KR101036177B1 - Method for constructing building using PRC integrating method - Google Patents
Method for constructing building using PRC integrating method Download PDFInfo
- Publication number
- KR101036177B1 KR101036177B1 KR1020090040767A KR20090040767A KR101036177B1 KR 101036177 B1 KR101036177 B1 KR 101036177B1 KR 1020090040767 A KR1020090040767 A KR 1020090040767A KR 20090040767 A KR20090040767 A KR 20090040767A KR 101036177 B1 KR101036177 B1 KR 101036177B1
- Authority
- KR
- South Korea
- Prior art keywords
- slab
- pillar
- binding
- shape
- concrete
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
본 발명은 지하 주차장과 같은 건축 구조물에 있어 공장 제작에 의해 완성된 피씨 기둥과 피씨 보 및 피씨 슬래브를 현장으로 운반하여, 기초바닥에 수직으로 세워 설치되는 피씨 기둥으로부터 피씨 보를 결합하고, 상기 피씨 보에는 피씨 슬래브를 나열하여 결합하되, 상기 피씨 기둥에는 내부의 철근이 노출되도록 콘크리트를 미성형한 중간결합부와 상부결합부를 각각 형성하고, 상기 피씨 보의 단부는 평면상 "L"자형으로 된 체결부를 형성하며, 상기 피씨 슬래브는 "⊃"자 형태로 된 측부결속구와 "∩"자 형태로 된 상부결속구를 형성하여, 이들 피씨 보와 피씨 슬래브를 피씨 기둥에 견고하게 배근 및 결합한 상태에서 이들 피씨부재 간의 접합부와 피씨 슬래브의 상면에 콘크리트를 현장 타설에 의해 토핑함에 따라 견고한 건축 구조물이 완성되게 한 피알씨 복합화 공법을 이용한 건축 구조물의 시공방법에 관한 것이다.The present invention transports the PC pillar and the PC beam and PC slab completed by the factory manufacturing in the construction structure such as underground parking lot, combines the PC beam from the PC pillar installed vertically on the foundation floor, the PC beam The PC slab is coupled to each other, but the intermediate pillar and the upper coupling portion which are unmolded concrete are respectively formed on the PC pillar to expose the internal reinforcing bars, and the ends of the PC beams have a planar "L" shaped fastening. And the PC slab forms a side binding sphere in the form of "⊃" and an upper binding sphere in the form of "∩", so that these PC beams and PC slabs are firmly rooted and bonded to the PC pillar. As the topping of the joints between the PC members and the upper surface of the PC slab is made by topping the concrete, a solid building structure is completed. The present invention relates to a construction method of a building structure using a PPC composite method.
구조물, 피알씨, 복합공법, 피씨 기둥, 피씨 보, 피씨 슬래브, 주차장 Structure, PC, composite method, PC column, PC beam, PC slab, parking lot
Description
본 발명은 지하 주차장과 같은 건축 구조물에 있어 기둥과 보 및 슬래브를 모두 피씨공법에 의해 제작한 후, 현장으로 옮겨진 피씨(PC) 기둥을 기초바닥에 설치하고, 상기 피씨(PC) 기둥에는 피씨(PC) 보를 결속하여 설치하며, 상기의 피씨(PC) 보에는 피씨 슬래브(PC Slab)를 결속하여 설치한 상태에서 콘크리트(Concrete)를 토핑(Topping)함에 따라, 공기의 단축은 물론 인력 감소와 더불어 고강도의 시공 품질을 얻을 수 있는 것이고 효율적인 공간 활용은 물론 폐기물 발생을 크게 감소시킬 수 있게 한 건축 구조물의 시공방법에 관한 것이다.According to the present invention, in a building structure such as an underground parking lot, the pillars, beams, and slabs are manufactured by the PC method, and then, the PC pillars moved to the site are installed on the foundation floor, and the PC pillars PC) When the beam is bound and installed, the PC beam is bonded to PC concrete in the state where the PC slab is bound and installed, so as topping the concrete and reducing the manpower, The present invention relates to a method of constructing a building structure that can obtain high-strength construction quality and efficiently reduce waste generation as well as efficient space utilization.
일반적으로 대형 매장이나 공장과 같이 긴 경간이 요구되는 대공간 건물을 시공하는 피씨(PC)공법으로는 더블 티 슬래브(Double Tee Slab), HCS(Hollow core Slab) 등을 이용한 피알씨(PRC) 복합화 공법(Precast Reinforced Concrete Layer Construction Method)이 있고, 지하 주차장과 같이 하중이 많은 중규모 이하의 건 물에 적용하는 피씨공법으로는 하프 피씨 슬래브(Harf PC Slab)를 이용한 피알씨(PRC) 복합화 공법이 있다.In general, the PC method for constructing a large-space building, such as a large store or a factory, which requires a long span, is combined with a double tee slab, a hollow core slab, or HCS. There is a Precast Reinforced Concrete Layer Construction Method, and the PrC composite method using Half PC Slab is applied to the sub-medium sized buildings such as underground parking lots. .
이러한 PRC 복합화 공법은 철근 콘크리트 라멘(Rahmen) 구조의 건물을 PC(Precast Concrete)화하는 공법으로서, 공장에서 제작한 피씨 기둥, 피씨 보, 하프 슬래브 등의 PC부재를 현장으로 운송한 후 이를 양중하여 조립한 상태에서 부재간의 접합부와 하프 슬래브의 상부면에 덧침 콘크리트를 현장에서 타설하여 구조체를 일체화시키는 공법이다.The PRC compounding method is a method of converting reinforced concrete ramen (PC) into a precast concrete (PC), and the PC members such as PC columns, PC beams, and half slabs manufactured at the factory are transported to the site and doubled. In the assembled state, it is a method of integrating the structure by pouring concrete on the joint between the members and the upper surface of the half slab in the field.
또한, 근자에 들어서는 기둥과 기둥 사이의 경간을 늘려 안전한 주차 유도와 동시에 차량 회전반경을 여유있게 확보할 수 있게 하면서도, 피씨 기둥이나 피씨 보의 소요 수량을 절감하여 공사비를 절감할 수 있게 한 다양한 시공법이 제안되고 있는 추세이다.In addition, various construction methods that increase the span between the pillars and the pillars in the near-industry to induce safe parking and secure the radius of rotation of the vehicle at the same time, while reducing the cost of construction by reducing the required amount of PC pillars and PC beams This is the trend that is being proposed.
즉, 등록특허 10-0807395호에 따르면 피씨 콘크리트 기둥 중간부의 양측면에 일체로 돌출 형성되어 지하층의 보를 구성하는 보가 안착되도록 돌출 형성된 중간지지판과, 상기 중간지지판에 매립되고 상부로 돌출된 복수개의 끼움볼트와, 상기 끼움볼트에 삽입되는 복수개의 관통 끼움홀을 양단의 단차부에 구비하여 상기 끼움볼트에 끼움홀이 끼워지고 고정되어 상기 중간지지판에 고정되는 역티형 하프 보와, 상기 피씨 콘크리트 기둥의 상부 양측면에 일체로 돌출 형성되어 지붕층의 보를 구성하는 보가 고정되도록 돌출 형성된 상부지지판과, 상기 상부지지판에 매립되고 상부로 돌출된 복수개의 끼움볼트와, 상기 끼움볼트에 삽입되는 관통 끼움홀을 양단부에 구비하여 상기 끼움볼트에 끼움홀이 끼워지고 너트로 고정되어 상기 상부지지판에 안착되며 양단부에 요홈이 형성된 장방형 하프보와, 상기 장방형 하부보의 요홈이 상기 피씨 콘크리트 기둥의 중앙부에서 상부로 일정길이 노출되는 수직 주철근을 둘러싸면서 상기 장방형 하프보가 고정되도록 한 지하주차장 골조부의 구조 및 시공방법을 제안한 바 있다.That is, according to Korean Patent No. 10-0807395, an intermediate support plate protruding integrally formed on both sides of the intermediate part of the PC concrete pillar to protrude so as to mount the beam constituting the beam of the basement layer, and a plurality of fitting bolts embedded in the intermediate support plate and protruding upwards And a plurality of through fitting holes inserted into the fitting bolts at the steps of both ends, and the inverted half beams are fitted and fixed to the fitting bolts and fixed to the intermediate support plate, and the upper portion of the PC concrete pillar. The upper support plate is formed integrally protruding on both sides to protrude the beam constituting the beam of the roof layer, a plurality of fitting bolts embedded in the upper support plate and protruded upwards, and through fitting holes inserted into the fitting bolts at both ends The fitting holes are fitted to the fitting bolts and fixed with nuts to be seated on the upper support plate. The structure and construction of a rectangular half beam, in which the rectangular half beams are fixed, while the rectangular half beams with grooves formed at both ends and the grooves of the rectangular lower beams surround the vertical reinforcing bars exposed at a predetermined length from the center of the PC concrete column to the upper part thereof are fixed. I have suggested a method.
상기의 지하주차장 골조부의 구조 및 시공방법은, 피씨 콘크리트 기둥의 상부지지판과 지붕층 보에 고정수단을 구비하여 안정성의 문제를 불식시키는 동시에 역티형 하프보를 사용하여 지하층 보 및 슬래브를 강접합함에 따라 비용을 절감하고 층간 높이를 확보하는 효과를 갖도록 하고 있다.The structure and construction method of the basement frame structure of the underground parking lot is provided with fixing means in the upper support plate and the roof layer beam of the PC concrete pillar to solve the problem of stability, and by using the inverted half beam to strongly join the basement beam and the slab. It has the effect of reducing costs and securing height between floors.
그러나, 상기와 같은 골조에 의한 구조물은 피씨 기둥에 피씨 보를 얹어 고정하기 위한 상부지지판과 중간지지판이 피씨 기둥으로부터 일체로 돌출된 형상을 갖고 있어 미관상 좋지 못한 것이고, 상기와 같이 돌출된 상부지지판과 중간지지판은 구조물의 천정부에 대한 공간 침해가 발생하는 문제점을 갖게 된다.However, the structure by the frame as described above has a shape in which the upper support plate and the intermediate support plate for fixing the PC beam on the PC pillar has a shape protruding integrally from the PC pillar, which is not good in appearance, and the upper support plate and the intermediate projecting plate as described above The support plate has a problem that space invasion to the ceiling of the structure occurs.
특히, 상기와 같은 구조물의 결합구조는 수직의 피씨 기둥에 대하여 양측으로 분할된 피씨 보가 체결되는 형태를 갖고 있고 상기의 피씨 보에는 연속하여 나열되는 피씨 슬래브가 얹혀지는 형태를 취하고 있으므로 각각의 피씨 보에는 피씨 슬래브로부터 작용하는 하중을 집중적으로 받게 되므로 취약 파손에 대비한 보강 설계가 이루어져야 하는 것이고, 이와 같은 보강 설계 및 안전 설계에 따라 과도한 량의 강선 또는 철근과 콘크리트가 소요되는 것이다. 이에 따라 상기와 같은 구조로 된 구조물은 층고를 확보하는데 어려움이 뒤따르면서도 많은 량의 자재 소모로 인해 경제성이 떨어지는 것이다.In particular, the coupling structure of the structure as described above has a form in which the PC beam divided into both sides with respect to the vertical PC pillar is fastened, and the PC beam is in the form of a series of PC slab arranged in succession, each of the PC beam Since the load acting from the PC slab will be concentrated, reinforcement design should be made for vulnerable breakage, and according to such reinforcement design and safety design, excessive amount of steel wire or rebar and concrete will be required. Accordingly, the structure having the structure as described above is difficult to secure the floor height, but also economical due to the consumption of a large amount of material.
또한, 상기와 같이 집중하중을 받게 되는 피씨 보는 양단부를 이격된 피씨 기둥에 결합한 상태이므로 상기의 피씨 보 단부에서는 응력이 집중됨에 따라 부득이 상기의 상부지지판과 중간지지판을 넓고 두껍게 설계하여야 하는 폐단이 발생하는 것이고, 상기의 상부지지판과 중간지지판으로부터 돌출된 끼움볼드에 피씨 보의 끼움홀을 삽입하여 결합하는 구조를 갖고 있으므로 연속하여 설치되는 피씨 기둥의 경간이 정확하게 일치하도록 시공되어야 함은 물론 허용 오차를 감안하여 상기의 끼움홀을 장방형으로 제작하여야 하므로 그에 따른 단면 손실로 인해 구조적인 강성이 감소하게 되는 것이다.In addition, the PC beam that is subjected to the concentrated load as described above is coupled to the spaced apart pillars of the PC beam because the stress is concentrated at the end of the PC beam inevitably the upper support plate and the intermediate support plate in need of wide and thick design occurs Since the fitting holes of the PC beams are inserted into the fitting bolts protruding from the upper support plate and the intermediate support plate, the construction should be carried out so that the spans of successive installations of the pillars are exactly matched. In view of the above, the fitting holes must be manufactured in a rectangular shape, thereby reducing the structural rigidity due to the cross-sectional loss.
이와 같은 결합구조는 내진성에도 극히 취약함을 드러낼 뿐만 아니라 차량의 빈번한 출입과 이동으로부터 발생하는 진동이 피씨 기둥과 피씨 보의 결합부에 집중적이고 지속적으로 전달됨에 따라 군열이나 파손이 쉽게 발생하여 그에 다른 보수작업을 주기적으로 수행하여야 하는 폐단이 있는 것이다.This coupling structure not only shows extremely weak resistance to seismic resistance, but also vibration and vibration generated from frequent entry and movement of the vehicle are concentrated and continuously transmitted to the coupling part of the PC column and the PC beam, so that a group or breakage occurs easily. There is a need to periodically perform other maintenance work.
아울러, 피씨 기둥에 결합된 상태로 서로 나란하게 배치되는 피씨 보에 결합되는 피씨 슬래브는 피씨 보와의 견고하고 안정적인 결합이 이루어지지 않고 있어 작업 안정성이 극히 떨어지면서도 고품질과 고강도의 구조물을 구축하지 못하고 있는 실정인 것이다.In addition, the PC slab coupled to the PC beams arranged in parallel with each other in a state of being coupled to the PC pillars does not have a strong and stable coupling with the PC beams, resulting in extremely poor work stability and high quality and high strength structures. There is a situation.
본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 공장 제작에 의해 완성된 피씨 기둥과 피씨 보 및 피씨 슬래브를 현장으로 운반하여, 기초바닥에 수직으로 세워 설치되는 피씨 기둥으로부터 피씨 보를 결합하고, 상기 피씨 보에는 피씨 슬래브를 나열하여 결합하되, 상기 피씨 기둥에는 내부의 철근이 노출되도록 콘크리트를 미성형한 중간결합부와 상부결합부를 각각 형성하고, 상기 피씨 보의 단부는 평면상 "L"자형으로 된 체결부를 형성하며, 상기 피씨 슬래브는 "⊃"자 형태로 된 측부결속구와 "∩"자 형태로 된 상부결속구를 형성하여, 이들 피씨 보와 피씨 슬래브를 피씨 기둥에 견고하게 배근 및 결합한 상태에서 이들 피씨부재 간의 접합부와 피씨 슬래브의 상면에 콘크리트를 현장 타설에 의해 토핑함에 따라 견고한 건축 구조물이 완성되게 한 피알씨 복합화 공법을 이용한 건축 구조물의 시공방법을 제공함에 본 발명의 목적이 있는 것이다.The present invention is to solve the problems as described above, to carry the PC column and the PC beam and PC slab completed by the factory manufacturing, the PC beam from the PC column installed perpendicular to the base floor, The PC beams are lined up with a PC slab, and the PC pillars are formed with an intermediate coupling part and an upper coupling part, each of which is formed of an unmolded concrete so as to expose the internal reinforcing bars. Forming a fastening portion, wherein the PC slab forms a side fastening hole having a "⊃" shape and an upper binding hole having a "∩" shape, and firmly roots and couples these PC beams and PC slabs to the PC column. As the topping of the PC members and the concrete slab on the upper surface of the PC slab are cast to the site, a solid building structure is completed. It is an object of the present invention to provide a method for constructing a building structure using a CB composite method.
상기한 바와 같은 목적을 달성하기 위한 본 발명은, 매립된 주철근이 노출되도록 콘크리트를 미성형한 중간결합부와 상부결합부가 형성된 일자 형태의 피씨 기둥과, 양단에 평면상 "L"자 형태의 체결부가 형성되고 상면에는 "ㄱ"자 형태로 된 결합구가 나열 돌출된 피씨 보와, 양측단에 형성된 "⊃"자 형태의 측부결속구와 상부면에 연속하여 형성된 "∩"자 형태의 상부결속구를 갖는 피씨 슬래브를 공장으로 부터 제작하여 현장으로 옮긴 후, 현장에 양생된 기초바닥에 피씨 기둥을 세워 설치하는 단계와; 피씨 기둥의 중간결합부와 상부결합부에 피씨 보의 체결부를 걸쳐 상기 노출상태의 주철근과 피씨 보의 단부를 서로 결속하는 단계와; 피씨 보에 피씨 슬래브를 올려 피씨 보의 결합구와 피씨 슬래브의 측부결속구를 서로 연결하는 단계와; 피씨 기둥과 피씨 보 및 피씨 슬래브 간의 접합부와 피씨 슬래브의 상면에 콘크리트를 토핑하는 단계로 이루어지는 것이다.The present invention for achieving the object as described above, the form of the intermediate pillar and the upper coupling portion is formed in the form of the intermediate coupling portion and the upper coupling portion unexposed concrete to expose the embedded reinforcing bar, fastening in the form of "L" shape on both ends The upper portion of the upper portion formed in the form and the upper surface of the "b" -shaped coupling sphere protruding the PC beam, the "b" -shaped side binding sphere formed on both sides and the "b" -shaped upper binding sphere formed continuously in the upper surface After manufacturing the slab having a PC from the factory and moved to the site, the step of installing the PC column on the foundation floor cured on the site; Engaging the ends of the exposed reinforcement cast iron and the PC beam through the fastening portion of the PC beam to the middle coupling portion and the upper coupling portion of the PC pillar; Raising the PC slab on the PC beam and connecting the coupling hole of the PC beam and the side binding hole of the PC slab to each other; Topping the concrete between the PC column and the PC beam and the PC slab and the upper surface of the PC slab.
본 발명은, 돌출부가 전혀없는 일자형태의 피씨 기둥에 의해 미려한 외관은 물론 공간 활용도가 매우 뛰어난 것이고, 피씨 기둥에 결합되는 피씨 보 및 피씨 보에 결합되는 피씨 슬래브는 현장 타설공법에 의해 모두 일체화 연결되므로 피씨 슬래브에 작용하는 직접 하중을 효과적으로 분산시킬 수 있어 구조적인 강성 증대는 물론 소요 자재를 경감시킬 수 있어 매우 경제적인 것이며, 피씨부재 간의 결합력이 우수하여 뛰어난 내진성은 물론 집중 하중이나 응력을 방지하므로 균열이나 파손으로부터 안전하여 유지 보수 등의 사후 관리 비용이 크게 절감되는 특징을 갖는다.The present invention has a beautiful appearance as well as excellent space utilization by the linear pillars having no protrusions at all, and the PC beams coupled to the PC pillars and the PC slab coupled to the PC beams are all integrated by in-situ casting. Therefore, the direct load acting on the PC slab can be effectively distributed, which can increase the structural rigidity and reduce the required materials.It is very economical. It is safe from cracks and breaks, and has a characteristic of greatly reducing post-management costs such as maintenance.
또한, 피씨공법과 알씨공법을 복합적으로 적용함에 따라 공사기간의 단축이 기능하고, 인력감소로 인한 경제성은 물론 안전사고율을 감소시킬 수 있는 것이며, 미장이 불필요하고 균열 하자가 크게 줄어 고품질의 시공성을 확보할 수 있는 것이고, 가설 자재의 최소화로 인해 폐기물의 발생이 크게 줄어 매우 친환경적이라 할 수 있는 것이다.In addition, it is possible to shorten the construction period and reduce the safety accident rate as well as the economics due to the reduction of manpower. It can be said that the generation of waste is greatly reduced due to the minimization of temporary materials is very environmentally friendly.
본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor may properly define the concept of the term to describe its invention in the best possible way And should be construed in accordance with the principles and meanings and concepts consistent with the technical idea of the present invention.
이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명에 의해 완성된 건축 구조물의 골조 사시도이다.1 is a skeleton perspective view of a building structure completed by the present invention.
도시와 같이 본 발명에 의한 건축 구조물은 공장 제작된 피씨 기둥(10)과 피씨 보(20) 및 피씨 슬래브(30)를 현장으로 옮겨, 상기 피씨 기둥(10)에 대한 고정 설치단계와 피씨 보(20)의 결속단계 및 피씨 슬래브(30)에 대한 결속단계를 거쳐 이들 피씨부재 간의 접합부와 피씨 슬래브(30)의 상면에 대한 콘크리트 토핑을 거쳐 시공이 완료되는 것이다. 즉, 상기의 피씨부재들은 공장 제작방법인 피씨(PC)공법에 의한 것이고 이들 피씨부재들을 서로 접합하는 공정은 알씨(RC)공법에 의하므로 이들에 의한 피알씨(PRC) 복합 공법이 수행되는 것이다.As shown in the figure, the building structure according to the present invention moves a factory manufactured
상기의 피씨 기둥(10)은 도 2의 도시와 같다.The
즉, 상기의 피씨 기둥(10)은 수직의 길이방향을 따라 내부에 주철근(13)이 매립된 상태의 콘크리트 부재로서, 상기의 피씨 기둥(10)의 중간부와 상부에는 매립된 주철근(13)이 노출되도록 한 콘크리트 미성형부인 중간결합부(11)와 상부결합부(12)를 갖고 있는 것이다. 또한, 상기의 도시에서는 단일의 중간결합부(11)만이 형성된 상태로 도시하였으나 이와 같은 경우는 단일의 지하층과 지붕층만으로 이루어진 경우에 해당되는 것이고, 다층의 지하층을 갖도록 구조물을 시공하고자 하는 경우에는 상기의 중간결합부(11)를 균일 간격으로 더 형성하면 되는 것이고, 이들 중간결합부(11)의 간격과 개수에 따라 시공하고자 하는 구조물의 층고와 층수가 결정될 것이다.That is, the
또한, 상기의 피씨 기둥(10)에 콘크리트 미성형부인 중간결합부(11)와 상부결합부(12)를 형성하는 것은 상기의 중간결합부(11)와 상부결합부(12)에 피씨 보(20)의 단부를 올려놓기 위함이다.In addition, forming the
이와 같은 상태로 제작된 피씨 기둥(10)은 현장에서 미리 타설 및 양생된 상태의 기초바닥(40)에 세워 설치하는 것으로서, 상기의 기초바닥(40)에는 도 3의 도시와 같이 앵커볼트(41)를 시공 간격에 따라 고정 설치한 상태에서 상기의 앵커볼트(41)를 이용하여 피씨 기둥(10)의 하단을 견고하게 고정 설치하면 되는 것이다. The
이때 상기 기초바닥(40)과 피씨 기둥(10)의 사이에는 레벨링심(42)이 위치하는 것으로, 상기의 레벨링심(42)은 피씨 기둥(10)이 수직으로 정확하게 세워 고정될 수 있도록 하는 평활부재의 역할을 수행하게 되는 것이다. 이에 상기 레벨링심(42)의 포함하는 기초바닥(40)과 피씨 기둥(10)의 사이에 무수축몰탈층(43)을 형성함으로서 상기 피씨 기둥(10)이 침하하여 설계 상의 오류가 발생하는 것을 방지 하게 된다.At this time, the leveling
이러한 고정 설치구조를 갖는 피씨 기둥(10)을 구조물의 크기와 특징에 따라 일정한 간격으로 세워 설치하면 도 4의 도시와 같이 시공하고자 하는 구조물에 대한 피씨 기둥(10)의 설치단계가 이루어지는 것이다.When the
이와 같은 피씨 기둥(10)의 설치가 이루어지면 도 5의 도시와 같이 서로 이웃하는 피씨 기둥(10)의 중간결합부(11)와 상부결합부(12)를 이용하여 피씨 보(20)를 나란하게 결합 설치하는 단계를 수행하게 된다.When the installation of the
이때의 피씨 보(20)는 도 6의 도시와 같이 양단에 평면상 "L"자 형태의 체결부(21)가 형성되어 있고, 상면에는 연속하여 반복 형성된 "ㄱ"자 형태로 된 결합구(22)가 돌출되어 있는 것이다.At this time, the
이에 따라 상기의 피씨 보(20)를 크레인 등을 통해 양중하여 중간결합부(11)에는 피씨 기둥(10)의 측부로부터 피씨 보(20)를 삽입하는 과정을 수행하고, 상부결합부(12)에는 피씨 기둥(10)의 상측으로부터 피씨 보(20)를 하강시켜 안치하는 과정을 수행하게 된다. 따라서, 도 7의 도시와 같이 피씨 기둥(10)의 중간결합부(11)와 상부결합부(12)에는 피씨 보(20)의 단부가 걸쳐진 상태를 갖게 되는 것으로서, 이와 같은 상태의 피씨 보(20)는 작업 안정성과 구조 성능을 보강하기 위해 상기 피씨 기둥(10)의 주철근(13)과 견고하게 결속시켜 연결하는 과정을 수행하게 된다.Accordingly, the process of inserting the
즉, 상기와 같이 피씨 기둥(10)의 중간결합부(11)와 상부결합부(12) 상에 피씨 보(20)의 단부가 걸쳐진 상태에서 피씨 보(20)의 단부로부터 "⊃"자 형태의 결 속부재(50)를 피씨 보(20)의 내측방향으로 삽입하게 되면 상기의 결속부재(50)의 내부로 피씨 기둥(10)의 주철근(13)이 위치하게 될 것이고, 상기의 결속부재(50)는 도 8의 도시와 같이 피씨 보(20)의 상면으로부터 함몰 형성된 홈부(23) 내측으로 돌출되면서 상기의 홈부(23) 내측에 돌출된 결속부재(50)의 단부에 별도의 너트(51)를 견고하게 나사 체결함에 따라 상기의 결속부재(50)가 피씨 보(20)의 단부에 결합됨은 물론 이와 동시에 피씨 기둥(10)의 주철근(13)과 배근된 상태를 유지할 수 있게 된다. 이때의 결속부재(50)는 피씨 기둥(10)의 주철근(13) 일부를 둘러싸고 있는 형태를 갖고 될 것이므로 상기의 피씨 기둥(10)과 피씨 보(20)는 서로 안정된 결속 상태를 유지할 수 있게 된다.That is, the shape of the "단부" from the end of the
따라서, 상기와 같은 결속부재(50)는 피씨 기둥(10)과 피씨 보(20)의 안정된 결속이 이루어지게 하면서도 차후 작업인 콘크리트 토핑시 피씨 기둥(10)과 피씨 보(20) 간의 더욱 견고한 결합력을 연출하게 된다.Therefore, the
상기와 같은 피씨 보(20)의 설치단계가 종료되면 도 9의 도시와 같이 나란하게 배치된 피씨 보(20)를 따라 다수의 피씨 슬래브(30)를 배치하는 작업을 수행하게 되는데, 상기의 피씨 슬래브(30) 단부를 기설치된 피씨 보(20)와 결속하는 과정에 의해 상기의 피씨 슬래브(30)에 대한 설치 단계가 이루어지는 것이다.When the installation step of the
이와 같은 피씨 슬래브(30)는 도 10의 도시와 같이 양단에는 "⊃"자 형태의 측부결속구(31)가 돌출 형성되어 있고 상면에는 "∩"자 형태의 상부결속구(32)가 연속하여 반복 나열된 상태로 돌출되어 있는 것으로서, 상기의 측부결속구(31)와 상부결속구(32)는 모두 피씨 슬래브(30) 내에 단부가 매립 고정된 철근에 의한 것 이다.As shown in FIG. 10, the
특히, 상기의 상부결속구(32)는 도 11의 도시와 같이 피씨 슬래브(30) 내에 매립된 철근이 표면으로 돌출되어 나타나는 것으로서, 단일의 철근을 상,하 지그재그 형태로 연속하여 절곡함에 따라 절곡된 상부만이 피씨 슬래브(30)의 표면으로 노출되도록 콘크리트를 포설함에 따라 상기의 상부결속구(32)가 연속하여 나열된 상태로 돌출되는 것이다.In particular, the upper
상기의 상부결속구(32)는 폐곡선 형태의 철근 양단이 모두 피씨 슬래브(30) 내에 매립되어 있으므로 상측으로부터 작업자 또는 작업장비 등의 하중이 가해지더라도 지지력이 매우 뛰어나 본래의 형태를 그대로 유지할 수 있어 콘크리트 토핑시 우수한 결합력을 제공할 뿐만 아니라 콘크리트 토핑 두께를 가늠하기 위한 스페이서 기능을 충실히 수행할 수 있게 된다. 즉, 종래의 경우 상기의 상부결속구(32)가 "ㄱ"자 형태의 철근으로 이루어져 있었기 때문에 작업자가 상부결속구를 밟거나 작업장비의 하중이 가해지는 경우에는 상기와 같은 형태의 상부결속구가 휘어지거나 쓰러지게 되므로 콘크리트 토핑부와의 결합력이 현저히 약화됨은 물론 콘트리트 토피량과 두께를 가늠하는데에도 어려움을 겪게 되는데 본 발명에 따른 상부결속구(32)를 통해 상기의 문제점을 일시에 해소할 수 있게 된 것이다.Since the upper binding
따라서, 상기와 같이 피씨 보(20)의 상부면에 걸쳐진 상태의 피씨 슬래브(30)는 피씨 보(20)의 결합구(22)와 피씨 슬래브(30)의 측부결속구(31)를 서로 연결함에 따라 상기 피씨 슬래브(30)에 대한 안전성과 구조성능을 향상시킬 수 있는 것인데, 도 12의 도시와 같이 피씨 보(20)에 올려진 상태의 피씨 슬래브(30)는 단부의 측부결속구(31)가 피씨 보(20)의 결합구(22) 사이로 진입하여 교차 위치될 것이므로 상기의 측부결속구(31)와 피씨 보(20)의 결합부(22)를 와이어를 통해 서로 배근하거나 별도의 배근용 철근을 가로질러 삽입함에 따라 상기 피씨 보(20)와 피씨 슬래브(30)에 대한 결속작업이 완료되는 것이다.Therefore, the
이와 같이 공장 제작된 상태의 피씨 기둥(10)과 피씨 보(20) 및 피씨 슬래브(30)를 현장으로 운반한 후 피씨 기둥(10)의 설치와 피씨 보(20) 및 피씨 슬래브(30)를 설치하여 이들이 서로 견고한 결합력을 갖도록 접합부에 대한 결속과정을 수행한 상태에서, 도 13의 도시와 같이 상기 피씨부재 간의 접합부와 피씨 슬래브(30)의 상면에 대하여 현장 타설공법에 의해 덧침 콘크리트를 토핑함에 따라 견고하고 안정적인 구조물이 완성되는 것이다.After transporting the
특히, 상기와 같이 공장에서 각기 제작된 피씨부재들을 현장에서 결속하여 시공하는 반면 이들 피씨부재 즉, 피씨 기둥(10)과 피씨 보(20) 및 피씨 슬래브(30)는 피씨 기둥(10)의 주철근(13)이나 피씨 보(20)의 결합구(22) 및 피씨 슬래브(30)의 측부결속구(31)를 통해 서로 견고하게 연결 및 결합되어 있는 상태를 유지하고 있어, 콘크리트 토핑에 의해 이들이 모두 일체화상태로 시공되는 형태를 취하게 되는 것이고, 이와 같은 상태의 구조물은 차량 등의 하중이 피씨 슬래브(30)에 작용할 경우 이와 같은 하중은 종래와 같이 부분적인 구성물에 대하여 집중하중이 가해지는 것이 아니라 구조물 전체적으로 하중이 분산되는 효과를 얻을 수 있게 된다.In particular, the PC members manufactured in the factory as described above are bonded to the construction while the PC members, that is, the
따라서, 구조적인 강성의 증대는 물론 하중 분산 효과가 매우 탁월하므로 구 조물에 소요되는 자재의 절감이 가능하면서도 작업 효율성이 뛰어나 매우 경제적인 것이며, 시공기간의 단축은 물론 현장에서 배출되는 폐기물이 거의 없어 매우 환경 친화적이라 할 수 있을 것이다.Therefore, the structural rigidity is increased and the load distribution effect is very excellent. Therefore, it is possible to reduce the materials required for the structure, and it is very economical because of the excellent work efficiency. It's very environmentally friendly.
이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the present invention as defined by the appended claims. Examples should be understood.
도 1은 본 발명에 의한 건축 구조물의 골조에 대한 사시도1 is a perspective view of a skeleton of a building structure according to the present invention
도 2는 본 발명의 피씨 기둥을 보인 사시도Figure 2 is a perspective view showing a PC pillar of the present invention
도 3은 본 발명의 피씨 기둥의 하부 고정부를 보인 단면도3 is a cross-sectional view showing a lower fixing portion of the PC pillar of the present invention
도 4는 본 발명의 피씨 기둥을 세워 설치한 상태도4 is a state in which the PC pillar of the present invention is installed upright
도 5는 본 발명의 피씨 기둥에 피씨 보를 설치한 상태도5 is a state in which the PC beam is installed in the PC pillar of the present invention
도 6은 본 발명의 피씨 보를 보인 사시도Figure 6 is a perspective view of the PC beam of the present invention
도 7은 본 발명의 피씨 기둥과 피씨 보를 연결한 평면도7 is a plan view connecting the PC pillar and PC beam of the present invention
도 8은 본 발명의 피씨 기둥과 피씨 보를 연결한 측단면도Figure 8 is a side cross-sectional view connecting the PC pillar and PC beam of the present invention
도 9는 본 발명의 피씨 보에 피씨 슬래브를 설치한 상태도9 is a state in which the PC slab is installed in the PC beam of the present invention
도 10은 본 발명의 피씨 슬래브를 보인 사시도10 is a perspective view showing a PC slab of the present invention
도 11은 본 발명의 피씨 슬래브를 보인 단면 확대도Figure 11 is an enlarged cross-sectional view showing the PC slab of the present invention
도 12는 본 발명의 피씨 보와 피씨 슬래브를 연결한 측단면도12 is a side cross-sectional view connecting the PC beam and PC slab of the present invention;
도 13은 본 발명의 피씨부재 간 접합부와 피씨 슬래브의 상면에 콘크리트를 토핑한 상태의 단면도Figure 13 is a cross-sectional view of the concrete topping on the upper surface of the joint between the PC member and the PC slab of the present invention
* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 피씨 기둥 11 : 중간결합부10: PC pillar 11: intermediate coupling portion
12 : 상부결합부 13 : 주철근12: upper coupling portion 13: cast steel
20 : 피씨 보 21 : 체결부20: pcbo 21: fastening portion
22 : 결합구 23 : 홈부22: coupler 23: groove
30 : 피씨 슬래브 31 : 측부결속구30: PC slab 31: side binding sphere
32 : 상부결속구32: upper binding port
40 : 기초바닥 41 : 앵커볼트40: base bottom 41: anchor bolt
42 : 레벨링심 43 : 무수축몰탈층42: leveling core 43: non-contraction mortar layer
50 : 결속부재 51 : 너트50: binding member 51: nut
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090040767A KR101036177B1 (en) | 2009-05-11 | 2009-05-11 | Method for constructing building using PRC integrating method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090040767A KR101036177B1 (en) | 2009-05-11 | 2009-05-11 | Method for constructing building using PRC integrating method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100121865A KR20100121865A (en) | 2010-11-19 |
KR101036177B1 true KR101036177B1 (en) | 2011-05-23 |
Family
ID=43406959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090040767A KR101036177B1 (en) | 2009-05-11 | 2009-05-11 | Method for constructing building using PRC integrating method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101036177B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101555560B1 (en) | 2015-04-28 | 2015-10-07 | 조상규 | Building construction method using precast concrete column with a progressive collapse prevention means |
KR20160128523A (en) * | 2015-04-28 | 2016-11-08 | 주식회사 신화엔지니어링 | Building construction method using precast column with a progressive collapse prevention part |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160008694A (en) | 2014-07-14 | 2016-01-25 | 삼성물산 주식회사 | Apparatus for simultaneously lifting slab and construction method thereof |
KR102171825B1 (en) * | 2018-01-22 | 2020-10-29 | 유병훈 | Double wall structure construction method using connection steel beam and wall structure construction method therewith |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10115000A (en) | 1996-10-08 | 1998-05-06 | Fudo Kenken Kk | Wet type connecting method of precast beam and column in reinforced-concrete constructed building |
KR100343369B1 (en) | 1999-03-24 | 2002-07-15 | 하진규 | Precast concrete beam and connecting method with the other building elements |
JP2008063802A (en) | 2006-09-07 | 2008-03-21 | Takenaka Komuten Co Ltd | Method and structure for joining precast reinforced concrete beam members to each other |
-
2009
- 2009-05-11 KR KR1020090040767A patent/KR101036177B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10115000A (en) | 1996-10-08 | 1998-05-06 | Fudo Kenken Kk | Wet type connecting method of precast beam and column in reinforced-concrete constructed building |
KR100343369B1 (en) | 1999-03-24 | 2002-07-15 | 하진규 | Precast concrete beam and connecting method with the other building elements |
