CN202578023U - 双人正杆器 - Google Patents

双人正杆器 Download PDF

Info

Publication number
CN202578023U
CN202578023U CN 201220222955 CN201220222955U CN202578023U CN 202578023 U CN202578023 U CN 202578023U CN 201220222955 CN201220222955 CN 201220222955 CN 201220222955 U CN201220222955 U CN 201220222955U CN 202578023 U CN202578023 U CN 202578023U
Authority
CN
China
Prior art keywords
pole
straightening
jack
connecting rod
person
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220222955
Other languages
English (en)
Inventor
温涛
孙志刚
张承武
王广利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoqing county power supply Co
State Grid Corp of China SGCC
Original Assignee
Gaoqing county power supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoqing county power supply Co filed Critical Gaoqing county power supply Co
Priority to CN 201220222955 priority Critical patent/CN202578023U/zh
Application granted granted Critical
Publication of CN202578023U publication Critical patent/CN202578023U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及一种双人正杆器,特别涉及一种适用于无拉线水泥电杆的扶正工作的双人正杆器,其特征在于:包括连接杆,连接杆的两端分别连接有抱箍和千斤顶。双人正杆器由于采用了千斤顶对电杆进行平稳扶正,因此不存在碰线危险,不需停电工作,且仅需两人即可操作,一人操作,一人监护并查看杆塔扶正情况即可。本实用新型体积小、重量轻、结构紧凑,便于携带和操作,适用于各种地形和环境,可准确稳定的对电杆进行扶正,同时节省了人力物力,既保证了正杆过程中的安全性、稳定性,又能避免发生意外碰线,确保了线路工作人员的安全,并且还可以确保电杆的完好。

Description

双人正杆器
技术领域
本实用新型涉及一种双人正杆器,特别涉及一种适用于无拉线水泥电杆的扶正工作的双人正杆器。 
背景技术
电力线路电杆运行过程中,经过气候环境等各种负面因素的影响容易发生倾斜。这样就会产生事故隐患,甚至有可能造成倒杆、断杆及电网大面积停电事故,时刻在危及电网的安全运行。消除诸如此类的缺陷至少需要5人以上甚至更多才能完成,1人登杆栓绳,三人拉绳,1人监护并查看杆塔扶正情况,并且需要大绳、脚扣等工具,这样的工作费时、费力、费工。正杆消缺工作需要人力拉正,并且在正杆过程中很容易造成导线晃动、甚至导致碰线,而且人力拉杆用力不均易将电杆拉过或拉断等危险情况,且由于人工拉杆,杆塔晃动严重,极易造成碰线,因此必须停电后工作,操作不方便。 
实用新型内容
根据以上现有技术中的不足,本实用新型要解决的技术问题是:提供一种解决了上述缺陷的,不存在碰线危险,不需停电工作,且节省了人力的双人正杆器。 
本实用新型解决其技术问题所采用的技术方案是:所述的双人正杆器,其特征在于:包括连接杆,连接杆的两端分别连接有抱箍和千斤顶。 
所述的连接杆为直径3cm的实心连接杆。 
所述的千斤顶为5t千斤顶。 
遇有倾斜电杆时,只需将抱箍安装于电杆距离地面2米高度处,在电杆倾斜方向距离电杆根部2m处挖一30cm斜坑,放置40cm*60cm垫木一块,将千斤顶至于垫木上,连接杆一端与千斤顶连接,连接杆另一端与抱箍连接,直接操作千斤顶将电杆扶正即可。 
本实用新型所具有的有益效果是:双人正杆器由于采用了千斤顶对电杆进行平稳扶正,因此不存在碰线危险,不需停电工作,且仅需两人即可操作,1人操作,1人监护并查看杆塔扶正情况即可。本实用新型体积小、重量轻、结构紧凑,便于携带和操作,适用于各种地形和环境,可准确稳定的对电杆进行扶正,同时节省了人力物力,既保证了正杆过程中的安全性、稳定性,又能避免发生意外碰线,确保了线路工作人员的安全,并且还可以确保电杆的完好。 
附图说明
图1是本实用新型的结构示意图。 
图中:1、连接杆;2、抱箍;3、千斤顶。 
具体实施方式
下面结合附图对本实用新型的实施例做进一步描述: 
如图1所示,连接杆1的两端分别连接有抱箍2和千斤顶3,连接杆1为直径3cm的实心连接杆,千斤顶3为5t千斤顶。 
遇有倾斜电杆时,只需将抱箍2安装于电杆距离地面两米高度处,在电杆倾斜方向距离电杆根部2m处挖一30cm斜坑,放置40cm*60cm垫木一块,将千斤顶3至于垫木上,随后将连接杆1一端与千斤顶3连接,另一端与抱箍2连接,直接操作千斤顶3将电杆扶正即可。 

Claims (2)

1.一种双人正杆器,其特征在于:包括连接杆(1),连接杆(1)的两端分别连接有抱箍(2)和千斤顶(3)。
2.根据权利要求1所述的双人正杆器,其特征在于:所述的连接杆(1)为直径3cm的实心连接杆。
3. 根据权利要求1所述的双人正杆器,其特征在于:所述的千斤顶(3)为5t千斤顶。 
CN 201220222955 2012-05-17 2012-05-17 双人正杆器 Expired - Fee Related CN202578023U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220222955 CN202578023U (zh) 2012-05-17 2012-05-17 双人正杆器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220222955 CN202578023U (zh) 2012-05-17 2012-05-17 双人正杆器

Publications (1)

Publication Number Publication Date
CN202578023U true CN202578023U (zh) 2012-12-05

Family

ID=47247447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220222955 Expired - Fee Related CN202578023U (zh) 2012-05-17 2012-05-17 双人正杆器

Country Status (1)

Country Link
CN (1) CN202578023U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442918A (zh) * 2015-10-28 2016-03-30 国网山东省电力公司潍坊供电公司 电力线杆校正抢修工具
CN105464451A (zh) * 2015-10-28 2016-04-06 国网山东省电力公司潍坊供电公司 能快速施工的电力线杆校正抢修工具
CN107035215A (zh) * 2017-05-05 2017-08-11 国网浙江杭州市余杭区供电公司 一种两段式扶正的电杆校正装置
CN114293837A (zh) * 2021-12-07 2022-04-08 国家电网有限公司 配电线路扶正倾斜电杆的正杆器

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442918A (zh) * 2015-10-28 2016-03-30 国网山东省电力公司潍坊供电公司 电力线杆校正抢修工具
CN105464451A (zh) * 2015-10-28 2016-04-06 国网山东省电力公司潍坊供电公司 能快速施工的电力线杆校正抢修工具
CN107035215A (zh) * 2017-05-05 2017-08-11 国网浙江杭州市余杭区供电公司 一种两段式扶正的电杆校正装置
CN114293837A (zh) * 2021-12-07 2022-04-08 国家电网有限公司 配电线路扶正倾斜电杆的正杆器

Similar Documents

Publication Publication Date Title
CN202578023U (zh) 双人正杆器
CN204511277U (zh) 一种双人绝缘挂梯
CN203339564U (zh) 高空加长接线钳
CN203865934U (zh) 一种电杆用滑轮提升机构临时悬挂装置
CN205721283U (zh) 一种输电杆塔的远程安全监测系统
CN205206454U (zh) 一种绿色安全电线杆
CN106374342A (zh) 一种节能式避雷针
CN203218792U (zh) 多功能绝缘梯
CN206976600U (zh) 一种可连接式柔性石墨接地极
CN206927538U (zh) 一种可移动式升降gil运输装置
CN206533034U (zh) 一种节能式避雷针
CN204333859U (zh) 一种高压输电杆塔线缆防坠器
CN203640050U (zh) 球形网架结构的长方形整体屋顶顶升装置
CN204167797U (zh) 一种停电连接应急车
CN205846261U (zh) 一种具有报警功能的伸缩式接地棒
CN206279695U (zh) 一种便于吊装的钢柱结构
CN207530446U (zh) 一种可调节式电缆放线装置
CN203569956U (zh) 输电杆塔桁架
CN201377200Y (zh) 高压防护网
CN206888492U (zh) 一种电力施工用承物平台
CN204920423U (zh) 杆塔支撑墩
CN207218117U (zh) 一种绝缘组合式跨越架
CN205089034U (zh) 等径杆立杆器
CN203867448U (zh) 一种简易抄电表支架
CN204703742U (zh) 一种高压线检修三角形绝缘梯

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: GAOQING COUNTY POWER SUPPLY COMPANY

Effective date: 20130808

Owner name: GAOQING COUNTY POWER SUPPLY COMPANY

Effective date: 20130808

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 256300 ZIBO, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130808

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Gaoqing County Power Supply Company

Address before: 256300 Qingcheng Road, Gaoqing County, Shandong, Zibo, China, No. 31

Patentee before: Gaoqing County Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20160517