CN108360809A - 一种附墙式施工升降平台 - Google Patents
一种附墙式施工升降平台 Download PDFInfo
- Publication number
- CN108360809A CN108360809A CN201810104760.5A CN201810104760A CN108360809A CN 108360809 A CN108360809 A CN 108360809A CN 201810104760 A CN201810104760 A CN 201810104760A CN 108360809 A CN108360809 A CN 108360809A
- Authority
- CN
- China
- Prior art keywords
- driver
- connector
- processing unit
- pressure sensor
- central processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
- G01L5/0061—Force sensors associated with industrial machines or actuators
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
本发明公开了一种附墙式施工升降平台,包括立柱、驱动器和平台梁,所述驱动器安装于立柱上,所述驱动器的两侧和平台梁之间通过连接件连接,连接件的上部分通过销轴与平台梁连接,连接件的下部分与驱动器焊接固定,连接件的上下部分之间安装有压力传感器,所述压力传感器与中央处理单元电性连接,还包括与中央处理单元电性连接的显示器,所述中央处理单元还与电控箱电性连接。本发明通过新增加的压力传感器及相关的部件,实现载荷的精准显示,并通过与电控装置的连接实现对平台的操作,进行有效的安全控制。
Description
技术领域
本发明涉及一种重量感应装置,具体是一种附墙式施工升降平台。
背景技术
附墙式施工升降平台在实际使用过程中,会因为施工人员无法准确计算平台上物料的准确重量,造成平台装载物料超出平台的有效载荷,从而发生危险。现有装置的缺点是施工升降平台的载荷没有明确的显示和控制。因此,针对这一现状,迫切需要开发一种通过与控制系统相连接后实现对平台的操作进行自动控制的附墙式施工升降平台,以克服当前实际应用中的不足。
发明内容
本发明的目的在于提供一种附墙式施工升降平台,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种附墙式施工升降平台,包括立柱、驱动器和平台梁,所述驱动器安装于立柱上,所述驱动器的两侧和平台梁之间通过连接件连接,连接件的上部分通过销轴与平台梁连接,连接件的下部分与驱动器焊接固定,连接件的上下部分之间安装有压力传感器,所述压力传感器与中央处理单元电性连接,还包括与中央处理单元电性连接的显示器,所述中央处理单元还与电控箱电性连接。
作为本发明进一步的方案:所述立柱的截面呈等边三角形状。
作为本发明进一步的方案:所述电控箱用于通过数值设定控制整个平台的载荷。
与现有技术相比,本发明的有益效果是:通过新增加的压力传感器及相关的部件,实现载荷的精准显示,并通过与电控装置的连接实现对平台的操作,进行有效的安全控制。
附图说明
图1为本发明的主视结构示意图。
图2为本发明的俯视结构示意图。
图3为本发明的压力传感器的原理框图。
图4为本发明的压力传感器的电路图。
图中:1-立柱,2-驱动器,3-压力传感器,4-平台梁。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1~4,本发明实施例中,一种附墙式施工升降平台,包括立柱1、驱动器2和平台梁4,所述驱动器2安装于立柱1上,立柱1的截面呈等边三角形状,所述驱动器2的两侧和平台梁4之间通过连接件连接,连接件的上部分通过销轴与平台梁4连接,连接件的下部分与驱动器2焊接固定,连接件的上下部分之间安装有压力传感器3,所述压力传感器3与中央处理单元(未示出)电性连接,还包括与中央处理单元电性连接的显示器(未示出),所述中央处理单元还与电控箱(未示出)电性连接,电控箱用于通过数值设定控制整个平台的载荷。
将原有的驱动器2与平台梁4连接方式,由销轴连接改为上下压接式连接,新增结构包括驱动器连接件、压力传感器3及显示器等,此装置每台(双立柱)共安装4组,分别安装在两个驱动器2相对的一侧,工作原理为平台梁4与驱动器2是通过连接件连接,连接件分为上下两部分,上部分与平台梁4通过销轴连接,保证平台梁可以进行左右自由调整高度,下部分与驱动器2焊接在一起,连接件上下部分之间装有压力传感器3,所有来自于连接件上部分的压力,包括平台梁4的自重都要经过压力传感器3,通过压力传感器3分别收集到的几组压力数据,汇总到中央处理单元进行汇总,最终在显示器上显示整个平台的载荷数值,中央处理单元与电控箱电路连接,通过数值设定来控制整个平台的载荷,当载荷超出设定数值时,处理器就会报警并自动断开主电源,使平台不能运行。
本发明的目的是通过新增加的压力传感器3及相关的部件,实现载荷的精准显示,并通过与电控装置的连接实现对平台的操作,进行有效的安全控制;本发明的优点就是与控制系统相连接后实现对平台的操作进行自动控制。
以上的仅是本发明的优选实施方式,应当指出,对于本领域的技术人员来说,在不脱离本发明构思的前提下,还可以作出若干变形和改进,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。
Claims (3)
1.一种附墙式施工升降平台,包括立柱(1)、驱动器(2)和平台梁(4),其特征在于,所述驱动器(2)安装于立柱(1)上,所述驱动器(2)的两侧和平台梁(4)之间通过连接件连接,连接件的上部分通过销轴与平台梁(4)连接,连接件的下部分与驱动器(2)焊接固定,连接件的上下部分之间安装有压力传感器(3),所述压力传感器(3)与中央处理单元电性连接,还包括与中央处理单元电性连接的显示器,所述中央处理单元还与电控箱电性连接。
2.根据权利要求1所述的附墙式施工升降平台,其特征在于,所述立柱(1)的截面呈等边三角形状。
3.根据权利要求1所述的附墙式施工升降平台,其特征在于,所述电控箱用于通过数值设定控制整个平台的载荷。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104760.5A CN108360809A (zh) | 2018-02-02 | 2018-02-02 | 一种附墙式施工升降平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810104760.5A CN108360809A (zh) | 2018-02-02 | 2018-02-02 | 一种附墙式施工升降平台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108360809A true CN108360809A (zh) | 2018-08-03 |
Family
ID=63004249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810104760.5A Pending CN108360809A (zh) | 2018-02-02 | 2018-02-02 | 一种附墙式施工升降平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360809A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113428778A (zh) * | 2020-03-23 | 2021-09-24 | 广东博智林机器人有限公司 | 附着支座及升降架系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201343424Y (zh) * | 2009-01-22 | 2009-11-11 | 中际联合工业技术(北京)有限公司 | 一种过载保护装置 |
CN201679222U (zh) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | 双桅柱爬升工作平台 |
CN203007918U (zh) * | 2012-11-09 | 2013-06-19 | 大连船舶重工集团有限公司 | 一种基于桁架式桩腿的自升式钻井平台 |
KR20160115605A (ko) * | 2015-03-27 | 2016-10-06 | 주식회사 경성기업 | 곤돌라 과하중 방지장치 및 그의 제어방법 |
CN106894622A (zh) * | 2017-03-08 | 2017-06-27 | 上海建工集团股份有限公司 | 导架爬升式双层矩形桁架模块化平台系统及其施工方法 |
-
2018
- 2018-02-02 CN CN201810104760.5A patent/CN108360809A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201343424Y (zh) * | 2009-01-22 | 2009-11-11 | 中际联合工业技术(北京)有限公司 | 一种过载保护装置 |
CN201679222U (zh) * | 2010-05-25 | 2010-12-22 | 中国建筑科学研究院建筑机械化研究分院 | 双桅柱爬升工作平台 |
CN203007918U (zh) * | 2012-11-09 | 2013-06-19 | 大连船舶重工集团有限公司 | 一种基于桁架式桩腿的自升式钻井平台 |
KR20160115605A (ko) * | 2015-03-27 | 2016-10-06 | 주식회사 경성기업 | 곤돌라 과하중 방지장치 및 그의 제어방법 |
CN106894622A (zh) * | 2017-03-08 | 2017-06-27 | 上海建工集团股份有限公司 | 导架爬升式双层矩形桁架模块化平台系统及其施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113428778A (zh) * | 2020-03-23 | 2021-09-24 | 广东博智林机器人有限公司 | 附着支座及升降架系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201321356Y (zh) | 塔机群防互撞及区域和边界保护系统 | |
CN206552975U (zh) | 一种碳纤维长丝束切断用输送装置 | |
CN204089042U (zh) | 旋翼式跨越障碍的输电线路巡检行走机构 | |
CN108360809A (zh) | 一种附墙式施工升降平台 | |
CN104101489A (zh) | 一种便捷式高压断路器检测工装 | |
CN205973698U (zh) | 一种高空作业平台防夹装置和高空作业平台 | |
CN202975854U (zh) | 自来水加氯监测装置 | |
CN207903825U (zh) | 一种基于销轴式压力传感器的施工升降平台 | |
CN106567569A (zh) | 一种平台升降智能停车装置 | |
CN106129846B (zh) | 电力配电柜 | |
CN206602344U (zh) | 一种能够防止积雪覆冰的集束耐张线夹 | |
CN206195457U (zh) | 双电源报警自动切换浪涌保护模块 | |
CN202578023U (zh) | 双人正杆器 | |
CN203706332U (zh) | 智能高压脉冲电子围栏主机 | |
CN205283491U (zh) | 多模块逆变器直流侧绝缘监测装置及包含其的光伏系统 | |
CN205772724U (zh) | 一种智能型建筑用升降机 | |
CN208561484U (zh) | 一种杠杆式起重限制器 | |
CN205184809U (zh) | 一种双驱磁导航移动机器人用框架结构 | |
CN208938389U (zh) | 一种综合电工实训台 | |
CN208954883U (zh) | 一种隔离开关 | |
CN205693240U (zh) | 一种全自动导线行走车 | |
CN208093390U (zh) | 一种智能电网切换装置 | |
CN207792507U (zh) | 安装施工辅助升降装置 | |
CN206479168U (zh) | 塔式起重机套架状态监测系统 | |
CN220853483U (zh) | 一种绝缘斗臂车带电作业安全距离检测报警系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |