process; timber formwork operation is convenient; the installation efficiency is high; and the construction time can be effectively shortened on the basis of ensuring the floor structure strength.

Description

A kind of construction of prefabricated joist steel board resistance mesh sheet Assembled floor
Technical field
The invention belongs to construction engineering technical field, relate to a kind of prefabricated joist steel board resistance The construction of mesh sheet Assembled floor.
Background technology
Industrial premises, as the term suggests, it is the house in industrial processes.Industry Factory Building, except the workshop for producing, also includes its annex, such as Factory Building dormitory, Dining room, the supporting house such as office building, broadly fall into the category of industrial premises, or industrial premises A part.Along with industrial expansion, it has been economic development that industrial premises quickly emerges Inexorable trend.When building industrial premises, owing to the floor area of industrial premises is relatively big, So needing substantial amounts of circulation material, such as steel pipe and plank sheathing etc., and using wooden model The when that plate being as support system, construction duration is the longest.
Along with the development of science and technology, in prior art, people's commonly used steel board is built Industrial premises.When steel board is installed, the two ends of steel board can be bridged respectively On the secondary beam of building, watering to water on the face of putting and put concrete then at steel board.Existing Steel board is directly to install when casting concrete, and this not only can hold installing steel Delaying the duration during plate, the stability between the most each steel board is inadequate.So, for this The technical staff in field, develops a kind of prefabricated joist steel board resistance mesh sheet Assembled floor and executes Work engineering method so that it is can either quickly shorten the duration of industrial premises, ensure that again industry The structural strength of Factory Building flooring and structural stability.
Summary of the invention
It is an object of the invention to there are the problems referred to above for existing technology, it is proposed that a kind of The construction of prefabricated joist steel board resistance mesh sheet Assembled floor, its technology to be solved Problem is if shortening the construction period of flooring building, can also ensure that the knot of flooring simultaneously Structure stability.
The purpose of the present invention can be realized by following technical proposal: a kind of prefabricated joist steel holds The construction of plate resistance mesh sheet Assembled floor, it is characterised in that comprise the following steps:
Step a, casting concrete post: cast-in-situ concrete columns on construction site;
Step b, installation precast main beam: the two ends of precast main beam are set up to one respectively On concrete column;
Step c, prefabricated secondary beam is installed: the two ends of prefabricated secondary beam are set up to one respectively In precast main beam or a concrete column;
Step d, install steel board: the two ends of steel board are set up to respectively one prefabricated On secondary beam;
Step e, installation reinforced mesh: on steel board, lay crisscross bar-mat reinforcement Sheet;
Step f, pour flooring: casting concrete on steel board, by precast main beam, Prefabricated secondary beam and reinforced mesh pour integral to form flooring.
Pour in this prefabricated joist steel board resistance mesh sheet Assembled floor construction is mixed Solidifying earth pillar as the cushion cap for supporting precast beam, erection of precast beams on concrete column, Can reduce and support the reinforcing bar usage amount used, cost-effective, concrete column is permissible simultaneously Being separated out a bigger underground space between flooring and ground, space utilization rate is higher, Precast main beam, prefabricated secondary beam, steel board and reinforced mesh for setting up are prefabricated structure Part, they all first carry out in grown place prefabricated, are transported on job site carry out the most again Install, installation process is supported without supporting constructions such as plank sheathings, easy to operate, Installation effectiveness is high.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, institute Stating precast main beam and prefabricated secondary beam is composite beam, the end face of precast main beam has several The exposed girder stirrup outside and set gradually along precast main beam length direction, prefabricated time The end face of beam has several and exposed outside and sets gradually along prefabricated secondary beam length direction Secondary beam stirrup, in step e, also there is reinforcement installation on beam: intert in girder stirrup There are the some main beam main tendons arranged along precast main beam length direction, wear in secondary beam stirrup Being inserted with the some secondary beam main tendons arranged along prefabricated secondary beam length direction, reinforced mesh leads to Cross tinsel to be connected on time beam main tendon and main beam main tendon.Composite beam is at assembled integral The beam of casting concrete at twice in structure.Carry out in precasting yard for the first time, make pre- Beam processed, second time is carried out at the construction field (site), after precast floor slab is shelved on precast beam, The concrete on casting beams top makes floor and beam composite beam again, and girder stirrup is positioned at the most flat On face, and along the width setting of precast main beam, secondary beam stirrup is positioned at perpendicular On, and along prefabricated secondary beam width arrange, reinforced mesh by main beam main tendon, Secondary beam main tendon and reinforced mesh are connected as one overall by tinsel, assemble convenient soon Victory, structure is more firm.