CN102418418A - Short-slab-span prefabricated beam floor formwork system - Google Patents

Short-slab-span prefabricated beam floor formwork system Download PDF

Info

Publication number
CN102418418A
CN102418418A CN2010102978468A CN201010297846A CN102418418A CN 102418418 A CN102418418 A CN 102418418A CN 2010102978468 A CN2010102978468 A CN 2010102978468A CN 201010297846 A CN201010297846 A CN 201010297846A CN 102418418 A CN102418418 A CN 102418418A
Authority
CN
China
Prior art keywords
bar
shelving
precast beam
die mould
platelet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102978468A
Other languages
Chinese (zh)
Inventor
杨峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Original Assignee
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAHUI ENGINEERING DESIGN GROUP Co Ltd filed Critical HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority to CN2010102978468A priority Critical patent/CN102418418A/en
Publication of CN102418418A publication Critical patent/CN102418418A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a short-slab-span prefabricated beam floor formwork system, which comprises a floor template and a placement rod for supporting the floor template, wherein a prefabricated beam is provided with a formwork hole; a connecting piece is arranged at the formwork hole; and the placement rod is arranged on the prefabricated beam through the connecting piece. In the system, the prefabricated beam is provided with the formwork hole; the placement rod is arranged through the formwork hole; the floor template is directly erected on the placement rod, and a landing supporting scaffold is not required to be arranged at the bottom of the floor template; and thus, a template supporting member is saved, load of an upper layer floor is not transferred to a lower layer floor, a lower layer floor template can be dismantled before completion of construction of the upper layer floor, and accordingly, the turnover efficiency of the template is increased.

