CN105544798B - Assembled hollow slab shear wall structure and construction method thereof - Google Patents

Assembled hollow slab shear wall structure and construction method thereof Download PDF

Info

Publication number
CN105544798B
CN105544798B CN201610048045.5A CN201610048045A CN105544798B CN 105544798 B CN105544798 B CN 105544798B CN 201610048045 A CN201610048045 A CN 201610048045A CN 105544798 B CN105544798 B CN 105544798B
Authority
CN
China
Prior art keywords
wall panel
hollow wall
hollow
shear
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610048045.5A
Other languages
Chinese (zh)
Other versions
CN105544798A (en
Inventor
肖正元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Sanneng Integrated Housing Technology Co ltd
Original Assignee
Sanneng Integrated Housing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanneng Integrated Housing Co Ltd filed Critical Sanneng Integrated Housing Co Ltd
Priority to CN201610048045.5A priority Critical patent/CN105544798B/en
Publication of CN105544798A publication Critical patent/CN105544798A/en
Application granted granted Critical
Publication of CN105544798B publication Critical patent/CN105544798B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an assembled hollow wallboard shear wall structure and a construction method thereof. The shear wall structure comprises at least 4 assembled shear walls; each assembled shear wall comprises a plurality of hollow wallboards which are sequentially arranged from bottom to top, a horizontal joint is formed at the joint of two adjacent hollow wallboards, and a hidden beam is arranged at the joint; a plurality of reserved drawing holes of the wall plate are vertically formed in each hollow wall plate, and vertical connecting pieces are arranged in the reserved drawing holes of the wall plates; at the joint of two adjacent assembled shear walls, the end part of the corresponding hollow wallboard is provided with an overhanging thin wall extending outwards and an embedded wallboard connecting piece, and a cast-in-place node connecting piece is arranged at the joint; and a channel for embedding a wire tube box or/and a water tube is arranged in the hidden beam along the length direction of the hidden beam. The invention has strong universality, relatively low cost, easy production and convenient construction.

Description

一种装配式空心板剪力墙结构及其施工方法An assembled hollow slab shear wall structure and construction method thereof

技术领域technical field

本发明涉及一种装配式空心墙板剪力墙结构及其施工方法,属于建筑工业化领域。The invention relates to an assembled hollow wall panel shear wall structure and a construction method thereof, belonging to the field of construction industrialization.

背景技术Background technique

现有预制装配式剪力墙结构体系中,预制剪力墙均采用分层预制(按楼层高度)、现场拼装的形式施工。上下层预制剪力墙之间的竖向钢筋,采用灌浆套筒、波纹管浆锚、约束浆锚形式连接。此三种连接形式的剪力墙结构,墙板均为实心墙板,墙板重量较大,起吊难度大。In the existing prefabricated shear wall structure system, the prefabricated shear walls are constructed in the form of layered prefabrication (according to floor height) and on-site assembly. The vertical steel bars between the upper and lower prefabricated shear walls are connected in the form of grouting sleeves, bellows grout anchors and restraint grout anchors. In the shear wall structure of these three connection forms, the wall panels are all solid wall panels, which are heavy and difficult to lift.

《装配式剪力墙结构设计规程》DB11/ 1003-2013(北京市地方标准)中规定,7度地区,房屋高度低于60m时可采用预制圆孔板剪力墙体系。该体系中,圆孔板剪力墙分层预制(按楼层高度),圆孔内布置墙板竖向连接钢筋,上下层钢筋搭接连接。圆孔板按一定的宽度模数拼接,墙板竖向拼缝较多,且施工时有大量外侧模板,现场施工不便利。According to DB11/1003-2013 (Beijing local standard), "Design Regulations for Fabricated Shear Wall Structure", prefabricated circular perforated plate shear wall system can be used when the building height is less than 60m in the 7 degree area. In this system, the circular hole plate shear wall is prefabricated in layers (according to the height of the floor), the vertical connection steel bars of the wall panels are arranged in the circular holes, and the upper and lower layers of steel bars are lapped and connected. The round orifice panels are spliced according to a certain width and modulus. There are many vertical seams on the wall panels, and there are a large number of external formwork during construction, which is inconvenient for on-site construction.

此外,在现有的空心墙板结构体系中,线管预埋需沿圆孔通道竖向布置,线管水平敷设时,需要现场开槽处理,施工效率低。In addition, in the existing hollow wall panel structure system, the pre-embedded line pipe needs to be arranged vertically along the round hole channel, and when the line pipe is laid horizontally, it needs to be slotted on site, and the construction efficiency is low.

发明内容SUMMARY OF THE INVENTION

本发明旨在提供一种装配式空心墙板剪力墙结构及其施工方法,该装配式空心墙板剪力墙结构通用性强,成本相对较低,易于生产,且施工便捷。The invention aims to provide an assembled hollow wall panel shear wall structure and a construction method thereof. The assembled hollow wall panel shear wall structure has strong versatility, relatively low cost, easy production and convenient construction.

为了实现上述目的,本发明所采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:

一种装配式空心墙板剪力墙结构,包括至少4面装配式剪力墙,至少4面装配式剪力墙依次连接而围成封闭式剪力墙结构;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝,且在该拼缝处的墙体内设有横向布置的暗梁;每块空心墙板上竖向设有多个墙板预留抽孔,上下相邻两块空心墙板对应的墙板预留抽孔对接连通,且在对接连通的墙板预留抽孔内布置有竖向连接件;在相邻两面装配式剪力墙的连接处,相应的空心墙板的端部具有向外延伸的悬挑薄壁和预埋墙板连接件,且在连接处设有现浇节点连接件,水平相邻的两块空心墙板的预埋墙板连接件之间以及预埋墙板连接件与现浇节点连接件之间均固定相连;所述暗梁内沿其长度方向设有预埋线管或/和水管的通道。A prefabricated hollow wall panel shear wall structure, comprising at least 4 prefabricated shear walls, at least 4 prefabricated shear walls are connected in sequence to form a closed shear wall structure; each prefabricated shear wall includes A plurality of hollow wall panels are arranged in sequence from bottom to top, and a horizontal joint is formed at the joint of the two adjacent hollow wall panels, and horizontally arranged concealed beams are arranged in the wall at the joint; There are a plurality of reserved draw holes for wall panels vertically on the wall panel, and the reserved draw holes for the wall panels corresponding to the two adjacent hollow wall panels at the top and bottom are connected to each other, and vertical draw holes are arranged in the reserved draw holes of the butt-connected wall panels. At the connection of the adjacent two-sided prefabricated shear walls, the ends of the corresponding hollow wall panels have outwardly extending cantilevered thin walls and pre-embedded wall panel connectors, and there is a cast-in-place connection at the connection. Node connectors, between the embedded wall panel connectors of two horizontally adjacent hollow wall panels and between the embedded wall panel connectors and the cast-in-place node connectors are fixedly connected; There are channels for pre-embedded line pipes or/and water pipes.

由此,上下相邻两块空心墙板拼接,通过横向布置的暗梁加固,相邻两块空心墙板之间通过悬挑薄壁和预埋墙板连接件、现浇节点连接件固定后浇筑相连,结构可靠,同时,通过竖向布置的墙板预留抽孔浇筑,进一步增强了墙体的结构整体性,且施工方便易行。As a result, two adjacent hollow wall panels are spliced together and reinforced by horizontally arranged hidden beams, and the two adjacent hollow wall panels are fixed by cantilevered thin walls, pre-embedded wall panel connectors, and cast-in-place node connectors. The pouring is connected, and the structure is reliable. At the same time, the vertical wall panels are reserved for pouring, which further enhances the structural integrity of the wall, and the construction is convenient and easy.

根据本发明的实施例,还可以对本发明作进一步的优化,以下为优化后形成的技术方案:According to the embodiment of the present invention, the present invention can also be further optimized, and the following are the technical solutions formed after optimization:

优选地,每面装配式剪力墙由3-6块空心墙板装配而成,且至少一面装配式剪力墙中部位置设有窗户安装区域。Preferably, each prefabricated shear wall is assembled from 3-6 hollow wall panels, and a window installation area is provided in the middle of at least one prefabricated shear wall.

作为一种具体的结构形式,设有窗户安装区域的单面剪力墙包括位于最下层的一块空心墙板,位于最上层的一块空心墙板,以及设置在最下层的一块空心墙板与最上层的一块空心墙板之间的两块中间空心墙板;两块中间空心墙板、最下层的一块空心墙板、以及最上层的一块空心墙板之间围成所述窗户安装区域。As a specific structural form, a single-sided shear wall with a window installation area includes a hollow wall panel on the lowermost layer, a hollow wall panel on the uppermost layer, and a hollow wall panel on the lowermost layer and the lowest layer. Two middle hollow wall panels between one hollow wall panel on the upper layer; two middle hollow wall panels, one hollow wall panel on the lowermost layer, and one hollow wall panel on the uppermost layer enclose the window installation area.

每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板的上端面形成水平设置的下凹槽,所述上层空心墙板的下端面形成水平设置的上凹槽;所述下凹槽的两个侧壁的顶端和上凹槽的两个侧壁的底端对接相连而形成水平拼缝。上凹槽开口朝下的,下凹槽开口朝上,优选地,所述下凹槽和上凹槽对接形成横向设置的贯通通道,该贯通通道内设有所述的暗梁。贯通通道的纵截面优选为方形。In the upper and lower adjacent two hollow wall panels of each prefabricated shear wall, the upper end face of the lower hollow wall panel forms a horizontally arranged lower groove, and the lower end face of the upper layer hollow wall panel forms a horizontally arranged upper groove; The top ends of the two side walls of the lower groove and the bottom ends of the two side walls of the upper groove are butt-jointed to form a horizontal seam. If the opening of the upper groove is downward, the opening of the lower groove is upward. Preferably, the lower groove and the upper groove are butted to form a transversely arranged through channel, and the through channel is provided with the dark beam. The longitudinal section of the through channel is preferably square.

为了增加暗梁的结构强度,所述暗梁为横向设置的箍筋,所述预埋墙板连接件为箍筋或弯钩筋,所述现浇节点连接件为箍筋。进一步地,所述暗梁内设有梁纵筋;所述预埋墙板连接件和现浇节点连接件内均设有现浇节点纵筋。In order to increase the structural strength of the concealed beams, the concealed beams are horizontally arranged stirrups, the pre-embedded wall panel connectors are stirrups or hook bars, and the cast-in-place node connectors are stirrups. Further, beam longitudinal bars are provided in the concealed beam; cast-in-place node longitudinal bars are provided in the pre-embedded wall panel connectors and the cast-in-place node connectors.

每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板或上层空心墙板内预埋有与所述线管连通的线盒,所述下层空心墙板或上层空心墙板内侧壁上预设有给水点位。Among the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the lower hollow wall panel or the upper hollow wall panel is pre-buried with a wire box connected to the line pipe, and the lower hollow wall panel or the upper hollow wall panel A water supply point is preset on the inner side wall of the wall panel.

优选地,所述墙板预留抽孔为方孔或圆孔。Preferably, the wall panel reserved draw holes are square holes or round holes.

基于同一个发明构思,本发明还提供了一种如上述的装配式空心墙板剪力墙结构的施工方法,其包括如下步骤:Based on the same inventive concept, the present invention also provides a construction method for the above-mentioned prefabricated hollow wall panel shear wall structure, which comprises the following steps:

S1、布置竖向连接件形成所述装配式空心墙板结构的竖向连接筋;S1, arranging vertical connecting pieces to form the vertical connecting ribs of the assembled hollow wall panel structure;

S2、吊装最下层的空心墙板,使竖向连接件穿过最下层的所述空心墙板的墙板预留抽孔;S2, hoist the hollow wall panel of the lowest layer, so that the vertical connector passes through the wall panel of the hollow wall panel of the lowest layer to reserve an extraction hole;

S3、最下层空心墙板安装就位,使相邻两块空心墙板端部的悬挑薄壁垂直或水平拼接,且相邻两块空心墙板端部的预埋墙板连接件之间固定相连;并在最下层的空心墙板顶端布设暗梁,并使所述竖向连接件穿过暗梁;S3. The lowermost hollow wall panel is installed in place, so that the cantilevered thin walls at the ends of two adjacent hollow wall panels are vertically or horizontally spliced, and the embedded wall panel connectors at the ends of the two adjacent hollow wall panels are connected between Fixed and connected; and a hidden beam is arranged at the top of the hollow wall panel of the lowermost layer, and the vertical connecting piece is passed through the hidden beam;

S4、暗梁布置完成后,根据水电线路布置情况,沿暗梁和墙板预留抽孔内预埋线管线盒或/水管;S4. After the hidden beam layout is completed, according to the layout of the water and electricity lines, the pre-buried wire line box or/water pipe is reserved in the pumping hole along the hidden beam and the wall panel;

S5、最下层空心墙板内混凝土现浇,待管线完成布置后,浇筑墙板预留抽孔、暗梁以及相邻两面装配式剪力墙现浇节点处的混凝土;S5. The concrete in the lowermost hollow wall panel is poured in-situ. After the pipeline is arranged, the concrete at the in-situ nodes of the cast-in-place nodes of the adjacent two-sided prefabricated shear walls shall be reserved for the pouring of the wall panel;

S6、中层及顶层空心墙板的施工,施工过程中,重复下层墙板施工中S2—S5的过程步骤,待顶层的空心墙板浇筑完成后,进行后续楼面施工。S6, the construction of the middle and top hollow wall panels, during the construction process, repeat the process steps S2-S5 in the construction of the lower layer wall panels, and after the top layer of the hollow wall panels is poured, the subsequent floor construction is carried out.

当然,也可在整个层高高度范围内的墙板安装完成后,一次性完成整个层高范围内抽孔及暗梁的混凝土浇筑。Of course, it is also possible to complete the concrete pouring of the holes and concealed beams in the entire storey height range at one time after the wall panels are installed in the entire storey height range.

与现有技术相比,本发明的有益效果是:本发明的剪力墙结构施工简单,通用性强,连接稳固,成本相对较低,易于生产,极大地加快了施工速度,提高了施工效率。Compared with the prior art, the beneficial effects of the present invention are: the shear wall structure of the present invention is simple in construction, strong in versatility, stable in connection, relatively low in cost, easy in production, greatly accelerated in construction speed, and improved in construction efficiency .

以下结合附图和实施例对本发明作进一步阐述。The present invention will be further elaborated below with reference to the accompanying drawings and embodiments.

附图说明Description of drawings

图1是本发明的预制空心墙板体系拼装示意图;Fig. 1 is the assembly schematic diagram of the prefabricated hollow wall panel system of the present invention;

图2是本发明的预制墙板抽孔大样图;Fig. 2 is a large sample drawing of the prefabricated wallboard of the present invention;

图3是本发明预制墙板立面分隔图;Fig. 3 is the prefabricated wall panel elevation separation view of the present invention;

图4是本发明薄壁现浇节点平面示意图;4 is a schematic plan view of a thin-walled cast-in-place node of the present invention;

图5是本发明墙顶翻边示意图;Fig. 5 is a schematic diagram of the present invention's wall top flanging;

图6是本发明带窗户安装区域的剪力墙示意图;6 is a schematic diagram of a shear wall with a window installation area of the present invention;

图7是本发明水平连接缝中电线管敷设大样图;Fig. 7 is a large-scale drawing of the laying of electric conduits in the horizontal connection seam of the present invention;

图8是本发明水平连接缝中水管敷设大样图;FIG. 8 is a large sample view of the laying of water pipes in the horizontal joint of the present invention;

图9是本发明水平连接缝处的局部放大图。Fig. 9 is a partial enlarged view of the horizontal connecting seam of the present invention.

具体实施方式Detailed ways

一种装配式空心墙板剪力墙结构,如图1-3所示,包括4面装配式剪力墙,4面装配式剪力墙依次连接而围成封闭式剪力墙结构;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝5,且在该拼缝5处的墙体内设有横向布置的暗梁3;每块空心墙板20上竖向设有多个墙板预留抽孔18,上下相邻两块空心墙板对应的墙板预留抽孔18对接连通,且在对接连通的墙板预留抽孔18内布置有竖向连接件26,上下的竖向连接件26依次串接固定相连;如图4和5所示,在相邻两面装配式剪力墙的连接处,即拐角处,相应的空心墙板20的端部具有向外延伸的悬挑薄壁21和预埋墙板连接件23,且在连接处设有现浇节点连接件22,水平相邻的两块空心墙板20的预埋墙板连接件23之间以及预埋墙板连接件23与现浇节点连接件22之间均固定相连;所述暗梁3为横向设置的箍筋,所述预埋墙板连接件23为箍筋或弯钩筋和现浇节点连接件22为箍筋。所述暗梁3内设有梁纵筋4;所述预埋墙板连接件23和现浇节点连接件22内均设有现浇节点纵筋24。如图7和8所示,所述暗梁3内沿其长度方向设有预埋线管16、线盒19或/水管17。A prefabricated hollow wall panel shear wall structure, as shown in Figure 1-3, includes 4 prefabricated shear walls, which are connected in turn to form a closed shear wall structure; The prefabricated shear wall includes a plurality of hollow wall panels arranged in sequence from bottom to top, and a horizontal joint 5 is formed at the joint of the two adjacent hollow wall plates, and a horizontal joint 5 is formed in the wall at the joint 5. The hidden beam 3 arranged; each hollow wall panel 20 is vertically provided with a plurality of wall panel reserved draw holes 18, and the wall panels reserved draw holes 18 corresponding to the upper and lower adjacent two hollow wall panels are butt-connected, and in the docking Vertical connectors 26 are arranged in the reserved draw holes 18 of the connected wall panels, and the upper and lower vertical connectors 26 are connected in series and fixed in sequence; At the corner, the end of the corresponding hollow wall panel 20 has a cantilevered thin wall 21 and a pre-embedded wall panel connector 23 extending outward, and a cast-in-place node connector 22 is provided at the connection, which is horizontally adjacent Between the embedded wall panel connectors 23 of the two hollow wall panels 20 and between the embedded wall panel connectors 23 and the cast-in-place node connectors 22 are fixedly connected; the concealed beam 3 is a horizontally arranged stirrup, The pre-embedded wall panel connectors 23 are stirrups or hook bars and the cast-in-place node connectors 22 are stirrups. Beam longitudinal bars 4 are provided in the concealed beam 3 ; cast-in-place node longitudinal bars 24 are both provided in the embedded wall panel connector 23 and the cast-in-place node connector 22 . As shown in Figures 7 and 8, the concealed beam 3 is provided with a pre-embedded wire pipe 16, a wire box 19 or/a water pipe 17 along its length.

优选地,每面装配式剪力墙由3-6块空心墙板装配而成,且至少一面装配式剪力墙中部位置设有窗户安装区域12。本实施例中,不带窗户的剪力墙自下而上由3块空心墙板13,14,15拼接而成,带窗户的剪力墙由4块空心墙板1,2,10,11拼接而成。如图1和图6所示,设有窗户安装区域12的单面剪力墙包括位于最下层的一块空心墙板1,位于最上层的一块空心墙板11,以及设置在最下层的一块空心墙板1与最上层的一块空心墙板11之间的两块中间空心墙板2,10;两块中间空心墙板2,10、最下层的一块空心墙板1、以及最上层的一块空心墙板11之间围成所述窗户安装区域12。Preferably, each prefabricated shear wall is assembled from 3-6 hollow wall panels, and a window installation area 12 is provided in the middle of at least one prefabricated shear wall. In this embodiment, the shear wall without windows is composed of 3 hollow wall panels 13, 14, 15 from bottom to top, and the shear wall with windows is composed of 4 hollow wall panels 1, 2, 10, 11 stitched together. As shown in FIGS. 1 and 6 , the single-sided shear wall provided with the window installation area 12 includes a hollow wall panel 1 on the lowermost layer, a hollow wall panel 11 on the uppermost layer, and a hollow wall panel on the lowermost layer. Two middle hollow wall panels 2, 10 between the wall panel 1 and the uppermost hollow wall panel 11; The window installation area 12 is enclosed between the wall panels 11 .

如图9所示,每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板的上端面形成水平设置的下凹槽8,所述上层空心墙板的下端面形成水平设置的上凹槽9;所述下凹槽8的两个侧壁7的顶端和上凹槽9的两个侧壁6的底端对接相连而形成水平拼缝。所述下凹槽8和上凹槽9对接形成横向设置的贯通通道,该贯通通道内设有所述的暗梁3。As shown in FIG. 9 , in the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the upper end surface of the lower hollow wall panel forms a horizontally arranged lower groove 8, and the lower end surface of the upper layer hollow wall panel forms a horizontally arranged lower groove 8. The upper groove 9 is arranged horizontally; the top ends of the two side walls 7 of the lower groove 8 and the bottom ends of the two side walls 6 of the upper groove 9 are connected to each other to form a horizontal seam. The lower groove 8 and the upper groove 9 are connected to form a transversely arranged through channel, and the above-mentioned dark beam 3 is arranged in the through channel.

每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板1或上层空心墙板2内预埋有与所述线管16连通的线盒19,所述下层空心墙板1或上层空心墙板2内侧壁上预设有给水点位25。所述墙板预留抽孔18为方孔或圆孔。In the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the lower hollow wall panel 1 or the upper hollow wall panel 2 is pre-buried with a wire box 19 communicating with the line pipe 16, and the lower hollow wall A water supply point 25 is preset on the inner side wall of the panel 1 or the upper hollow wall panel 2 . The drawing holes 18 reserved for the wall panel are square holes or round holes.

水电管线施工时,如图7所示,在同一构件内同一回路上的两个插座点位间,管线连接时的施工工序为:下层空心墙板安装完成→开孔→安装线盒→敷设管线(暗梁钢筋敷设后,在空心墙板拼缝中敷设线管)→线管线盒对接→上层空心墙板安装。其中h为线盒离地高度。如图8所示,给水管水平管可利用空心墙板的水平接缝敷设。具体施工工序为:下层空心墙板安装完成→敷设水管(暗梁钢筋敷设后,在空心墙板拼缝中敷设水管)→上层空心墙板安装。During the construction of water and electricity pipelines, as shown in Figure 7, between two socket points on the same circuit in the same component, the construction process for pipeline connection is: completion of installation of lower hollow wall panels → opening → installation of junction boxes → laying pipelines (After the hidden beam reinforcement is laid, the line pipe is laid in the joint of the hollow wall panel) → the connection of the line duct box → the installation of the upper hollow wall panel. Where h is the height of the wire box from the ground. As shown in Figure 8, the horizontal pipe of the water supply pipe can be laid by using the horizontal joint of the hollow wall panel. The specific construction process is as follows: the installation of the lower hollow wall panel is completed → the laying of water pipes (after the laying of the hidden beams, the water pipes are laid in the joints of the hollow wall panel) → the installation of the upper hollow wall panel.

如图1所示,本发明采用了多种不同于传统结构体系的多种连接形式:As shown in Figure 1, the present invention adopts a variety of connection forms different from the traditional structural system:

首先,剪力墙预制部分采用抽空设计,抽空部分可为圆孔,也可为方孔。抽孔内布置剪力墙竖向连接钢筋,竖向钢筋采用绑扎形式搭接。剪力墙抽空后,可大大降低墙板重量,预制构件易于起吊,如图2。First, the prefabricated part of the shear wall adopts an evacuation design, and the evacuation part can be a round hole or a square hole. The vertical connection steel bars of the shear wall are arranged in the pumping holes, and the vertical steel bars are lapped in the form of binding. After the shear wall is evacuated, the weight of the wall panel can be greatly reduced, and the prefabricated components are easy to lift, as shown in Figure 2.

其次,预制剪力墙空心墙板在一个层高高度范围内设置两条水平分隔缝,墙板沿高度划分为三段,分别为窗台高度H1、窗高H2、窗顶梁高H3,如图3所示。墙板沿高度分隔后,沿墙板分缝位置做贯通的结构暗梁。暗梁可以保证墙板沿竖向的整体性,且能够解决墙板水平接缝漏水的问题。分隔后,墙板高度减小,质量减轻,便于工厂批量化生产。预制墙板的竖缝位置根据建筑的开间、进深尺寸确定,采用整间宽度,减少现场竖向拼缝数量。Secondly, the prefabricated shear wall hollow wall panel is set with two horizontal separation seams within the height range of one storey height, and the wall panel is divided into three sections along the height, namely the height of the window sill H1, the height of the window H2, and the height of the window top beam H3, as shown in the figure 3 shown. After the wall panels are separated along the height, a through structural dark beam is made along the wall panel seam position. Concealed beams can ensure the vertical integrity of the wall panels, and can solve the problem of water leakage in the horizontal joints of the wall panels. After the separation, the height of the wall panel is reduced and the quality is reduced, which is convenient for mass production in the factory. The position of the vertical joints of the prefabricated wall panels is determined according to the size of the bay and the depth of the building, and the width of the whole room is adopted to reduce the number of vertical joints on site.

预制剪力墙空心墙板与竖向现浇节点拼接处设置悬挑薄壁。节点混凝土浇筑,现场支模时,此薄壁结构可当外侧模板使用。简化现场支模工艺,加快现场施工进度,项目可达到整体无外架的效果。如图4、图5。Cantilever thin walls are set at the splices of prefabricated shear wall hollow wall panels and vertical cast-in-place nodes. This thin-walled structure can be used as an outer formwork when the node is poured and the formwork is supported on site. Simplify the on-site formwork support process, speed up the on-site construction progress, and the project can achieve the effect of no external frame as a whole. Figure 4, Figure 5.

如图5所示,预制剪力墙空心墙板与楼面交接位置,沿外侧设置翻边,翻边高度同楼板厚度。此种结构设计方式,可以解决楼板浇筑时楼面外侧支模问题,简化现场支模工艺,加快现场施工进度。同时可以保证楼板浇筑后,墙体外观平整,提高现场浇筑的施工质量。As shown in Figure 5, at the intersection of the prefabricated shear wall hollow wall panel and the floor, a flange is set along the outside, and the flange height is the same as the thickness of the floor. This structural design method can solve the problem of formwork support on the outside of the floor when the floor is poured, simplify the on-site formwork support process, and speed up the on-site construction progress. At the same time, it can ensure that the appearance of the wall body is smooth after the floor slab is poured, and the construction quality of the in-situ pouring can be improved.

本发明结构体系具体安装过程如下:The specific installation process of the structural system of the present invention is as follows:

1)、竖向钢筋绑扎搭接,剪力墙抽孔内的竖向钢筋与拉筋(箍筋)绑扎成型,成型后按钢筋搭接长度要求,与下层预留竖向钢筋绑扎搭接。1) The vertical steel bars are bound and lapped. The vertical steel bars in the shear walls are bound and formed with the tie bars (stirrups). After forming, they are bound and overlapped with the reserved vertical steel bars on the lower layer according to the length of the steel bars.

2)、墙板安装固定,竖向钢筋绑扎完成后,吊装最下层预制空心墙板,使绑扎竖向钢筋穿过墙板预留抽孔。2) The wall panel is installed and fixed. After the vertical steel bars are bound, the bottom prefabricated hollow wall panel is hoisted, so that the binding vertical steel bars pass through the reserved holes in the wall panel.

3)、暗梁布置,最下层墙板安装就位后,布置墙体拼缝位置暗梁钢筋笼,使墙体竖向预留钢筋穿过暗梁钢筋笼。3) Concealed beam arrangement. After the bottom wall panel is installed in place, the concealed beam reinforcement cage is arranged at the joint position of the wall, so that the vertical reserved steel bars of the wall pass through the concealed beam reinforcement cage.

4)、水电管线布置,暗梁布置完成后,根据水电线路布置情况,沿墙板竖向抽孔及暗梁水平通道布置线管、线盒及水管。4) Layout of water and electricity pipelines. After the layout of hidden beams is completed, according to the layout of water and electricity lines, line pipes, junction boxes and water pipes are arranged along the vertical drilling holes of the wall panels and the horizontal passages of hidden beams.

5)、底层墙板混凝土浇筑,待管线完成布置后,可浇筑抽孔及暗梁内混凝土。5) The bottom wall slab is poured with concrete. After the pipeline is arranged, the concrete in the pumping hole and the hidden beam can be poured.

6)、中层及顶层墙板施工,中层、顶层墙板施工过程,重复下层墙板施工中2)—5)过程步骤。顶层墙板安装完成后,进行后续楼面施工。6), the construction of the middle and top wall panels, the construction process of the middle and top wall panels, repeat the process steps 2)-5) in the construction of the lower wall panels. After the top wall panels are installed, the subsequent floor construction will be carried out.

上述实施例阐明的内容应当理解为这些实施例仅用于更清楚地说明本发明,而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落入本申请所附权利要求所限定的范围。It should be understood that these embodiments are only used to illustrate the present invention more clearly, but not to limit the scope of the present invention. After reading the present invention, those skilled in the art will recognize various equivalent forms of the present invention. The modifications fall within the scope defined by the appended claims of this application.

Claims (8)

1.一种装配式空心墙板剪力墙结构,其特征在于,包括至少4面装配式剪力墙,至少4面装配式剪力墙依次连接而围成封闭式剪力墙结构;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝(5),且在该水平拼缝(5)处的墙体内设有横向布置的暗梁(3);每块空心墙板(20)上竖向设有多个墙板预留抽孔(18),上下相邻两块空心墙板对应的墙板预留抽孔(18)对接连通,且在对接连通的墙板预留抽孔(18)内布置有竖向连接件(26);在相邻两面装配式剪力墙的连接处,相应的空心墙板(20)的端部具有向外延伸的悬挑薄壁(21)和预埋墙板连接件(23),且在连接处设有现浇节点连接件(22),水平相邻的两块空心墙板(20)的预埋墙板连接件(23)之间以及预埋墙板连接件(23)与现浇节点连接件(22)之间均固定相连;所述暗梁(3)内沿其长度方向设有预埋线管(16)或/水管(17)的通道;1. a prefabricated hollow wall panel shear wall structure, is characterized in that, comprises at least 4 prefabricated shear walls, and at least 4 prefabricated shear walls are connected successively to form a closed shear wall structure; The prefabricated shear wall includes a plurality of hollow wall panels arranged in sequence from bottom to top, and a horizontal joint (5) is formed at the connection of the two adjacent hollow wall plates at the top and bottom, and the wall at the horizontal joint (5) is formed. Concealed beams (3) arranged horizontally are arranged in the body; each hollow wall panel (20) is vertically provided with a plurality of wall panel reserved extraction holes (18), and the wall panels corresponding to the upper and lower adjacent two hollow wall panels The reserved extraction holes (18) are connected to each other, and vertical connectors (26) are arranged in the reserved extraction holes (18) of the butt-connected wall panels; The end of the hollow wall panel (20) is provided with a cantilevered thin wall (21) extending outward and a pre-embedded wall panel connector (23), and a cast-in-place node connector (22) is provided at the connection, which is horizontally adjacent The embedded wall panel connectors (23) of the two hollow wall panels (20) and between the embedded wall panel connectors (23) and the cast-in-place node connectors (22) are fixedly connected; (3) There is a channel for embedded line pipe (16) or/water pipe (17) along its length; 每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板的上端面形成水平设置的下凹槽(8),上层空心墙板的下端面形成水平设置的上凹槽(9);所述下凹槽(8)的两个侧壁(7)的顶端和上凹槽(9)的两个侧壁(6)的底端对接相连而形成水平拼缝;Among the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the upper end face of the lower hollow wall panel forms a horizontally arranged lower groove (8), and the lower end face of the upper layer hollow wall panel forms a horizontally arranged upper groove (9); The top ends of the two side walls (7) of the lower groove (8) and the bottom ends of the two side walls (6) of the upper groove (9) are butt-jointed to form a horizontal seam; 所述下凹槽(8)和上凹槽(9)对接形成横向设置的贯通通道,该贯通通道内设有所述的暗梁(3)。The lower groove (8) and the upper groove (9) are butted to form a transversely arranged through channel, and the concealed beam (3) is arranged in the through channel. 2.根据权利要求1所述的装配式空心墙板剪力墙结构,其特征在于,每面装配式剪力墙由3-6块空心墙板装配而成,且至少一面装配式剪力墙中部位置设有窗户安装区域(12)。2. The prefabricated hollow wall panel shear wall structure according to claim 1 is characterized in that, each prefabricated shear wall is assembled from 3-6 hollow wall panels, and at least one prefabricated shear wall is assembled A window installation area (12) is provided in the central position. 3.根据权利要求2所述的装配式空心墙板剪力墙结构,其特征在于,设有窗户安装区域(12)的单面剪力墙包括位于最下层的一块空心墙板(1),位于最上层的一块空心墙板(11),以及设置在最下层的一块空心墙板(1)与最上层的一块空心墙板(11)之间的两块中间空心墙板(2,10);两块中间空心墙板(2,10)、最下层的一块空心墙板(1)、以及最上层的一块空心墙板(11)之间围成所述窗户安装区域(12)。3. The prefabricated hollow wall panel shear wall structure according to claim 2, characterized in that, the single-sided shear wall provided with the window installation area (12) comprises a hollow wall panel (1) located at the lowest level, A hollow wall panel (11) on the uppermost layer, and two intermediate hollow wall panels (2, 10) arranged between a hollow wall panel (1) on the lowermost layer and a hollow wall panel (11) on the uppermost layer The window installation area (12) is enclosed between two middle hollow wall panels (2, 10), a hollow wall panel (1) on the lowermost layer, and a hollow wall panel (11) on the uppermost layer. 4.根据权利要求1-3之一所述的装配式空心墙板剪力墙结构,其特征在于,所述暗梁(3)为横向设置的箍筋,所述预埋墙板连接件(23)为箍筋或弯钩筋,所述现浇节点连接件(22)为箍筋。4. The prefabricated hollow wall panel shear wall structure according to any one of claims 1-3, characterized in that, the hidden beam (3) is a horizontally arranged stirrup, and the embedded wall panel connector ( 23) is a stirrup or a hook bar, and the cast-in-place node connector (22) is a stirrup. 5.根据权利要求4所述的装配式空心墙板剪力墙结构,其特征在于,所述暗梁(3)内设有梁纵筋(4);所述预埋墙板连接件(23)和现浇节点连接件(22)内均设有现浇节点纵筋(24)。The prefabricated hollow wall panel shear wall structure according to claim 4, characterized in that, beam longitudinal bars (4) are provided in the concealed beam (3); the embedded wall panel connector (23) ) and the cast-in-place node connector (22) are provided with cast-in-place node longitudinal bars (24). 6.根据权利要求1-3之一所述的装配式空心墙板剪力墙结构,其特征在于,每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板(1)或上层空心墙板(2)内预埋有与所述线管(16)连通的线盒(19),所述下层空心墙板(1)或上层空心墙板(2)内侧壁上预设有给水点位(25)。6. The prefabricated hollow wall panel shear wall structure according to one of claims 1-3 is characterized in that, in the upper and lower adjacent two hollow wall panels of each prefabricated shear wall, the lower hollow wall panel ( 1) or the upper-layer hollow wall panel (2) is pre-buried with a wire box (19) communicating with the line pipe (16), and the lower-layer hollow wall panel (1) or the upper-layer hollow wall panel (2) is on the inner side wall. The water supply point (25) is preset. 7.根据权利要求1-3之一所述的装配式空心墙板剪力墙结构,其特征在于,所述墙板预留抽孔(18)为方孔或圆孔。7. The assembled hollow wall panel shear wall structure according to any one of claims 1-3, characterized in that the wall panel reserved drawing holes (18) are square holes or round holes. 8.一种如权利要求1-7之一所述的装配式空心墙板剪力墙结构的施工方法,其特征在于,包括如下步骤:8. a construction method of the fabricated hollow wall panel shear wall structure as described in one of claims 1-7, is characterized in that, comprises the steps: S1、布置竖向连接件(26)形成所述装配式空心墙板结构的竖向连接筋;S1, arranging vertical connecting pieces (26) to form vertical connecting ribs of the assembled hollow wall panel structure; S2、吊装最下层的空心墙板,使竖向连接件(26)穿过最下层的所述空心墙板的墙板预留抽孔(18);S2, hoisting the lowermost hollow wall panel, so that the vertical connector (26) passes through the wall panel of the lowermost layer of the hollow wall panel reserved extraction holes (18); S3、最下层空心墙板安装就位,使相邻两块空心墙板端部的悬挑薄壁(21)垂直或水平拼接,且相邻两块空心墙板端部的预埋墙板连接件(23)之间固定相连;并在最下层的空心墙板顶端布设暗梁(3),并使所述竖向连接件(26)穿过暗梁(3);S3. The lowermost hollow wall panels are installed in place, so that the cantilevered thin walls (21) at the ends of two adjacent hollow wall panels are spliced vertically or horizontally, and the embedded wall panels at the ends of the two adjacent hollow wall panels are connected The parts (23) are fixedly connected; and a concealed beam (3) is arranged at the top of the hollow wall panel of the lowermost layer, and the vertical connecting piece (26) is passed through the concealed beam (3); S4、暗梁(3)布置完成后,根据水电线路布置情况,沿暗梁(3)和墙板预留抽孔(18)内预埋线管(16)线盒(19)或/水管(17);S4. After the arrangement of the hidden beam (3) is completed, according to the layout of the water and electricity lines, the pre-buried line pipe (16), the junction box (19) or the water pipe ( 17); S5、最下层空心墙板内混凝土现浇,待管线完成布置后,浇筑墙板预留抽孔(18)、暗梁(3)以及相邻两面装配式剪力墙现浇节点处的混凝土;S5. The concrete in the lowermost hollow wall panel is poured in-situ. After the pipeline is arranged, the reserved pumping holes (18), hidden beams (3) and the concrete at the in-situ nodes of the adjacent two-sided fabricated shear walls are poured in the wall panel; S6、中层及顶层空心墙板的施工,施工过程中,重复下层墙板施工中S2—S5的过程步骤,待顶层的空心墙板浇筑完成后,进行后续楼面施工。S6, the construction of the middle and top hollow wall panels, during the construction process, repeat the process steps S2-S5 in the construction of the lower layer wall panels, and after the top layer of the hollow wall panels is poured, the subsequent floor construction is carried out.
CN201610048045.5A 2016-01-25 2016-01-25 Assembled hollow slab shear wall structure and construction method thereof Active CN105544798B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610048045.5A CN105544798B (en) 2016-01-25 2016-01-25 Assembled hollow slab shear wall structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610048045.5A CN105544798B (en) 2016-01-25 2016-01-25 Assembled hollow slab shear wall structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN105544798A CN105544798A (en) 2016-05-04
CN105544798B true CN105544798B (en) 2022-10-25

Family

ID=55824313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610048045.5A Active CN105544798B (en) 2016-01-25 2016-01-25 Assembled hollow slab shear wall structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN105544798B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804409B (en) * 2016-05-10 2018-01-26 华北理工大学 Device and method for positioning longitudinal reinforcement in assembly face of prefabricated shear wall structure
CN107023160A (en) * 2017-04-28 2017-08-08 广东省建科建筑设计院有限公司 A kind of assembly concrete shear wall structure dedicated aluminium alloy template
CN108729591B (en) * 2018-05-22 2020-05-01 吉林建筑大学 Positioning device and positioning method of vertical distribution connecting reinforcement of circular hole plate shear wall
CN109898738B (en) * 2019-04-12 2024-02-02 中国建筑设计研究院有限公司 A kind of prefabricated building
CN110847374B (en) * 2019-12-12 2024-10-29 上海建工五建集团有限公司 Assembled core tube structure and application construction method thereof
CN111042379A (en) * 2020-01-08 2020-04-21 湖南仲鹏实业有限公司 An integrated construction method for cast-in-place modular combined wall without dismantling
CN113389167A (en) * 2021-07-02 2021-09-14 中交第一航务工程局有限公司 Fabricated caisson applicable to wharf structure and construction process of fabricated caisson
CN115928874B (en) * 2023-02-03 2024-09-24 河南省第二建设集团有限公司 Full-prefabricated assembly type structural system based on prefabricated hollow slab and construction method thereof
CN116791743A (en) * 2023-06-08 2023-09-22 中建一局集团第一建筑有限公司 Construction method of outer-frame-free support-free assembled integral concrete structure
CN117071783B (en) * 2023-08-29 2025-11-21 旭杰科技(苏州)股份有限公司 ALC (aluminum logic control) board assembly structure based on constructional column and connection installation method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324093A (en) * 2008-07-17 2008-12-17 王军艇 Combined type relief component cast-in-situ hollow building roof and construction method thereof
CN103726607A (en) * 2014-01-20 2014-04-16 王睿敏 Wall board for assembling integral shear wall, shear wall and construction method of shear wall
CN203808293U (en) * 2014-05-01 2014-09-03 西安科技大学 Vertical connecting structure for prefabricated grid shear wall plate
CN204089102U (en) * 2014-10-28 2015-01-07 成都市第四建筑工程公司 The spool of light aggregate concrete hollow partition board and floor built-in pipe syndeton
CN104358330B (en) * 2014-12-03 2017-12-01 黑龙江宇辉新型建筑材料有限公司 Carry precast concrete wall reinforcing bar pin joint connecting elements and the connection method of template
CN104763080A (en) * 2015-04-08 2015-07-08 倪文蛟 Novel assembled integral-type hollow shear wall structure
CN104847014B (en) * 2015-05-19 2017-06-09 杨文琳 The vertical connecting structure of assembly concrete shear wall and construction method
CN205348461U (en) * 2016-01-25 2016-06-29 三新房屋制造股份有限公司 Empty core plate shear wall structure of assembled

Also Published As

Publication number Publication date
CN105544798A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544798B (en) Assembled hollow slab shear wall structure and construction method thereof
CN109339220B (en) Assembling an integrated stairwell and its production and construction method
CN115030307B (en) Local steel-concrete combined assembled beam column node
CN100402765C (en) Box-type building model and its construction method
CN102535738A (en) A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN103669905B (en) Lightweight composite prefabricated wall panel combined house and its construction method
CN103924710B (en) Low layer assembled combined wall house Plate Welding node structure
CN106013237A (en) Precast concrete component assembly type subway station and installation method
CN205776348U (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural
CN109184028B (en) Assembled shear wall vertical connection structure convenient to construct and installation method
CN111119332A (en) Prefabrication and installation and connection construction method of new type electric wire pipe of prefabricated building
CN108005304A (en) An assembled prestressed concrete frame system and its construction method
CN107893496A (en) A kind of assembly concrete integrated floor and its manufacture method
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN106253188A (en) Assembly type cable slot and construction method thereof
CN116084591B (en) Horizontal connection structure and construction method of multi-story and high-rise concrete modular composite buildings
CN105275089A (en) Fully-prefabricated cold-formed steel house modular unit and assembly connection method
CN103061517A (en) A new sub-structure modular prefabricated assembly node-type frame structure assembly method
CN210067020U (en) A sub-structure assembled frame structure
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN204530982U (en) A kind of prefabricated assembled special-shaped wallette limb industrialization Housing Structure System
CN109629664A (en) Basement construction method based on assembled resin concrete drainage ditch
CN207453225U (en) A kind of superstructure unit and assembly concrete integrated floor
CN103711232A (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 410005 Hunan province Changsha Kaifu District, Furong Road Xingang Street Jinpen Hill Community Building Room 618

Applicant after: SANNENG INTEGRATED HOUSING Co.,Ltd.

Address before: 410005, room 618, golden hill community office building, Xingang street, Furong North Road, Changsha, Hunan

Applicant before: SANXIN HOUSING MANUFACTURING Co.,Ltd.

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250730

Address after: 516347 Buildings 1 and 2, Shangchuan Section, Guangshan Road, Furong Village, Renshan Town, Huidong County, Huizhou City, Guangdong Province

Patentee after: Huizhou Sanneng Integrated Housing Technology Co.,Ltd.

Country or region after: China

Address before: 410005 Hunan province Changsha Kaifu District, Furong Road Xingang Street Jinpen Hill Community Building Room 618

Patentee before: SANNENG INTEGRATED HOUSING Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right