JP2008063802A (en) | 2006-09-07 | 2008-03-21 | Takenaka Komuten Co Ltd | Method and structure for joining precast reinforced concrete beam members to each other |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101555560B1 (en) | 2015-04-28 | 2015-10-07 | 조상규 | Building construction method using precast concrete column with a progressive collapse prevention means |
KR20160128523A (en) * | 2015-04-28 | 2016-11-08 | 주식회사 신화엔지니어링 | Building construction method using precast column with a progressive collapse prevention part |
KR101685937B1 (en) | 2015-04-28 | 2016-12-14 | 조상규 | Building construction method using precast column with a progressive collapse prevention part |
Also Published As
Publication number | Publication date |
---|---|
KR20100121865A (en) | 2010-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101379305B1 (en) | Wall structure manufacturing method using precast front wall panel and precast back wall panel | |
KR101086222B1 (en) | PC slave for building having reinforcement structure as a set | |
KR100903398B1 (en) | Precast multi tee fiber and wiremesh slab | |
KR101478131B1 (en) | Construction Method of Precast Pier | |
CN110359452B (en) | Node connecting part, frame prestress anchor cable supporting structure and construction method | |
KR100694587B1 (en) | Wall Structure Using Precast Concrete Panel with Multi Rib Rows | |
KR101765334B1 (en) | Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor | |
KR101263370B1 (en) | Precast end-block with girder connection member and bridge construction method using ths same | |
KR101036177B1 (en) | Method for constructing building using PRC integrating method | |
KR100712354B1 (en) | PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein | |
CN113718753B (en) | Anchor underground continuous wall foundation assembled type intermediate wall and construction method | |
KR200414349Y1 (en) | Connection structure of precast concrete structure | |
KR101329443B1 (en) | Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning | |
KR102319792B1 (en) | 2-way precast pannel and structure construction method using the same | |
KR100747665B1 (en) | Concrete mold for slab and construction method of slab using the same | |
KR100544368B1 (en) | Precast transfer girder and method for constructing a structure by using of it | |
KR101476411B1 (en) | Precast concrete frame for buildings using precast concrete beam continued by post tensioning | |
KR20090075484A (en) | Preflex composite girder bridge coupled width composite girder and method thereof | |
KR101324884B1 (en) | Hybrid building construction method combining dry type and wet type | |
KR101576224B1 (en) | Prefabricated precast concrete girder for building construction | |
KR100769154B1 (en) | Precast concrete pillar for prevention buckling in panel-zone and its manufacture method | |
CN203475609U (en) | Connecting structure of composite floor slab and steel tube shear wall of building | |
ITVR20100206A1 (en) | FOUNDATION STRUCTURE PARTICULARLY FOR PREFABRICATED BUILDINGS | |
KR102507299B1 (en) | The construction method precast prestressed concrete parking buildings with precast concrete wall panels | |
KR100860592B1 (en) | Temporary system for vertical structure using precast concreat block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140424 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150611 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160325 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180226 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190225 Year of fee payment: 9 |