Description

Platelet is striden precast beam floor slab formerecting system
Technical field
The present invention relates to an a kind of mode structure of building house structural system, relate in particular to platelet and stride precast beam floor slab formerecting system.
Background technology
General floor adopts superimposed sheet in the integral precast system; And slab form and bracing frame have been saved; But this system cost is high, and globality is poor, when floor adopts when cast-in-place; How making floor slab formerecting, simple cost is low fast, and need not taking template, to land bracing frame be the problem that novel integral precast system must solve.
But generally still adopt traditional bracing frame that lands to support to cast-in-situ floor in the prior art; Upper strata load is delivered on lower floor's floor through landing bracing frame; Therefore, lower floor's slab form must be accomplished by floor slab construction on the upper strata, and could remove after reaching certain intensity.Take a large amount of support elements, thereby limited all transfer efficients of template greatly.
Summary of the invention
Technical problem to be solved by this invention is to overcome the deficiency of above-mentioned prior art, provides a kind of platelet simple in structure, that cost is low, all transfer efficients of template are high to stride precast beam floor slab formerecting system.
Stride precast beam floor slab formerecting system according to platelet provided by the invention; Comprise slab form and the bar of shelving that supports said slab form; Precast beam is provided with a nib, and said nib place is provided with connector, and the said bar of shelving is installed on the said precast beam through said connector.
Stride precast beam floor slab formerecting system according to platelet provided by the invention and also have following attached technical characterictic:
Said slab form is the die mould steel form, and the end of said die mould steel form is shelved on said shelving on the bar.
The end of said die mould steel form is positioned at said top of shelving bar, and said die mould steel form and said shelving are provided with plug between the bar.
Said slab form is a flat formwork, and the bottom of said flat formwork is provided with bracing frame, and the end of support frame as described above is shelved on said shelving on the bar.
Support frame as described above comprises adjustable length shaped steel or truss and is laid on the wooden grid on said shaped steel or the truss.
Said connector comprises connection steel pipe and fixture, and the said bar of shelving is fixedly connected on the said connection steel pipe through said fixture.
Said arranged outside of shelving bar has plank, and the height of said plank is higher than the said height of shelving bar, thereby said plank is fixed said plug.
Said plug is a rubber plug; Comprise basic courses department, be formed in the said basic courses department and the closure part that cooperates with said die mould steel form; Said closure part is a plurality of lug bosses that are formed in the said basic courses department, and the radial direction along rubber plug in the said basic courses department is provided with reinforcing rib.
Said die mould steel form transversely is made up of monolithic die mould steel form in single span, is vertically upward overlapped each other by polylith die mould steel form to constitute.
Stride precast beam floor slab formerecting system according to a kind of platelet provided by the invention and compared with prior art have following advantage:
At first, the present invention is provided with a nib on precast beam, installs through a nib and shelves bar; Directly build slab form on the bar shelving, its bottom need not to be provided with lands support scaffolding, has not only saved the template supporting member; And; The load of upper strata floor can not be delivered on lower floor's floor, and lower floor's slab form can be built early than the upper strata floor and accomplish preceding the dismounting, thereby has improved all transfer efficients of template.
Secondly, formwork system of the present invention can be realized the multi-level junction construction, has improved speed of application.
Once more, slab form of the present invention adopts self rigidity of die mould steel form directly to bear working load, and this die mould steel form is across shelving on the bar; Saved the template supporting member, therefore, this slab form formwork is simple; Reduce cost greatly, improve efficiency of construction.And the floor basal surface is smooth smooth, and impression quality is good.
At last, because the plug that is provided with can and be shelved the slit shutoff between the bar with the die mould steel form, prevent spillage, make the length of template allow certain error simultaneously, form removal is also more convenient.
Description of drawings
Fig. 1 is that master of the present invention looks sketch map.
Fig. 2 is a partial structurtes stereogram of the present invention.
Fig. 3 is an A place enlarged drawing among Fig. 1.
Fig. 4 is the front view of connector among the present invention.
Fig. 5 is the stereogram of plug among the present invention.
Fig. 6 is the stereogram of ribbed slab floor template among the present invention.
Fig. 7 is that the master of the another kind of embodiment of the present invention looks sketch map.
The specific embodiment
Referring to Fig. 1 and Fig. 2; The platelet that provides in the present invention is striden the embodiment of precast beam floor slab formerecting system; Comprise the slab form that overlaps mutually with precast beam 12 with support said slab form 2 shelve bar 3; Precast beam 1 is provided with a nib 4, and said nib 4 places are provided with connector 41, and the said bar 3 of shelving is installed on the said precast beam 1 through said connector 41.The present invention is provided with a nib 4 on precast beam 1, through said nib 4 slab form 2 is installed, and therefore, need not to be provided with floor stand and supports slab form, can save the space, is beneficial to other operations and carries out synchronously.
Referring to Fig. 1, Fig. 2 and Fig. 6; In the foregoing description that the present invention provides; Said slab form 2 is the die mould steel form, and the end of said die mould steel form 2 is shelved on said shelving on the bar 3, and the said bar 3 of shelving is close on the sidewall that presets beam 1; The end of said die mould steel form 2 is positioned at the top of shelving bar 3, said die mould steel form 2 and shelve and be provided with plug 5 between the bar 3.Slab form of the present invention adopts self rigidity of die mould steel form directly to bear working load, and this die mould steel form saved the template supporting member across shelving on the bar, and therefore, this slab form formwork is simple, reduces cost greatly, improves efficiency of construction.Because the plug 5 that is provided with can and be shelved the slit shutoff between the bar with the die mould steel form, prevents spillage, make the die mould steel form with shelve bar and overlap convenient.
Referring to Fig. 2 and Fig. 3, in the foregoing description that the present invention provides, said arranged outside of shelving bar 3 has plank 31, and the height of said plank 31 is higher than the said height of shelving bar 3, thereby said plank 3 is fixed said plug 5.The present invention makes said plank 31 that said plug 5 is clamped, thereby reaches fixing purpose through said structure, is beneficial to later stage die mould steel form 2 overlap joints on plug 5.
Referring to Fig. 5; In the foregoing description that the present invention provides; Said plug 5 is a rubber plug; Comprise basic courses department 51, be formed in the said basic courses department 51 and the closure part 52 that cooperates with said die mould steel form that said closure part 52 is for being formed on a plurality of lug bosses in the said basic courses department, the radial direction along rubber plug in the said basic courses department 51 is provided with reinforcing rib 54.Rubber plug has certain elasticity, in the time of above ribbed slab floor template 2 is pressed in, can make both joint more compact, and said reinforcing rib 54 can improve the globality of plug 5, even fracture also can be used.
Referring to Fig. 1 and Fig. 2, in the foregoing description that the present invention provides, said die mould steel form 2 transversely is made up of monolithic die mould steel form in single span, is vertically upward overlapped each other by polylith die mould steel form to constitute.The present invention can be at die mould steel form of horizontally set owing to being that platelet is striden, and this die mould steel form plays the effect of support, and in the vertical because length is bigger, is spliced by polylith die mould steel form so adopt.
Referring to Fig. 1 and Fig. 2; In the foregoing description that the present invention provides; Said connector 41 comprises connection steel pipe 42 and fixture 43, and said connection steel pipe 42 is arranged in said the nib 4, and the said bar 3 of shelving is fixedly connected on the said connection steel pipe 41 through fixture 43.Said fixture 43 is sleeved on and connects on the steel pipe 42, and it has a jut 431, and said jut 431 blocks the said bar 3 of shelving, thereby realizes fixing.This mounting structure is simple more, convenient, and cost is lower.
Referring to Fig. 7, in another embodiment that the present invention provides, said ribbed slab floor template 2 is a flat formwork, and the bottom of said flat formwork is provided with bracing frame 9, and the end of support frame as described above 9 is shelved on said shelving on the bar 3.Support frame as described above 9 comprises adjustable length shaped steel 91 and is laid on the wooden grid 92 on the said shaped steel 91.Present embodiment is a flat formwork, for flat formwork is supported, is provided with bracing frame 9, thus convenient construction.Certainly, the present invention can also adopt adjustable truss to substitute adjustable shaped steel.

Claims (9)

1. platelet is striden precast beam floor slab formerecting system; Comprise slab form and the bar of shelving that supports said slab form; It is characterized in that: precast beam is provided with a nib, and said nib place is provided with connector, and the said bar of shelving is installed on the said precast beam through said connector.
2. platelet as claimed in claim 1 is striden precast beam floor slab formerecting system, it is characterized in that: said slab form is the die mould steel form, and the end of said die mould steel form is shelved on said shelving on the bar.
3. platelet as claimed in claim 2 is striden precast beam floor slab formerecting system, it is characterized in that: the end of said die mould steel form is positioned at said top of shelving bar, and said die mould steel form and said shelving are provided with plug between the bar.
4. platelet as claimed in claim 1 is striden precast beam floor slab formerecting system, it is characterized in that: said slab form is a flat formwork, and the bottom of said flat formwork is provided with bracing frame, and the end of support frame as described above is shelved on said shelving on the bar.
5. platelet as claimed in claim 4 is striden precast beam floor slab formerecting system, it is characterized in that: support frame as described above comprises adjustable length shaped steel or truss and is laid on the wooden grid on said shaped steel or the truss.
6. platelet as claimed in claim 1 is striden precast beam floor slab formerecting system, it is characterized in that: said connector comprises connection steel pipe and fixture, and the said bar of shelving is fixedly connected on the said connection steel pipe through said fixture.
7. platelet as claimed in claim 3 is striden precast beam floor slab formerecting system, it is characterized in that: said arranged outside of shelving bar has plank, and the height of said plank is higher than the said height of shelving bar, thereby said plank is fixed said plug.
8. platelet as claimed in claim 3 is striden precast beam floor slab formerecting system; It is characterized in that: said plug is a rubber plug; Comprise basic courses department, be formed in the said basic courses department and the closure part that cooperates with said die mould steel form; Said closure part is a plurality of lug bosses that are formed in the said basic courses department, and the radial direction along rubber plug in the said basic courses department is provided with reinforcing rib.
9. platelet as claimed in claim 2 is striden precast beam floor slab formerecting system, it is characterized in that: said die mould steel form transversely is made up of monolithic die mould steel form in single span, is vertically upward overlapped each other by polylith die mould steel form to constitute.
CN2010102978468A 2010-09-28 2010-09-28 Short-slab-span prefabricated beam floor formwork system Pending CN102418418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102978468A CN102418418A (en) 2010-09-28 2010-09-28 Short-slab-span prefabricated beam floor formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102978468A CN102418418A (en) 2010-09-28 2010-09-28 Short-slab-span prefabricated beam floor formwork system

Publications (1)

Publication Number Publication Date
CN102418418A true CN102418418A (en) 2012-04-18

Family

ID=45943043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102978468A Pending CN102418418A (en) 2010-09-28 2010-09-28 Short-slab-span prefabricated beam floor formwork system

Country Status (1)

Country Link
CN (1) CN102418418A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130969A (en) * 2018-02-14 2018-06-08 上海欧本钢结构有限公司 A kind of dismountable floor plates system and its construction method
CN110397199A (en) * 2019-07-31 2019-11-01 安徽鼎峰钢结构科技有限公司 A kind of H profile steel beam form bracing structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2244065A1 (en) * 1973-09-15 1975-04-11 Sgb Group Ltd
EP0430351A1 (en) * 1989-11-27 1991-06-05 de Leeuw, Petrus Johannes Lambertus Supporting structure for floorshuttering panels
CN2539618Y (en) * 2002-05-07 2003-03-12 吴树瑜 Shuttering for working wall board
CN1534154A (en) * 2003-04-01 2004-10-06 勇 滕 Construction method of steel-concrete composite storey
CN201254832Y (en) * 2008-09-10 2009-06-10 中国建筑第四工程局有限公司 Self-supporting template apparatus for conversion layer structure
CN101575911A (en) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 Top-down decreasing-formwork formwork system and construction method
CN101787796A (en) * 2010-01-25 2010-07-28 郑蓉军 Suspended formwork bracing system for steel structure concrete floor slab construction
CN201794295U (en) * 2010-09-28 2011-04-13 杨峰 Mold supporting system of small-slab span precast beam floor

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2244065A1 (en) * 1973-09-15 1975-04-11 Sgb Group Ltd
EP0430351A1 (en) * 1989-11-27 1991-06-05 de Leeuw, Petrus Johannes Lambertus Supporting structure for floorshuttering panels
CN2539618Y (en) * 2002-05-07 2003-03-12 吴树瑜 Shuttering for working wall board
CN1534154A (en) * 2003-04-01 2004-10-06 勇 滕 Construction method of steel-concrete composite storey
CN201254832Y (en) * 2008-09-10 2009-06-10 中国建筑第四工程局有限公司 Self-supporting template apparatus for conversion layer structure
CN101575911A (en) * 2009-05-27 2009-11-11 上海市第一建筑有限公司 Top-down decreasing-formwork formwork system and construction method
CN101787796A (en) * 2010-01-25 2010-07-28 郑蓉军 Suspended formwork bracing system for steel structure concrete floor slab construction
CN201794295U (en) * 2010-09-28 2011-04-13 杨峰 Mold supporting system of small-slab span precast beam floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130969A (en) * 2018-02-14 2018-06-08 上海欧本钢结构有限公司 A kind of dismountable floor plates system and its construction method
CN110397199A (en) * 2019-07-31 2019-11-01 安徽鼎峰钢结构科技有限公司 A kind of H profile steel beam form bracing structure

Similar Documents

Publication Publication Date Title
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN203174770U (en) Connection structure of prefabricated column and construction site base and building
CN201649633U (en) Steel formwork for forming building stair treads
CN103009477A (en) Construction method for prefabricated components for prefabricated component factory
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN102677895B (en) Suspended formwork pouring method for concrete foundation steps
CN107916677A (en) Piping lane construction formwork system and its construction method
CN105332506A (en) Formwork support system for parallel multi-section stair and method for constructing same
CN102828614B (en) Building template system capable of being quickly detached and installed and installation method thereof
CN205171994U (en) A stencil assembly for clear water concrete construction
CN207538078U (en) A kind of pipe gallery early tears sliding plate device open
CN201809971U (en) Floor formwork erecting system with large plate-span precast beam
CN102418418A (en) Short-slab-span prefabricated beam floor formwork system
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system
CN201794295U (en) Mold supporting system of small-slab span precast beam floor
CN207469744U (en) Platform constructing device
CN108086523B (en) Light steel concrete block composite wall and construction method thereof
CN205242891U (en) Prefabricated hollow staircase
CN214834742U (en) Anti-bank template structure
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN201358550Y (en) Tool type reinforcing bar support
CN207892083U (en) Fabricated shear wall board bottom has height difference junction support system
CN105133770A (en) Roof structure of underpass inlet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120418