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, institute Stating steel board is pressure profiled steel decking sheets, and described steel board includes plate body, and described plate body is by curved The mode of bent molding forms the U-shaped groove of several opening up settings, and described is U-shaped The opening of groove, towards upper, forms an opening court between the U-shaped groove that each two is adjacent Under gap groove, described reinforced mesh also includes muscle at the bottom of several plates, in step e, Also have and end tendon protective layer is installed: muscle at the bottom of plate is laid along the length direction of U-shaped groove. Muscle at the bottom of plate is positioned at the lower section of time beam main tendon, and muscle at the bottom of plate is watering for increasing steel board further Building the structural strength after cement, muscle at the bottom of plate is also set with cushion block, cushion block can avoid plate End muscle directly contacts with steel board and steel board is caused damage.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, In step d, also there is connection steel board: by the side edge of two adjacent steel boards It is fixedly connected with by securing member after being stacked up and down.By the securing member such as bolt, screw by adjacent Two pressure profiled steel decking sheets be connected, pressure profiled steel decking sheets junction be arranged on gap lead to The top of groove, it is possible to increase the bulk strength of steel board junction, can also avoid simultaneously By running pulp occurs during junction between two pieces of steel boards during concreting.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, In step c, on prefabricated erection to precast main beam after, the end face of secondary beam stirrup and master The end face of beam stirrup flushes.It is more conducive to the interspersed and steel of main beam main tendon and time beam main tendon The laying of muscle mesh sheet, and the flooring after pouring is more smooth.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, Between step a and step b, also there is laying bed course: at the adjacent concrete poured Concrete cushion is laid between post.Concrete cushion is it can be avoided that the mud at concrete column edge Soil sliding, thus improve structural strength and the stability of flooring.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, Between step c and step d, also there is limit mould construction: at precast main beam and concrete column Limit mould is installed outside.Limit mould can increase the structural strength of precast main beam and concrete column, The calibration location of prefabricated secondary beam can be also convenient for simultaneously and install.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, Between step e and step f, also there is reinforced mesh self-inspection: the height to reinforced mesh And the junction between adjacent reinforced mesh checks.In the region that reinforced mesh is too low Installing reinforcing bar stirrup additional, and check the bonding strength between adjacent reinforced mesh, deficiency is sentenced Tinsel is reinforced.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, In step c, the sidewall of precast main beam has outwardly convex and for supporting prefabricated secondary beam Steel bar rack, the end of prefabricated secondary beam have along prefabricated secondary beam length direction towards Connecting portion protruding outside prefabricated beam end, when connecting portion is erected in precast main beam, The bottom surface, end of prefabricated secondary beam is erected on Steel bar rack.Prefabricated secondary beam and precast main beam it Between be connected further by Steel bar rack, structural strength is higher.
In the construction of above-mentioned prefabricated joist steel board resistance mesh sheet Assembled floor, In step a, cast-in-place concrete column rectangular array arrangement.Between each concrete column Spacing is roughly the same, it is simple to carry out pre-to beam, steel board and the reinforced mesh of follow-up erection System, saves the construction period of job site.
Compared with prior art, this construction has the advantage that
1, for the girder prefabricated processed set up, prefabricated secondary beam, steel board in this construction And reinforced mesh is prefabricated components, they all first carry out prefabricated, the most again in grown place It is transported on job site install, installation process is supported without gripper shoe, Plank sheathing is easy to operate, and installation effectiveness is high;
2, in this construction reinforced mesh by installing muscle at the bottom of plate, main beam main tendon and secondary beam additional Main muscle, structural strength is high.
Accompanying drawing explanation
Fig. 1 is the construction process figure of the present invention.
Fig. 2 is the attachment structure schematic diagram of precast main beam and prefabricated secondary beam in the present invention.
Fig. 3 is the attachment structure schematic diagram of steel board and reinforced mesh in the present invention.
In figure, 1, concrete column;2, precast main beam;3, prefabricated secondary beam;31, connect Portion;4, steel board;41, U-shaped groove;42, gap groove;5, reinforced mesh;6、 Girder stirrup;7, secondary beam stirrup;8, main beam main tendon;9, secondary beam main tendon;10, at the bottom of plate Muscle;11, Steel bar rack;12, cushion block;13, bolt.
Detailed description of the invention
The following is the specific embodiment of the present invention and combine accompanying drawing, the technical side to the present invention Case is further described, but the present invention is not limited to these embodiments.
Reference Fig. 1, the construction of a kind of prefabricated joist steel board resistance mesh sheet Assembled floor, It is characterized in that, comprise the following steps:
Step a
1, casting concrete post: cast-in-situ concrete columns 1 on construction site;
2, bed course is laid: between the adjacent concrete post 1 poured, lay concrete mats Layer;
Step b
Precast main beam is installed: the two ends of precast main beam 2 are set up to a concrete respectively On post 1, precast main beam 2 is composite beam, and it is naked that the end face of precast main beam 2 has several The girder stirrup 6 exposed outside and set gradually along precast main beam 2 length direction;
Step c
1, prefabricated secondary beam is installed: the two ends of prefabricated secondary beam 3 are set up to respectively one prefabricated On girder 2 or a concrete column 1, prefabricated secondary beam 3 is composite beam, prefabricated secondary beam The end face of 3 has several and exposed outside and sets successively along prefabricated secondary beam 3 length direction The secondary beam stirrup 7 put;
2, limit mould construction: install limit mould in precast main beam 2 and the outside of concrete column 1.
Step d
1, steel board is installed: the two ends of steel board 4 are set up to a prefabricated secondary beam respectively On 3, steel board 4 is pressure profiled steel decking sheets 4, and described steel board 4 includes plate body, described plate Body forms the U-shaped groove 41 of several opening up settings by the way of brake forming, The opening of described U-shaped groove 41 towards upper, the adjacent U-shaped groove 41 of each two it Between formed a downward opening gap groove 42;
2, steel board is connected: the side edge of two adjacent steel boards 4 be stacked up and down It is fixedly connected with by bolt 13 afterwards;
Step e
1, reinforcement installation on beam: main beam main tendon 8 is worn along precast main beam 2 length direction It is inserted in girder stirrup 6, secondary beam main tendon 9 is interted along prefabricated secondary beam 3 length direction In secondary beam stirrup 7;
2, end tendon protective layer is installed: muscle 10 at the bottom of plate is along the length direction of U-shaped groove 41 Lay, and muscle 10 at the bottom of plate is positioned at secondary beam master, the lower section of 9, and muscle 10 at the bottom of plate is set with pad Block 12, and muscle 10 at the bottom of plate is positioned at the lower section of time beam main tendon 9;
3, reinforced mesh is installed: on steel board 4, lay crisscross reinforced mesh 5, Reinforced mesh 5 is resistance mesh sheet prefabricated in factory, and reinforced mesh 5 is erected at secondary beam master On muscle 9 and main beam main tendon 8;
4, reinforced mesh self-inspection: height and the adjacent reinforced mesh 5 to reinforced mesh 5 Between junction check;
Step f
Pour flooring: casting concrete on steel board 4, by precast main beam 2, prefabricated Secondary beam 3 and reinforced mesh 5 pour integral to form flooring.
The present embodiment has on the sidewall of precast main beam 2 outwardly convex and pre-for supporting The Steel bar rack 11 of secondary beam 3 processed, the end of prefabricated secondary beam 3 has along prefabricated secondary beam 3 Length direction towards connecting portion 31 protruding outside prefabricated secondary beam 3 end, this construction party In step c of method, when connecting portion 31 is erected in precast main beam 2, prefabricated secondary beam 3 Bottom surface, end be erected on Steel bar rack 11.
This construction method is in step a, and cast-in-place concrete column 1 rectangular array arranges, And the height of concrete column 1 is 3~5m, between concrete column 1, lay concrete cushion After, a spacious underground space can be separated out in the lower section of Factory Building flooring.
In step c of this construction method, after prefabricated secondary beam 3 sets up in precast main beam 2, The end face of secondary beam stirrup 7 flushes with the end face of girder stirrup 6, the most main beam main tendon 8 and the interting and the laying of reinforced mesh 5 of time beam main tendon 9, and the building after pouring Face is the most smooth firmly.
This construction method can shorten the construction man-hour of job site, Accelerating The Construction engineering Progress, also ensures that structural strength and the knot applying Assembled floor on industrial premises simultaneously Structure stability.
Specific embodiment described herein is only to present invention spirit theory for example Bright.Those skilled in the art can be to described specific embodiment Make various amendment or supplement or use similar mode to substitute, but without departing from The spirit of the present invention or surmount scope defined in appended claims.

Claims (10)

1. a construction for prefabricated joist steel board resistance mesh sheet Assembled floor, its feature It is, comprises the following steps:
Step a, casting concrete post: cast-in-situ concrete columns (1) on construction site;
Step b, installation precast main beam: the two ends of precast main beam (2) are set up respectively On one concrete column (1);
Step c, prefabricated secondary beam is installed: set up respectively at the two ends of prefabricated secondary beam (3) On a piece precast main beam (2) or a concrete column (1);
Step d, installation steel board: the two ends of steel board (4) are set up to one respectively On prefabricated secondary beam (3);
Step e, installation reinforced mesh: at the steel that the upper laying of steel board (4) is crisscross Muscle mesh sheet (5);
Step f, pour flooring: at the upper casting concrete of steel board (4), by prefabricated master Beam (2), prefabricated secondary beam (3) and reinforced mesh (5) pour integral to form flooring.
Prefabricated joist steel board resistance mesh sheet Assembled floor the most according to claim 1 Construction, it is characterised in that described precast main beam (2) and prefabricated secondary beam (3) are equal For composite beam, it is exposed outside and along prefabricated that the end face of precast main beam (2) has several The girder stirrup (6) that girder (2) length direction sets gradually, prefabricated secondary beam (3) End face has several and exposed outside and sets gradually along prefabricated secondary beam (3) length direction Secondary beam stirrup (7), some main beam main tendons (8) and some time beam main tendons (9), In step e, also there is reinforcement installation on beam: girder stirrup is interspersed with some in (6) The main beam main tendon (8) arranged along precast main beam (2) length direction, secondary beam stirrup (7) Inside it is interspersed with the some secondary beam main tendons (9) arranged along prefabricated secondary beam (3) length direction, Reinforced mesh (5) is connected in time beam main tendon (9) and main beam main tendon (8) by tinsel On.
Prefabricated joist steel board resistance mesh sheet Assembled floor the most according to claim 2 Construction, it is characterised in that described steel board (4) is pressure profiled steel decking sheets (4), institute State steel board (4) and include that plate body, described plate body are formed some by the way of brake forming The U-shaped groove (41) of individual opening up setting, the opening of described U-shaped groove (41) Towards upper, between the U-shaped groove (41) that each two is adjacent, formation one is downward opening Gap groove (42), in step e, also has installation end tendon protective layer: along U-shaped logical The length direction of groove (41) lays muscle (10) at the bottom of plate.
Prefabricated joist steel board resistance mesh sheet Assembled floor the most according to claim 3 Construction, it is characterised in that in step d, also has connection steel board: by phase The side edge of two adjacent steel boards (4) is fixedly connected with by securing member after being stacked up and down.
5. according to the prefabricated joist steel board resistance mesh sheet group described in Claims 2 or 3 or 4 Close the construction of flooring, it is characterised in that in step c, prefabricated secondary beam (3) frame After being set in precast main beam (2), the end face of secondary beam stirrup (7) and girder stirrup (6) End face flush.
6. according to the prefabricated joist steel board resistance net described in claim 1 or 2 or 3 or 4 The construction of sheet Assembled floor, it is characterised in that between step a and step b, Also there is laying bed course: between the adjacent concrete post (1) poured, lay concrete Bed course.
7. according to the prefabricated joist steel board resistance net described in claim 1 or 2 or 3 or 4 The construction of sheet Assembled floor, it is characterised in that between step c and step d, Also there is limit mould construction: in precast main beam (2) and the outside installation of concrete column (1) Bian Mo.
8. according to the prefabricated joist steel board resistance net described in claim 1 or 2 or 3 or 4 The construction of sheet Assembled floor, it is characterised in that between step e and step f, Also there is reinforced mesh self-inspection: height and the adjacent reinforced mesh (5) to reinforced mesh (5) Between junction check.
9. according to the prefabricated joist steel board resistance net described in claim 1 or 2 or 3 or 4 The construction of sheet Assembled floor, it is characterised in that in step c, precast main beam (2) Sidewall on there is outwardly convex and for supporting the Steel bar rack (11) of prefabricated secondary beam (3), The end of prefabricated secondary beam (3) has the length direction along prefabricated secondary beam (3) towards in advance Connecting portion protruding outside secondary beam processed (3) end, when connecting portion is erected at precast main beam (2) Time upper, the bottom surface, end of prefabricated secondary beam (3) is erected on Steel bar rack (11).
10. according to the prefabricated joist steel board resistance described in claim 1 or 2 or 3 or 4 The construction of mesh sheet Assembled floor, it is characterised in that in step a, cast-in-place is mixed Solidifying earth pillar (1) rectangular array arrangement.
CN201610290894.1A 2016-05-03 2016-05-03 Construction method for precast beam steel support plate resistance mesh combined floor Active CN105926820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610290894.1A CN105926820B (en) 2016-05-03 2016-05-03 Construction method for precast beam steel support plate resistance mesh combined floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610290894.1A CN105926820B (en) 2016-05-03 2016-05-03 Construction method for precast beam steel support plate resistance mesh combined floor

Publications (2)

Publication Number Publication Date
CN105926820A true CN105926820A (en) 2016-09-07
CN105926820B CN105926820B (en) 2020-06-26

Family

ID=56834256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610290894.1A Active CN105926820B (en) 2016-05-03 2016-05-03 Construction method for precast beam steel support plate resistance mesh combined floor

Country Status (1)

Country Link
CN (1) CN105926820B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762065A (en) * 2017-10-16 2018-03-06 杭萧钢构(安徽)有限公司 A kind of flooring steel beam structure and floor steel beam construction method
CN113897999A (en) * 2021-11-03 2022-01-07 中建四局建设发展有限公司 Construction method for constructing elevator foundation structure on subway upper cover project

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031215U (en) * 2010-05-06 2011-11-09 北京建筑工程学院 Combined floor of bar-mat reinforcement sheets and profiled steel sheets by adopting spot welding
CN105040829A (en) * 2015-06-26 2015-11-11 南京长江都市建筑设计股份有限公司 Prefabricated concrete main beam and secondary beam connecting structure and construction method thereof
CN204876256U (en) * 2015-08-19 2015-12-16 台州远信建设工程有限公司 Steel carrier plate for building
CN204876255U (en) * 2015-08-19 2015-12-16 台州远信建设工程有限公司 A resistance net piece for building industry factory building usefulness

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031215U (en) * 2010-05-06 2011-11-09 北京建筑工程学院 Combined floor of bar-mat reinforcement sheets and profiled steel sheets by adopting spot welding
CN105040829A (en) * 2015-06-26 2015-11-11 南京长江都市建筑设计股份有限公司 Prefabricated concrete main beam and secondary beam connecting structure and construction method thereof
CN204876256U (en) * 2015-08-19 2015-12-16 台州远信建设工程有限公司 Steel carrier plate for building
CN204876255U (en) * 2015-08-19 2015-12-16 台州远信建设工程有限公司 A resistance net piece for building industry factory building usefulness

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762065A (en) * 2017-10-16 2018-03-06 杭萧钢构(安徽)有限公司 A kind of flooring steel beam structure and floor steel beam construction method
CN113897999A (en) * 2021-11-03 2022-01-07 中建四局建设发展有限公司 Construction method for constructing elevator foundation structure on subway upper cover project

Also Published As

Publication number Publication date
CN105926820B (en) 2020-06-26

Similar Documents

Publication Publication Date Title
US6041561A (en) Self-contained molded pre-fabricated building panel and method of making the same
US8161691B2 (en) Precast composite structural floor system
CN206667459U (en) A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall
CN212957170U (en) Precast concrete bottom plate integrated with truss steel bars and prestressed steel wire meshes
CN213418183U (en) Heat-preservation sound-insulation composite assembled floor
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
WO2011012974A2 (en) Method for manufacturing a precast composite steel and concrete beam and a precast composite steel and concrete beam made according to said method
CN102418425A (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
KR20160039855A (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
CN201087489Y (en) Prefabricated floor
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
KR100712354B1 (en) PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein
CN105951983A (en) Building frame structure and construction method thereof
CN105926820A (en) Construction method for prefabricated beam steel bearing plate resistance net piece combination floor
KR20010005431A (en) Steel concrete structure
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN205857697U (en) The anti-form bracing constructing device hanging template
KR101036177B1 (en) Method for constructing building using PRC integrating method
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN113123506B (en) Prefabricated die-removal-free steel bar truss floor bearing plate based on uhpc and using method
CN212802189U (en) Assembly type disassembly-free template
CN205224281U (en) Connection structure of precast floor plank and girder steel
KR20130022656A (en) Hybrid building construction method combining dry type and wet type
KR101103680B1 (en) Pc slab with arch type rib for underground parking lot

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant