CN108360509A - 一种装配式带肋减震型抗拔桩及其施工方法 - Google Patents
一种装配式带肋减震型抗拔桩及其施工方法 Download PDFInfo
- Publication number
- CN108360509A CN108360509A CN201810408650.8A CN201810408650A CN108360509A CN 108360509 A CN108360509 A CN 108360509A CN 201810408650 A CN201810408650 A CN 201810408650A CN 108360509 A CN108360509 A CN 108360509A
- Authority
- CN
- China
- Prior art keywords
- pile
- connecting rod
- hollow pile
- hollow
- ribbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/08—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810408650.8A CN108360509B (zh) | 2018-05-02 | 2018-05-02 | 一种装配式带肋减震型抗拔桩及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810408650.8A CN108360509B (zh) | 2018-05-02 | 2018-05-02 | 一种装配式带肋减震型抗拔桩及其施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108360509A true CN108360509A (zh) | 2018-08-03 |
| CN108360509B CN108360509B (zh) | 2023-10-10 |
Family
ID=63011577
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810408650.8A Active CN108360509B (zh) | 2018-05-02 | 2018-05-02 | 一种装配式带肋减震型抗拔桩及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108360509B (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109295949A (zh) * | 2018-10-15 | 2019-02-01 | 沈靖林 | 一种钻井平台固定安装设备及钻井平台固定安装工艺 |
| CN109853535A (zh) * | 2019-01-18 | 2019-06-07 | 吴洪林 | 一种混凝土预制桩上浮长度自动补偿装置 |
| CN112281899A (zh) * | 2020-10-01 | 2021-01-29 | 单士营 | 一种基坑预制围护减震桩及搭建基坑围护墙的方法 |
| CN114197458A (zh) * | 2021-12-29 | 2022-03-18 | 成都采筑电子商务有限公司 | 一种减震建筑桩及施工方法 |
Citations (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4793111A (en) * | 1987-04-15 | 1988-12-27 | Peter Shewchuk | Threaded mounting for extruded pole |
| JPH06193056A (ja) * | 1992-12-28 | 1994-07-12 | Taisei Corp | Pc基礎杭及びその製法 |
| JPH11200396A (ja) * | 1998-01-12 | 1999-07-27 | Maeda Corp | 山留め壁を利用する入力地震力低減構造 |
| JP2007146421A (ja) * | 2005-11-25 | 2007-06-14 | Shimizu Corp | 既製コンクリート杭の杭頭半剛接構造 |
| KR20080013236A (ko) * | 2006-08-08 | 2008-02-13 | 정훈준 | 토목 및 건물 기초용 매입말뚝 및 매입말뚝 제작용 거푸집 |
| CN101220591A (zh) * | 2005-11-28 | 2008-07-16 | 王国奋 | 沉管预制钢砼扩底桩的扩底设备 |
| CN101858199A (zh) * | 2010-05-20 | 2010-10-13 | 中冶建筑研究总院有限公司 | 可调控挤土量的双向螺旋挤扩钻头 |
| WO2010147306A2 (ko) * | 2009-06-19 | 2010-12-23 | (주)하경엔지니어링 | 합성 피에이취씨 말뚝, 합성 피에이취씨 말뚝의 제작방법 및 합성 피에이취씨 말뚝 시공방법 |
| KR101039341B1 (ko) * | 2010-12-08 | 2011-06-08 | 삼표건설 주식회사 | 파일 조립체 및 이를 이용한 기초구조물 시공방법 |
| CN102127913A (zh) * | 2011-05-04 | 2011-07-20 | 江苏建华管桩有限公司 | 一种混凝土桩与承台的连接方法 |
| CN202430712U (zh) * | 2011-12-29 | 2012-09-12 | 南京金宸建筑设计有限公司 | 机械增阻玻璃钢抗拔管 |
| CN202989913U (zh) * | 2012-06-05 | 2013-06-12 | 广东保威新能源有限公司 | 无尖头螺旋桩 |
| CN103180516A (zh) * | 2010-10-28 | 2013-06-26 | 杰富意钢铁株式会社 | 钢板桩及由该钢板桩形成的钢板桩壁 |
| CN203129134U (zh) * | 2013-03-22 | 2013-08-14 | 厦门特房建设工程集团有限公司 | 一种部分贯通的抗拉预应力桩芯 |
| CN203188202U (zh) * | 2013-04-28 | 2013-09-11 | 刘正军 | 一种压力型高承载力复合抗拔桩 |
| KR20130107172A (ko) * | 2012-03-21 | 2013-10-01 | 연세대학교 산학협력단 | 소구경 기초파일의 프리보링 시공방법 |
| CN103603346A (zh) * | 2013-10-15 | 2014-02-26 | 中铁三局集团有限公司 | 一种抗拉拔刺桩的施工方法 |
| CN203583468U (zh) * | 2013-06-25 | 2014-05-07 | 青岛理工大学 | 一种内置非金属筋材的抗浮桩 |
| CN204112354U (zh) * | 2013-12-10 | 2015-01-21 | 江苏建华管桩有限公司 | 混凝土预制桩与桩基承台的连接结构 |
| CN204125941U (zh) * | 2014-08-26 | 2015-01-28 | 深圳市工勘岩土集团有限公司 | 抗拔桩结构 |
| CN204225086U (zh) * | 2014-10-25 | 2015-03-25 | 肖美义 | 环保木桩结构 |
| CN204475331U (zh) * | 2015-03-19 | 2015-07-15 | 大庆市超力机械制造有限公司 | 快换锚杆装置 |
| CN205100233U (zh) * | 2015-10-26 | 2016-03-23 | 上海正轶建筑设计有限公司 | 一种减震地基 |
| CN105780761A (zh) * | 2016-02-02 | 2016-07-20 | 王志耸 | 一种挤压土体全螺纹灌注桩桩机及其成桩工法 |
| CN205399415U (zh) * | 2016-02-19 | 2016-07-27 | 中国长江三峡集团公司 | 一种带有螺旋式翼板的海上风电抗拔桩 |
| CN205475308U (zh) * | 2016-03-16 | 2016-08-17 | 武汉未澜合创科技有限公司 | 一种采用快凝嵌固材料的预制混凝土刚性短桩基础 |
| CN106626032A (zh) * | 2016-11-29 | 2017-05-10 | 金陵科技学院 | 一种整体式内凸起空心抗拔桩及其制备方法 |
| CN206216889U (zh) * | 2016-11-29 | 2017-06-06 | 金陵科技学院 | 一种整体式内凸起空心抗拔桩 |
| CN107386272A (zh) * | 2017-07-20 | 2017-11-24 | 重庆交通大学 | 一种适于松软地基的现浇螺杆抗拔桩及其施工方法 |
| CN206928317U (zh) * | 2017-06-29 | 2018-01-26 | 国家电网公司 | 一种架空输电线路用变截面混凝土预制管桩 |
| CN207176670U (zh) * | 2017-08-26 | 2018-04-03 | 建华建材(嘉兴)有限公司 | 一种环境友好型u型混凝土复合板桩 |
| CN208563313U (zh) * | 2018-05-02 | 2019-03-01 | 金陵科技学院 | 一种装配式带肋减震型抗拔桩 |
-
2018
- 2018-05-02 CN CN201810408650.8A patent/CN108360509B/zh active Active
Patent Citations (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4793111A (en) * | 1987-04-15 | 1988-12-27 | Peter Shewchuk | Threaded mounting for extruded pole |
| JPH06193056A (ja) * | 1992-12-28 | 1994-07-12 | Taisei Corp | Pc基礎杭及びその製法 |
| JPH11200396A (ja) * | 1998-01-12 | 1999-07-27 | Maeda Corp | 山留め壁を利用する入力地震力低減構造 |
| JP2007146421A (ja) * | 2005-11-25 | 2007-06-14 | Shimizu Corp | 既製コンクリート杭の杭頭半剛接構造 |
| CN101220591A (zh) * | 2005-11-28 | 2008-07-16 | 王国奋 | 沉管预制钢砼扩底桩的扩底设备 |
| KR20080013236A (ko) * | 2006-08-08 | 2008-02-13 | 정훈준 | 토목 및 건물 기초용 매입말뚝 및 매입말뚝 제작용 거푸집 |
| WO2010147306A2 (ko) * | 2009-06-19 | 2010-12-23 | (주)하경엔지니어링 | 합성 피에이취씨 말뚝, 합성 피에이취씨 말뚝의 제작방법 및 합성 피에이취씨 말뚝 시공방법 |
| CN101858199A (zh) * | 2010-05-20 | 2010-10-13 | 中冶建筑研究总院有限公司 | 可调控挤土量的双向螺旋挤扩钻头 |
| CN103180516A (zh) * | 2010-10-28 | 2013-06-26 | 杰富意钢铁株式会社 | 钢板桩及由该钢板桩形成的钢板桩壁 |
| KR101039341B1 (ko) * | 2010-12-08 | 2011-06-08 | 삼표건설 주식회사 | 파일 조립체 및 이를 이용한 기초구조물 시공방법 |
| CN102127913A (zh) * | 2011-05-04 | 2011-07-20 | 江苏建华管桩有限公司 | 一种混凝土桩与承台的连接方法 |
| CN202430712U (zh) * | 2011-12-29 | 2012-09-12 | 南京金宸建筑设计有限公司 | 机械增阻玻璃钢抗拔管 |
| KR20130107172A (ko) * | 2012-03-21 | 2013-10-01 | 연세대학교 산학협력단 | 소구경 기초파일의 프리보링 시공방법 |
| CN202989913U (zh) * | 2012-06-05 | 2013-06-12 | 广东保威新能源有限公司 | 无尖头螺旋桩 |
| CN203129134U (zh) * | 2013-03-22 | 2013-08-14 | 厦门特房建设工程集团有限公司 | 一种部分贯通的抗拉预应力桩芯 |
| CN203188202U (zh) * | 2013-04-28 | 2013-09-11 | 刘正军 | 一种压力型高承载力复合抗拔桩 |
| CN203583468U (zh) * | 2013-06-25 | 2014-05-07 | 青岛理工大学 | 一种内置非金属筋材的抗浮桩 |
| CN103603346A (zh) * | 2013-10-15 | 2014-02-26 | 中铁三局集团有限公司 | 一种抗拉拔刺桩的施工方法 |
| CN204112354U (zh) * | 2013-12-10 | 2015-01-21 | 江苏建华管桩有限公司 | 混凝土预制桩与桩基承台的连接结构 |
| CN204125941U (zh) * | 2014-08-26 | 2015-01-28 | 深圳市工勘岩土集团有限公司 | 抗拔桩结构 |
| CN204225086U (zh) * | 2014-10-25 | 2015-03-25 | 肖美义 | 环保木桩结构 |
| CN204475331U (zh) * | 2015-03-19 | 2015-07-15 | 大庆市超力机械制造有限公司 | 快换锚杆装置 |
| CN205100233U (zh) * | 2015-10-26 | 2016-03-23 | 上海正轶建筑设计有限公司 | 一种减震地基 |
| CN105780761A (zh) * | 2016-02-02 | 2016-07-20 | 王志耸 | 一种挤压土体全螺纹灌注桩桩机及其成桩工法 |
| CN205399415U (zh) * | 2016-02-19 | 2016-07-27 | 中国长江三峡集团公司 | 一种带有螺旋式翼板的海上风电抗拔桩 |
| CN205475308U (zh) * | 2016-03-16 | 2016-08-17 | 武汉未澜合创科技有限公司 | 一种采用快凝嵌固材料的预制混凝土刚性短桩基础 |
| CN106626032A (zh) * | 2016-11-29 | 2017-05-10 | 金陵科技学院 | 一种整体式内凸起空心抗拔桩及其制备方法 |
| CN206216889U (zh) * | 2016-11-29 | 2017-06-06 | 金陵科技学院 | 一种整体式内凸起空心抗拔桩 |
| CN206928317U (zh) * | 2017-06-29 | 2018-01-26 | 国家电网公司 | 一种架空输电线路用变截面混凝土预制管桩 |
| CN107386272A (zh) * | 2017-07-20 | 2017-11-24 | 重庆交通大学 | 一种适于松软地基的现浇螺杆抗拔桩及其施工方法 |
| CN207176670U (zh) * | 2017-08-26 | 2018-04-03 | 建华建材(嘉兴)有限公司 | 一种环境友好型u型混凝土复合板桩 |
| CN208563313U (zh) * | 2018-05-02 | 2019-03-01 | 金陵科技学院 | 一种装配式带肋减震型抗拔桩 |
Non-Patent Citations (2)
| Title |
|---|
| 李彦国;: "PHC桩在石化装置设计中的应用", 石油化工设计, no. 03 * |
| 陶文成;宋永生;严发根;徐风;郭彤;卫海;: "面向基坑工程的预应力混凝土管桩改进型结构(节点)研究", 江苏建筑, no. 02 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109295949A (zh) * | 2018-10-15 | 2019-02-01 | 沈靖林 | 一种钻井平台固定安装设备及钻井平台固定安装工艺 |
| CN109295949B (zh) * | 2018-10-15 | 2020-06-05 | 山东海洋工程装备有限公司 | 一种钻井平台固定安装设备及钻井平台固定安装工艺 |
| CN109853535A (zh) * | 2019-01-18 | 2019-06-07 | 吴洪林 | 一种混凝土预制桩上浮长度自动补偿装置 |
| CN109853535B (zh) * | 2019-01-18 | 2023-10-27 | 吴洪林 | 一种混凝土预制桩上浮长度自动补偿装置 |
| CN112281899A (zh) * | 2020-10-01 | 2021-01-29 | 单士营 | 一种基坑预制围护减震桩及搭建基坑围护墙的方法 |
| CN114197458A (zh) * | 2021-12-29 | 2022-03-18 | 成都采筑电子商务有限公司 | 一种减震建筑桩及施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108360509B (zh) | 2023-10-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106351217B (zh) | 一种自复位多维减震管桩群桩基础及施工方法 | |
| CN108360509A (zh) | 一种装配式带肋减震型抗拔桩及其施工方法 | |
| CN205530247U (zh) | 一种预钻孔囊袋注浆锚杆结构 | |
| CN102561377A (zh) | 带扩底的抗震柱岩石锚杆基础及其施工方法 | |
| CN107288138B (zh) | 含软弱夹层岩质边坡的防治结构与施工方法 | |
| US3108403A (en) | Foundation column | |
| CN103603445B (zh) | 一种耗能钢框架砌块填充墙 | |
| CN107313424A (zh) | 一种建筑抗震桩基及施工方法 | |
| CN208563313U (zh) | 一种装配式带肋减震型抗拔桩 | |
| CN106988303A (zh) | 一种桩基及其施工方法 | |
| CN203213001U (zh) | 一种仿古景观栈道 | |
| CN209053119U (zh) | 一种组合抗震悬臂式挡土墙 | |
| CN115748758A (zh) | 一种复合支挡结构 | |
| CN105297763A (zh) | 一种山区输电线路装配式柔性半掏挖基础 | |
| CN211006730U (zh) | 一种新型减震式建筑工程桩 | |
| CN111236287B (zh) | 用于快速建造的整体式基础承台 | |
| CN205171537U (zh) | 一种山区输电线路装配式柔性半掏挖基础 | |
| CN201687080U (zh) | 抗震低碳的建筑结构 | |
| CN218757590U (zh) | 一种复合支挡结构 | |
| CN207597754U (zh) | 一种装配式楼梯连接装置 | |
| CN212427189U (zh) | 具有耗能减震功能的混凝土挡土墙结构 | |
| CN216379544U (zh) | 一种用于软土地基双层内抛斜撑的基坑支撑结构 | |
| CN115748806A (zh) | 一种装配式减震加固型挡土墙 | |
| CN211621660U (zh) | 一种输电塔安装加强抗拔基座 | |
| CN103276724A (zh) | 一种内置非金属筋材的抗浮桩 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20230910 Address after: No. 01, 12th Floor, Building 2, Happy Coast Leisure Commercial Shopping Center, Korla City, Bayingolin Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region, 841000 Applicant after: Xinjiang chuantao Construction Engineering Co.,Ltd. Address before: 1003, Building A, Zhiyun Industrial Park, No. 13 Huaxing Road, Henglang Community, Dalang Street, Longhua District, Shenzhen City, Guangdong Province, 518000 Applicant before: Shenzhen Wanzhida Technology Transfer Center Co.,Ltd. Effective date of registration: 20230910 Address after: 1003, Building A, Zhiyun Industrial Park, No. 13 Huaxing Road, Henglang Community, Dalang Street, Longhua District, Shenzhen City, Guangdong Province, 518000 Applicant after: Shenzhen Wanzhida Technology Transfer Center Co.,Ltd. Address before: No. 99 Jiangning Road, Nanjing District hirokage 211169 cities in Jiangsu Province Applicant before: JINLING INSTITUTE OF TECHNOLOGY |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |